ELECTRICITY
Grenada Electricity Services Ltd (GRENLEC), a
private limited liability company is the sole provider
of electricity for Grenada, Carriacou and Petite
Martinique.
Voltage:
230 volts, single phase, 50Hz cycles & 400 volts, 3
phase, 50Hz cycles.
Rates
Domestic:
Base Charge -0.15¢ per unit/kW
Minimum Monthly Charge-$1.58
Fuel Surcharge -Based on the determined rate per
unit each month
Commercial:
Service Charge-0.08¢/50 square feet
Each kW-0.16¢
Fuel Charge -Based on the determined rate per
unit each month
Minimum Monthly Charge-0.08¢/50 square feet
Industrial:
Greater than 5 hp between 6 p.m. & 10 pm
Each kW - 0.12¢
Demand Charge - 0.75¢/kW/month
Minimum Monthly Charge - $3.75
All rates are quoted in USD currency.
Application Requirements for Obtaining Electricity
Connection
1. A certificate of inspection from the
government electrical inspector.
2. Proper identification of applicant (voter’s
registration ID, driver’s license, etc).
3. Completion and submission of application
form.
4. Payment of required customer deposit and
connection fees.
Procedures for Connection
1. The applicant or representative presents the
certificate of inspection to the Grenada
Electricity Services Ltd. and fills out the
prescribed form.
2. The distance from the nearest pole to the
premises will be measured by GRENLEC in
keeping with the company’s policy of
connection without additional charges to
premises within 100 ft of the nearest utility pole
for commercial and industrial customers and
300 ft for residential customers.
3. The applicant is then required to pay the
necessary consumer deposit and connection
fees based on the type of supply and
estimated consumption. A fee of US$38 is
charged for single phase connections to
domestic, commercial and industrial properties.
Three phase connections to commercial and
industrial properties are charged a fee of
US$132. The customer deposit required for
connection is usually twice the amount of the
estimated monthly bill. This estimation is derived
from taking into consideration the number of
lights and circuit on the premises.
4. In cases where the connection required is
beyond 300 ft. of the main line, an estimate for
the cost of that extension must be requested by
the customer and connection will proceed
after proper authorization from the accounts
department and/or upon payment of
connection fee and consumer deposit. The
customer is responsible for purchase of the pole
in these instances.
5. Where an agent is making the application on
behalf of a company or business, a letter of
authorization must be presented with the
company’s official letterhead and the
company’s stamp must be affixed to the
application form.
WATER
The National Water and Sewerage Authority
(NAWASA) provides clean, safe, pipe borne water
from a series of catchments, rivers and deep wells.
Procedures for connection
1. Application form must be filled (Available from
the NAWASA offices)
2. A site visit is conducted by NAWASA to estimate
the connection cost
3. The customer is required to pay the estimated
connection cost
4. Upon payment the water supply is connected
Service Delivery
Connection of water supply is within four (4) weeks.
Rates:
Unmetered Industrial, Commercial and Government
Buildings (per annum)
0.35% of the market value of the property for the first
$187,266.00
0.30% of the market value of the property for the next
$187,266.00
0.25% of the market value of the property above
$374,532.00
Minimum charge of $36.00 per year.
Metered Industrial & Commercial
Proportional Charge: $6 per 1000 gals per month.
Fixed Charge: 40% of unmetered rates for these
premises.
Metered Domestic Consumers
Proportional Charge:
Category 1: consumption less than
2,200 gal: - $2.25/1000 gals per month
Category 2: consumption between
2,200 and 5,500 gal. - $3.75/1000 gals per month
Category 3: consumption above
5,500 gals. - $6/1000 gals per month
Fixed Charge: $3 per month per connection.
Unmetered Domestic Consumers
0.25% of the market value of the property for the first
$37,454.00
0.15% of the market value of the property for the
next $74,907.00
0.05% of the market value of the property for the
next $112,360.000.025% of the market value of the
property above $224,720.00
Minimum charge of $36.00 per year (if property is
valued at $14,233.00 or less)
Sewerage Rates
Unmetered Commercial, Industrial and Government
Buildings: 2/3 of the water rate or charges
Metered Commercial and Industrial Consumers:
2/3 of water rate or charges
Metered Domestic: 1/3 of water rate or charges
Unmetered Domestic: 1/3 of water rate or charges
Total no. of buildings with water connection as of
