SlideShare a Scribd company logo
1 of 11
Benti Shimina’s Curriculum Vitae - Form T 4
1. Proposed Position: CPM Technical Specialist-2
2. Name of Firm: MARAFET CONSULTANCY AND TRAINING SERVICE PLC
3. Name of Staff: Benti Shimina Kanaa
4. Date of Birth: April 15, 1964 Nationality: Ethiopian
5. Education: M. Sc. Degree in Environmental Science, Addis Ababa University, 23rd
August, 2007 and B. Sc.
Degree in Chemistry, Addis Ababa University, 18th
July, 1986.
6. Membership of Professional Associations:
7. Other Training:
 MS Project 2007; Project management software, organized by Water Works Design and Supervision Enterprise,
conducted by Construction Solutions PLC, 17–27 May, 2010 Addis Ababa, Ethiopia.
 Environmental Management System (EMS) and Municipal Solid Waste Management Strategic Action Plan
Preparation organized by the Environmental Protection Authority of Ethiopia, held from 14-19 January 2008 at
Ghion Hotel, Addis Ababa, Ethiopia.
 Integrated Water Resources Management, Organized by The Federal Democratic Republic of Ethiopia, Ministry
of Water Resources, 18-20 October, 2004, Addis Ababa, Ethiopia.
 Strategic Management, Performance Management, Process Re-Engineering, Customer Service, Standard and
Institutional Code Of Conduct, Training, organized by The Oromia Management Institute, in collaboration with
the Oromia National Regional State Capacity Building Supreme Office, held from 19 -28 April, 2004, Ziway,
Ethiopia.
 Environmental Audit Training, Aspect International, England, Organized by The Environmental Protection
Authority Of Ethiopia, held from October 21st
– November 01, 2002, Addis Ababa, Ethiopia.
 Environment, Population and Development, Training workshop, organized by LEM, Environment and
Development Society of Ethiopia, held from 27th
-30th
May, 2002.
 Media Use for Environmental Awareness & Action Training Workshop, organized by The Environmental
Protection Authority of Ethiopia, held at Ethiopian Red Cross Society Training Centre from 12-15th
January,
1999, Addis Ababa, Ethiopia.
 Environmental Economics, Training Workshop, organized by The Environmental Protection Authority of
Ethiopia, held at Ethiopian Red Cross Society Training Centre from 21-25th
December, 1998, Addis Ababa,
Ethiopia.
 Strategic Planning and Project Preparation, Training Workshop, organized by The Environmental Protection
Authority of Ethiopia, held at Ethiopian Red Cross Society Training Centre from November 30 - December 6,
1998, Addis Ababa, Ethiopia.
 Mining and the Environment in Ethiopia, Training Workshop, organized by The Chemical Society of Ethiopia,
held at Addis Ababa University Conference Hall on 27th
January, 1998, Addis Ababa, Ethiopia.
 Environmental Impact Assessment (EIA) for Regional Experts Training Workshop, organized by Conservation
Strategy of Ethiopia in collaboration with Environmental Protection Authority of Ethiopia, held at Ethiopian
Management Institute (EMI) from 25-30th
October, 1997, Debrezeit, Ethiopia. Etc.
8. Countries of Work Experience: Ethiopia
9. Languages: English, Amharic and Afan Oromo
10. Employment Record:
10.1EMPLOYMENT WORKS
10.1.1 From: May, 2009 To: To date
Employer: Federal Water Works Design and Supervision Enterprise
Positions held: Senior Environmentalist
11.1.1 Detailed
Tasks Assigned:
Environmental
Impact Assessment
(EIA), Socio-
economic and
environmental audit
studies of different
development
projects
12.1.1 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Senior Environmentalist.
Year: May, 2009 – To date
Location: Addis Ababa, Ethiopia
Client: Different governmental and private organizations.
Main project features: Environmental Impact Assessment (EIA), Socio-economic and
environmental audit studies of different development projects.
Positions held: Senior Environmentalist
Activities performed:
He has conducted Environmental Impact Assessment (EIA), Socio-economic and
environmental audit studies of different development projects
1
10.1.2 From: November 11, 2002 To: April, 2009
Employer: Oromia National Regional State Environmental Protection Office
Positions held: Team Leader, Environmental pollution Control and Study
11.1.2 Detailed Tasks
Assigned:
Coordinating pollution
control and study
activities, EIA reports
review, environmental
pollution control,
governmental and non-
governmental sectors
environmental impacts
monitoring and control,
awareness creation on
environmental harmony
of development
activities, undertaking
environmental audits.
12.1.2 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: Environmental pollution Control and Study.
Year: November 11, 2002-April, 2009
Location: Addis Ababa, Ethiopia
Client: Different governmental and private organizations.
Main project features: Coordinating pollution control and study activities, EIA reports
review, environmental pollution control, governmental and non-governmental sectors
environmental impacts monitoring and control, awareness creation on environmental
harmony of development activities, undertaking environmental audits.
Positions held: Team Leader, Environmental pollution Control and Study
Activities performed:
He has coordinated pollution control and study activities, reviewed EIA reports,
environmental pollution control, governmental and non-governmental sectors
environmental impacts monitoring and control, conducted awareness creation on
environmental harmony of development activities, undertaken environmental audits.
10.1.3 From: October 1, 2001 To: November 10, 2002
Employer: Oromia Natural Resources Development and Environment Protection Authority
Positions held: Senior Environmentalist
11.1.3 Detailed Tasks
Assigned:
EIA reports review,
environmental
pollution control,
governmental and non-
governmental sectors
environmental impacts
monitoring and
control, awareness
creation on
environmental
harmony of
development activities,
undertaking
environmental audits.
12.1.3 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: Senior Environmentalist.
Year: October 1, 2001-November 10, 2002
Location: Addis Ababa, Ethiopia
Client: Different governmental and private organizations.
Main project features: EIA reports review, environmental pollution control, governmental
and non-governmental sectors environmental impacts monitoring and control, awareness
creation on environmental harmony of development activities, undertaking environmental
audits.
Positions held: Senior Environmentalist
Activities performed:
He has reviewed EIA reports, environmental pollution control, governmental and non-
governmental sectors environmental impacts monitoring and control, conducted awareness
creation on environmental harmony of development activities, undertaken environmental
audits.
10.1.4 From: December 10, 2000 To: September 30, 2001
Employer: Oromia Bureau of Agriculture
Positions held: Coordinator, Regional Soil Laboratory Centers
11.1.4 Detailed
Tasks Assigned:
Coordinating
laboratory at Fiche,
Bedelle, Nekemte
12.1.4 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Regional Soil Laboratory Centers.
Year: December 10, 2000-September 30, 2001
Location: Addis Ababa, Ethiopia
Client: Different governmental and private organizations.
2
and Ziway Soil
laboratory
construction,
laboratory tools and
materials purchase
and accommodation,
etc.
Main project features: Coordinating laboratory Fiche, Bedelle, Nekemte and Ziway Soil
laboratory construction, laboratory tools and materials purchase and accommodation, etc.
Positions held: Coordinator, Regional Soil Laboratory Centers
Activities performed:
He has coordinated laboratory at Fiche, Bedelle, Nekemte and Ziway Soil laboratory
construction, laboratory tools and materials purchase and accommodation, etc.
10.1.5 From: November 1, 1996 To: December 9, 2000
Employer: Oromia Natural Resources Development and Environmental Protection Bureau
Positions held: Environmentalist
11.1.5 Detailed Tasks
Assigned:
EIA reports review,
environmental
pollution control,
governmental and non-
governmental sectors
environmental impacts
monitoring and
control, awareness
creation on
environmental
harmony of
development activities,
undertaking
environmental audits.
12.1.5 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: Environmentalist.
Year: November 1, 1996-December 9, 2000
Location: Addis Ababa, Ethiopia
Client: Different governmental and private organizations.
Main project features: EIA reports review, environmental pollution control, governmental
and non-governmental sectors environmental impacts monitoring and control, awareness
creation on environmental harmony of development activities, undertaking environmental
audits.
Positions held: Environmentalist
Activities performed:
He has reviewed EIA reports, environmental pollution control, governmental and non-
governmental sectors environmental impacts monitoring and control, conducted awareness
creation on environmental harmony of development activities, undertaken environmental
audits.
10.1.6 From: June 8, 1995 To: October 30, 1996
Employer: Oromia Natural Resources Development and Environmental Protection Bureau, West
Wollega Zone Department, Environmental Protection and Land Use Team
Positions held: Team Leader
11.1.6 Detailed Tasks
Assigned:
Coordinating zone level
environmental
protection activities,
pollution control and
studies, EIA reports
review, governmental
and non-governmental
sectors environmental
impacts monitoring and
control, awareness
creation on
environmental harmony
of development
activities, undertaking
environmental audits.
12.1.6 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: West Wollega Zone Department, Environmental
Protection and Land Use Team.
Year: June 8, 1995-October 30, 1996
