1. BEHIND THE SCENES AT THE WANETA EXPANSION PROJECT
MAY 29, 2015
KOOTENAY WOMEN IN
BUSINESS AWARDS
AUDREY
REPIN
Director, Stakeholder and
External Relations
2. COLUMBIA POWER
develops, builds and operates hydro electric generating
facilities… our expertise is in project development,
procurement, construction management – in particular
design/build – and operations
Over the past 20 years, we have worked with communities to
develop three hydro power generation facilities. Operating as a
Crown corporation, we generate clean energy, support jobs,
contribute to the local economy, invest in the physical
environment, and partner with First Nations and communities.
22. Project Quick Facts
• Normal head, which creates enough pressure to drive the runner: 62.3 m
• Height of powerhouse above and below ground: 60 m
• Lifting capacity of main powerhouse crane: 440 tonnes
• Rock and overburden removed: 82,000 tandem truckloads
• Average depth of powerhouse excavation: 42 m
• Transmission line: 10 km, 230 kV
• Concrete: 85,000 m3
• Structural steel: 445,000 kg
• Reinforcing steel: 5,740,000 kg
• Depth of intake: 40 m
• Diameter of water tunnels: 10.5 m