1. CONFIDENTIAL 1
CURRICULUM VITAE
PERSONAL DETAILS
Surname: Wijburg Full Names: Bernard Wynand
Nationality: South African Passport No.: M00079499
Date of Birth: 26 February 1968 ID Number: 680226 5175 086
Age: 46 years Nationality: South African
Marital Status: Married Spouse: Johanna Wilhelmina
(Anjé) Wijburg
Tel.: 082 787 0030
Residential Address: 1 Edinburgh Postal Address: P.O. Box 566
Umtentweni Umtentweni
Port Shepstone KwaZulu Natal
KwaZulu Natal 4235
4235
Contact Details: 072 306 9635(Cel) 039 695 2853 (Residential)
Email Address: Bernard_w26@hotmail.com
Home Language: English and Afrikaans
Languages Proficiency Speak Read Write
English good good good
Afrikaans good good good
Dutch Fair Fair Fair
Malay/Bahasa Fair Fair Fair
Health: In good health (Non-Smoker)
Fit and active
2. CONFIDENTIAL 2
Driver’s License: Code 08 Military Driver’s License: 10 Ton (EC1)
Hobbies: Hiking, Camping, Fishing, Building Puzzles, Handy Work
Architectural and Mechanical drafting.
EDUCATIONAL QUALIFICATIONS
Education Matriculated
1986 – 2002 Served in the S.A Defence Force and Airforce
Tertiary Education
Architectural /
Mechanical Drafting
Detailed drawings.
Assembly drawings.
Castings.
Springs/screw thread/gears.
Isometric.
Sectional drawings.
The who, what & why illustrations.
Aids and Guides.
Changing & updating Illustration.
Isometric Illustrations.
Advanced Axonometric Techniques
Perspective Drawings.
Perspective of Illustrations.
History of architectural designs.
Fundaments of architecture.
Building material and composites.
Basic construction elements.
Human Recourse
Management
Personal Management I
(Basic Psychology or Practitioners)
Business Management I
English Communication
(First Language)
Quantitative Techniques
(Statistics)
End User Computer
Training Management I
Personal Management II
Business Management II
Labour Law I
Training Management I
Labour Relations I
3. CONFIDENTIAL 3
Training courses
attended
Fire Training Programme
IMS Awareness Training
Advanced Occupational Health & Safety
Wire Rope Inspector – Level 2
Lifting Gear Inspector
Senior Supervisor Course
Education, Training & Development Practitioner Course
HUET
Hydrogen Sulphide Awareness
Task Risk Assessment
Permit to Work.
Sea Survival
Basic Fire Fighting
Boat transfer
Fall Protection
BBSM Observer Training
Confined Space Entry Orientation
Rigging Level 4 [NOHSC:1006 (2006)]
UK Standard Training
courses
OPITO Survival Offshore Training 2019 June 23 Expire
OPITO Approved Rigging Training 2017 June 18 Expire
Working Safer in the Subsea Sector (IOSH) 2018 July 30
UKOOA Medical Certificate of fitness for Offshore work.
2017 June 11
Technip Task Risk Assessment 2018 March
Technip Permit to Work. 2017 June
Technip Abrasive wheels. 2018 March
Technip Genetic COSSH 2017 October
Technip Genetic manual handling 2017 September
Technip Genetic Dropping objects 2017 September
Technip Working at Heights 2017 October
Technip Confined Space Entry 2017 October
Technip PUWER / LOULER lifting operations 2017 October
Rigging Level 4 [NOHSC:1006
OFFSHORE CONSTRUCTION SUMMORY
I have a diverse and dynamic field of work from local to international experience.
I was never unable to reach an objective or outcome that was laid out to accomplish. I love a
challenge with the capability to use own initiative to solve complex problems.
I have the dedication to keep an easy flow of work and to promote a neat and tidy environment
with the right team
I can exercise the right management skills and create positive work environment in a stressful
environment.
I have a passion for construction, with a quick snap for learning complex construction problems
and applying them.
4. CONFIDENTIAL 4
I have 11 years’ experience in offshore construction with various companies and different
construction barges as follows:
a. Pipe lay and Subsea construction on pipelines from shallow water to as deep as 200m
and various sizes ranging from 6” to 34” as follows:
Spool installation and removal of dummy spool pieces.
Risers Installation.
Plem Installation
Y junction installation up to 80 tons
Piggy backs.
Beach pulls.
Trenching pipelines.
J-Tubes
Commissioning of pipelines.
Various pipeline tie-ins.
Clamp installations on jacket legs etc.
Recently installation of subsea structures inline (FLET) Flow Line End TEE for Total
ranging between 33 tons to 48 tons.
Suction Piles as for foundations.
Manifolds ranging from 380 tons to 680 tons at a depth of 750m to 1200m.
b. Top side construction and not limited to as follows:
Jacket installation.
Installation portable deck modules of different types and different tonnage.
Removal (demolish) top existing topside
Removing and replacing of flare booms
Installing bridges
25750 ton float over topside modules.
