Introduction
 Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act,
2003 (the Act). Development of a transmission system is essential both for encouraging competition and for
creating electricity markets.
 The Ministry of Power, Government of India vide Resolution No. 11/5/2005-PG(i) dated 17.4.06 (Revision dtd.
04.7.07, 10.10.08 & 02.05.12) has issued guidelines regarding new transmission projects under Tariff Based
Competitive Bidding (TBCB).
 These guidelines are issued under the provisions of Section 63 of the Electricity Act, 2003 for procurement of
transmission services for transmission of electricity.
 These guidelines are aimed at facilitating competition in this sector through wider participation in providing
transmission services and tariff determination through a process of tariff based bidding.
Objectives of TBCB
The specific objectives of TBCB are as follows:
 Promote competitive procurement of transmission services.
 Encourage private investment in transmission projects
 Entire investment by Bidder/Developer hence no burden on State.
 Being transparency & fairness in process will ensure compliance with standards, norms & codes for
transmission projects while allowing flexibility in operation to the transmission service providers.
 enhance standardization & reduce ambiguity and hence time for materialization of projects.
 Ensure in time completion of project
 Protect consumer interests by facilitating competitive conditions in procurement of transmission
services of electricity
SCOPE OF THE GUIDELINES
 Guidelines issued under provisions of Section 63 of the EA, 2003 for procurement of
transmission services for transmission of electricity
 Select transmission service provider for a new transmission line and to build, own, maintain
and operate the specified transmission system elements.
 Procurement of transmission services would include all activities related to
 survey, detailed project report formulation, arranging finance, project management,
obtaining transmission license, obtaining right of way, necessary clearances, site
identification, land compensation, design, engineering, equipment, material,
construction, erection, testing and commissioning, maintenance and operation of
transmission lines and/or substations and/or switching stations and/or HVDC links
including terminal stations and HVDC transmission line. It will be in such a manner
Bid Process Coordinator (BPC)
 The Bid Process Coordinator (BPC) would be responsible for coordination the bid process for procurement of required
transmission services.
 Procurement of transmission services, required for inter-state transmission, the Central Government shall notify any
Central Government Organization/ Central Public Sector Undertaking to be the BPC.
 The BPC will be notified by MoP and will be for a period of three years.
 For procurement of transmission services required for intra-state transmission, the appropriate State Government may
notify any Organization/ State Public Sector Undertaking especially engaged for this purpose by the appropriate state
government or BPC notified by the Central Government to be the BPC for the state.
 All the expenditure incurred by the BPC in the process of selection of bidder shall be recovered from the bidder who is
finally identified. The amount to be recovered shall be indicated in RFP.
PREPARATION FOR INVITING BIDS & TRANMISSION SERVICE PROVIDER (TSP)
 The BPC shall prepare the bid documentation in accordance with these guidelines and obtain approval of the
Appropriate Commission.
 Alternatively, the BPC can use the standard bidding documents notified by Ministry of Power.
 Standard Bid Documents in accordance with these guidelines will be notified by Ministry of Power within three
months of the notification of these guidelines.
 Approval of the Appropriate Commission would be necessary if any material deviation is proposed to be made from
the Standard Bid Documents
 Intimation shall be sent by the BPC to the appropriate Commission about initiation of the bidding process
 For location specific substations, switching stations or HVDC terminal or inverter stations the BPC or its authorized
representative should facilitate the transfer of the project site to the successful bidder.
 The BPC or its authorized representative will also facilitate the successful bidder in acquisition of Right of Way.
 The successful bidder shall seek transmission license from the appropriate Regulatory Commission, if it is not a
deemed licensee & shall be designated as TSP
 The TSP would take-up execution of the transmission scheme so as to complete commission and operationalise the
transmission line as per the specified schedule in the bid documents.
RECOVERY OF TRANSMISSION CHARGES & TRANSMISSION CHARGE STRUCTURE
