2016 Emerson Brian Projects List
1. BRIAN K. EMERSON
PROJECTS LIST
SPAWGLASS CONSTRUCTION CORP.:
Project 621 Central Plant Upgrades Phase II and III at Bush IAH - $32mil
Design-Build project to replace 5,840ton capacity cooling tower, 7,500tons of electric chillers,
66MMbtu electric hot water heaters, replace and/or upgrade all controls and electrical systems as
required, construction of new LEED Platinum control building to house control room and staff
offices, new 85kw photovoltaic power system, upgrade controls from pneumatic to DDC for 600
terminal boxes in Terminals A and C.
Golden Pass LNG Administration Building - $2,000,000
Design-Build project for new ground up construction of a 7,000sf administration building
addition for Golden Pass LNG facility in Sabine Pass, TX.
City of Orange Central Fire Station - $4,700,000
New ground-up construction of a four bay 20,272sf two story fire house in Orange, TX
United Terminal A to Terminal C Relocation - $600,000
Renovation of office spaces in the Ramp Level, Mezzanine Level and Baggage Service area to
provide support functions for the relocation of two (2) gates from Terminal A to Terminal C at
George Bush International Airport in Houston, TX.
Vidor City Hall - $4,900,000 ABC Excellence-In-Construction Merit Award
New ground-up construction of a 16,355 square foot one story municipal administration building
in Vidor, TX.
Bayer Fire House and Emergency Operation Center - $5,900,000
New ground-up construction of a 19,200 square foot two story fire house and EOC at the Bayer
Baytown plant in Baytown, TX
Valero Port Arthur New Administration Building - $22,000,000
New ground-up construction of a 92,000 square feet two story elevated post tensioned pan slab
building in Port Arthur, TX.
Valero Port Arthur Refinery Perimeter Security Fence Replacement - $1,500,000
Removal and replacement of approximately 30,000 linear feet of perimeter security fencing at
Valero Port Arthur Refinery in Port Arthur, TX
Lamar State College Orange Hurricane Ike Repairs - $4,100,000
Interior repairs of six buildings at the LSCO campus in Orange, Texas damaged by Hurricane
Ike.
2. BRIAN EMERSON
PAGE 2
SKANSKA USA BUILDING, INC.:
Pasadena Independent School District Genoa Red Bluff Middle School -
$13,000,000
New ground-up construction of a 119,000SF, two story middle school and associated site
improvements.
Pasadena Independent School District Richey Elementary School - $11,000,000
New ground-up construction of a 99,000SF, single story elementary school and associated site
improvements.
Continental Airlines Vertical Circulation Cores at Gate C27 and Terminal A -
$5,000,000
Preconstruction services for constructing vertical circulation cores and nine aircraft boarding
gates and associated structure at Terminals A and C at George Bush Intercontinental Airport,
Houston, TX.
Continental Airlines Terminal C Terminal E Connector - $1,000,000
Preconstruction services and construction management for construction of connector between
Terminals E and C at George Bush Intercontinental Airport, Houston, TX.
Continental Airlines Renovation of Incident Command Center - $100,000
Preconstruction services and construction management for renovation of Incident Command
Center at George Bush Intercontinental Airport, Houston, TX.
Continental Airlines Hangar Complex Concrete Repairs - $4,500,000
Preconstruction services and construction management for the rehabilitation and construction of
new concrete tarmac at Continental Airlines’ Aircraft Maintenance Facility at George Bush
Intercontinental Airport, Houston, TX.
Continental Airlines Chelsea Loading Dock Expansion - $250,000
Preconstruction services and for adding ten additional loading docks and associated structure for
the Chelsea Flight Kitchen facility.
Continental Airlines QuickPak Remodel - $200,000
Preconstruction services for the remodel of a 10,000 SF office space for Continental Airlines’
cargo operations.
Continental Airlines Hangar Complex Emergency Power Enhancements -
$2,000,000
Preconstruction services for providing additional emergency power generators, associated
circuits and equipment for providing emergency power for Continental Airlines’ Hangar
Complex at George Bush Intercontinental Airport in Houston, TX.
3. BRIAN EMERSON
PAGE 3
ACI/SKANSKA:
Continental Airlines Terminal E at Bush IAH Houston, Texas - $200Million
Construction management of a 600,000 SF, 23 gate international services airport terminal for
Continental Airlines.
TRIBBLE & STEPHENS CO.:
HEB Central Market Houston, Texas - $14,000,000
New ground-up construction of a 78,000 SF high-end grocery store.
EMPIRE CONSTRUCTION SERVICES:
Minute Maid Park Houston, Texas- $260,000,000
Construction management of a 48,000-seat retractable roof baseball stadium for the Houston
Astros.
JAY DEE CONTRACTORS, INC.:
Costal Water Authority Water Treatment Renovation Houston, Texas - $8,000,000
The renovation of a water treatment facility and transmission line.
Mangum Road Sludge Transfer/Relief Facility Houston, Texas - $4,000,000
New construction of a wastewater treatment facility and associated collection lines.
Center Street Relief Sewer Houston, Texas - $16,000,000
New construction of a large diameter sewer transmission tunnel and related facilities.
MONTGOMERY WATSON AMERICAS:
Greater Houston Wastewater Program Houston, Texas - $1.2Billion
Program management for the upgrade of the City of Houston’s wastewater collection and
treatment systems.
SALIGER ENGINEERING:
Magnolia Plantation Subdivision in Sugar Land, Texas
Land Development for the construction of a residential subdivision.