Personal Information
Occupation
Software Developer, Self employed consultant,
Industry
Education
Website
chachrist.com
Tags
optimization
repetitive projects
repetitive scheduling method
genetic algorithm
simulation-based scheduling method
construction project scheduling
stroboscope
repetitive project scheduling
scheduling software
scheduling
critical path method
resource leveling
ms project
s-curve
controlling point
controlling sequence
line-of-balance
continuous resource utilization
idle time
resource planning
construction
construction management
cost
pert
probabilistic activity duration
random
two-way table
data table
conditional formatting
excel
risk
cpm
simulation
work break
confidence level
workshop
See more
Presentations
(12)Documents
(1)Personal Information
Occupation
Software Developer, Self employed consultant,
Industry
Education
Website
chachrist.com
Tags
optimization
repetitive projects
repetitive scheduling method
genetic algorithm
simulation-based scheduling method
construction project scheduling
stroboscope
repetitive project scheduling
scheduling software
scheduling
critical path method
resource leveling
ms project
s-curve
controlling point
controlling sequence
line-of-balance
continuous resource utilization
idle time
resource planning
construction
construction management
cost
pert
probabilistic activity duration
random
two-way table
data table
conditional formatting
excel
risk
cpm
simulation
work break
confidence level
workshop
See more