 Recovery of transmission charges from the users of the transmission services such as State supply utilities, distribution
companies, generation companies, traders, bulk consumers, etc., shall be done as provided in the “ Guidelines for
encouraging competition in development of transmission Projects”
 A transmission charge for providing transmission service and operation and maintenance required for the various
transmission elements shall form the basis for bidding and evaluation
 Tariff structure will have two components – one scaleable and the other non-scaleable. The scaleable component shall
not be more than 15% of the non-scaleable component.
 The BPC shall specify scheduled month of commercial operationalisation for the transmission line required for the
transmission service and invite bids for the transmission charge.
 A bidder can quote different annual tariff for various years within a variation band of maximum ten percent between
two successive years.
 The bidders shall quote annual tariff payable after commissioning till expiry of license period and the monthly tariff
payable shall be annual tariff divided by 12.
 Reasonableness of Transmission Charges:
PAYMENT SECURITY MECHANSIM & BIDDING PROCESS
 The payment security may constitute:
(i) Letter of Credit (LC)
(ii) Letter of Credit (LC) backed by credible escrow mechanism.
 Bidding Process
 Request for Qualification (RFQ) and Request for Proposal (RFP) or adopt a single stage two envelope tender
process combining the RFP and RFQ processes.
 The bidding shall necessarily be by way of International Competitive Bidding (ICB).
 For the purpose of issue of RFQ minimum conditions to be met by the bidder shall be specified in the RFQ
notice.
 Standard documentation to be provided in the RFQ shall include,
• Details of location and technical specifications as may be applicable for each component of the
transmission line ;
• Construction milestones to be specified by the bidders;
• Financial requirements to be met by bidders including, minimum net-worth, revenues, etc with necessary
proof of the same, as outlined in the bid documents;
BIDDING PROCESS
 PROPOSED TRANSMISSION SERVICE AGREEMENT (TSA)
 The TSP will enter into a Transmission Service Agreement (TSA) with the concerned utilities & would clearly
indicate
 Risk allocation between parties;
 Inter -- utility allocation of transmission charges
 Force majeure clauses as per industry standards;
 Default conditions and cure thereof, and penalties;
 Other technical, operational and safety criteria to be met by bidder/TSP, including the provisions of the IEGC/State
Grid Code, relevant orders of the Appropriate Commission, etc., as applicable.
 The BPC may, at its option, require demonstration of financial commitments from lenders at the time of
submission of the bids. This would accelerate the process of financial closure and delivery of transmission services
for transmission of electricity;
 Standard documentation to be provided by the BPC in the RFP shall include,
 Bid submission and evaluation : To ensure competitiveness, the minimum number of qualified bidders will be two.
 Bid evaluation committee : The BPC shall constitute a committee for evaluation of the bids with at least one
member each from CEA and the concerned Regional Power Committees. The member from CEA shall have
expertise in cost engineering of transmission projects.
 The bidder who has quoted lowest transmission charge as per evaluation procedure shall be considered for the
award.
ARBITRATION AND TIME TABLE FOR BID PROCESS
 Arbitration : In case of any dispute regarding TSA or tariff, the same will be subject to jurisdiction of the appropriate
Regulatory Commission under the provisions of the Electricity Act 2003.
 Suggested time-table for the bid process is indicated below
 Suggested time-table for the Single stage two envelope bid process is indicated below
 12. Contract award and conclusion
 selected bidder shall make an application for grant of transmission license to the appropriate Commission within one
month of selection
 TSA shall be signed with the selected bidder
 Final TSA along with the certification by the BPC shall be forwarded to the Appropriate Commission for adoption of tariffs
in terms of Section 63 of the Act
Event Elapsed Time from Zero date
Publication of RFQ Zero date
Submission of Responses of RFQ 30 days
Short listing based on responses and
issuance of RFP
60 days
Bid clarification, conferences, Final
clarification and revision of RFP
85 days
Technical and price bid submission 120 days
Short listing of bidder and issue of
LOI
135 days
Signing of Agreements 145 days
Event Elapsed Time from Zero date
Publication of RFP Zero date
Bid clarification, conferences etc. & revision of
RFP
60 days
Technical and price bid submission 120 days
Short-listing of bidder and issue of LOI 150 days
Signing of Agreements 180 days
THANK YOU

