Greg Short Managing Director 
Town Planner PIA 
HOW TO READ DIFFERENT PLAN 
FORMATS AND DEFINITIONS OF LOTS 
& COMMON PROPERTY
How to Read the Different Format Plans and 
Definitions of Lots and Common Property 
• The Meaning of a Community Titles scheme ‘CTS’ 
• The different title plan formats, Standard, Building & Volumetric 
• How to read them, and where they are used in CTS's 
• Building Management Area Plans 
• Exclusive Use Plans and Occupational Authority Area Plans 
• Layered Schemes, Runaway Lagoons & Calypso Bay 
• Staged Development ( Concept Plans ) 
• High Density Development Easements
Meaning of Community Titles Scheme (BCCM) Act 
Part 4 Section 10 of the BCCM Act 1997 
1. A community titles scheme is: 
a) A singular community management statement recorded by the 
registrar identifying land (the scheme land); and 
b) The scheme land 
4. For each community titles scheme, there must be-a) 
at least 2 lots; 
b) Common property; 
c) A single body corporate; and 
d) A single community management statement 
Section 66 of the BCCM Act defines the requirements for a 
Community Management Statement.
PLAN FORMATS 
The different formats of surveys is in Division 2A 
“Plans of Subdivisions” under the Land Titles Act 1994 (LTA). 
The definitions are as follows:- 
• LTA Section 48B – Standard Format Plan (SFP) 
“A Standard Format Plan of survey defines land using a horizontal plane and 
references to marks on the ground”. 
That is a survey of the land defined by dimensions (bearings and distances) with 
boundaries marked on the ground (examples by survey pegs or alike). 
• LTA Section 48C – Building Format Plan (BFP) 
“A Building Format Plan of survey defines land using structural elements of a building, 
including, for example, floors, walls or ceilings”. 
That is a survey of a building. This format can only be used when a building exists. 
• LTA Section 48D – Volumetric Format Plan (VFP) 
“A Volumetric Format Plan of survey defines land using 3 dimensionally located 
points to identify the position, shape and dimensions of each bounding surface.” 
That is a volumetric plan creates a 3 dimensional lot.
STANDARD FORMAT PLAN – SFP 
“A Standard Format Plan of survey defines land by using a 
horizontal plane and references to marks on the ground.” 
• The simplest plan format 
• Utilised for subdivision of land within or outside of a Community Titles 
Scheme ‘CTS’ 
• Group Titles Plan Lots under the prior legislation are considered Standard 
Format Lots, as they are defined by dimensions. 
• Vertically, SFP Lots extend from the centre of the earth to the heavens. 
• Horizontally SFP Lots are defined by dimensions. 
• All boundary corners have been marked at one stage. 
• SFP Lots can contain original dimensions.
BUILDING FORMAT PLAN – BFP 
“A Building Format Plan of survey defines land using structural elements of a 
building, including for example, floors, walls or ceilings.” 
• Well utilised in Community Title Schemes and more complex than SFP’s. 
• Utilised for the subdivision of a building and they must create a CTS. 
• In previous legislation, these surveys were Building Units Plans. 
• Acceptable structural elements (Registrars Directions 9.6) 
 Floors or ceilings, centre; 
 Walls, full height, centre; 
 Walls, not full height, centre; 
 Doors or windows, centre, other than where incorporated into a wall, when 
the boundary would be collinear with the centre of the wall; 
 Balustrades or railings, outer face; 
 Edge of a floor or a concrete base not abutting a wall, outer edge; 
 Corners within a building or structure defined by the centres of posts which 
are structurally required for the building or a wall. 
• Registrar can approve other structural elements Acceptable structural 
elements (Registrars Directions 9.6)
Boundaries may also be dimensioned and 
survey marked and referenced to structural 
elements when in or on a building.
Boundaries must be 
dimensioned and 
survey marked where 
they are located in the 
land outside the 
building.
Vertical boundaries on roofs to be defined 
by a distance above the roof, where there 
is no ceiling of an adjoining lot.
VOLUMETRIC FORMAT PLAN – VFP 
“A Volumetric Format Plan of survey defines land using 3 dimensionally located 
points to identify the position, shape and dimensions of each bounding surface.” 
• The most complex format and least understood. 
• Utilised for subdivision of land within or outside of a CTS. 
• No prior legislation for this format, save for a few specialist Acts (e.g. HSP 
Nominees Act, Southbank Act). 
• Volumetric Surveys do not need structural elements. 
• All dimensions horizontally and vertically are defined on the plan of survey. 
• Typically used in large scale mixed use projects, but this is not mandatory. 
• VFP are ideal where different land use ownership is required within or around a 
building. 
• Extremely flexible in their potential shape, which allows developers to create a 
title around anything. 
• The first VFP out of a Standard Format Parcel always creates a Standard 
Format Remainder Lot. 
• Not all boundary corners will be marked, due to inaccessibility. 