Location: Ghimbi, West Wollega Zone, Ethiopia
Client: Different governmental and private organizations.
Main project features: Coordinating zone level environmental protection activities,
pollution control and studies, EIA reports review, governmental and non-governmental
sectors environmental impacts monitoring and control, awareness creation on
environmental harmony of development activities, undertaking environmental audits.
Positions held: Team Leader
Activities performed:
He has Coordinated zone level environmental protection activities, pollution control and
studies, reviewed EIA reports, governmental and non-governmental sectors environmental
impacts monitoring and control, conducted awareness creation on environmental harmony
of development activities, undertaken environmental audits.
3
10.1.7 From: October 1, 1993 To: June 7, 1995
Employer: Oromia Natural Resources Development and Environmental Protection Bureau, West
Wollega Zone Department, Environmental Protection and Land Use Team
Positions held: Environmentalist
11.1.7 Detailed Tasks
Assigned:
Undertaking zone level
environmental
protection activities,
EIA reports review,
environmental pollution
control, governmental
and non-governmental
sectors environmental
impacts monitoring and
control, awareness
creation on
environmental harmony
of development
activities, undertaking
environmental audits.
12.1.7 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: West Wollega Zone Department, Environmental
Protection and Land Use Team.
Year: October 1, 1993-June 7, 1995
Location: Ghimbi, West Wollega Zone, Ethiopia
Client: Different governmental and private organizations.
Main project features: Undertaking zone level environmental protection activities, EIA
reports review, environmental pollution control, governmental and non-governmental
sectors environmental impacts monitoring and control, awareness creation on
environmental harmony of development activities, undertaking environmental audits.
Positions held: Environmentalist
Activities performed:
He has Undertaken zone level environmental protection activities, reviewed EIA reports,
environmental pollution control, governmental and non-governmental sectors
environmental impacts monitoring and control, conducted awareness creation on
environmental harmony of development activities, undertaken environmental audits.
10.1.8 From: November 7, 1989 To: September 30, 1993
Employer: Ethiopian Livestock Development and Meat Corporation, Sopral Combolcha Meat Factory,
Production Department
Positions held: Vice Production Manager or Supervisor
11.1.8 Detailed Tasks
Assigned:
Coordinating day to
day production
activities, production
department workers
activities, raw
materials supply,
controlling daily
production quality and
quantity, reporting
daily, weekly and
monthly, quarterly, six
months and yearly
activities factory
production activities.
12.1.8 Work Undertaken that Best Illustrates Capability to Handle the Tasks
Assigned:
Name of assignment or project: Sopral Combolcha Meat Factory, Production Department.
Year: November 7, 1989-September 30, 1993
Location: Combolcha, Wollo, Ethiopia
Client: Different governmental and private organizations.
Main project features: Coordinating day to day production activities, production department
workers activities, raw materials supply, controlling daily production quality and quantity,
reporting daily, weekly and monthly, quarterly, six months and yearly activities factory
production activities.
Positions held: Vice Production Manager or Supervisor
Activities performed:
He has Coordinated day to day production activities, production department workers
activities, raw materials supply, controlling daily production quality and quantity, reporting
daily, weekly and monthly, quarterly, six months and yearly activities factory production
activities.
10.1.9 From: October 10, 1986 To: November 6, 1989
Employer: Ethiopian Livestock Development and Meat Corporation, Sopral Combolcha Meat Factory,
Quality Control Service
Positions held: Chemist
11.1.9 Detailed
Tasks Assigned:
12.1.9 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Sopral Combolcha Meat Factory, Quality Control Service.
4
Production
quality control
through sampling
products and
analyzing the
quality status of
every production
batch.
Year: October 10, 1986-November 6, 1989
Location: Combolcha, Wollo, Ethiopia
Client: Production department of Sopral Combolcha Meat Factory.
Main project features: Production quality control through sampling products and analyzing the
quality status of every production batch.
Positions held: Chemist
Activities performed:
He has production quality controlled through sampling products and analyzed the quality status
of every production batch.
10.2 CONSULTANCY WORKS
10.2.1 Year: 2015
Employer: Addis Ababa Water and Sanitation Authority
Positions held: Environmentalist
11.2.1 Detailed Tasks Assigned:
Environmental Impact Assessment Studies
 Technical Proposal preparation;
 Preliminary fieldwork for inception report preparation;
 Pertinent policies and previous study documents
review;
 Project area baseline environmental conditions
(physical, biological and socio-economic) assessment;
 Interim Report preparation;
 Possible beneficial and adverse impacts identification;
 Adverse impacts significance evaluation;
 Project alternatives analysis from environmental
perspectives;
 Identification of possible mitigation measures;
 Environmental management and monitoring plans
preparation;
 Proposing environmental reporting mechanisms;
 Environmental management and monitoring activities
budget preparation;
 Preparation of the draft ESIA report with appropriate
and standard contents;
 Receiving stakeholders’ comment/s, incorporating into
the draft ESIA report and finalizing the report.
12.2.1 Work Undertaken that Best Illustrates
Capability to Handle the Tasks Assigned:
Name of assignment or project: Feasibility and Detail
Design Study of Alternative water sources for non-
domestic use EIA Study.
Year: 2015
Location: Addis Ababa, Ethiopia
Client: Addis Ababa Water and Sanitation Authority
Main project features: Inception EIA report
preparation, Existing situation analysis report
preparation, Draft EIA feasibility study preparation,
Final EIA study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and
socio-economic environmental conditions
 Identification of potential positive and negative
environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the
potential identified adverse impacts
 Identification of environmental management and
monitoring plan
10.2.2 Year: 2014
Employer: : Ministry Water, Irrigation and Energy; Electric Light and Power Corporation
Positions held: Environmentalist
11.2.2 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies
(Please see
11.2.1 for
Detail
Description)
12.2.2 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Amhara National Regional State, Wag Himera Zone, 16 kebeles
water supply project, EIA Study.
Year: 2014
Location: Addis Ababa, Ethiopia
Client: Ministry Water, Irrigation and Energy; Electric Light and Power Corporation
Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation,
Final EIA feasibility study preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
5
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.3 Year: 2014
Employer: Ministry Water, Irrigation and Energy
Positions held: Environmentalist
11.2.3 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies
(Please see
11.2.1 for
Detail
Description)
12.2.3 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Middle Awash Feasibility and Detail Design Multipurpose Dam
Project, EIA Study.
Year: 2014
Location: Addis Ababa, Ethiopia
Client: Ministry Water, Irrigation and Energy
Main project features: Inception EIA report preparation, Draft EIA feasibility study report
preparation, Final EIA feasibility study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.4 Year: 213
Employer: Ministry Water, Irrigation and Energy
Positions held: Environmentalist
11.2.4 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies
(Please see
11.2.1 for
Detail
Description)
12.2.4 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Feasibility and Detail Design Study of Upper Guder Multipurpose
Dam Project, EIA Study.
Year: 213
Location: Addis Ababa, Ethiopia
Client: Ministry Water, Irrigation and Energy
Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation,
Final EIA study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.5 Year: 2012
Employer: Wonji Showa, Sugar Factory
6
Positions held: Environmentalist
11.2.5 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies
(Please see
11.2.1 for
Detail
Description)
12.2.5 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Welenchiti Bofa 8740 ha irrigation Design expansion project, EIA
study
Year: 2012
Location: Addis Ababa, Ethiopia
Client: Wonji Showa, Sugar Factory
Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation,
Final EIA study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.6 Year: 2011
Employer: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development
Bureau
Positions held: Environmentalist
11.2.6 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies
(Please see
11.2.1 for
Detail
Description)
12.2.6 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Kuraz Sugar Development 150,000ha Irrigation and drainage
project, EIA Study.
Year: 2011
Location: Ethiopia
Client: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water
Development Bureau
Main project features: Inception EIA report preparation, Interim EIA report preparation