2005 – 55,000 (includes households and businesses).
Access to water supply: Urban – 100% Rural - 96%
All rates are quoted in USD currency
TELECOMMUNICATIONS
The National Telecommunications Regulatory
Commission of Grenada was established pursuant to
the Eastern Caribbean Telecommunications
Authority (ECTEL) Treaty (Act 30 of 2000) and the
Telecommunications Act No. 31 of 2000 and is
responsible for regulating the liberalized
telecommunications market in Grenada, Carriacou
and Petite Martinique.
Grenada boasts of a modern state-of-the-art
telecommunication sector with both fixed and
mobile line telecom markets with two (2) major
players i.e. Cable & Wireless (Grenada) Limited and
the Digicel Grenada Limited.
Telecom Services offered in Grenada
• Internet
• Data Services
• Domestic Telecom Products/Features
• Business Systems/ Features
• Card Services
• Roaming
• Mobile
Rates & Pricing
Local Calls and Rates (Per Minute in US$)
FIXED LINE TO FIXED LINE
Day $0.026
Evening $0.018
Weekends $0.018
FIXED LINE TO MOBILE
Day $0.29 per minute
Evening $0.28 per minute
Weekends $0.28 per minute
International Calling Rates (Per Minute in US$)
DESTINATION DAYTIME EVENING WEEKEND
LOCAL 0.17¢ - 0.33¢ 0.17¢ – 0.33¢ 0.17¢ - 0.33¢
REGIONAL 0.32¢ - 0.37¢ 0.32¢ - 0.37¢ 0.32 ¢- 0.37¢
USA, CANADA, UK0. 36¢ - 0.61¢ 0.36¢ - 0.37¢ 0.36 ¢- 0.37¢
REST OF THE WORLD 0.49 ¢- 0.61¢ 0.46¢ – 0.49¢ 0.46¢ –0.49¢
Procedures for applying for Land Line Telephone
Service (Cable and Wireless):
1. Complete and sign application form (can be
obtained from any of the offices).
2. Present valid identification(Passport, National
ID Card, Driver’s License)
3. Pay installation fee - EC$230.00
4. Pay minimum deposit of EC$150.00 (if you are
not the property owner).
5. Pay security deposit of EC$500.00 (if you are a
non-national).
Service Delivery
Delivery is within nine (9) working days for
residential customers and four (4) working days for
business customers.
TRANSPORTATION & DISTRIBUTION
Seaports
The Grenada Ports Authority is responsible for the
operation and administration for sea ports within
the tri-island state of Grenada, Carriacou and
Petite Martinique.
Services
Ports of Entry (Grenada)
St. George's- nearly all of Grenada’s container
traffic is handled through the Port of St. George’s.
This facility provides 1,100 ft of continuous berth
from oceangoing shipping and five (5) acres of
container handling and Storage Park.
Grenville - This port is located 12°7’N, 61°37’W. The
port has single pier with a depth alongside of 3.0
metres at its head. Vessels over 3.0 metres of
draught can anchor within the outer reef.
Prickly Bay- The port is located 12°00’N, 61°45.7’W
on the southern coast of the mainland at Lance
aux Epines. Prickly Bay is a port of entry for yachts
and contains a modern full service marina with a
35 ton travel hoist.
St.David’s- This port is located 12°0.63’N, 61°40.96’W
from Little Bacolet point to St. David’s Point at
12°0.78’N, 61°40.51’W . The port may be used only
by yachts.
Carriacou
Tyrrel Bay- This port is located 12°27’N, 61°29’W. At
this port, vessels can anchor in 9.1 to 27.45 metres
in the northern outer part of the bay. There is a 90
metre long jetty at the northern end of the beach
and a tanker terminal to the south of the jetty.
Pilotage is compulsory for tankers over 100 grt with
at least 24 hours notice required.
Hillsborough- The port of Hillsborough is located
12°’N, 61°28’W on the west coast of the island of
Carriacou between Jack-a dan and Sandy Islet.
Port Services
• Berthing
• Cargo receipt
• Storage & delivery
• Cargo sorting
• Chart sales
• Container rentals
• Delivery of containers to consignees premises
InfrastructureofGrenada
• Equipment hire for cargo handling
• Mooring buoys, mooring or running lines
• Pilotage
• Stripping or unstuffing containers
• Water sales and navigational aid
Port rates
These rates are applied under the legislation of
SRO#12 of 1997. (All fees are quoted in USD
currency)
Storage
General Cargo:
• $ 2.62 per ton upon arrival
• $ 3.75 per ton/day (removal fee on 6th working
day)
• $1.87 per ton/day( from 7th working day)
Cargo in Containers:
20ft containers- $159.18 for 1st two (2) working days
& $58.05 after.
40ft container- $ 241.57 for 1st two (2) working days
& $131.09 after.
Container Handling
Stripping-20 ft container- $112.36
40 ft container-$206
Forklift charge
<6000 lbs – $41.20 per hour>6000 lbs-$46.82 per hour
Terminal Use
Bulk and Break Bulk- $3.75 per ton
Containerized cargo**-
20 ft- $65.54 40ft – $131.0 45ft- $149.81
These rates are subject to a 15% charge for high
cube boxes.
Ship to Truck
• General cargo-$0.47 per ton