• Marks may not always remain. 
• VFP Lot boundaries can contain original information. 
• Surveyors normally work through the building in slices to resolve the extent of 
the volumetric Title
BUILDING MANAGEMENT STATEMENT PLANS -BMS 
• The BMS is a 
document that 
regulates areas of the 
building shared 
between different 
volumetric lot owners 
• Integral part of 
Volumetric Survey 
• Plans define areas as 
described in the 
Building Management 
Statement
EXCLUSIVE USE PLANS 
• Exclusive Use can be done by Document where not readily 
accessible & easily defined by description (e.g. sign of roof, outside 
face of building)
• Exclusive Use can be done by simple sketch, where not readily 
accessible and simple sketch provides sufficient clarity (e.g. tenant 
sign board)
All other Exclusive Use Plans are defined by detailed sketch in accordance 
with Registrars Direction. 
Exclusive Use Plans have to be defined so there are no ambiguities in the 
area being defined. 
Boundaries are defined by:- 
• Structural elements (walls, balustrades, edge of concrete floor and centre of 
fences); 
• References to structural elements where the exclusive use are in generally 
rectilinear (e.g. carparks); 
• Marking the corners with survey marks and delineating by dimensions; 
• Any combination of the above; 
• Exclusive Use plans do not need to be prepared by a cadastral surveyor, 
unless they have boundaries by dimensions; 
• Body corporate committee members are acceptable to prepare exclusive 
use plans but not the Body Corporate Manager (Direction 11.11.16); 
• All plans are to be certified as being correct (i.e. in accordance with the 
Registrars Directions)
LAYERED ARRANGEMENTS 
• A layered arrangement is a grouping of community titles scheme (CTA Sec 
115C and BCCM Sec 18(1)) 
• Includes a principal scheme which is made up lots and its own common 
property, with at least one of the lots being a basic scheme (i.e. subsidiary 
scheme). 
• Layered Schemes can be changed by progressive subdivisions to create 
additional subsidiary schemes. 
• Typically used in resort style developments where large pieces of private 
infrastructure are shared. 
• (e.g. Private roads to precincts, golf course, landscaped recreation areas, 
private waterways, etc.) 
• Layered schemes are not restricted to resort style developments and can 
be used for any project. 
• All plan formats can be utilised to establish and progressively develop 
layered schemes.
Runaway Lagoons – Layered CTS 
Original Title Structure 
Lot 801/802 
‘East Shore 
CTS 
Subsidiary Scheme 
Original Site 
Lot 803 
‘Montego Res’ 
CTS 
Subsidiary Scheme 
Lot 804 
‘Laguna Res’ 
CTS 
Subsidiary Scheme 
Common 
Property 
Traditional Residential 
Subdivision Layered CTS 
Standard Format 
Subdivision 
Standard Format 
Subdivision 
Lots 1–16 & CP Lots 1–100&CP Lots 1–60 & CP Staged Building 
Format & Standard 
Format Subdivisions, 
as appropriate 
Regulated by CMS
Layered Arrangement – Calypso Bay 
PBC 
CP 
1 – 92 etc. 
RES 
LAND 
CTS 
CALYPSO 
BAY 
APARTMENTS 
DEV. 
LOTS 
HARBOUR 
VILLAGE 
PBC 
SUBMERGED 
HARBOUR 
LOT 
SUPERMARKET 
LOT 
Common 
Property 
Boardwalk 
Villas 
CTS 
Lot 2 
Commercial 
Lot 
Lot 3 
Commercial 
Lot 
Lot 4 
Commercial 
Lot 
Common 
Property 
CP Lots 
Waterfront 
Marina 
Apartments 
Common 
Property 
Key Site 
CTS 
Etc. 
CP Lots CP Lots 
TAVERN 
LOT 
To be progressively subdivided 
To be progressively subdivided 
To be progressively subdivided into further subsidiary scheme
Layered Arrangement – Calypso Bay
Layered Arrangement – Calypso Bay
Layered Arrangement – Calypso Bay
STAGED DEVELOPMENT 
(CONCEPT PLANS) 
• Reasons for staging (i.e. Development Cashflow, construction completion times, 
flexibility for project modification due to changed market). 
• Typically staging involves leaving a balance development lot, which is usually 
SFP or VFP. 
• Building Format Plans can also create a Standard Format balance development 
lot. 
• Schedule B of the CMS provides the relevant explanation for the progressive 
development of scheme land. 
• Schedule B is often accompanied by a Concept Plan. 
• Staging can also occur by bringing land into the scheme from outside of the 
scheme. This is the most flexible method for developers as their development 
parcels are not contained within the scheme. 
• Where developers propose to leave future development land outside the 
scheme, they need to ensure they retain an interest (at least 1 lot) in the scheme.
HIGH DENSITY DEVELOPMENT EASEMENTS 
Division 4AA Land Title Act 1994 
• High Density Statutory Easement Legislation introduced for Standard Format lots under 
300m2 – June 2013 
• The Legislation applies to the principles of Statutory Easements for lots in a Community 
Titles Scheme (CTS) of support, shelter, projections, maintenance to attached townhouses 
not in a CTS 
The Benefits 
“At the time we bought 
we didn’t know what an 
easement was” 
• A Community Titles Scheme does not need to be created 
• Party wall easements are not required 
• Cost savings, through less documentation and simpler ownership structure
Thank you for your attention 
Greg Short – Town Planner