Draft EIA feasibility study preparation, Final EIA study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.7 Year: November, 2010
Employer: Ministry Water, Irrigation and Energy
Positions held: Environmentalist
11.2.7 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies (Please
see 11.2.1 for
12.2.7 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Beseka Lake level rise and expansion Project–II, ESIA Study.
Year: November, 2010
Location: Ethiopia
Client: Ministry Water, Irrigation and Energy
Main project features: Inception ESIA report preparation, Interim ESIA report preparation, Draft
ESIA feasibility study preparation, Final ESIA study report preparation
Positions held: Environmentalist
7
Detail
Description)
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.8 Year: 2010
Employer: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development
Bureau
Positions held: Environmentalist
11.2.8 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies (Please
see 11.2.1 for
Detail
Description)
12.2.8 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Rate 10,000ha Irrigation and drainage project, EIA Study.
Year: 2010
Location: Ethiopia
Client: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water
Development Bureau
Main project features: Inception EIA report preparation, Interim EIA report preparation, Draft EIA
feasibility study preparation, Final EIA study report preparation
Positions held: Environmentalist
Activities performed:
 Field visit to the project area
 Assessment of baseline physical, biological and socio-economic environmental conditions
 Identification of potential positive and negative environmental impacts
 Conducting stakeholders and public consultations
 Identification of mitigation measures for the potential identified adverse impacts
 Identification of environmental management and monitoring plan
10.2.9 Year: 2001
Employer: Oromiya Water Works Design and Supervision Enterprise
Positions held: Environmentalist
11.2.9 Detailed
Tasks
Assigned:
Environmental
Impact
Assessment
Studies (Please
see 11.2.1 for
Detail
Description)
12.2.9 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Homba Spate Irrigation Project, EIA Study.
Year: 2001
Location: Ethiopia
Client: Oromiya Water Works Design and Supervision Enterprise
Main project features: EIA Study
Positions held: Environmentalist
Activities performed:
 Draft EIA feasibility study report preparation
 Final EIA study report preparation
10.2.10 Year: 2001
Employer: Oromia Irrigation Development Authority
Positions held: Environmentalist
8
11.2.10
Detailed Tasks
Assigned:
Environmental
Impact
Assessment
Studies (Please
see 11.2.1 for
Detail
Description)
12.2.10 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Meki Irrigation and Rural Development Project Community
Resource Mapping.
Year: 2000
Location: Ethiopia
Client: Oromia Irrigation Development Authority
Main project features: Community resource mapping
Positions held: Environmentalist
Activities performed:
 Preparation of study reports and community resource map
10.2.11 Year: 1999
Employer: Oromia Irrigation Development Authority
Positions held: Environmentalist
11.2.11
Detailed Tasks
Assigned:
Environmental
Impact
Assessment
Studies (Please
see 11.2.1 for
Detail
Description)
12.2.11 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Meki Irrigation and Rural Development Project Verification study
of Phase II, extension materials preparation.
Year: 1999
Location: Ethiopia
Client: Oromia Irrigation Development Authority
Main project features: Preparation of extension tools and research program
Positions held: Environmentalist
Activities performed:
 Existing research data and extension materials collection, Suitable extension materials
preparation and Preparation of workshops on the outcome.
10.2.12 Year: 2014
Employer: Ministry Water, Irrigation and Energy; Electric Light and Power Corporation
Positions held: Socio-economist
11.2.12 Detailed Tasks Assigned:
Socio-economic Studies
 Technical Proposal preparation;
 Undertaking preliminary field work for inception report preparation;
 Identification of demographic characteristics such as population size,
settlement pattern, population density, population growth trends and
population dynamics;
 Identifications of social services such as:
 number of education institution, Net Enrollment Ratio (NER), Gross
Enrollment Ratio (GER) of students in different school level,
 Number of health institutions, number of health professionals, and the
extent of basic health service coverage of the area,
 Existing water supply schemes, number of clean water supply schemes
sorting in their category (Protected spring, hand pump, piped water,
etc.),
 Undertaking household survey;
 Project area community livelihood system assessment,
 Identification of stakeholders of various groups who have an interest on the
12.2.12 Work Undertaken that
Best Illustrates Capability to
Handle the Tasks Assigned:
Name of assignment or project:
Amhara National Regional State,
Wag Himera Zone, 16 kebeles
water supply project, Socio-
economic Study.
Year: 2014
Location: Ethiopia
Client: Ministry Water, Irrigation
and Energy; Electric Light and
Power Corporation
Main project features: Inception
Socio-economic study report
preparation, Draft Socio-
economic study report
preparation, Final Socio-
economic study report
9
project,
 Assessing attitudes of the project area community, authorities and other
stakeholders towards the project;
 Pertinent Policy, Legal and Administrative Frameworks review;
 Identification of the project possible positive and negative impacts;
 Undertaking detail fieldwork so as to collect primary and secondary data;
 Organizing collected data, encoding, evaluation and analysis;
 Preparation of the draft socio-economic study report with appropriate and
standard contents;
 Receiving stakeholders’ comment/s, incorporating into the draft socio-
economic study report and finalizing the report.
preparation.
Positions held: Socio-economist
Activities performed:
 Human population
identification,
 Livestock population
identification,
 Social impact assessment
 Current water sources and uses
identification, etc.
10.2.13 Year: 2013
Employer: Tigray National regional State, Water Resources, Irrigation and Energy Bureau
Positions held: Socio-economist
11.2.13 Detailed
Tasks Assigned:
Socio-economic
Studies (Please
see 12.2.12 for
Detail
Description)
12.2.13 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Adwa Town, Midmar Water Supply Project, Socio-economic
Study.
Year: 2013
Location: Ethiopia
Client: Tigray National regional State, Water Resources, Irrigation and Energy Bureau
Main project features: Inception Socio-economic study report preparation, Draft Socio-economic
study report preparation, Final Socio-economic study report preparation.
Positions held: Socio-economist
Activities performed:
 Human population identification,
 Livestock population identification,
 Social impact assessment
 Current water sources and uses identification, etc.
10.2.14 Year: 2013
Employer: Tigray National regional State, Water Resources, Irrigation and Energy Bureau
Positions held: Socio-economist
11.2.14 Detailed
Tasks Assigned:
Socio-economic
Studies (Please
see 12.2.12 for
Detail
Description)
12.2.14 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Erob Town Water Supply Project, Socio-economic Study.
Year: 2013
Location: Ethiopia
Client: Tigray National regional State, Water Resources, Irrigation and Energy Bureau
Main project features: Inception Socio-economic study report preparation, Draft Socio-economic
study report preparation, Final Socio-economic study report preparation.
Positions held: Socio-economist
Activities performed:
 Human population identification,
 Livestock population identification,
 Social impact assessment
10
 Current water sources and uses identification, etc.
10.2.15 Year: 2013
Employer: Adama Town Administration
Positions held: Socio-economist
11.2.15 Detailed
Tasks Assigned:
Socio-economic
Studies (Please
see 12.2.12 for
Detail
Description)
12.2.15 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
Name of assignment or project: Design and Supervision of Adama Migira Pond Inundation and
Flood Control Project, Socioeconomic Study.
Year: 2013
Location: Ethiopia
Client: Adama Town Administration
Main project features: Inception Socio-economic study report preparation, Draft Socio-economic
study report preparation, Final Socio-economic study report preparation.
Positions held: Socio-economist
Activities performed:
 Human population identification,
 Livestock population identification,
 Social impact assessment
 Current water sources and uses identification, etc.
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my
qualifications, and my experience. I understand that any willful misstatement described herein may lead to my
disqualification or dismissal, if engaged.
Full name: Benti Shimina Kanaa
Signature: ______ Date:
Full name of authorized representative: BERHANU BECHERE ADERE, GENERAL MANAGER
14. Referees:
 Mr. Solomon Tadese; Head, Agriculture and Soil Sub-Process, Federal Water Works Design and Supervision,
Tel.(Mobile) 0911 542954, Addis Ababa, Ethiopia.
 Mr. Desta Horecha, General Manager, DH Consult – First Class Water Sector National Consultants, Tel.(Mobile)
0911 21 56 85 or 0116620576, Addis Ababa, Ethiopia.
 Mr. Taye Duresa, Manager (Earlier), Infrastructure and Headwork Sub Process, Water Works Design and
Supervision, Tel. (Mobile) 0911 31 82 28, Addis Ababa, Ethiopia.
 Mr. Ahimad Hussen, Oromia Environmental Protection Office, Head, for Environmental Impact Assessment and
Ecosystem Department, Tel. (Mobile) 0911842155, Addis Ababa, Ethiopia.
11

