SlideShare a Scribd company logo
1 of 1
Cover Letter.
Electrical/Mechanical engineerwith 15 yearsoverall experience,3 years’experience as
engineerfor electromechanicalinstallation, 3 years’experiencein operation of GasTurbines
(GE) / Combined CyclePowerPlant(CCPP) and 9 years’experiencein commissioning of
Combined CyclePowerPlant (CCPP) and ThermalPowerPlant (TPP) .
I am a proactive, confident and self-motivated individual with high level of responsibility. I am
keen to secure a position in an organization that offers challenges and the opportunity to
progress and utilize my skills, enthusiastic personality, and excellent team player. Through my
work experience I have developed highly interpersonal and communication skills. I would like
to work in the power and water sector as it is a sector that keeps changing and offers great
prospects and challenges for its employees.
11/2015 – Today: I work as Commissioning Manager with ILF Consultancy Company in a
Thermal Power Plant of 300 MW in Erbil Iraq/Kurdistan.
10/2014 – 10/2015: I worked as independent consultant for EPC contractor HANWHA for a
Power and Water project, capacity 60000 cubic meter per day process water and 670 MW, in
Yanbu city in KSA.
12/2012 – 09/2014: I work as commissioning Manager in SAUDI ARCHIRODON LTD in a
Marine Facility project total cost 220.000.000 $ in KSA.
METKA EPC CONTRACTOR 03/2007 – 03/2012
I workedasLead Installation Engineerinelectrical installation of powertrainin 710 MW Gas
powerplantinDer Ali IIin Syria,METKA-ANSALDO.
I worked asLead CommissioningEngineerin460 MW Gas powerplantin Korinthos Greece
withMETKA.
I have workas Assistant CommissioningManagerin 860 MW powerplantinBRAZI Rumania
withconsortiumGE-METKA.
I workedas Contract Engineerin METKA’s office inAthensGreece
I worked asElectrical and I&C CommissioningEngineerin220 MW Gas powerplantin
Karachi Pakistan (10/2007-10/2009) withMETKA.
I workedas I&C CommissioningEngineerin400MW CogenerationpowerplantinAgios
NikolasViotiasinGreece
07/2005 – 06/2007: I worked as ShiftTeam Leader in440 MW Gas powerplant in
ThessalonikiGreece withRWEnPower.
07/2007 – 07/2005: I have workedas Operator ina 100 MW Gas powerplantopencycle in
Lavrio-Greece fortwosummers(2004 & 2005)
03/2001 – 03/2004: I work as electromechanical installationengineerinprivate andpublic
sector.
I have leadershipand communication skills.Iamable to workin multiculturalenvironments,
very organized, independentandable toschedule and followthroughtoensure thatthe job
getsdone.

More Related Content

What's hot

CV ARSHAD ABBAS MECHANICAL ENGINEER .
CV ARSHAD ABBAS MECHANICAL ENGINEER .CV ARSHAD ABBAS MECHANICAL ENGINEER .
CV ARSHAD ABBAS MECHANICAL ENGINEER .arshad abbas SIAL
 
Resume Of M Pal(4)
Resume Of M Pal(4)Resume Of M Pal(4)
Resume Of M Pal(4)Mohinder Pal
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016NAZAKATH ALI
 
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011Tuija Hyvönen
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALdarren sahlen
 
BREISCH_Resume 102116
BREISCH_Resume 102116BREISCH_Resume 102116
BREISCH_Resume 102116Wade Breisch
 
Renewables Business
Renewables BusinessRenewables Business
Renewables Businessguestfdbe0e
 
Integration of PV, Battery and Supercapacitor in Islanded Microgrid
Integration of PV, Battery and Supercapacitor in Islanded MicrogridIntegration of PV, Battery and Supercapacitor in Islanded Microgrid
Integration of PV, Battery and Supercapacitor in Islanded MicrogridAsoka Technologies
 
last cv update2017english
last cv update2017englishlast cv update2017english
last cv update2017englishYasir Ali
 
ATT_1437054094908_Resume final
ATT_1437054094908_Resume finalATT_1437054094908_Resume final
ATT_1437054094908_Resume finalSWAPNIL BORE
 
Clive_Roberts new 2015 c.v
Clive_Roberts new 2015 c.vClive_Roberts new 2015 c.v
Clive_Roberts new 2015 c.vClive Roberts
 

What's hot (18)

Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
 
CV ARSHAD ABBAS MECHANICAL ENGINEER .
CV ARSHAD ABBAS MECHANICAL ENGINEER .CV ARSHAD ABBAS MECHANICAL ENGINEER .
CV ARSHAD ABBAS MECHANICAL ENGINEER .
 
balu UG
balu UGbalu UG
balu UG
 
Resume Of M Pal(4)
Resume Of M Pal(4)Resume Of M Pal(4)
Resume Of M Pal(4)
 
amit
amitamit
amit
 
Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011
Natur(s) al 3rd meeting, Kastamonu, Turkey 27.-29.10.2011
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERAL
 
BREISCH_Resume 102116
BREISCH_Resume 102116BREISCH_Resume 102116
BREISCH_Resume 102116
 
Faizan cv (1)
Faizan cv (1)Faizan cv (1)
Faizan cv (1)
 
