Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Implementation of the PIMS 
Project in CEMEX 
Implementation of the PIMS 
Project in CEMEX 
King Becerra 
Gerardo Palacios 
King Becerra 
Gerardo Palacios
2 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
CEMEX  is  a  growing  global  building­solutions  company  that  produces, 
distributes,  and  markets  cement,  ready­mix  concrete,  aggregates,  and 
related building materials … 
CEMEX  is  a  growing  global  building­solutions  company  that  produces, 
distributes,  and  markets  cement,  ready­mix  concrete,  aggregates,  and 
related building materials … 
Operations in more than 50 countries across four continents. 
Notes: 
Source: http://www.cemex.com/tc/tc_gl.asp 
Data as of December 31, 2006 
Notes: 
Source: http://www.cemex.com/tc/tc_gl.asp 
Data as of December 31, 2006 
Annual production capacity of more than 93 million metric tons of cement . 
Annual production levels of approximately 74 million cubic meters of ready­mix 
concrete and 166 million metric tons of aggregates. 
66 wholly owned cement plants, more than 1,900 ready­mix concrete facilities, 
and a minority participation in 11 cement plants. 
394 aggregate quarries, 258 land­distribution centers, and 80 marine terminals.
3 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Cement  Plants,  and  in  general,  Industrial  Plants,  rely  on  its  automation 
systems to assure the continuity and integrity of the operations … 
Cement  Plants,  and  in  general,  Industrial  Plants,  rely  on  its  automation 
systems to assure the continuity and integrity of the operations … 
Assure the sustainability of operations. 
Standardize criteria and suppliers. 
Support the company’s growth by following a standard. 
Reduce working capital. 
Promote global negotiations. 
A Strategic Vision to achieve the above mentioned factors is a must … A Strategic Vision to achieve the above mentioned factors is a must … 
In  regard  to  Automation  and  Process  Control  Systems  there  are  several 
factors that demand the development of a strategic vision, and the resulting 
master plan is the key to a successful Automation program:
4 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Eliminate Automation 
risks due to 
obsolescence? 
Preserve Automation 
Assets and extend 
their lifetime? 
Reduce capital 
requirements? 
The industry’s accelerating rate of change affects the Automation assets; 
additionally,  global  competition  demands  the  optimization  of  the 
operations using Automation and Control Systems … 
The industry’s accelerating rate of change affects the Automation assets; 
additionally,  global  competition  demands  the  optimization  of  the 
operations using Automation and Control Systems … 
Eliminate information 
barriers? 
Empower personnel? 
Create a collaborative 
environment? 
Comply with 
regulations? 
Maximize operational 
effectiveness? 
Increase asset 
utilization? 
Reduce cost  and 
increase profits? 
Be open yet secure? 
How To?
5 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
To address all those issues the CEMEX Strategic Automation Plan (CSAP) 
Initiative was launched; this Initiative established the foundation to define 
the Automation and Control Standards … 
To address all those issues the CEMEX Strategic Automation Plan (CSAP) 
Initiative was launched; this Initiative established the foundation to define 
the Automation and Control Standards … 
The main objectives of the CSAP Initiative are: 
Develop and implement a 5­year plan to eliminate the obsolescence of the 
Process Control System. 
Standardize the Process Control Systems. 
Optimize the operations using Advanced Process Control Systems. 
Support  the  decision­making  process  by  using  Real  Time  Information 
Systems. 
Integrate Process Control Networks (PCN) with Business Networks through. 
Assure the integrity of our Automation Assets by a Cyber Security Program.
6 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  CSAP  Initiative  covers  the  two  bottom  levels  (Process  Control  and 
Real­Time Information)  of the typical pyramid describing the information 
flow … 
The  CSAP  Initiative  covers  the  two  bottom  levels  (Process  Control  and 
Real­Time Information)  of the typical pyramid describing the information 
flow … 
PROCESS CONTROL LEVEL 
REAL TIME 
INFORMATION LEVEL 
ENTERPRISE 
LEVEL 
MANAGEMENT LEVEL 
CEMEX Strategic CEMEX Strategic 
Automation Plan Automation Plan 
Process Control Systems (PCS) 
Plantwide Information Management 
System (PIMS) 
Advanced Process Control (APC) 
Cyber­Security
7 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
A CSAP Committee was formed with Automation Specialists of the different 
CEMEX Regions and Countries to build and develop this initiative … 
A CSAP Committee was formed with Automation Specialists of the different 