• Break bulk (cement) - $0.37 per ton
• Frozen goods-$0.28 per ton
• Container- $18.73 per metric ton
Shipping Agents
There are a number of shipping agents in Grenada.
The following is a list of the agents, the shipping
lines represented and country of origin:
Paddy’s Shipping:
Norpoint-Guyana, Eastpack- St. Vincent,
Benrose-Dominica, Stenguard- St. Vincent, Jaden-T
Frequente Industrial Park
Frequente, St. George’s,
Grenada W.I.
Phone: (473) - 444-1035/40
Fax: (473) - 444-4828
E-mail: invest@grenadaidc.com
Website: www.grenadaworld.com
Grenada Industrial
Development Corporation
Grenada Industrial
Development Corporation
- St. Vincent, Safiya- St. Vincent, Carmen
Cecilia-Venezuela, Anita – St. Vincent, Von-tim
Dominica, Elita- St. Vincent, Munie Chandra- St.
Vincent.
Otway’s Shippping
Admiral Bay- St. Vincent, Lady Grace 2- St.
Vincent, Goncalo St. Vincent, Patri- St. Vincent
Strategic Alliance
Ocean Princess –Trinidad, Style- St. Vincent,
Anora- St. Vincent, Anjijang- St. Vincent,
Andajian- St. Vincent
George F. Huggins
Anina-St. Vincent, Tropical- St. Vincent,
Stena-Caribbean- London, Stena Calypso- U.K,
Whistler-Malta, Edsel- Hong Kong
Jonas Browne Hubbards
Johnnie Lambros- St. Vincent, Geestline Cold
Stream- Netherlands, Santa Catharina- Bahamas
Santa Lucia- Netherlands, Marcliff- Antigua,
Westerland- Antigua, Franklin Strait- Antigua,
Nera- Antigua
W. E. Julien & CO Ltd
Seapack, Seafreight, Zim –Miami St. Lucia
Trinidad, Grenada, Jamaica
St. John Agency
Scol- Malta, CMA/ CGM Caracas- Antigua,
CMA/CGM, Balsa- Panama, Sea explorer-
Antigua, Lewbro- Panama, CIC Brazil- Bahamas,
Gatun- Panama.
International Freight Forwarders
Cargo Consolidators Agency Grenada Ltd.,
Roberts Agency, Caribbean American Shipping
Ship Registration
Registration of Grenadian ships is governed by
the Shipping Act of 1994 and the Shipping
(Registration) Regulations SRO51 of 1997.
All Grenadian ships over 24 metres LOA must be
registered in the port registry, St. George’s if they
are to be taken outside of Grenadian waters or
if a mortgage is required. A ship may be
registered only by qualified persons that is; any
citizen of Grenada, any public body of Grenada
and any body incorporated or not which is
authorized by the relevant Minister. At least
11/16th of the shares in a ship must be owned
by qualified persons before the vessel is eligible for
registration.
Documentation to be provided:
• Application form for registration
• Declaration of ownership
• Bill of sale for vessel
• Notice of proposed ship’s name
• Declaration of appointment of managing
owner or manager
• Proof of survey for ships over twenty (20)
years old
• Builder’s certificate for new ships
Upon successful registration, a certificate of
registry is issued together with an official number
which must be displayed on the ship. Any
changes in details of registry must be notified to
the Registrar.
Airports
Grenada’s main airport, Point Salines International
Airport (PSIA) which is managed by the Grenada
Airport Authority has excellent connections with
North America and Europe via direct flights and
other Caribbean islands. PSIA is located just south
of St. George’s and close to the island’s hotel and
tourism belt. The airport is capable of handling
large commercial jets for both day and night
landings.
A smaller airport is located in the sister isle of
Carriacou and is utilized for inter-island services.
Scheduled Passenger Airlines:
International:
American Eagle - Daily flights from San Juan,
Puerto Rico.
Air Jamaica - Three weekly flights to Grenada from
New York
British Airways – One weekly flight to Grenada from
London.
Other North American Airlines
Condor- One weekly flight
Virgin Airways- one weekly flight from London
Interregional Airlines:
Liat Airlines- Daily flights
Saint Vincent and Grenadines - Flights to
Carriacou
Cubana Airlines-Once weekly
Charter Passenger Airlines:
Trans Meridian
Zoom
Scheduled Cargo Airlines:
Amerijet Int'l- Twice weekly
DHL – Twice per day, weekly
Merlin Air (FedEx) - Daily
Charter Cargo Airlines:
Liat (1974) (Quik Pak)
Aircraft Refueling: Texaco West Indies Grenada Ltd
Average airfare cost from Grenada to:
• Trinidad: USD$125
• Barbados: USD$147
• St. Vincent: USD$120
Ground Transportation
Grenada has a comprehensive road network that
allows any part of the island to be reached within
two hours from St. George’s. Public transportation is
available from 6:00 am to 8:00 pm. Taxi services,
vehicle rental agencies, airport ground handlers
and Aviation Services of Grenada Ltd are also
available.
Average cost of transportation to tourism belt from
Airport- US$15
Design & Artwork by: MwendaRobinson.com