FAHEEM_Power Engineer
FAHEEM_Power EngineerFAHEEM_Power Engineer
FAHEEM_Power Engineer
 
Renewables Business
Renewables BusinessRenewables Business
Renewables Business
 
Integration of PV, Battery and Supercapacitor in Islanded Microgrid
Integration of PV, Battery and Supercapacitor in Islanded MicrogridIntegration of PV, Battery and Supercapacitor in Islanded Microgrid
Integration of PV, Battery and Supercapacitor in Islanded Microgrid
 
last cv update2017english
last cv update2017englishlast cv update2017english
last cv update2017english
 
ATT_1437054094908_Resume final
ATT_1437054094908_Resume finalATT_1437054094908_Resume final
ATT_1437054094908_Resume final
 
Clive_Roberts new 2015 c.v
Clive_Roberts new 2015 c.vClive_Roberts new 2015 c.v
Clive_Roberts new 2015 c.v
 
finalle - Copy
finalle - Copyfinalle - Copy
finalle - Copy
 

Similar to Cover Letter

Similar to Cover Letter (20)

Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_
 
RANA AZHAR HUSSAIN
RANA AZHAR HUSSAINRANA AZHAR HUSSAIN
RANA AZHAR HUSSAIN
 
CV2015
CV2015CV2015
CV2015
 
CV updated G
CV updated GCV updated G
CV updated G
 
dharma cv . Ts
dharma cv . Tsdharma cv . Ts
dharma cv . Ts
 
BASKAR-CV
BASKAR-CVBASKAR-CV
BASKAR-CV
 
pecaaa
pecaaapecaaa
pecaaa
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
Sohaib Siddique Elec (2022).docx
Sohaib Siddique Elec (2022).docxSohaib Siddique Elec (2022).docx
Sohaib Siddique Elec (2022).docx
 
Current CV 23-6-16r2
Current CV 23-6-16r2Current CV 23-6-16r2
Current CV 23-6-16r2
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
AKM
AKMAKM
AKM
 
Resume mju 03.10.2016
Resume mju 03.10.2016Resume mju 03.10.2016
Resume mju 03.10.2016
 
Vishnu Resume
Vishnu ResumeVishnu Resume
Vishnu Resume
 
Bio-data -MSK
Bio-data -MSKBio-data -MSK
Bio-data -MSK
 
Randolf-resume
Randolf-resume Randolf-resume
Randolf-resume
 
Arun kumar V_Resume..
Arun kumar V_Resume..Arun kumar V_Resume..
Arun kumar V_Resume..
 
CV Turyan Salimov
CV Turyan SalimovCV Turyan Salimov
CV Turyan Salimov
 

Cover Letter

  • 1. Cover Letter. Electrical/Mechanical engineerwith 15 yearsoverall experience,3 years’experience as engineerfor electromechanicalinstallation, 3 years’experiencein operation of GasTurbines (GE) / Combined CyclePowerPlant(CCPP) and 9 years’experiencein commissioning of Combined CyclePowerPlant (CCPP) and ThermalPowerPlant (TPP) . I am a proactive, confident and self-motivated individual with high level of responsibility. I am keen to secure a position in an organization that offers challenges and the opportunity to progress and utilize my skills, enthusiastic personality, and excellent team player. Through my work experience I have developed highly interpersonal and communication skills. I would like to work in the power and water sector as it is a sector that keeps changing and offers great prospects and challenges for its employees. 11/2015 – Today: I work as Commissioning Manager with ILF Consultancy Company in a Thermal Power Plant of 300 MW in Erbil Iraq/Kurdistan. 10/2014 – 10/2015: I worked as independent consultant for EPC contractor HANWHA for a Power and Water project, capacity 60000 cubic meter per day process water and 670 MW, in Yanbu city in KSA. 12/2012 – 09/2014: I work as commissioning Manager in SAUDI ARCHIRODON LTD in a Marine Facility project total cost 220.000.000 $ in KSA. METKA EPC CONTRACTOR 03/2007 – 03/2012 I workedasLead Installation Engineerinelectrical installation of powertrainin 710 MW Gas powerplantinDer Ali IIin Syria,METKA-ANSALDO. I worked asLead CommissioningEngineerin460 MW Gas powerplantin Korinthos Greece withMETKA. I have workas Assistant CommissioningManagerin 860 MW powerplantinBRAZI Rumania withconsortiumGE-METKA. I workedas Contract Engineerin METKA’s office inAthensGreece I worked asElectrical and I&C CommissioningEngineerin220 MW Gas powerplantin Karachi Pakistan (10/2007-10/2009) withMETKA. I workedas I&C CommissioningEngineerin400MW CogenerationpowerplantinAgios NikolasViotiasinGreece 07/2005 – 06/2007: I worked as ShiftTeam Leader in440 MW Gas powerplant in ThessalonikiGreece withRWEnPower. 07/2007 – 07/2005: I have workedas Operator ina 100 MW Gas powerplantopencycle in Lavrio-Greece fortwosummers(2004 & 2005) 03/2001 – 03/2004: I work as electromechanical installationengineerinprivate andpublic sector. I have leadershipand communication skills.Iamable to workin multiculturalenvironments, very organized, independentandable toschedule and followthroughtoensure thatthe job getsdone.