More Related Content

Viewers also liked

Каталог сборочных деталей и единиц ямз 650
Каталог сборочных деталей и единиц ямз 650Каталог сборочных деталей и единиц ямз 650
Каталог сборочных деталей и единиц ямз 650Bla-Bla_Media
 
Shipping your logs to elk from mule app/cloudhub part 2
Shipping your logs to elk from mule app/cloudhub   part 2Shipping your logs to elk from mule app/cloudhub   part 2
Shipping your logs to elk from mule app/cloudhub part 2Alex Fernandez
 
Howdidweaddressattarctourtargetaudience
HowdidweaddressattarctourtargetaudienceHowdidweaddressattarctourtargetaudience
Howdidweaddressattarctourtargetaudiencethetaleofdemise
 
Lindenwood Legacy Cartoon
Lindenwood Legacy CartoonLindenwood Legacy Cartoon
Lindenwood Legacy CartoonWes Murrell
 
CV_Herselman-Werner_May2016
CV_Herselman-Werner_May2016CV_Herselman-Werner_May2016
CV_Herselman-Werner_May2016Werner Herselman
 
Corporate Gifts Brochure
Corporate Gifts BrochureCorporate Gifts Brochure
Corporate Gifts Brochuresurinder mehra
 
Faisal Resume 20062015
Faisal Resume 20062015Faisal Resume 20062015
Faisal Resume 20062015Faisal Firfire
 
Abc para estimular la función cerebral
Abc para estimular la función cerebralAbc para estimular la función cerebral
Abc para estimular la función cerebralMaría Camacho
 
Problems and prospects of working in Pakistan
Problems and prospects of working in PakistanProblems and prospects of working in Pakistan
Problems and prospects of working in Pakistandina ismail
 

Viewers also liked (13)

Каталог сборочных деталей и единиц ямз 650
Каталог сборочных деталей и единиц ямз 650Каталог сборочных деталей и единиц ямз 650
Каталог сборочных деталей и единиц ямз 650
 
Shipping your logs to elk from mule app/cloudhub part 2
Shipping your logs to elk from mule app/cloudhub   part 2Shipping your logs to elk from mule app/cloudhub   part 2
Shipping your logs to elk from mule app/cloudhub part 2
 