Removing and replacing of boat landings.
c. Involved in various setting up of procedures and preparation for installations.
d. Involved with plenty supervisory ROV work at a depth ranging from 45m to 3000m as
follows:
Building bridges over existing live pipelines using concrete mattresses.
Subsea structures lining up and installations.
Simultaneous ROV and Diving operations lining up and installation of spool pieces.
Simultaneous ROV and derrek crane load transfer operation.
e. Assisting with Air and Sat Diving subsea work.
Offshore Work Experience
Oct 2005 – Oct 2009
McDermott
Anchor hoist operator, Anchor Foreman
DB26, KP 1, PLB Israfil Huseynov , Intermac 650
ARAMCO Saudi Arabia
CHEVRON Indonesia
5. CONFIDENTIAL 5
BP Azerbaijan
SHELL Malaysia
EMPMI Malaysia
Vietman Petrolium Vietnam
Chevron Thailand
Subsea construction on pipelines.
Spool pieces.
Risers.
Installation of jackets.
Installation portable deck modules.
Beach pulls.
Dredging / trenching pipelines.
19 650ton float over.
Bridge construction.
Flare boom Installation and removal.
Drilling templates installation.
Commissioning of pipelines.
Matress installations
Sleeper installation.
March 2010 – Nov 2010
Sea Truck Group
Anchor Foreman and (Construction Supervisor/Foreman)
Jascon 2 Amhoist Duel Drum winches
Jascon 33
CHEVRON Nigeria Limited
Shell Nigeria LTD TIP Project
Subsea construction on pipelines.
Spool pieces.
Risers.
Currently 24” import and export line beach pulls and tie in.
Dredging/Trenching on both beach pull pipelines.
Commissioning of 24” import line.
Febr 2011 – May 2011
McDermott
Beck Foreman, Anchor Foreman
Jascon 25, DB26, Intermac 650
CHEVRON Thialand
Vietman Petrolium Vietnam
24 750 ton Platform Central Processing Plant 2 topside
floatover in Plantong Gas field in Thailand.
450 ton walkway between the PLCPP2 and PLCPP Living
Quarters.
All preparation of 8 legged jacket leading up to the floatover.
Subsea construction on pipelines ranging from 6” to 18”
production lines to flow lines.
Spool pieces.
Installation of SSIV & PLEM
6. CONFIDENTIAL 6
May 2011 – July 2011
Seatruck Group
Deck Foreman (Construction Supervisor/Foreman)
Jascon 25 DP3
BP Greater Plutonio Heavy Lifting Project.
Total E&P Angola Heavy Lifting Project.
Topside processing platform installation
Manifold skid
(4) HP coolers remove and replace
Gas compression trains(1st
stage & 2nd
stage)
Off-loading of equipment, Skid beams, skid carts,
stopper posts, protection frames and guide posts.
July 2011 – April 2012
McDermott
Barge/Deck Foreman
Thebaud Sea DP2 DSV
Saudi Aramco (ABUSAFA field)
Saudi Aramco (Safaniyah field)
Pipelines (12”, 16” and 20”)
Install new risers to Platforms
Dummy spools remove
Subsea valve skids (T-junctions)
Production spools
Do metrology and fabricate tie-in spools
Pre-lay and post-lay concrete mattresses (10 ton)
J-tubes
Sleeper removals.
Anode installations
May 2012 – Feb 2014
Mcdermott Caspian
Company Incorporate
Barge Foreman
PLB Israfil Huseynov
Azerbaijan BP COP Project
Reactivate and mobilization of the PLBG.
Install new 800 ton stinger system.
Lay various pipelines. (30”, 24”,18”, 16.75”)
Install 3 x 190m Rises.
Spools & Plems.
Dummy spools.
Riser Clamps.
March 2014 – July 2014
OCS
Superintendent
Labuan 2310
Consult as an “Independent Contractor” for HAFAR
7. CONFIDENTIAL 7
Post Trenching.
Grout bag and Mattress Installations.
Assist with Mooring Tower Installation procedure.
July 2014 – December
2014
PT Timas Samudera
(Indonesia)
Superintendent
DLB 01 (ex DB26)
Ketapeng Project
Trenching and Grout bag installation.
Mattress Installations.
25 June 2015 to
Present Technip
(Aberdeen)
Rigging Supervisor
DP 3 Global 1200
MOHO NORD for TOTAL Congo
Recently installation of subsea structures inline (FLET) Flow
Line End TEE for Total ranging between 33 tons to 48
tons.
Suction Piles as for foundations.
Manifolds ranging from 380 tons to 680 tons at a depth of
750m to 1200m.
Beach pull export oil line
REFERENCES
Person Company Contact Numbers
Ken Hagerman Ken Hagerman Architects 012 803 2033
Sid Kelso SK Architectural Technologist Deceased
Micheal Oostuizen Cimla Projects & Developments 084 553 0387
Douglas La Fluer Shuweihat CMS International Power
Company
009712665959
Michel Leonard
Paul Dawson
JR Mcdermott
Barry White Sea Truck Group