CEMEX Regions and Countries to build and develop this initiative … 
A  Committee  composed  of  11  Worldwide  Members  was  conformed  to 
address all the issues of the CSAP Initiative. 
This Committee brought together CEMEX talent and experience to create a 
space for conversation and discussion.
8 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
For the PIMS Component –subject of this presentation­ a multidisciplinary 
team to evaluate the different technologies was formed; the final goal was 
the implementation in all of CEMEX … 
For the PIMS Component –subject of this presentation­ a multidisciplinary 
team to evaluate the different technologies was formed; the final goal was 
the implementation in all of CEMEX … 
Technical Technical  IT IT  Global Sourcing Global Sourcing Neoris * Neoris * 
* Neoris: Our Global Business & IT Consulting Partner 
Different actions were performed for each component of the CSAP Initiative. 
The Committee recognized the use of the Real­Time Information Systems 
(PIMS in CEMEX) to empower our operations. 
The final goal was the approval of the CEMEX Technology Council and the 
implementation in all of CEMEX. 
A multidisciplinary team to evaluate the different technologies was formed.
9 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
For the PIMS Component –subject of this presentation­ a multidisciplinary 
team to evaluate the different technologies was formed; the final goal was 
the implementation in all of CEMEX … 
For the PIMS Component –subject of this presentation­ a multidisciplinary 
team to evaluate the different technologies was formed; the final goal was 
the implementation in all of CEMEX … 
Technical Technical  IT IT  Global Sourcing Global Sourcing Neoris * Neoris * 
* Neoris: Our Global Business & IT Consulting Partner 
Different actions were performed for each component of the CSAP Initiative. 
The Committee recognized the use of the Real­Time Information Systems 
(PIMS in CEMEX) to empower our operations. 
The final goal was the approval of the CEMEX Technology Council and the 
implementation in all of CEMEX. 
A multidisciplinary team to evaluate the different technologies was formed. 
Consulting Services 
l  Business 
l  IT 
Deployment & Integrations Services 
l  Application Development 
l  Implementation and Deployment 
l  Systems Integration 
Nearshore IT Managed Services 
l  Operations and Infrastructure 
l  Applications Management Services 
l  Help Desk Services 
www.neoris.com
10 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The PIMS System is a Platform to integrate the operations and process 
information of the Plant in one system; the final objective is to support 
the Plant’s decisions using Real­Time Information … 
The PIMS System is a Platform to integrate the operations and process 
information of the Plant in one system; the final objective is to support 
the Plant’s decisions using Real­Time Information … 
The PIMS’ objective is to 
provide the information to 
support the key decisions 
of  the  Plant,  at  different 
levels. 
The PIMS’ objective is to 
provide the information to 
support the key decisions 
of  the  Plant,  at  different 
levels. 
What is a PIMS System in CEMEX? 
Platform to integrate the operations and process information of the 
Plant in one single System. 
Maintenance  Procurement 
Marketing 
& 
Sales 
Logistic 
Quarry & 
Crushing 
Raw 
Milling 
Pyro 
processing 
Cement 
Milling 
Packing 
PIMS 
ERP 
Advanced Process
Control
Statistical Process
Control
Advanced Process
Control
Statistical Process
Control 
Maintenance  Human 
Resources 
Quality,
Operations and
Production
Applications 
Quality, 
Operations and
Production
Applications 
PIMS 
Process Areas
11 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  objective  of  the  PIMS  Project  is  to  define  a  standardized  model  to 
gather,  consolidate  and  analyze  the  process  information  of  our 
Cement Plants … 
The  objective  of  the  PIMS  Project  is  to  define  a  standardized  model  to 
gather,  consolidate  and  analyze  the  process  information  of  our 
Cement Plants … 
The objectives of the PIMS Project are: 
Design  a  standardized  model  for  data  gathering,  consolidation 
and analysis of manufacturing information: 
Minimizing the delay time & maximizing automation 
Avoiding human intervention 
Supporting the integrity of the Information 
Declare  a  standard  practice  for  the  use  of  the  Real­Time 
Information Systems in CEMEX. 
Select  the  technology  and  architecture  to  support  the  defined 
model, that aligns with the CEMEX Enterprise Architecture.
12 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  added  value  is    a  better  knowledge    of  our  operations  by 
transforming data into information, and information into Knowledge … 
The  added  value  is    a  better  knowledge    of  our  operations  by 