More Related Content

Similar to Grenada's Infrastructure Guide: Electricity, Water, Telecom, Transportation

Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationJacques Babel
 
Small Wind 101: An Overview of Small-Scale Wind Electric Systems
Small Wind 101: An Overview of Small-Scale Wind Electric SystemsSmall Wind 101: An Overview of Small-Scale Wind Electric Systems
Small Wind 101: An Overview of Small-Scale Wind Electric SystemsUniversity of Minnesota
 
Presentation for LinkedIn 1-15-16
Presentation for LinkedIn 1-15-16Presentation for LinkedIn 1-15-16
Presentation for LinkedIn 1-15-16Court Miller
 
Your monthlybill
Your monthlybillYour monthlybill
Your monthlybillrein28
 
Techno Water Information
Techno Water InformationTechno Water Information
Techno Water InformationNegalltd
 
Sentas Rulings set 1
Sentas Rulings set 1Sentas Rulings set 1
Sentas Rulings set 1senta0210
 
Impervious based stormwater billing
Impervious based stormwater billingImpervious based stormwater billing
Impervious based stormwater billingcrockettc
 
Financial Impacts, Cost Calculators, and Technologies for Idle Reduction
Financial Impacts, Cost Calculators, and Technologies for Idle ReductionFinancial Impacts, Cost Calculators, and Technologies for Idle Reduction
Financial Impacts, Cost Calculators, and Technologies for Idle ReductionWisconsin Clean Cities
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Dr. Oliver Massmann
 
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018HOMER Energy
 
The Ultimate Guide to Non-Commodity Costs Management in the UK
The Ultimate Guide to Non-Commodity Costs Management in the UKThe Ultimate Guide to Non-Commodity Costs Management in the UK
The Ultimate Guide to Non-Commodity Costs Management in the UKDaniel Cerescu
 
Smart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxSmart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxLawrenceMutinda1
 
Expresspay e business 2012v2 140k
Expresspay e business 2012v2 140kExpresspay e business 2012v2 140k
Expresspay e business 2012v2 140ksscvelasco
 
Sc workshop topics 5 6 community energy and liquid fuels
Sc workshop topics 5 6 community energy and liquid fuelsSc workshop topics 5 6 community energy and liquid fuels
Sc workshop topics 5 6 community energy and liquid fuelsPublic Technology Institute
 

Similar to Grenada's Infrastructure Guide: Electricity, Water, Telecom, Transportation (20)

Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
Small Wind 101: An Overview of Small-Scale Wind Electric Systems
Small Wind 101: An Overview of Small-Scale Wind Electric SystemsSmall Wind 101: An Overview of Small-Scale Wind Electric Systems
Small Wind 101: An Overview of Small-Scale Wind Electric Systems
 
Presentation for LinkedIn 1-15-16
Presentation for LinkedIn 1-15-16Presentation for LinkedIn 1-15-16
Presentation for LinkedIn 1-15-16
 
Your monthlybill
Your monthlybillYour monthlybill
Your monthlybill
 
Techno Water Information
Techno Water InformationTechno Water Information
Techno Water Information
 
Sentas Rulings set 1
Sentas Rulings set 1Sentas Rulings set 1
Sentas Rulings set 1
 
Impervious based stormwater billing
Impervious based stormwater billingImpervious based stormwater billing
Impervious based stormwater billing
 
Financial Impacts, Cost Calculators, and Technologies for Idle Reduction
Financial Impacts, Cost Calculators, and Technologies for Idle ReductionFinancial Impacts, Cost Calculators, and Technologies for Idle Reduction
Financial Impacts, Cost Calculators, and Technologies for Idle Reduction
 
Service Plan
Service PlanService Plan
Service Plan
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018
HOMER Energy Webinar. Modeling Energy Storage in Microgrids, November 2018
 
GPRS Franchise File
GPRS Franchise FileGPRS Franchise File
GPRS Franchise File
 
Wind4
Wind4Wind4
Wind4
 
Exporting to Canada
Exporting to CanadaExporting to Canada
Exporting to Canada
 
Telecommuting and Sustainability
Telecommuting and SustainabilityTelecommuting and Sustainability
Telecommuting and Sustainability
 
The Ultimate Guide to Non-Commodity Costs Management in the UK
The Ultimate Guide to Non-Commodity Costs Management in the UKThe Ultimate Guide to Non-Commodity Costs Management in the UK
The Ultimate Guide to Non-Commodity Costs Management in the UK
 
Smart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptxSmart_Grid_Tanzania_bsd.pptx
Smart_Grid_Tanzania_bsd.pptx
 
Expresspay e business 2012v2 140k
Expresspay e business 2012v2 140kExpresspay e business 2012v2 140k
Expresspay e business 2012v2 140k
 
Sc workshop topics 5 6 community energy and liquid fuels
Sc workshop topics 5 6 community energy and liquid fuelsSc workshop topics 5 6 community energy and liquid fuels
Sc workshop topics 5 6 community energy and liquid fuels
 

More from Office of Trade Negotiations (OTN), CARICOM Secretariat

More from Office of Trade Negotiations (OTN), CARICOM Secretariat (20)

2014 Annual Report - World Trade Organization (WTO)
2014 Annual Report - World Trade Organization (WTO)2014 Annual Report - World Trade Organization (WTO)
2014 Annual Report - World Trade Organization (WTO)
 
the Association of Caribbean States (ACS): 1994-2014 - 20 Years Promoting Coo...
the Association of Caribbean States (ACS): 1994-2014 - 20 Years Promoting Coo...the Association of Caribbean States (ACS): 1994-2014 - 20 Years Promoting Coo...
the Association of Caribbean States (ACS): 1994-2014 - 20 Years Promoting Coo...
 