More Related Content

Similar to TBCB_29032019.pptx

Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
Tariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionTariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionDaily 10 Minutes
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaAmitava Nag
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5cesarqueiroz
 
K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionsrinivasdeepak
 
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project InformationMountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project InformationMarcellus Drilling News
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Jay Ranvir
 
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptxCRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptxDoraDora58
 
BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)Nazirul Islam Zico
 
resolution no 142 2011, issuance of access deficit contribution guideline
 resolution no 142 2011, issuance of access deficit contribution guideline resolution no 142 2011, issuance of access deficit contribution guideline
resolution no 142 2011, issuance of access deficit contribution guidelinetraoman
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Gurparvesh kaur
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Harish Sharma
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for differenceGeoff White
 

Similar to TBCB_29032019.pptx (20)

OPEN ACCESS REGULATION
OPEN ACCESS REGULATIONOPEN ACCESS REGULATION
OPEN ACCESS REGULATION
 
TENDERS.pptx
TENDERS.pptxTENDERS.pptx
TENDERS.pptx
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Tariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionTariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and Distribution
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in India
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
 
K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distribution
 
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project InformationMountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 
AFCS_PQConference.pdf
AFCS_PQConference.pdfAFCS_PQConference.pdf
AFCS_PQConference.pdf
 
Document samples
Document samplesDocument samples
Document samples
 
Open access
Open accessOpen access
Open access
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)
 
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptxCRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
 
BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)BD Telecom Policy (ETE 521 L4)
BD Telecom Policy (ETE 521 L4)
 
resolution no 142 2011, issuance of access deficit contribution guideline
 resolution no 142 2011, issuance of access deficit contribution guideline resolution no 142 2011, issuance of access deficit contribution guideline
resolution no 142 2011, issuance of access deficit contribution guideline
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Tariff policy
Tariff policyTariff policy
Tariff policy
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