transforming data into information, and information into Knowledge … 
Information  Knowledge Data 
l  Flows 
l  Temperatures 
l  Pressures 
l  Powers 
l  Feeds 
l  Emissions 
l  Physical and chemical 
analysis 
l  Receipts 
l  Consumptions 
l  Productions 
l  Sales 
l  Costs 
l  Product quality 
l  Productions 
l  Energy consumptions 
l  Energy and material 
balances 
l  Operation & Quality 
reports 
l  Preventive maintenance 
l  Environmental control 
l  Shutdown analysis 
l  Key performance 
indicators 
l  Production reports  (daily, 
monthly, yearly), by: 
l  Plant 
l  Region 
l  Country 
l  Better process 
knowledge 
l  New operation practices 
l  Decrease energy 
consumptions 
l  Shutdowns reduction 
l  Increase equipment 
availability 
l  Operation margins 
l  Strategic planning 
l  Benchmarking between 
business units 
l  Transfers better 
operation practices
13 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
A  formal  process  to  evaluate  the  different  PIMS  Technologies  was  put 
into  action;  the  process  involved  people  from  different  disciplines, 
assuring a level of expertise in all the domains .. 
A  formal  process  to  evaluate  the  different  PIMS  Technologies  was  put 
into  action;  the  process  involved  people  from  different  disciplines, 
assuring a level of expertise in all the domains .. 
Main Tasks 
lConfirm PIMS 
Project Definition 
Document 
lDefine project 
team and scope 
lFormal Project 
Kick Off 
l  Gather 
Business 
Process 
Requirements 
l  Gather Plants 
Inventory 
lEvaluate 
technologies 
and vendors 
lDefine the 
Preliminary 
Standard 
l  Definition of the 
architecture 
l  Propose the 
Implementation 
plan 
l  Define Roles and 
Responsibilities 
l  Perform Global 
negotiation 
lApproval of the 
solution 
lApproval of the 
implementation 
plan 
lConfirmation of 
the 
implementation 
team 
As­Is 
Scenario 
Start 
To­Be 
Scenario 
Closure 
Solution 
Definition 
The process  used to evaluate the different  PIMS  Technologies was the 
following:
14 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The Plant Inventory detected areas of opportunity for the Plants already 
having a PIMS System, as well as for the Plants without such a system … 
The Plant Inventory detected areas of opportunity for the Plants already 
having a PIMS System, as well as for the Plants without such a system … 
The first activity was to gather the Real­Time Information Systems existing in 
CEMEX; the main findings were: 
Three different PIMS Systems were used in CEMEX: 
At  least,  in  70%  of  the  plants  there  were  area  of  opportunity  to 
integrate Process Information and to share this with the rest of  the 
organization:
15 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The different technologies and vendors were analyzed using the CEMEX 
IT  Standard  Process;  once  again,  the  process  involved  people  from 
different disciplines, assuring a level of expertise in all the domains .. 
The different technologies and vendors were analyzed using the CEMEX 
IT  Standard  Process;  once  again,  the  process  involved  people  from 
different disciplines, assuring a level of expertise in all the domains .. 
The different technologies and vendors were analyzed using the CEMEX IT 
Standard Process: 
Market Research to define Technologies and Vendors (Long List) 
Define Potential Technologies and Vendors (Candidates) 
Request for Information (RFI) 
Workshops 
Request for Proposal (RFP) 
Evaluation Matrix Fill Out 
Recommendation
16 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
An  Evaluation  Matrix  to  analyze  the  different  technologies  and  vendors 
was  developed;  this  Evaluation  Matrix  was  the  base  for  the  Technical 
Recommendation of the PIMS System ... 
An  Evaluation  Matrix  to  analyze  the  different  technologies  and  vendors 
was  developed;  this  Evaluation  Matrix  was  the  base  for  the  Technical 
Recommendation of the PIMS System ... 
The following concepts were analyzed as part of the Evaluation Matrix: 
Company Overview 
Interfaces 
DataBase 
Client Tools 
Applications 
Solution Cost 
Alignment with the 
CEMEX’s Enterprise 
Architecture
17 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Once the process to  evaluate the PIMS Technologies finished,  the next 
step was the approval of the CEMEX Technology Council … 
Once the process to  evaluate the PIMS Technologies finished,  the next 
step was the approval of the CEMEX Technology Council … 
To validate the implementation of the PIMS Technology in all of CEMEX, as 
well as the recommended technology, an internal voting process was carried 
out by the Members of the CEMEX Technology Council. 
Additionally, this voting process helped us to: 
Measure  the  knowledge  of  the 
CEMEX  Technology  Council 
regarding the PIMS Systems. 
Hear the main concerns. 
Establish  some  considerations 
