1. Extended Diploma in Creative Media Production
IG3 Assignment Production Diary
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including Possible
Contingency Plans If Problems Anticipated)
Mon W/B 25/02/13
(Detailed Weekly Summary)
This week we decided whose script we were going to use. We
looked though each other’s scripts and decided which one was the
best and most realistic to make with our facilities. We came to the
decision to use my script. We made did second draft scripts and
carried on using mine.
Next week we will be writing our second draft script.
This will mean Hannah and Georgia takes my script and
improve it/ add their own ideas.
Mon W/B 04/03/13
(Detailed Weekly Summary)
This week we improved the second draft script. We chose mine
and each of us improved it/ added their own ideas
Next week we will be choosing our final draft scripts.
This means we will chose one of the second draft scripts
to be our final idea.
Mon W/B 11/03/13
(Detailed Weekly Summary)
This week we read through all three of the final second draft
scripts and decided on the best one to be our final idea for our
music video.
Next week we will start creating our storyboards. Next
week we will look into our locations and make sure they
are suitable.
Mon W/B 18/03/13
(Detailed Weekly Summary)
We filled out our storyboards. This included a picture of each shot,
the timings and a short description of what happens in the shot.
We took pictures of our locations and filled out risk assessments
for all our locations.
We will start filming our music video. We need to make
sure things like all people in the video are present, that
the weather isn’t raining and that the camera is charged
up.
Mon W/B 01/04/13
(Detailed Weekly Summary)
This week we filmed our music video. We took a trip to town to
film some footage and the rest was filmed in and around college.
Luckily the weather was nice and we made sure the camera was
charged up.
Next week I will import all our footage onto Adobe
Premier and will edit the footage together. I need to
make sure it is set up correctly and save my work on a
regular basis.
Mon W/B 08/04/13
(Detailed Weekly Summary)
This week I edited my music video. I imported the song ‘Sweet
Disposition’ by the Temper Trap. I then imported all the footage
and edited all the clips to the way I wanted it to look at the right
timings.
Next week I will be writing up a rough evaluation,
including things that I would like to change about my
music video.
Mon W/B 15/04/13
(Detailed Weekly Summary)
I have edited my music video resolving the minor problems and
changing the things I wrote about in my rough evaluation. This is
now my final music video.
Next week I will write up my final evaluation.
Mon W/B 22/04/13
(Detailed Weekly Summary)
This week I will write up my final evaluation. I will write up
everything I have done to make this music video. That is pre and
post production.
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible
2. Extended Diploma in Creative Media Production
IG3 Assignment Production Diary
Contingency Plans)