Howdidweaddressattarctourtargetaudience
HowdidweaddressattarctourtargetaudienceHowdidweaddressattarctourtargetaudience
Howdidweaddressattarctourtargetaudience
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
Lindenwood Legacy Cartoon
Lindenwood Legacy CartoonLindenwood Legacy Cartoon
Lindenwood Legacy Cartoon
 
CV_Mohamed Mohssen
CV_Mohamed MohssenCV_Mohamed Mohssen
CV_Mohamed Mohssen
 
CV_Herselman-Werner_May2016
CV_Herselman-Werner_May2016CV_Herselman-Werner_May2016
CV_Herselman-Werner_May2016
 
Corporate Gifts Brochure
Corporate Gifts BrochureCorporate Gifts Brochure
Corporate Gifts Brochure
 
Efecto invernadero
Efecto invernaderoEfecto invernadero
Efecto invernadero
 
Dhanvika_Consulting
Dhanvika_ConsultingDhanvika_Consulting
Dhanvika_Consulting
 
Faisal Resume 20062015
Faisal Resume 20062015Faisal Resume 20062015
Faisal Resume 20062015
 
Abc para estimular la función cerebral
Abc para estimular la función cerebralAbc para estimular la función cerebral
Abc para estimular la función cerebral
 
Problems and prospects of working in Pakistan
Problems and prospects of working in PakistanProblems and prospects of working in Pakistan
Problems and prospects of working in Pakistan
 

Similar to BSh - Curriculum Vitae - Form T 4 (Final)

CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015Alex Mutiso
 
abhay resume.docx
abhay resume.docxabhay resume.docx
abhay resume.docxAbhay Singh
 
Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma
 
Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma
 
Department of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshDepartment of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshTokiTahmidPrangon
 
Agri-water Share Fair Projects' Presentations
Agri-water Share Fair Projects' PresentationsAgri-water Share Fair Projects' Presentations
Agri-water Share Fair Projects' PresentationsSimone Staiger-Rivas
 
CURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouCURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouStavros Stavrou
 
Dr. elham cv 2013 final3 (1)
Dr. elham cv 2013 final3 (1)Dr. elham cv 2013 final3 (1)
Dr. elham cv 2013 final3 (1)Elham Aziz
 
Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Tuan Vu Dinh
 
Curriculum Vitae of Tsegaye Ginbo Gatiso
Curriculum Vitae of Tsegaye Ginbo GatisoCurriculum Vitae of Tsegaye Ginbo Gatiso
Curriculum Vitae of Tsegaye Ginbo GatisoTsegaye Ginbo Gatiso
 
Clean Air and Blue Skies Exchange Program Phase IV Exit Report
Clean Air and Blue Skies Exchange Program Phase IV Exit ReportClean Air and Blue Skies Exchange Program Phase IV Exit Report
Clean Air and Blue Skies Exchange Program Phase IV Exit ReportDonald Roy Grospe
 
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...Pranav Gupta
 

Similar to BSh - Curriculum Vitae - Form T 4 (Final) (20)

CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015CV Alex Mwenesi Mutiso 2015
CV Alex Mwenesi Mutiso 2015
 
cv
cvcv
cv
 
Resume for Dr. Eng. Aklilu Asfaw 1
Resume for Dr. Eng. Aklilu Asfaw 1Resume for Dr. Eng. Aklilu Asfaw 1
Resume for Dr. Eng. Aklilu Asfaw 1
 
abhay resume.docx
abhay resume.docxabhay resume.docx
abhay resume.docx
 
Krishna Chaitanya_100615
Krishna Chaitanya_100615Krishna Chaitanya_100615
Krishna Chaitanya_100615
 
Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)
 
Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)Nigussie Yisma_CV (2016updated)
Nigussie Yisma_CV (2016updated)
 
Department of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshDepartment of environment(DOE),Bangladesh
Department of environment(DOE),Bangladesh
 
CV_DAtilano_Apr2015
CV_DAtilano_Apr2015CV_DAtilano_Apr2015
CV_DAtilano_Apr2015
 
Agri-water Share Fair Projects' Presentations
Agri-water Share Fair Projects' PresentationsAgri-water Share Fair Projects' Presentations
Agri-water Share Fair Projects' Presentations
 
CURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouCURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros Stavrou
 
Expert db
Expert dbExpert db
Expert db
 
Resume11 modiifed
Resume11 modiifedResume11 modiifed
Resume11 modiifed
 
STeLA Progress Report (2010-06-05)
STeLA Progress Report (2010-06-05)STeLA Progress Report (2010-06-05)
STeLA Progress Report (2010-06-05)
 
Dr. elham cv 2013 final3 (1)
Dr. elham cv 2013 final3 (1)Dr. elham cv 2013 final3 (1)
Dr. elham cv 2013 final3 (1)
 
Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)Dinh Tuan Vu CV(E)
Dinh Tuan Vu CV(E)
 
Curriculum Vitae of Tsegaye Ginbo Gatiso
Curriculum Vitae of Tsegaye Ginbo GatisoCurriculum Vitae of Tsegaye Ginbo Gatiso
Curriculum Vitae of Tsegaye Ginbo Gatiso
 
Clean Air and Blue Skies Exchange Program Phase IV Exit Report
Clean Air and Blue Skies Exchange Program Phase IV Exit ReportClean Air and Blue Skies Exchange Program Phase IV Exit Report
Clean Air and Blue Skies Exchange Program Phase IV Exit Report
 
MMA_C.V.2015
MMA_C.V.2015MMA_C.V.2015
MMA_C.V.2015
 
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...
“UNEP” – United Nations Environment Programme (Projects In India)- By Pranav ...
 

BSh - Curriculum Vitae - Form T 4 (Final)