TTIP: The Economic Analysis Explained
TTIP: The Economic Analysis ExplainedTTIP: The Economic Analysis Explained
TTIP: The Economic Analysis Explained
 
2014 National Trade Estimate Report on Foreign Trade Barriers
2014 National Trade Estimate Report on Foreign Trade Barriers2014 National Trade Estimate Report on Foreign Trade Barriers
2014 National Trade Estimate Report on Foreign Trade Barriers
 
OTN - Private Sector Trade Note - Vol 2 2014 - CARICOM-Ghana Trade
OTN - Private Sector Trade Note - Vol 2 2014 - CARICOM-Ghana TradeOTN - Private Sector Trade Note - Vol 2 2014 - CARICOM-Ghana Trade
OTN - Private Sector Trade Note - Vol 2 2014 - CARICOM-Ghana Trade
 
2014-03-03 OTN Special Update (The Focus of the WTO MC9)
2014-03-03 OTN Special Update (The Focus of the WTO MC9)2014-03-03 OTN Special Update (The Focus of the WTO MC9)
2014-03-03 OTN Special Update (The Focus of the WTO MC9)
 
OTN Special Update - Economic and Trade Policies Related to Diet and Obesity ...
OTN Special Update - Economic and Trade Policies Related to Diet and Obesity ...OTN Special Update - Economic and Trade Policies Related to Diet and Obesity ...
OTN Special Update - Economic and Trade Policies Related to Diet and Obesity ...
 
WTO Trade Facilitation Agreement - A Business Guide for Developing Countries ...
WTO Trade Facilitation Agreement - A Business Guide for Developing Countries ...WTO Trade Facilitation Agreement - A Business Guide for Developing Countries ...
WTO Trade Facilitation Agreement - A Business Guide for Developing Countries ...
 
OTN - Private Sector Trade Note - vol 4 2013
OTN - Private Sector Trade Note - vol 4 2013OTN - Private Sector Trade Note - vol 4 2013
OTN - Private Sector Trade Note - vol 4 2013
 
The CARICOM Common External Tariff (CET) – The Tariff Structure
The CARICOM Common External Tariff (CET) – The Tariff StructureThe CARICOM Common External Tariff (CET) – The Tariff Structure
The CARICOM Common External Tariff (CET) – The Tariff Structure
 
Innovation for Economic Performance the Case of Latin American Firms
Innovation for Economic Performance the Case of Latin American FirmsInnovation for Economic Performance the Case of Latin American Firms
Innovation for Economic Performance the Case of Latin American Firms
 
Caribbean Community Regional Aid for Trade Strategy 2013–2015 Caribbean Commu...
Caribbean Community Regional Aid for Trade Strategy 2013–2015 Caribbean Commu...Caribbean Community Regional Aid for Trade Strategy 2013–2015 Caribbean Commu...
Caribbean Community Regional Aid for Trade Strategy 2013–2015 Caribbean Commu...
 
CARIFESTA XI -Travel Guide
CARIFESTA XI -Travel GuideCARIFESTA XI -Travel Guide
CARIFESTA XI -Travel Guide
 
Details of the Post Technical Advisor Investment and Private Sector Office of...
Details of the Post Technical Advisor Investment and Private Sector Office of...Details of the Post Technical Advisor Investment and Private Sector Office of...
Details of the Post Technical Advisor Investment and Private Sector Office of...
 
CARICOM View: 40 years of integration, come celebrate with us
CARICOM View:     40 years of integration, come celebrate with usCARICOM View:     40 years of integration, come celebrate with us
CARICOM View: 40 years of integration, come celebrate with us
 
OTN - Private Sector Trade Note - Vol 3 2013
OTN - Private Sector Trade Note - Vol 3 2013OTN - Private Sector Trade Note - Vol 3 2013
OTN - Private Sector Trade Note - Vol 3 2013
 
Aid for Trade: Case Study - Caribbean Aid for Trade (AfT) and Regional Integr...
Aid for Trade: Case Study - Caribbean Aid for Trade (AfT) and Regional Integr...Aid for Trade: Case Study - Caribbean Aid for Trade (AfT) and Regional Integr...
Aid for Trade: Case Study - Caribbean Aid for Trade (AfT) and Regional Integr...
 