for the implementation plan.
18 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
To finish the process, a Global Negotiation was performed with OSIsoft; 
this Global Negotiation included the implementation of the PI System in 
all CEMEX’s Cement Plants ... 
To finish the process, a Global Negotiation was performed with OSIsoft; 
this Global Negotiation included the implementation of the PI System in 
all CEMEX’s Cement Plants ... 
Notes: 
(1) Rlink, Sigmafine and IT Monitor are not included 
A  Global  Negotiation  (Enterprise  Agreement)  was  performed  with  OSIsoft 
for the use of the PI Software, including the following: 
Unlimited PI Software (1). 
Implementation Services. 
Remote  Monitoring  in  the  OSIsoft’s  Network  Operation  Center 
(NOC) 
Maintenance Fee. 
This Global Negotiation was led by Global Sourcing,  and supported by IT 
Strategic Alliances and Technology Vicepresidency.
19 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Prior  to  the  RollOut,  some  additional  processes  were  accomplished: 
architecture of the solution, capacity planning, establishing of standards, 
PIMS Team definition and the implementation plan … 
Prior  to  the  RollOut,  some  additional  processes  were  accomplished: 
architecture of the solution, capacity planning, establishing of standards, 
PIMS Team definition and the implementation plan … 
Prior to the RollOut the following processes were accomplished: 
Definition of the PIMS Architecture 
Realization of the Capacity Planning 
Establishment of Standards 
Definition of the Move to Operation (M2O) Process 
Elaboration of the Implementation Plan 
Definition of the PIMS Team and Training
20 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  definition  of  the  PIMS  Architecture  and  the  Capacity  Planning 
Process  were  performed  by  IT,  Neoris  and  Technology  Vicepresidency, 
with the support of OSIsoft … 
The  definition  of  the  PIMS  Architecture  and  the  Capacity  Planning 
Process  were  performed  by  IT,  Neoris  and  Technology  Vicepresidency, 
with the support of OSIsoft … 
To define a suitable PIMS Architecture, some scenarios were tested in our 
Central Offices; main conclusions: 
Independent PI Servers for each Cement Plant. 
Grinding Plants will be connected remotely to the PI System of the 
nearest Cement Plant. 
The Capacity Planning Process specified the required hardware to support 
the PIMS Architecture, as well as to measure the impact in the bandwith of 
the CEMEX Network.
21 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Some  standards  to  be  used  in  all  the  Cement  Plants  were  established; 
those standards aim to facilitate the implementation and maintenance of 
the PIMS Systems ... 
Some  standards  to  be  used  in  all  the  Cement  Plants  were  established; 
those standards aim to facilitate the implementation and maintenance of 
the PIMS Systems ... 
To facilitate the implementation and  maintenance of the PIMS Systems 
some standards were defined; some examples are: 
Servers Name 
KPIs 
Parameters of the tags: exception, compression, scan classes, etc. 
Etc.
22 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
A  Move  to  Operation  (M2O)  process  was  defined  by  IT,  Neoris  and 
Technology Vicepresidency; this process  aims to involve all the actors 
and assure the implementation process … 
A  Move  to  Operation  (M2O)  process  was  defined  by  IT,  Neoris  and 
Technology Vicepresidency; this process  aims to involve all the actors 
and assure the implementation process … 
The  Move  to  Operations  (M2O)  process  is  the  link  between  Project 
Execution and IT Operation. 
Whenever a new service or application needs to be delivered by the project 
team  to  be  operated  by  the  IT  operation  teams,  certain  process  must  be 
executed:  that's  the  scope  of  M2O,  and  is  applicable  to  both  application 
software related projects and pure technology projects. 
Project Execution  Production 
M2O 
New / Change Servers 
New / Change Technology 
New / Change Applications
23 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The Implementation Plan covers two years, and includes all the Cement 
and  Grinding  Plants;  the  2007  scope  reaches  14  Countries,  34  Cement 
Plants and 4 Grinding Plants … 
The Implementation Plan covers two years, and includes all the Cement 
and  Grinding  Plants;  the  2007  scope  reaches  14  Countries,  34  Cement 
Plants and 4 Grinding Plants … 
The  PIMS  System  was  approved  to  be  installed  in  a  2  years  program, 
covering 82 Cement and Grinding facilities 
The  2007  Implementation  Plan  was  defined  together  with  the  Regional 
Technical and Operation VPs: 
Reaches 14 Countries. 
Covers 34 Cement Plants and 4 Grinding Plants: 29 new Systems 
and the upgrade of 9 Systems…