  • 1. Benti Shimina’s Curriculum Vitae - Form T 4 1. Proposed Position: CPM Technical Specialist-2 2. Name of Firm: MARAFET CONSULTANCY AND TRAINING SERVICE PLC 3. Name of Staff: Benti Shimina Kanaa 4. Date of Birth: April 15, 1964 Nationality: Ethiopian 5. Education: M. Sc. Degree in Environmental Science, Addis Ababa University, 23rd August, 2007 and B. Sc. Degree in Chemistry, Addis Ababa University, 18th July, 1986. 6. Membership of Professional Associations: 7. Other Training:  MS Project 2007; Project management software, organized by Water Works Design and Supervision Enterprise, conducted by Construction Solutions PLC, 17–27 May, 2010 Addis Ababa, Ethiopia.  Environmental Management System (EMS) and Municipal Solid Waste Management Strategic Action Plan Preparation organized by the Environmental Protection Authority of Ethiopia, held from 14-19 January 2008 at Ghion Hotel, Addis Ababa, Ethiopia.  Integrated Water Resources Management, Organized by The Federal Democratic Republic of Ethiopia, Ministry of Water Resources, 18-20 October, 2004, Addis Ababa, Ethiopia.  Strategic Management, Performance Management, Process Re-Engineering, Customer Service, Standard and Institutional Code Of Conduct, Training, organized by The Oromia Management Institute, in collaboration with the Oromia National Regional State Capacity Building Supreme Office, held from 19 -28 April, 2004, Ziway, Ethiopia.  Environmental Audit Training, Aspect International, England, Organized by The Environmental Protection Authority Of Ethiopia, held from October 21st – November 01, 2002, Addis Ababa, Ethiopia.  Environment, Population and Development, Training workshop, organized by LEM, Environment and Development Society of Ethiopia, held from 27th -30th May, 2002.  Media Use for Environmental Awareness & Action Training Workshop, organized by The Environmental Protection Authority of Ethiopia, held at Ethiopian Red Cross Society Training Centre from 12-15th January, 1999, Addis Ababa, Ethiopia.  Environmental Economics, Training Workshop, organized by The Environmental Protection Authority of Ethiopia, held at Ethiopian Red Cross Society Training Centre from 21-25th December, 1998, Addis Ababa, Ethiopia.  Strategic Planning and Project Preparation, Training Workshop, organized by The Environmental Protection Authority of Ethiopia, held at Ethiopian Red Cross Society Training Centre from November 30 - December 6, 1998, Addis Ababa, Ethiopia.  Mining and the Environment in Ethiopia, Training Workshop, organized by The Chemical Society of Ethiopia, held at Addis Ababa University Conference Hall on 27th January, 1998, Addis Ababa, Ethiopia.  Environmental Impact Assessment (EIA) for Regional Experts Training Workshop, organized by Conservation Strategy of Ethiopia in collaboration with Environmental Protection Authority of Ethiopia, held at Ethiopian Management Institute (EMI) from 25-30th October, 1997, Debrezeit, Ethiopia. Etc. 8. Countries of Work Experience: Ethiopia 9. Languages: English, Amharic and Afan Oromo 10. Employment Record: 10.1EMPLOYMENT WORKS 10.1.1 From: May, 2009 To: To date Employer: Federal Water Works Design and Supervision Enterprise Positions held: Senior Environmentalist 11.1.1 Detailed Tasks Assigned: Environmental Impact Assessment (EIA), Socio- economic and environmental audit studies of different development projects 12.1.1 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Senior Environmentalist. Year: May, 2009 – To date Location: Addis Ababa, Ethiopia Client: Different governmental and private organizations. Main project features: Environmental Impact Assessment (EIA), Socio-economic and environmental audit studies of different development projects. Positions held: Senior Environmentalist Activities performed: He has conducted Environmental Impact Assessment (EIA), Socio-economic and environmental audit studies of different development projects 1
  • 2. 10.1.2 From: November 11, 2002 To: April, 2009 Employer: Oromia National Regional State Environmental Protection Office Positions held: Team Leader, Environmental pollution Control and Study 11.1.2 Detailed Tasks Assigned: Coordinating pollution control and study activities, EIA reports review, environmental pollution control, governmental and non- governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. 12.1.2 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Environmental pollution Control and Study. Year: November 11, 2002-April, 2009 Location: Addis Ababa, Ethiopia Client: Different governmental and private organizations. Main project features: Coordinating pollution control and study activities, EIA reports review, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. Positions held: Team Leader, Environmental pollution Control and Study Activities performed: He has coordinated pollution control and study activities, reviewed EIA reports, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, conducted awareness creation on environmental harmony of development activities, undertaken environmental audits. 10.1.3 From: October 1, 2001 To: November 10, 2002 Employer: Oromia Natural Resources Development and Environment Protection Authority Positions held: Senior Environmentalist 11.1.3 Detailed Tasks Assigned: EIA reports review, environmental pollution control, governmental and non- governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. 12.1.3 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Senior Environmentalist. Year: October 1, 2001-November 10, 2002 Location: Addis Ababa, Ethiopia Client: Different governmental and private organizations. Main project features: EIA reports review, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. Positions held: Senior Environmentalist Activities performed: He has reviewed EIA reports, environmental pollution control, governmental and non- governmental sectors environmental impacts monitoring and control, conducted awareness creation on environmental harmony of development activities, undertaken environmental audits. 10.1.4 From: December 10, 2000 To: September 30, 2001 Employer: Oromia Bureau of Agriculture Positions held: Coordinator, Regional Soil Laboratory Centers 11.1.4 Detailed Tasks Assigned: Coordinating laboratory at Fiche, Bedelle, Nekemte 12.1.4 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Regional Soil Laboratory Centers. Year: December 10, 2000-September 30, 2001 Location: Addis Ababa, Ethiopia Client: Different governmental and private organizations. 2
  • 3. and Ziway Soil laboratory construction, laboratory tools and materials purchase and accommodation, etc. Main project features: Coordinating laboratory Fiche, Bedelle, Nekemte and Ziway Soil laboratory construction, laboratory tools and materials purchase and accommodation, etc. Positions held: Coordinator, Regional Soil Laboratory Centers Activities performed: He has coordinated laboratory at Fiche, Bedelle, Nekemte and Ziway Soil laboratory construction, laboratory tools and materials purchase and accommodation, etc. 10.1.5 From: November 1, 1996 To: December 9, 2000 Employer: Oromia Natural Resources Development and Environmental Protection Bureau Positions held: Environmentalist 11.1.5 Detailed Tasks Assigned: EIA reports review, environmental pollution control, governmental and non- governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. 12.1.5 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Environmentalist. Year: November 1, 1996-December 9, 2000 Location: Addis Ababa, Ethiopia Client: Different governmental and private organizations. Main project features: EIA reports review, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. Positions held: Environmentalist Activities performed: He has reviewed EIA reports, environmental pollution control, governmental and non- governmental sectors environmental impacts monitoring and control, conducted awareness creation on environmental harmony of development activities, undertaken environmental audits. 10.1.6 From: June 8, 1995 To: October 30, 1996 Employer: Oromia Natural Resources Development and Environmental Protection Bureau, West Wollega Zone Department, Environmental Protection and Land Use Team Positions held: Team Leader 11.1.6 Detailed Tasks Assigned: Coordinating zone level environmental protection activities, pollution control and studies, EIA reports review, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. 12.1.6 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: West Wollega Zone Department, Environmental Protection and Land Use Team. Year: June 8, 1995-October 30, 1996 Location: Ghimbi, West Wollega Zone, Ethiopia Client: Different governmental and private organizations. Main project features: Coordinating zone level environmental protection activities, pollution control and studies, EIA reports review, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. Positions held: Team Leader Activities performed: He has Coordinated zone level environmental protection activities, pollution control and studies, reviewed EIA reports, governmental and non-governmental sectors environmental impacts monitoring and control, conducted awareness creation on environmental harmony of development activities, undertaken environmental audits. 3