OTN Special Update - Innovation - A New Frontier in Trade Multilateralism [20...
OTN Special Update - Innovation - A New Frontier in Trade Multilateralism [20...OTN Special Update - Innovation - A New Frontier in Trade Multilateralism [20...
OTN Special Update - Innovation - A New Frontier in Trade Multilateralism [20...
 
WTO Report - The Future of Trade: The Challenges of Convergence
WTO Report - The Future of Trade: The Challenges of ConvergenceWTO Report - The Future of Trade: The Challenges of Convergence
WTO Report - The Future of Trade: The Challenges of Convergence
 
OTN - Private Sector Trade Note - Vol 2 2013
OTN - Private Sector Trade Note - Vol 2 2013OTN - Private Sector Trade Note - Vol 2 2013
OTN - Private Sector Trade Note - Vol 2 2013
 

Grenada's Infrastructure Guide: Electricity, Water, Telecom, Transportation

  • 1. ELECTRICITY Grenada Electricity Services Ltd (GRENLEC), a private limited liability company is the sole provider of electricity for Grenada, Carriacou and Petite Martinique. Voltage: 230 volts, single phase, 50Hz cycles & 400 volts, 3 phase, 50Hz cycles. Rates Domestic: Base Charge -0.15¢ per unit/kW Minimum Monthly Charge-$1.58 Fuel Surcharge -Based on the determined rate per unit each month Commercial: Service Charge-0.08¢/50 square feet Each kW-0.16¢ Fuel Charge -Based on the determined rate per unit each month Minimum Monthly Charge-0.08¢/50 square feet Industrial: Greater than 5 hp between 6 p.m. & 10 pm Each kW - 0.12¢ Demand Charge - 0.75¢/kW/month Minimum Monthly Charge - $3.75 All rates are quoted in USD currency. Application Requirements for Obtaining Electricity Connection 1. A certificate of inspection from the government electrical inspector. 2. Proper identification of applicant (voter’s registration ID, driver’s license, etc). 3. Completion and submission of application form. 4. Payment of required customer deposit and connection fees. Procedures for Connection 1. The applicant or representative presents the certificate of inspection to the Grenada Electricity Services Ltd. and fills out the prescribed form. 2. The distance from the nearest pole to the premises will be measured by GRENLEC in keeping with the company’s policy of connection without additional charges to premises within 100 ft of the nearest utility pole for commercial and industrial customers and 300 ft for residential customers. 3. The applicant is then required to pay the necessary consumer deposit and connection fees based on the type of supply and estimated consumption. A fee of US$38 is charged for single phase connections to domestic, commercial and industrial properties. Three phase connections to commercial and industrial properties are charged a fee of US$132. The customer deposit required for connection is usually twice the amount of the estimated monthly bill. This estimation is derived from taking into consideration the number of lights and circuit on the premises. 4. In cases where the connection required is beyond 300 ft. of the main line, an estimate for the cost of that extension must be requested by the customer and connection will proceed after proper authorization from the accounts department and/or upon payment of connection fee and consumer deposit. The customer is responsible for purchase of the pole in these instances. 5. Where an agent is making the application on behalf of a company or business, a letter of authorization must be presented with the company’s official letterhead and the company’s stamp must be affixed to the application form. WATER The National Water and Sewerage Authority (NAWASA) provides clean, safe, pipe borne water from a series of catchments, rivers and deep wells. Procedures for connection 1. Application form must be filled (Available from the NAWASA offices) 2. A site visit is conducted by NAWASA to estimate the connection cost 3. The customer is required to pay the estimated connection cost 4. Upon payment the water supply is connected Service Delivery Connection of water supply is within four (4) weeks. Rates: Unmetered Industrial, Commercial and Government Buildings (per annum) 0.35% of the market value of the property for the first $187,266.00 0.30% of the market value of the property for the next $187,266.00 0.25% of the market value of the property above $374,532.00 Minimum charge of $36.00 per year. Metered Industrial & Commercial Proportional Charge: $6 per 1000 gals per month. Fixed Charge: 40% of unmetered rates for these premises. Metered Domestic Consumers Proportional Charge: Category 1: consumption less than 2,200 gal: - $2.25/1000 gals per month Category 2: consumption between 2,200 and 5,500 gal. - $3.75/1000 gals per month Category 3: consumption above 5,500 gals. - $6/1000 gals per month Fixed Charge: $3 per month per connection. Unmetered Domestic Consumers 0.25% of the market value of the property for the first $37,454.00 0.15% of the market value of the property