TBCB_29032019.pptx

  • 1. Tariff based Competitive-bidding Guidelines for Transmission Service
  • 2. Introduction  Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act, 2003 (the Act). Development of a transmission system is essential both for encouraging competition and for creating electricity markets.  The Ministry of Power, Government of India vide Resolution No. 11/5/2005-PG(i) dated 17.4.06 (Revision dtd. 04.7.07, 10.10.08 & 02.05.12) has issued guidelines regarding new transmission projects under Tariff Based Competitive Bidding (TBCB).  These guidelines are issued under the provisions of Section 63 of the Electricity Act, 2003 for procurement of transmission services for transmission of electricity.  These guidelines are aimed at facilitating competition in this sector through wider participation in providing transmission services and tariff determination through a process of tariff based bidding.
  • 3. Objectives of TBCB The specific objectives of TBCB are as follows:  Promote competitive procurement of transmission services.  Encourage private investment in transmission projects  Entire investment by Bidder/Developer hence no burden on State.  Being transparency & fairness in process will ensure compliance with standards, norms & codes for transmission projects while allowing flexibility in operation to the transmission service providers.  enhance standardization & reduce ambiguity and hence time for materialization of projects.  Ensure in time completion of project  Protect consumer interests by facilitating competitive conditions in procurement of transmission services of electricity
  • 4. SCOPE OF THE GUIDELINES  Guidelines issued under provisions of Section 63 of the EA, 2003 for procurement of transmission services for transmission of electricity  Select transmission service provider for a new transmission line and to build, own, maintain and operate the specified transmission system elements.  Procurement of transmission services would include all activities related to  survey, detailed project report formulation, arranging finance, project management, obtaining transmission license, obtaining right of way, necessary clearances, site identification, land compensation, design, engineering, equipment, material, construction, erection, testing and commissioning, maintenance and operation of transmission lines and/or substations and/or switching stations and/or HVDC links including terminal stations and HVDC transmission line. It will be in such a manner
  • 5. Bid Process Coordinator (BPC)  The Bid Process Coordinator (BPC) would be responsible for coordination the bid process for procurement of required transmission services.  Procurement of transmission services, required for inter-state transmission, the Central Government shall notify any Central Government Organization/ Central Public Sector Undertaking to be the BPC.  The BPC will be notified by MoP and will be for a period of three years.  For procurement of transmission services required for intra-state transmission, the appropriate State Government may notify any Organization/ State Public Sector Undertaking especially engaged for this purpose by the appropriate state government or BPC notified by the Central Government to be the BPC for the state.  All the expenditure incurred by the BPC in the process of selection of bidder shall be recovered from the bidder who is finally identified. The amount to be recovered shall be indicated in RFP.
  • 6. PREPARATION FOR INVITING BIDS & TRANMISSION SERVICE PROVIDER (TSP)  The BPC shall prepare the bid documentation in accordance with these guidelines and obtain approval of the Appropriate Commission.  Alternatively, the BPC can use the standard bidding documents notified by Ministry of Power.  Standard Bid Documents in accordance with these guidelines will be notified by Ministry of Power within three months of the notification of these guidelines.  Approval of the Appropriate Commission would be necessary if any material deviation is proposed to be made from the Standard Bid Documents  Intimation shall be sent by the BPC to the appropriate Commission about initiation of the bidding process  For location specific substations, switching stations or HVDC terminal or inverter stations the BPC or its authorized representative should facilitate the transfer of the project site to the successful bidder.  The BPC or its authorized representative will also facilitate the successful bidder in acquisition of Right of Way.  The successful bidder shall seek transmission license from the appropriate Regulatory Commission, if it is not a deemed licensee & shall be designated as TSP  The TSP would take-up execution of the transmission scheme so as to complete commission and operationalise the transmission line as per the specified schedule in the bid documents.
  • 7. RECOVERY OF TRANSMISSION CHARGES & TRANSMISSION CHARGE STRUCTURE  Recovery of transmission charges from the users of the transmission services such as State supply utilities, distribution companies, generation companies, traders, bulk consumers, etc., shall be done as provided in the “ Guidelines for encouraging competition in development of transmission Projects”  A transmission charge for providing transmission service and operation and maintenance required for the various transmission elements shall form the basis for bidding and evaluation  Tariff structure will have two components – one scaleable and the other non-scaleable. The scaleable component shall not be more than 15% of the non-scaleable component.  The BPC shall specify scheduled month of commercial operationalisation for the transmission line required for the transmission service and invite bids for the transmission charge.  A bidder can quote different annual tariff for various years within a variation band of maximum ten percent between two successive years.  The bidders shall quote annual tariff payable after commissioning till expiry of license period and the monthly tariff payable shall be annual tariff divided by 12.  Reasonableness of Transmission Charges:
  • 8. PAYMENT SECURITY MECHANSIM & BIDDING PROCESS  The payment security may constitute: (i) Letter of Credit (LC) (ii) Letter of Credit (LC) backed by credible escrow mechanism.  Bidding Process  Request for Qualification (RFQ) and Request for Proposal (RFP) or adopt a single stage two envelope tender process combining the RFP and RFQ processes.  The bidding shall necessarily be by way of International Competitive Bidding (ICB).  For the purpose of issue of RFQ minimum conditions to be met by the bidder shall be specified in the RFQ notice.  Standard documentation to be provided in the RFQ shall include, • Details of location and technical specifications as may be applicable for each component of the transmission line ; • Construction milestones to be specified by the bidders; • Financial requirements to be met by bidders including, minimum net-worth, revenues, etc with necessary proof of the same, as outlined in the bid documents;
  • 9. BIDDING PROCESS  PROPOSED TRANSMISSION SERVICE AGREEMENT (TSA)  The TSP will enter into a Transmission Service Agreement (TSA) with the concerned utilities & would clearly indicate  Risk allocation between parties;  Inter -- utility allocation of transmission charges  Force majeure clauses as per industry standards;  Default conditions and cure thereof, and penalties;  Other technical, operational and safety criteria to be met by bidder/TSP, including the provisions of the IEGC/State Grid Code, relevant orders of the Appropriate Commission, etc., as applicable.  The BPC may, at its option, require demonstration of financial commitments from lenders at the time of submission of the bids. This would accelerate the process of financial closure and delivery of transmission services for transmission of electricity;  Standard documentation to be provided by the BPC in the RFP shall include,  Bid submission and evaluation : To ensure competitiveness, the minimum number of qualified bidders will be two.  Bid evaluation committee : The BPC shall constitute a committee for evaluation of the bids with at least one member each from CEA and the concerned Regional Power Committees. The member from CEA shall have expertise in cost engineering of transmission projects.  The bidder who has quoted lowest transmission charge as per evaluation procedure shall be considered for the award.
  • 10. ARBITRATION AND TIME TABLE FOR BID PROCESS  Arbitration : In case of any dispute regarding TSA or tariff, the same will be subject to jurisdiction of the appropriate Regulatory Commission under the provisions of the Electricity Act 2003.  Suggested time-table for the bid process is indicated below  Suggested time-table for the Single stage two envelope bid process is indicated below  12. Contract award and conclusion  selected bidder shall make an application for grant of transmission license to the appropriate Commission within one month of selection  TSA shall be signed with the selected bidder  Final TSA along with the certification by the BPC shall be forwarded to the Appropriate Commission for adoption of tariffs in terms of Section 63 of the Act Event Elapsed Time from Zero date Publication of RFQ Zero date Submission of Responses of RFQ 30 days Short listing based on responses and issuance of RFP 60 days Bid clarification, conferences, Final clarification and revision of RFP 85 days Technical and price bid submission 120 days Short listing of bidder and issue of LOI 135 days Signing of Agreements 145 days Event Elapsed Time from Zero date Publication of RFP Zero date Bid clarification, conferences etc. & revision of RFP 60 days Technical and price bid submission 120 days Short-listing of bidder and issue of LOI 150 days Signing of Agreements 180 days