24 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  final  stage  was  the  formation  of  the  PIMS  Team,  as  well  as  the 
training; the team was designed to implement ­as an average­ three new 
PIMS Systems per month … 
The  final  stage  was  the  formation  of  the  PIMS  Team,  as  well  as  the 
training; the team was designed to implement ­as an average­ three new 
PIMS Systems per month … 
The PIMS Team was formed and trained; to assure the successful of the 
implementation, the team involves people from different areas: 
IT 
Neoris 
Technology Vicepresidency 
The  PIMS  Team  was  designed  and  built  to  implement  ­as  an  average­ 
three new PIMS Systems per month.
25 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The  Rollout  began  towards  the  end  of  January  2007;  up  to  now,  the 
progress is going according to plans and no big potential deviations are 
expected for the rest of the year … 
The Rollout began towards the end of January 
2007. 
Up to now, the progress is going according to 
plans. 
No  big  potential  deviations  are  expected  for 
the rest of the year. 
The  2007  implementation  plan  will  be 
accomplished on­time.
26 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The PIMS Team’s learning curve,  the hardware  acquisition  process and 
the  on­time  communication  with  others  functional  areas  have  been  the 
main issues of the project… 
The  PIMS  Team  Learning  Curve  during  the 
first  two  months  implied  some  re­work  and 
delays. 
The  hardware  acquisition  process  was  not 
on­time in some Plants ­involves people from 
different Regions & Functions­ 
The  communication  with  the  Regions  and 
Countries was not the optimal in some cases. 
However, all these issues were identified on­ 
time, and the proper actions were taken.
27 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The Move to Support (M2S) process is under construction. 
This process establish the foundation to maintain the PIMS Systems, 
attend to the users and solve potential problems. 
Involved Actors in the M2S process are: 
Plants 
Regions 
IT 
Neoris 
Vicepresidency Technology 
Currently, we are working in the Move to Support (M2S) process; the M2S 
establishes  the  foundation  to  maintain  the  PIMS  Systems,  attend  the 
users and solve potential problems … 
Currently, we are working in the Move to Support (M2S) process; the M2S 
establishes  the  foundation  to  maintain  the  PIMS  Systems,  attend  the 
users and solve potential problems …
28 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
Benefits from the use of the PIMS System are appearing, as long as we 
move forward with the implementation; we expect more benefits as soon 
as more people are trained to use the system … 
Benefits from the use of the PIMS System are appearing, as long as we 
move forward with the implementation; we expect more benefits as soon 
as more people are trained to use the system … 
Some benefits coming from the PIMS Project are: 
Less time to collect information: 20% of the time to obtain 
information and 80% for analysis and conclusions. 
Key Performance Indicators in Real Time. 
Improved process knowledge. 
Ability to convert one of the most powerful corporate assets – data 
–  into knowledge. 
Common language for staff and technical employees. 
Improved communication across the organization. 
Prepare our facilities to integrate Plant Data  with Enterprise and 
Institutional Systems.
29 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
The PIMS Basic Platform is presently being installed and configured; at 
the  same  time,  the  activities  for  the  short,  medium  and  long  term  are 
under evaluation … 
The PIMS Basic Platform is presently being installed and configured; at 
the  same  time,  the  activities  for  the  short,  medium  and  long  term  are 
under evaluation … 
Future Plans include: 
PI Notifications. 
Visualization in Mobile 
Devices. 
High Availability PI System. 
New Features with Microsoft 
Excel 2007 and Web Services. 
Interface with the ERP System.
30 
Copyright © 2007 OSIsoft, Inc. All rights reserved. 
In conclusion, global companies must be committed to the use and the 
further development of Industrial  IT Technologies; and the PI System is a 
valuable tool to achieve this objective … 
In conclusion, global companies must be committed to the use and the 
further development of Industrial  IT Technologies; and the PI System is a 
valuable tool to achieve this objective … 
In  conclusion,  the  PIMS  System  in  CEMEX,  based  on  the  PI  System, 
contributes to: 
Eliminating the barriers between process control  system, people, 
and institutional systems. 
Integrating information from many sources. 
Providing a common structure to encapsulate business rules. 
Empowering  people  through  valuable  process  and  operation 
information.
Copyright © 2007 OSIsoft, Inc. All rights reserved.