More Related Content

Similar to How to read plan formats and definitions of lots and common property

Form-Based Design Ord.
Form-Based Design Ord.Form-Based Design Ord.
Form-Based Design Ord.Laura Oxley
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsBrunswick County
 
ICI/ ITD RPOJECT 1 (City planner)
ICI/ ITD RPOJECT 1 (City planner) ICI/ ITD RPOJECT 1 (City planner)
ICI/ ITD RPOJECT 1 (City planner) choo zizhao
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...University of Nebraska EWB-USA Chapter
 
RUPH121 Environmental Design-1.pptx
RUPH121 Environmental Design-1.pptxRUPH121 Environmental Design-1.pptx
RUPH121 Environmental Design-1.pptxAbelTomondo
 
Develpment contols chandigarh, periphery control pb laws
Develpment contols chandigarh, periphery control  pb lawsDevelpment contols chandigarh, periphery control  pb laws
Develpment contols chandigarh, periphery control pb lawsJIT KUMAR GUPTA
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingila vamsi krishna
 
Functional planning of building
Functional planning of buildingFunctional planning of building
Functional planning of buildingShivanshSood2
 
Residential Land Development Process
Residential Land Development ProcessResidential Land Development Process
Residential Land Development ProcessDuncan Smith
 
The Basics of Urban Planning - Chapter 8.pdf
The Basics of Urban Planning - Chapter 8.pdfThe Basics of Urban Planning - Chapter 8.pdf
The Basics of Urban Planning - Chapter 8.pdfIftikhar Ahmad Mukhtar
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pnsPratap Shinde
 
Principles and Building Bye Laws
Principles and Building Bye LawsPrinciples and Building Bye Laws
Principles and Building Bye LawsBurhanuddin Kapadia
 