  • 4. 10.1.7 From: October 1, 1993 To: June 7, 1995 Employer: Oromia Natural Resources Development and Environmental Protection Bureau, West Wollega Zone Department, Environmental Protection and Land Use Team Positions held: Environmentalist 11.1.7 Detailed Tasks Assigned: Undertaking zone level environmental protection activities, EIA reports review, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. 12.1.7 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: West Wollega Zone Department, Environmental Protection and Land Use Team. Year: October 1, 1993-June 7, 1995 Location: Ghimbi, West Wollega Zone, Ethiopia Client: Different governmental and private organizations. Main project features: Undertaking zone level environmental protection activities, EIA reports review, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, awareness creation on environmental harmony of development activities, undertaking environmental audits. Positions held: Environmentalist Activities performed: He has Undertaken zone level environmental protection activities, reviewed EIA reports, environmental pollution control, governmental and non-governmental sectors environmental impacts monitoring and control, conducted awareness creation on environmental harmony of development activities, undertaken environmental audits. 10.1.8 From: November 7, 1989 To: September 30, 1993 Employer: Ethiopian Livestock Development and Meat Corporation, Sopral Combolcha Meat Factory, Production Department Positions held: Vice Production Manager or Supervisor 11.1.8 Detailed Tasks Assigned: Coordinating day to day production activities, production department workers activities, raw materials supply, controlling daily production quality and quantity, reporting daily, weekly and monthly, quarterly, six months and yearly activities factory production activities. 12.1.8 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Sopral Combolcha Meat Factory, Production Department. Year: November 7, 1989-September 30, 1993 Location: Combolcha, Wollo, Ethiopia Client: Different governmental and private organizations. Main project features: Coordinating day to day production activities, production department workers activities, raw materials supply, controlling daily production quality and quantity, reporting daily, weekly and monthly, quarterly, six months and yearly activities factory production activities. Positions held: Vice Production Manager or Supervisor Activities performed: He has Coordinated day to day production activities, production department workers activities, raw materials supply, controlling daily production quality and quantity, reporting daily, weekly and monthly, quarterly, six months and yearly activities factory production activities. 10.1.9 From: October 10, 1986 To: November 6, 1989 Employer: Ethiopian Livestock Development and Meat Corporation, Sopral Combolcha Meat Factory, Quality Control Service Positions held: Chemist 11.1.9 Detailed Tasks Assigned: 12.1.9 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Sopral Combolcha Meat Factory, Quality Control Service. 4
  • 5. Production quality control through sampling products and analyzing the quality status of every production batch. Year: October 10, 1986-November 6, 1989 Location: Combolcha, Wollo, Ethiopia Client: Production department of Sopral Combolcha Meat Factory. Main project features: Production quality control through sampling products and analyzing the quality status of every production batch. Positions held: Chemist Activities performed: He has production quality controlled through sampling products and analyzed the quality status of every production batch. 10.2 CONSULTANCY WORKS 10.2.1 Year: 2015 Employer: Addis Ababa Water and Sanitation Authority Positions held: Environmentalist 11.2.1 Detailed Tasks Assigned: Environmental Impact Assessment Studies  Technical Proposal preparation;  Preliminary fieldwork for inception report preparation;  Pertinent policies and previous study documents review;  Project area baseline environmental conditions (physical, biological and socio-economic) assessment;  Interim Report preparation;  Possible beneficial and adverse impacts identification;  Adverse impacts significance evaluation;  Project alternatives analysis from environmental perspectives;  Identification of possible mitigation measures;  Environmental management and monitoring plans preparation;  Proposing environmental reporting mechanisms;  Environmental management and monitoring activities budget preparation;  Preparation of the draft ESIA report with appropriate and standard contents;  Receiving stakeholders’ comment/s, incorporating into the draft ESIA report and finalizing the report. 12.2.1 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Feasibility and Detail Design Study of Alternative water sources for non- domestic use EIA Study. Year: 2015 Location: Addis Ababa, Ethiopia Client: Addis Ababa Water and Sanitation Authority Main project features: Inception EIA report preparation, Existing situation analysis report preparation, Draft EIA feasibility study preparation, Final EIA study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.2 Year: 2014 Employer: : Ministry Water, Irrigation and Energy; Electric Light and Power Corporation Positions held: Environmentalist 11.2.2 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.2 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Amhara National Regional State, Wag Himera Zone, 16 kebeles water supply project, EIA Study. Year: 2014 Location: Addis Ababa, Ethiopia Client: Ministry Water, Irrigation and Energy; Electric Light and Power Corporation Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation, Final EIA feasibility study preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts 5
  • 6.  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.3 Year: 2014 Employer: Ministry Water, Irrigation and Energy Positions held: Environmentalist 11.2.3 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.3 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Middle Awash Feasibility and Detail Design Multipurpose Dam Project, EIA Study. Year: 2014 Location: Addis Ababa, Ethiopia Client: Ministry Water, Irrigation and Energy Main project features: Inception EIA report preparation, Draft EIA feasibility study report preparation, Final EIA feasibility study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.4 Year: 213 Employer: Ministry Water, Irrigation and Energy Positions held: Environmentalist 11.2.4 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.4 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Feasibility and Detail Design Study of Upper Guder Multipurpose Dam Project, EIA Study. Year: 213 Location: Addis Ababa, Ethiopia Client: Ministry Water, Irrigation and Energy Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation, Final EIA study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.5 Year: 2012 Employer: Wonji Showa, Sugar Factory 6
  • 7. Positions held: Environmentalist 11.2.5 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.5 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Welenchiti Bofa 8740 ha irrigation Design expansion project, EIA study Year: 2012 Location: Addis Ababa, Ethiopia Client: Wonji Showa, Sugar Factory Main project features: Inception EIA report preparation, Draft EIA feasibility study preparation, Final EIA study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.6 Year: 2011 Employer: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development Bureau Positions held: Environmentalist 11.2.6 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.6 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Kuraz Sugar Development 150,000ha Irrigation and drainage project, EIA Study. Year: 2011 Location: Ethiopia Client: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development Bureau Main project features: Inception EIA report preparation, Interim EIA report preparation Draft EIA feasibility study preparation, Final EIA study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.7 Year: November, 2010 Employer: Ministry Water, Irrigation and Energy Positions held: Environmentalist 11.2.7 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for 12.2.7 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Beseka Lake level rise and expansion Project–II, ESIA Study. Year: November, 2010 Location: Ethiopia Client: Ministry Water, Irrigation and Energy Main project features: Inception ESIA report preparation, Interim ESIA report preparation, Draft ESIA feasibility study preparation, Final ESIA study report preparation Positions held: Environmentalist 7