More Related Content

What's hot

The globalization of cemex.
The globalization of cemex.The globalization of cemex.
The globalization of cemex.Aditya Sagar
 
(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)shailesh yadav
 
Global Business & Market Strategy: CEMEX - China Market Entry Proposal
Global Business & Market Strategy: CEMEX - China Market Entry ProposalGlobal Business & Market Strategy: CEMEX - China Market Entry Proposal
Global Business & Market Strategy: CEMEX - China Market Entry ProposalAlexandra Brooks
 
MBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition StrategyMBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition Strategymarhenbun
 
IMC Strategy Of Premier Cement
IMC Strategy Of Premier CementIMC Strategy Of Premier Cement
IMC Strategy Of Premier CementSadman Prodhan
 
Leveraging Global CEMEX
Leveraging Global CEMEXLeveraging Global CEMEX
Leveraging Global CEMEXLuis Garza
 
Chalcroft Construction Building Partners issue 16
Chalcroft Construction Building Partners issue 16Chalcroft Construction Building Partners issue 16
Chalcroft Construction Building Partners issue 16Chalcroft Ltd
 
Crown Cork & Seal/CarnaudMetalbox Merger
Crown Cork & Seal/CarnaudMetalbox MergerCrown Cork & Seal/CarnaudMetalbox Merger
Crown Cork & Seal/CarnaudMetalbox Mergerrapidravi
 
Condensate Markets, Export & Takeaway Capacity 2014
Condensate Markets, Export & Takeaway Capacity 2014Condensate Markets, Export & Takeaway Capacity 2014
Condensate Markets, Export & Takeaway Capacity 2014marketinglbcg
 
Sava transformation chronicle
Sava transformation chronicleSava transformation chronicle
Sava transformation chronicleStanislavKoren
 
Blumenthal on Scrap Tire Markets
Blumenthal on Scrap Tire MarketsBlumenthal on Scrap Tire Markets
Blumenthal on Scrap Tire MarketsShayna Blumenthal
 
The Elusive Dream of Tire Recycling
The Elusive Dream of Tire RecyclingThe Elusive Dream of Tire Recycling
The Elusive Dream of Tire RecyclingShayna Blumenthal
 

What's hot (18)

The globalization of cemex.
The globalization of cemex.The globalization of cemex.
The globalization of cemex.
 
