1. Cover Letter.
Electrical/Mechanical engineerwith 15 yearsoverall experience,3 years’experience as
engineerfor electromechanicalinstallation, 3 years’experiencein operation of GasTurbines
(GE) / Combined CyclePowerPlant(CCPP) and 9 years’experiencein commissioning of
Combined CyclePowerPlant (CCPP) and ThermalPowerPlant (TPP) .
I am a proactive, confident and self-motivated individual with high level of responsibility. I am
keen to secure a position in an organization that offers challenges and the opportunity to
progress and utilize my skills, enthusiastic personality, and excellent team player. Through my
work experience I have developed highly interpersonal and communication skills. I would like
to work in the power and water sector as it is a sector that keeps changing and offers great
prospects and challenges for its employees.
11/2015 – Today: I work as Commissioning Manager with ILF Consultancy Company in a
Thermal Power Plant of 300 MW in Erbil Iraq/Kurdistan.
10/2014 – 10/2015: I worked as independent consultant for EPC contractor HANWHA for a
Power and Water project, capacity 60000 cubic meter per day process water and 670 MW, in
Yanbu city in KSA.
12/2012 – 09/2014: I work as commissioning Manager in SAUDI ARCHIRODON LTD in a
Marine Facility project total cost 220.000.000 $ in KSA.
METKA EPC CONTRACTOR 03/2007 – 03/2012
I workedasLead Installation Engineerinelectrical installation of powertrainin 710 MW Gas
powerplantinDer Ali IIin Syria,METKA-ANSALDO.
I worked asLead CommissioningEngineerin460 MW Gas powerplantin Korinthos Greece
withMETKA.
I have workas Assistant CommissioningManagerin 860 MW powerplantinBRAZI Rumania
withconsortiumGE-METKA.
I workedas Contract Engineerin METKA’s office inAthensGreece
I worked asElectrical and I&C CommissioningEngineerin220 MW Gas powerplantin
Karachi Pakistan (10/2007-10/2009) withMETKA.
I workedas I&C CommissioningEngineerin400MW CogenerationpowerplantinAgios
NikolasViotiasinGreece
07/2005 – 06/2007: I worked as ShiftTeam Leader in440 MW Gas powerplant in
ThessalonikiGreece withRWEnPower.
07/2007 – 07/2005: I have workedas Operator ina 100 MW Gas powerplantopencycle in
Lavrio-Greece fortwosummers(2004 & 2005)
03/2001 – 03/2004: I work as electromechanical installationengineerinprivate andpublic
sector.
I have leadershipand communication skills.Iamable to workin multiculturalenvironments,
very organized, independentandable toschedule and followthroughtoensure thatthe job
getsdone.