for the next $74,907.00 0.05% of the market value of the property for the next $112,360.000.025% of the market value of the property above $224,720.00 Minimum charge of $36.00 per year (if property is valued at $14,233.00 or less) Sewerage Rates Unmetered Commercial, Industrial and Government Buildings: 2/3 of the water rate or charges Metered Commercial and Industrial Consumers: 2/3 of water rate or charges Metered Domestic: 1/3 of water rate or charges Unmetered Domestic: 1/3 of water rate or charges Total no. of buildings with water connection as of 2005 – 55,000 (includes households and businesses). Access to water supply: Urban – 100% Rural - 96% All rates are quoted in USD currency TELECOMMUNICATIONS The National Telecommunications Regulatory Commission of Grenada was established pursuant to the Eastern Caribbean Telecommunications Authority (ECTEL) Treaty (Act 30 of 2000) and the Telecommunications Act No. 31 of 2000 and is responsible for regulating the liberalized telecommunications market in Grenada, Carriacou and Petite Martinique. Grenada boasts of a modern state-of-the-art telecommunication sector with both fixed and mobile line telecom markets with two (2) major players i.e. Cable & Wireless (Grenada) Limited and the Digicel Grenada Limited. Telecom Services offered in Grenada • Internet • Data Services • Domestic Telecom Products/Features • Business Systems/ Features • Card Services • Roaming • Mobile Rates & Pricing Local Calls and Rates (Per Minute in US$) FIXED LINE TO FIXED LINE Day $0.026 Evening $0.018 Weekends $0.018 FIXED LINE TO MOBILE Day $0.29 per minute Evening $0.28 per minute Weekends $0.28 per minute International Calling Rates (Per Minute in US$) DESTINATION DAYTIME EVENING WEEKEND LOCAL 0.17¢ - 0.33¢ 0.17¢ – 0.33¢ 0.17¢ - 0.33¢ REGIONAL 0.32¢ - 0.37¢ 0.32¢ - 0.37¢ 0.32 ¢- 0.37¢ USA, CANADA, UK0. 36¢ - 0.61¢ 0.36¢ - 0.37¢ 0.36 ¢- 0.37¢ REST OF THE WORLD 0.49 ¢- 0.61¢ 0.46¢ – 0.49¢ 0.46¢ –0.49¢ Procedures for applying for Land Line Telephone Service (Cable and Wireless): 1. Complete and sign application form (can be obtained from any of the offices). 2. Present valid identification(Passport, National ID Card, Driver’s License) 3. Pay installation fee - EC$230.00 4. Pay minimum deposit of EC$150.00 (if you are not the property owner). 5. Pay security deposit of EC$500.00 (if you are a non-national). Service Delivery Delivery is within nine (9) working days for residential customers and four (4) working days for business customers. TRANSPORTATION & DISTRIBUTION Seaports The Grenada Ports Authority is responsible for the operation and administration for sea ports within the tri-island state of Grenada, Carriacou and Petite Martinique. Services Ports of Entry (Grenada) St. George's- nearly all of Grenada’s container traffic is handled through the Port of St. George’s. This facility provides 1,100 ft of continuous berth from oceangoing shipping and five (5) acres of container handling and Storage Park. Grenville - This port is located 12°7’N, 61°37’W. The port has single pier with a depth alongside of 3.0 metres at its head. Vessels over 3.0 metres of draught can anchor within the outer reef. Prickly Bay- The port is located 12°00’N, 61°45.7’W on the southern coast of the mainland at Lance aux Epines. Prickly Bay is a port of entry for yachts and contains a modern full service marina with a 35 ton travel hoist. St.David’s- This port is located 12°0.63’N, 61°40.96’W from Little Bacolet point to St. David’s Point at 12°0.78’N, 61°40.51’W . The port may be used only by yachts. Carriacou Tyrrel Bay- This port is located 12°27’N, 61°29’W. At this port, vessels can anchor in 9.1 to 27.45 metres in the northern outer part of the bay. There is a 90 metre long jetty at the northern end of the beach and a tanker terminal to the south of the jetty. Pilotage is compulsory for tankers over 100 grt with at least 24 hours notice required. Hillsborough- The port of Hillsborough is located 12°’N, 61°28’W on the west coast of the island of Carriacou between Jack-a dan and Sandy Islet. Port Services • Berthing • Cargo receipt • Storage & delivery • Cargo sorting • Chart sales • Container rentals • Delivery of containers to consignees premises