(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)
 
Sm cemex final_1
Sm cemex final_1Sm cemex final_1
Sm cemex final_1
 
Lafarge Case Study
Lafarge Case StudyLafarge Case Study
Lafarge Case Study
 
Global Business & Market Strategy: CEMEX - China Market Entry Proposal
Global Business & Market Strategy: CEMEX - China Market Entry ProposalGlobal Business & Market Strategy: CEMEX - China Market Entry Proposal
Global Business & Market Strategy: CEMEX - China Market Entry Proposal
 
MBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition StrategyMBA 622 - Strategy I - Growth by Acquisition Strategy
MBA 622 - Strategy I - Growth by Acquisition Strategy
 
IMC Strategy Of Premier Cement
IMC Strategy Of Premier CementIMC Strategy Of Premier Cement
IMC Strategy Of Premier Cement
 
Leveraging Global CEMEX
Leveraging Global CEMEXLeveraging Global CEMEX
Leveraging Global CEMEX
 
The-truck-industry-in-2020
The-truck-industry-in-2020The-truck-industry-in-2020
The-truck-industry-in-2020
 
Chalcroft Construction Building Partners issue 16
Chalcroft Construction Building Partners issue 16Chalcroft Construction Building Partners issue 16
Chalcroft Construction Building Partners issue 16
 
Crown Cork & Seal/CarnaudMetalbox Merger
Crown Cork & Seal/CarnaudMetalbox MergerCrown Cork & Seal/CarnaudMetalbox Merger
Crown Cork & Seal/CarnaudMetalbox Merger
 
Condensate Markets, Export & Takeaway Capacity 2014
Condensate Markets, Export & Takeaway Capacity 2014Condensate Markets, Export & Takeaway Capacity 2014
Condensate Markets, Export & Takeaway Capacity 2014
 
Crown Cork & Seal in 1989
Crown Cork & Seal in 1989Crown Cork & Seal in 1989
Crown Cork & Seal in 1989
 
Sava transformation chronicle
Sava transformation chronicleSava transformation chronicle
Sava transformation chronicle
 
Crown Cork Seal
Crown Cork SealCrown Cork Seal
Crown Cork Seal
 
Treneco July IPBI
Treneco July IPBITreneco July IPBI
Treneco July IPBI
 
Blumenthal on Scrap Tire Markets
Blumenthal on Scrap Tire MarketsBlumenthal on Scrap Tire Markets
Blumenthal on Scrap Tire Markets
 
The Elusive Dream of Tire Recycling
The Elusive Dream of Tire RecyclingThe Elusive Dream of Tire Recycling
The Elusive Dream of Tire Recycling
 

Viewers also liked

Viewers also liked (20)

GlobalizationofCemex
GlobalizationofCemexGlobalizationofCemex
GlobalizationofCemex
 
Leadership guru
Leadership guruLeadership guru
Leadership guru
 
Functionality of pims
Functionality of pimsFunctionality of pims
Functionality of pims
 
Gurus1
Gurus1Gurus1
Gurus1
 
Deming
DemingDeming
Deming
 
ETOP and PIMS ANALYSIS
ETOP and PIMS ANALYSISETOP and PIMS ANALYSIS
ETOP and PIMS ANALYSIS
 
Presentation on Deming Philosophy
Presentation on Deming Philosophy Presentation on Deming Philosophy
Presentation on Deming Philosophy
 
TQM ppt.- Deming
TQM ppt.- DemingTQM ppt.- Deming
TQM ppt.- Deming
 
marketing_value_add_brochure-WEB
marketing_value_add_brochure-WEBmarketing_value_add_brochure-WEB
marketing_value_add_brochure-WEB
 
Reducing Opioid Abuse in the Appalachia Region
Reducing Opioid Abuse in the Appalachia RegionReducing Opioid Abuse in the Appalachia Region
Reducing Opioid Abuse in the Appalachia Region
 
Kudu and Rust
Kudu and RustKudu and Rust
Kudu and Rust
 
Researched Critical Essay
Researched Critical EssayResearched Critical Essay
Researched Critical Essay
 
Business-Day
Business-DayBusiness-Day
Business-Day
 
ink 22
ink 22ink 22
ink 22
 
Skeletal Remains of Jefferson
Skeletal Remains of JeffersonSkeletal Remains of Jefferson
Skeletal Remains of Jefferson
 
Assalamu’alaikum wr
Assalamu’alaikum wrAssalamu’alaikum wr
Assalamu’alaikum wr
 
AQF.PDF1
AQF.PDF1AQF.PDF1
AQF.PDF1
 
Fall 07 ProGd
Fall 07 ProGdFall 07 ProGd
Fall 07 ProGd
 
Asmeniniai rezultatai-5
Asmeniniai rezultatai-5Asmeniniai rezultatai-5
Asmeniniai rezultatai-5
 