  • 8. Detail Description) Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.8 Year: 2010 Employer: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development Bureau Positions held: Environmentalist 11.2.8 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.8 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Rate 10,000ha Irrigation and drainage project, EIA Study. Year: 2010 Location: Ethiopia Client: Southern Nations, Nationalities' and Peoples' Regional State (SNNPRS) Water Development Bureau Main project features: Inception EIA report preparation, Interim EIA report preparation, Draft EIA feasibility study preparation, Final EIA study report preparation Positions held: Environmentalist Activities performed:  Field visit to the project area  Assessment of baseline physical, biological and socio-economic environmental conditions  Identification of potential positive and negative environmental impacts  Conducting stakeholders and public consultations  Identification of mitigation measures for the potential identified adverse impacts  Identification of environmental management and monitoring plan 10.2.9 Year: 2001 Employer: Oromiya Water Works Design and Supervision Enterprise Positions held: Environmentalist 11.2.9 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.9 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Homba Spate Irrigation Project, EIA Study. Year: 2001 Location: Ethiopia Client: Oromiya Water Works Design and Supervision Enterprise Main project features: EIA Study Positions held: Environmentalist Activities performed:  Draft EIA feasibility study report preparation  Final EIA study report preparation 10.2.10 Year: 2001 Employer: Oromia Irrigation Development Authority Positions held: Environmentalist 8
  • 9. 11.2.10 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.10 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Meki Irrigation and Rural Development Project Community Resource Mapping. Year: 2000 Location: Ethiopia Client: Oromia Irrigation Development Authority Main project features: Community resource mapping Positions held: Environmentalist Activities performed:  Preparation of study reports and community resource map 10.2.11 Year: 1999 Employer: Oromia Irrigation Development Authority Positions held: Environmentalist 11.2.11 Detailed Tasks Assigned: Environmental Impact Assessment Studies (Please see 11.2.1 for Detail Description) 12.2.11 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Meki Irrigation and Rural Development Project Verification study of Phase II, extension materials preparation. Year: 1999 Location: Ethiopia Client: Oromia Irrigation Development Authority Main project features: Preparation of extension tools and research program Positions held: Environmentalist Activities performed:  Existing research data and extension materials collection, Suitable extension materials preparation and Preparation of workshops on the outcome. 10.2.12 Year: 2014 Employer: Ministry Water, Irrigation and Energy; Electric Light and Power Corporation Positions held: Socio-economist 11.2.12 Detailed Tasks Assigned: Socio-economic Studies  Technical Proposal preparation;  Undertaking preliminary field work for inception report preparation;  Identification of demographic characteristics such as population size, settlement pattern, population density, population growth trends and population dynamics;  Identifications of social services such as:  number of education institution, Net Enrollment Ratio (NER), Gross Enrollment Ratio (GER) of students in different school level,  Number of health institutions, number of health professionals, and the extent of basic health service coverage of the area,  Existing water supply schemes, number of clean water supply schemes sorting in their category (Protected spring, hand pump, piped water, etc.),  Undertaking household survey;  Project area community livelihood system assessment,  Identification of stakeholders of various groups who have an interest on the 12.2.12 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Amhara National Regional State, Wag Himera Zone, 16 kebeles water supply project, Socio- economic Study. Year: 2014 Location: Ethiopia Client: Ministry Water, Irrigation and Energy; Electric Light and Power Corporation Main project features: Inception Socio-economic study report preparation, Draft Socio- economic study report preparation, Final Socio- economic study report 9
  • 10. project,  Assessing attitudes of the project area community, authorities and other stakeholders towards the project;  Pertinent Policy, Legal and Administrative Frameworks review;  Identification of the project possible positive and negative impacts;  Undertaking detail fieldwork so as to collect primary and secondary data;  Organizing collected data, encoding, evaluation and analysis;  Preparation of the draft socio-economic study report with appropriate and standard contents;  Receiving stakeholders’ comment/s, incorporating into the draft socio- economic study report and finalizing the report. preparation. Positions held: Socio-economist Activities performed:  Human population identification,  Livestock population identification,  Social impact assessment  Current water sources and uses identification, etc. 10.2.13 Year: 2013 Employer: Tigray National regional State, Water Resources, Irrigation and Energy Bureau Positions held: Socio-economist 11.2.13 Detailed Tasks Assigned: Socio-economic Studies (Please see 12.2.12 for Detail Description) 12.2.13 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Adwa Town, Midmar Water Supply Project, Socio-economic Study. Year: 2013 Location: Ethiopia Client: Tigray National regional State, Water Resources, Irrigation and Energy Bureau Main project features: Inception Socio-economic study report preparation, Draft Socio-economic study report preparation, Final Socio-economic study report preparation. Positions held: Socio-economist Activities performed:  Human population identification,  Livestock population identification,  Social impact assessment  Current water sources and uses identification, etc. 10.2.14 Year: 2013 Employer: Tigray National regional State, Water Resources, Irrigation and Energy Bureau Positions held: Socio-economist 11.2.14 Detailed Tasks Assigned: Socio-economic Studies (Please see 12.2.12 for Detail Description) 12.2.14 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Erob Town Water Supply Project, Socio-economic Study. Year: 2013 Location: Ethiopia Client: Tigray National regional State, Water Resources, Irrigation and Energy Bureau Main project features: Inception Socio-economic study report preparation, Draft Socio-economic study report preparation, Final Socio-economic study report preparation. Positions held: Socio-economist Activities performed:  Human population identification,  Livestock population identification,  Social impact assessment 10
  • 11.  Current water sources and uses identification, etc. 10.2.15 Year: 2013 Employer: Adama Town Administration Positions held: Socio-economist 11.2.15 Detailed Tasks Assigned: Socio-economic Studies (Please see 12.2.12 for Detail Description) 12.2.15 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: Name of assignment or project: Design and Supervision of Adama Migira Pond Inundation and Flood Control Project, Socioeconomic Study. Year: 2013 Location: Ethiopia Client: Adama Town Administration Main project features: Inception Socio-economic study report preparation, Draft Socio-economic study report preparation, Final Socio-economic study report preparation. Positions held: Socio-economist Activities performed:  Human population identification,  Livestock population identification,  Social impact assessment  Current water sources and uses identification, etc. 13. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. Full name: Benti Shimina Kanaa Signature: ______ Date: Full name of authorized representative: BERHANU BECHERE ADERE, GENERAL MANAGER 14. Referees:  Mr. Solomon Tadese; Head, Agriculture and Soil Sub-Process, Federal Water Works Design and Supervision, Tel.(Mobile) 0911 542954, Addis Ababa, Ethiopia.  Mr. Desta Horecha, General Manager, DH Consult – First Class Water Sector National Consultants, Tel.(Mobile) 0911 21 56 85 or 0116620576, Addis Ababa, Ethiopia.  Mr. Taye Duresa, Manager (Earlier), Infrastructure and Headwork Sub Process, Water Works Design and Supervision, Tel. (Mobile) 0911 31 82 28, Addis Ababa, Ethiopia.  Mr. Ahimad Hussen, Oromia Environmental Protection Office, Head, for Environmental Impact Assessment and Ecosystem Department, Tel. (Mobile) 0911842155, Addis Ababa, Ethiopia. 11