Similar to How to read plan formats and definitions of lots and common property (20)

Form-Based Design Ord.
Form-Based Design Ord.Form-Based Design Ord.
Form-Based Design Ord.
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
 
Unit 5
Unit 5Unit 5
Unit 5
 
ICI/ ITD RPOJECT 1 (City planner)
ICI/ ITD RPOJECT 1 (City planner) ICI/ ITD RPOJECT 1 (City planner)
ICI/ ITD RPOJECT 1 (City planner)
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
 
RUPH121 Environmental Design-1.pptx
RUPH121 Environmental Design-1.pptxRUPH121 Environmental Design-1.pptx
RUPH121 Environmental Design-1.pptx
 
Town Planning
Town Planning Town Planning
Town Planning
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Urban Planning Lecture 3.pptx
Urban Planning Lecture 3.pptxUrban Planning Lecture 3.pptx
Urban Planning Lecture 3.pptx
 
SITE ANALYSIS.pptx
SITE ANALYSIS.pptxSITE ANALYSIS.pptx
SITE ANALYSIS.pptx
 
Orange County Developer's Forum - Orange Code
Orange County Developer's Forum - Orange CodeOrange County Developer's Forum - Orange Code
Orange County Developer's Forum - Orange Code
 
Develpment contols chandigarh, periphery control pb laws
Develpment contols chandigarh, periphery control  pb lawsDevelpment contols chandigarh, periphery control  pb laws
Develpment contols chandigarh, periphery control pb laws
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Functional planning of building
Functional planning of buildingFunctional planning of building
Functional planning of building
 
Residential Land Development Process
Residential Land Development ProcessResidential Land Development Process
Residential Land Development Process
 
The Basics of Urban Planning - Chapter 8.pdf
The Basics of Urban Planning - Chapter 8.pdfThe Basics of Urban Planning - Chapter 8.pdf
The Basics of Urban Planning - Chapter 8.pdf
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pns
 
Chap 3
Chap 3Chap 3
Chap 3
 
Principles and Building Bye Laws
Principles and Building Bye LawsPrinciples and Building Bye Laws
Principles and Building Bye Laws
 
Whats new
Whats newWhats new
Whats new
 

Recently uploaded

lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lodhisaajjda
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Delhi Call girls
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCamilleBoulbin1
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...amilabibi1
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfSkillCertProExams
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatmentnswingard
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Baileyhlharris
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Pooja Nehwal
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedDelhi Call girls
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Recently uploaded (20)

lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptx
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 