Surbhi Sukhija - Work Profile
Surbhi Sukhija - Work ProfileSurbhi Sukhija - Work Profile
Surbhi Sukhija - Work Profile
 

Similar to MO-02-04A_Becerra_Cemex

Loesche Symposium 2017 – Evolve the future
Loesche Symposium 2017 – Evolve the futureLoesche Symposium 2017 – Evolve the future
Loesche Symposium 2017 – Evolve the futureLOESCHE
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos ConstructionIndian Market Place
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos ConstructionIndian Market Place
 
Cecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_englishCecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_englishAlvaro E Hernandez
 
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersBest Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersTetra Engineering
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructionsara patil
 
Planta D'Concreto Quito English
Planta D'Concreto Quito EnglishPlanta D'Concreto Quito English
Planta D'Concreto Quito EnglishSergio Prahl
 
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALS
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALSMACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALS
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALSMargarita Xanthopoulou
 
Supply Chain Management of Jaypee Cement
Supply Chain Management of Jaypee CementSupply Chain Management of Jaypee Cement
Supply Chain Management of Jaypee Cementjigyasa soni
 
White Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportWhite Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportIMARC Group
 
Cementization
CementizationCementization
CementizationSaurabh B
 
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdfdolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdfFeteneBefekadu
 
Insights 2016 - Interview at page 46 - M.Mata
Insights 2016 - Interview at page 46 - M.MataInsights 2016 - Interview at page 46 - M.Mata
Insights 2016 - Interview at page 46 - M.MataMarcelo Mata
 
Enter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG PlantEnter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG PlantLOESCHE
 
Cement Manufacturing Plant Project Report 2023
Cement Manufacturing Plant Project Report 2023Cement Manufacturing Plant Project Report 2023
Cement Manufacturing Plant Project Report 2023AlinaEllis1
 

Similar to MO-02-04A_Becerra_Cemex (20)

Loesche Symposium 2017 – Evolve the future
Loesche Symposium 2017 – Evolve the futureLoesche Symposium 2017 – Evolve the future
Loesche Symposium 2017 – Evolve the future
 
MEKA CORPORATE PROFILE
MEKA CORPORATE PROFILEMEKA CORPORATE PROFILE
MEKA CORPORATE PROFILE
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Construction
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Construction
 
Cecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_englishCecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_english
 
Cecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_englishCecapaz 500ton 08-12-2009_english
Cecapaz 500ton 08-12-2009_english
 
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersBest Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
 
cosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Constructioncosmos construction machinery and equipments|Cosmos Construction
cosmos construction machinery and equipments|Cosmos Construction
 
Planta D'Concreto Quito English
Planta D'Concreto Quito EnglishPlanta D'Concreto Quito English
Planta D'Concreto Quito English
 
Acc.word
Acc.wordAcc.word
Acc.word
 
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALS
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALSMACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALS
MACON_INTERNATIONAL_DISTRIBUTORS_OF_BUILDING_MATERIALS
 
Supply Chain Management of Jaypee Cement
Supply Chain Management of Jaypee CementSupply Chain Management of Jaypee Cement
Supply Chain Management of Jaypee Cement
 
pg profile
pg profilepg profile
pg profile
 
pg profile
pg profilepg profile
pg profile
 
White Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportWhite Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant Report
 
Cementization
CementizationCementization
Cementization
 
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdfdolo_ix_None_Sample_Business_Plan_______ (2).pdf
dolo_ix_None_Sample_Business_Plan_______ (2).pdf
 
Insights 2016 - Interview at page 46 - M.Mata
Insights 2016 - Interview at page 46 - M.MataInsights 2016 - Interview at page 46 - M.Mata
Insights 2016 - Interview at page 46 - M.Mata
 
Enter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG PlantEnter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG Plant
 
Cement Manufacturing Plant Project Report 2023
Cement Manufacturing Plant Project Report 2023Cement Manufacturing Plant Project Report 2023
Cement Manufacturing Plant Project Report 2023
 

MO-02-04A_Becerra_Cemex