  • 2. InfrastructureofGrenada • Equipment hire for cargo handling • Mooring buoys, mooring or running lines • Pilotage • Stripping or unstuffing containers • Water sales and navigational aid Port rates These rates are applied under the legislation of SRO#12 of 1997. (All fees are quoted in USD currency) Storage General Cargo: • $ 2.62 per ton upon arrival • $ 3.75 per ton/day (removal fee on 6th working day) • $1.87 per ton/day( from 7th working day) Cargo in Containers: 20ft containers- $159.18 for 1st two (2) working days & $58.05 after. 40ft container- $ 241.57 for 1st two (2) working days & $131.09 after. Container Handling Stripping-20 ft container- $112.36 40 ft container-$206 Forklift charge <6000 lbs – $41.20 per hour>6000 lbs-$46.82 per hour Terminal Use Bulk and Break Bulk- $3.75 per ton Containerized cargo**- 20 ft- $65.54 40ft – $131.0 45ft- $149.81 These rates are subject to a 15% charge for high cube boxes. Ship to Truck • General cargo-$0.47 per ton • Break bulk (cement) - $0.37 per ton • Frozen goods-$0.28 per ton • Container- $18.73 per metric ton Shipping Agents There are a number of shipping agents in Grenada. The following is a list of the agents, the shipping lines represented and country of origin: Paddy’s Shipping: Norpoint-Guyana, Eastpack- St. Vincent, Benrose-Dominica, Stenguard- St. Vincent, Jaden-T Frequente Industrial Park Frequente, St. George’s, Grenada W.I. Phone: (473) - 444-1035/40 Fax: (473) - 444-4828 E-mail: invest@grenadaidc.com Website: www.grenadaworld.com Grenada Industrial Development Corporation Grenada Industrial Development Corporation - St. Vincent, Safiya- St. Vincent, Carmen Cecilia-Venezuela, Anita – St. Vincent, Von-tim Dominica, Elita- St. Vincent, Munie Chandra- St. Vincent. Otway’s Shippping Admiral Bay- St. Vincent, Lady Grace 2- St. Vincent, Goncalo St. Vincent, Patri- St. Vincent Strategic Alliance Ocean Princess –Trinidad, Style- St. Vincent, Anora- St. Vincent, Anjijang- St. Vincent, Andajian- St. Vincent George F. Huggins Anina-St. Vincent, Tropical- St. Vincent, Stena-Caribbean- London, Stena Calypso- U.K, Whistler-Malta, Edsel- Hong Kong Jonas Browne Hubbards Johnnie Lambros- St. Vincent, Geestline Cold Stream- Netherlands, Santa Catharina- Bahamas Santa Lucia- Netherlands, Marcliff- Antigua, Westerland- Antigua, Franklin Strait- Antigua, Nera- Antigua W. E. Julien & CO Ltd Seapack, Seafreight, Zim –Miami St. Lucia Trinidad, Grenada, Jamaica St. John Agency Scol- Malta, CMA/ CGM Caracas- Antigua, CMA/CGM, Balsa- Panama, Sea explorer- Antigua, Lewbro- Panama, CIC Brazil- Bahamas, Gatun- Panama. International Freight Forwarders Cargo Consolidators Agency Grenada Ltd., Roberts Agency, Caribbean American Shipping Ship Registration Registration of Grenadian ships is governed by the Shipping Act of 1994 and the Shipping (Registration) Regulations SRO51 of 1997. All Grenadian ships over 24 metres LOA must be registered in the port registry, St. George’s if they are to be taken outside of Grenadian waters or if a mortgage is required. A ship may be registered only by qualified persons that is; any citizen of Grenada, any public body of Grenada and any body incorporated or not which is authorized by the relevant Minister. At least 11/16th of the shares in a ship must be owned by qualified persons before the vessel is eligible for registration. Documentation to be provided: • Application form for registration • Declaration of ownership • Bill of sale for vessel • Notice of proposed ship’s name • Declaration of appointment of managing owner or manager • Proof of survey for ships over twenty (20) years old • Builder’s certificate for new ships Upon successful registration, a certificate of registry is issued together with an official number which must be displayed on the ship. Any changes in details of registry must be notified to the Registrar. Airports Grenada’s main airport, Point Salines International Airport (PSIA) which is managed by the Grenada Airport Authority has excellent connections with North America and Europe via direct flights and other Caribbean islands. PSIA is located just south of St. George’s and close to the island’s hotel and tourism belt. The airport is capable of handling large commercial jets for both day and night landings. A smaller airport is located in the sister isle of Carriacou and is utilized for inter-island services. Scheduled Passenger Airlines: International: American Eagle - Daily flights from San Juan, Puerto Rico. Air Jamaica - Three weekly flights to Grenada from New York British Airways – One weekly flight to Grenada from London. Other North American Airlines Condor- One weekly flight Virgin Airways- one weekly flight from London Interregional Airlines: Liat Airlines- Daily flights Saint Vincent and Grenadines - Flights to Carriacou Cubana Airlines-Once weekly Charter Passenger Airlines: Trans Meridian Zoom Scheduled Cargo Airlines: Amerijet Int'l- Twice weekly DHL – Twice per day, weekly Merlin Air (FedEx) - Daily Charter Cargo Airlines: Liat (1974) (Quik Pak) Aircraft Refueling: Texaco West Indies Grenada Ltd Average airfare cost from Grenada to: • Trinidad: USD$125 • Barbados: USD$147 • St. Vincent: USD$120 Ground Transportation Grenada has a comprehensive road network that allows any part of the island to be reached within two hours from St. George’s. Public transportation is available from 6:00 am to 8:00 pm. Taxi services, vehicle rental agencies, airport ground handlers and Aviation Services of Grenada Ltd are also available. Average cost of transportation to tourism belt from Airport- US$15 Design & Artwork by: MwendaRobinson.com