How to read plan formats and definitions of lots and common property

  • 1. Greg Short Managing Director Town Planner PIA HOW TO READ DIFFERENT PLAN FORMATS AND DEFINITIONS OF LOTS & COMMON PROPERTY
  • 2. How to Read the Different Format Plans and Definitions of Lots and Common Property • The Meaning of a Community Titles scheme ‘CTS’ • The different title plan formats, Standard, Building & Volumetric • How to read them, and where they are used in CTS's • Building Management Area Plans • Exclusive Use Plans and Occupational Authority Area Plans • Layered Schemes, Runaway Lagoons & Calypso Bay • Staged Development ( Concept Plans ) • High Density Development Easements
  • 3. Meaning of Community Titles Scheme (BCCM) Act Part 4 Section 10 of the BCCM Act 1997 1. A community titles scheme is: a) A singular community management statement recorded by the registrar identifying land (the scheme land); and b) The scheme land 4. For each community titles scheme, there must be-a) at least 2 lots; b) Common property; c) A single body corporate; and d) A single community management statement Section 66 of the BCCM Act defines the requirements for a Community Management Statement.
  • 4. PLAN FORMATS The different formats of surveys is in Division 2A “Plans of Subdivisions” under the Land Titles Act 1994 (LTA). The definitions are as follows:- • LTA Section 48B – Standard Format Plan (SFP) “A Standard Format Plan of survey defines land using a horizontal plane and references to marks on the ground”. That is a survey of the land defined by dimensions (bearings and distances) with boundaries marked on the ground (examples by survey pegs or alike). • LTA Section 48C – Building Format Plan (BFP) “A Building Format Plan of survey defines land using structural elements of a building, including, for example, floors, walls or ceilings”. That is a survey of a building. This format can only be used when a building exists. • LTA Section 48D – Volumetric Format Plan (VFP) “A Volumetric Format Plan of survey defines land using 3 dimensionally located points to identify the position, shape and dimensions of each bounding surface.” That is a volumetric plan creates a 3 dimensional lot.
  • 5. STANDARD FORMAT PLAN – SFP “A Standard Format Plan of survey defines land by using a horizontal plane and references to marks on the ground.” • The simplest plan format • Utilised for subdivision of land within or outside of a Community Titles Scheme ‘CTS’ • Group Titles Plan Lots under the prior legislation are considered Standard Format Lots, as they are defined by dimensions. • Vertically, SFP Lots extend from the centre of the earth to the heavens. • Horizontally SFP Lots are defined by dimensions. • All boundary corners have been marked at one stage. • SFP Lots can contain original dimensions.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. BUILDING FORMAT PLAN – BFP “A Building Format Plan of survey defines land using structural elements of a building, including for example, floors, walls or ceilings.” • Well utilised in Community Title Schemes and more complex than SFP’s. • Utilised for the subdivision of a building and they must create a CTS. • In previous legislation, these surveys were Building Units Plans. • Acceptable structural elements (Registrars Directions 9.6)  Floors or ceilings, centre;  Walls, full height, centre;  Walls, not full height, centre;  Doors or windows, centre, other than where incorporated into a wall, when the boundary would be collinear with the centre of the wall;  Balustrades or railings, outer face;  Edge of a floor or a concrete base not abutting a wall, outer edge;  Corners within a building or structure defined by the centres of posts which are structurally required for the building or a wall. • Registrar can approve other structural elements Acceptable structural elements (Registrars Directions 9.6)
  • 12.
  • 13.
  • 14. Boundaries may also be dimensioned and survey marked and referenced to structural elements when in or on a building.
  • 15. Boundaries must be dimensioned and survey marked where they are located in the land outside the building.
  • 16. Vertical boundaries on roofs to be defined by a distance above the roof, where there is no ceiling of an adjoining lot.
  • 17. VOLUMETRIC FORMAT PLAN – VFP “A Volumetric Format Plan of survey defines land using 3 dimensionally located points to identify the position, shape and dimensions of each bounding surface.” • The most complex format and least understood. • Utilised for subdivision of land within or outside of a CTS. • No prior legislation for this format, save for a few specialist Acts (e.g. HSP Nominees Act, Southbank Act). • Volumetric Surveys do not need structural elements. • All dimensions horizontally and vertically are defined on the plan of survey. • Typically used in large scale mixed use projects, but this is not mandatory. • VFP are ideal where different land use ownership is required within or around a building. • Extremely flexible in their potential shape, which allows developers to create a title around anything. • The first VFP out of a Standard Format Parcel always creates a Standard Format Remainder Lot. • Not all boundary corners will be marked, due to inaccessibility. • Marks may not always remain. • VFP Lot boundaries can contain original information. • Surveyors normally work through the building in slices to resolve the extent of the volumetric Title
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. BUILDING MANAGEMENT STATEMENT PLANS -BMS • The BMS is a document that regulates areas of the building shared between different volumetric lot owners • Integral part of Volumetric Survey • Plans define areas as described in the Building Management Statement
  • 28. EXCLUSIVE USE PLANS • Exclusive Use can be done by Document where not readily accessible & easily defined by description (e.g. sign of roof, outside face of building)
  • 29. • Exclusive Use can be done by simple sketch, where not readily accessible and simple sketch provides sufficient clarity (e.g. tenant sign board)
  • 30. All other Exclusive Use Plans are defined by detailed sketch in accordance with Registrars Direction. Exclusive Use Plans have to be defined so there are no ambiguities in the area being defined. Boundaries are defined by:- • Structural elements (walls, balustrades, edge of concrete floor and centre of fences); • References to structural elements where the exclusive use are in generally rectilinear (e.g. carparks); • Marking the corners with survey marks and delineating by dimensions; • Any combination of the above; • Exclusive Use plans do not need to be prepared by a cadastral surveyor, unless they have boundaries by dimensions; • Body corporate committee members are acceptable to prepare exclusive use plans but not the Body Corporate Manager (Direction 11.11.16); • All plans are to be certified as being correct (i.e. in accordance with the Registrars Directions)
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37. LAYERED ARRANGEMENTS • A layered arrangement is a grouping of community titles scheme (CTA Sec 115C and BCCM Sec 18(1)) • Includes a principal scheme which is made up lots and its own common property, with at least one of the lots being a basic scheme (i.e. subsidiary scheme). • Layered Schemes can be changed by progressive subdivisions to create additional subsidiary schemes. • Typically used in resort style developments where large pieces of private infrastructure are shared. • (e.g. Private roads to precincts, golf course, landscaped recreation areas, private waterways, etc.) • Layered schemes are not restricted to resort style developments and can be used for any project. • All plan formats can be utilised to establish and progressively develop layered schemes.
  • 38. Runaway Lagoons – Layered CTS Original Title Structure Lot 801/802 ‘East Shore CTS Subsidiary Scheme Original Site Lot 803 ‘Montego Res’ CTS Subsidiary Scheme Lot 804 ‘Laguna Res’ CTS Subsidiary Scheme Common Property Traditional Residential Subdivision Layered CTS Standard Format Subdivision Standard Format Subdivision Lots 1–16 & CP Lots 1–100&CP Lots 1–60 & CP Staged Building Format & Standard Format Subdivisions, as appropriate Regulated by CMS
  • 39.
  • 40.
  • 41. Layered Arrangement – Calypso Bay PBC CP 1 – 92 etc. RES LAND CTS CALYPSO BAY APARTMENTS DEV. LOTS HARBOUR VILLAGE PBC SUBMERGED HARBOUR LOT SUPERMARKET LOT Common Property Boardwalk Villas CTS Lot 2 Commercial Lot Lot 3 Commercial Lot Lot 4 Commercial Lot Common Property CP Lots Waterfront Marina Apartments Common Property Key Site CTS Etc. CP Lots CP Lots TAVERN LOT To be progressively subdivided To be progressively subdivided To be progressively subdivided into further subsidiary scheme
  • 42. Layered Arrangement – Calypso Bay
  • 43. Layered Arrangement – Calypso Bay
  • 44. Layered Arrangement – Calypso Bay
  • 45.
  • 46. STAGED DEVELOPMENT (CONCEPT PLANS) • Reasons for staging (i.e. Development Cashflow, construction completion times, flexibility for project modification due to changed market). • Typically staging involves leaving a balance development lot, which is usually SFP or VFP. • Building Format Plans can also create a Standard Format balance development lot. • Schedule B of the CMS provides the relevant explanation for the progressive development of scheme land. • Schedule B is often accompanied by a Concept Plan. • Staging can also occur by bringing land into the scheme from outside of the scheme. This is the most flexible method for developers as their development parcels are not contained within the scheme. • Where developers propose to leave future development land outside the scheme, they need to ensure they retain an interest (at least 1 lot) in the scheme.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53. HIGH DENSITY DEVELOPMENT EASEMENTS Division 4AA Land Title Act 1994 • High Density Statutory Easement Legislation introduced for Standard Format lots under 300m2 – June 2013 • The Legislation applies to the principles of Statutory Easements for lots in a Community Titles Scheme (CTS) of support, shelter, projections, maintenance to attached townhouses not in a CTS The Benefits “At the time we bought we didn’t know what an easement was” • A Community Titles Scheme does not need to be created • Party wall easements are not required • Cost savings, through less documentation and simpler ownership structure
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. Thank you for your attention Greg Short – Town Planner