  PROJECT OUTLINE
■ INTRODUCTION
■ PROBLEM STATEMENT
■ PROEJECT OBJECTIVES
■ Design CONSTRAINTS
■ METHODOLOGY
■ CURRENT LAYOUTS
■ DEVELOPMENT of A NEW LAYOUT
■ CONCLUSION AND RECOMMENDATIONS
  INTRODUCTION
  PROBLEM STATEMENT
Emirates Metallic Industries Company (EMIC) is an exclusive and
unique company, which is manufacturing cans as well as sheets in
variety of sizes and shapes using high technology methods.
assembly painting printing pressing packaging
Production Lines
cans Tuna cans
coated
sheets
printed
sheets
Easy open
Ends
Running 24 hours to produce different products such as;
  PROBLEM STATEMENT
Service
center
EMIC
NEW
manufacturer
company
The Company identified that there is a need to design an efficient layout in a
new location with the area of 130,000 (260 x 500).
  PROEJECT OBJECTIVES
The objective of this project is to get hands on experience working on a real life
problem, aimed at designing a layout for the combined two branches of EMIC in
order to:
 To utilize available space most effectively.
 Minimize material handling cost.
 Minimize overall production time.
 Provide for employee convenience, safe, healthy, and comfort workplace.
  DESIGN CONSTRAINTS
Design
Constrains
1) Space
Requirements
3) Health
and Safety
2) Efficiency
Rate
  METHODOLOGY
  THE CURRENT LAYOUTS
■ ■ Branch#1 (Service Center)
  Material Flow (Service Center)
 Area Requirement (Service Center)
Departm
ent NO.
Department Name Area( 𝒎 𝟐) Total Area( 𝒎 𝟐)
1 coil storage area (22.70x76.10)+(14.85x24
.30)
2088.3
2 ink storage area 22.9x5.10 116.8
3 new cutting area (8x24.3)+(4x50.4) 396
4 old cutting area 6.9x42.2 291.2
5 coil cutting area 6.9x11.3 78
6 Coating and printing
department
51.15x40.40 2066.5
7 food section 51.885x56.6 2936.7
8 food section store 40.2x25.5 1025.1
9 coating store 25.5x16 408
10 design section 15.55x7.2 112
11 Finish good store 40.2x16.2 651.2
  THE CURRENT LAYOUTS
■ ■ Branch#2 (EMIC I)
  Material Flow (EMIC I)
Departm
ent NO.
Department Name Area( 𝒎 𝟐
) Total Area( 𝒎 𝟐
)
1 sheet cutting area 26x34.1 886.6
2 Store1 28x34.1 954.8
3 assembly department 30.7x57.4 1762.2
4 pressing department 17.0x57.4 975.8
5 finish good store 31.7x45.7 1448.7
 Area Requirement (EMIC 1)
 Personnel Requirements
According to analysis and data provided from survey following
problems were identified:
 There isn’t enough parking for employees.
 Employees don’t have any lockers or cabinet where they can put
their clothes or any personal staff.
 Only few restrooms available for employees and it’s located far
away from working environment.
 There is only one small kitchen which is far from production area,
no vending machines offered along the factory and no specific
cafeterias are there.
 Material Handling
NO. Material Handling
Equipment
Description Type Quantity Fuel Type
1 Forklift Move the material
between departments.
(3 tons) 14 Gas
(15 tons) 2 Gasoline
2 Trolley Move the materials
within department.
- 10 -
3 Bridge Crane Move heavy weight of
coils in production area.
- 2 Gas
 Health and Safety
Service Center of EMIC Company suffers from two main problems that may
affect the health of employees which are noise and air contaminate.
1) Noise
2) Air Contaminate
 Coating department due to the painting process. This is because they use
thinner to paint without having any ventilation system
 The workers don’t wear masks to protect themselves from the bad smell.
 Paint thinners emit fumes, which can cause nausea, headache or breathing
trouble.
 The toxins in the paint thinner can absorbed into the body, so it will causes
skin irritation or skin inflammation.
 In the long term inhale the thinner for long time will causes Kidney
problems, Cancer, Muscle weakness, Lack of coordination and Deaths from
heart failure or asphyxiation
  DEVELOPMENT OF A NEW LAYOUT
Developing Blocks Using SLP Developing Blocks Using CORELAP
  Space Requirements
Departmen
t NO.
Department Name Total Area (𝒎 𝟐)
1 Coil storage 9835
2 Coil cutting 1443
3 Printing and Coating 2860
4 Coating and Ink store 1439
5 Store 1 950
6 Food section 6866
7 Store 2 1989
8 Prepress(design) 484
9 Sheet cutting 1439
10 Pressing 1470
11 Assembly 1426
12 Store 3
2966
13 Store 4
2946
Total Area
36113
  Material Flow
  Relationship Chart
  Block Layout Using SLP for EMIC
  Generating Layout Alternatives
using CORELAP software
Modified block layout (Alternative 1) Modified block layout (Alternative 2)
  Calculating the Efficiency
NO. Block Layout Efficiency
1 The block layout using SLP 76.05%
2 The block layout Using CORELAP 78.87 %
3 The block layout of alternative (1) 80.28 %
4 The block layout of alternative (2) 87.32 %
𝑻𝒐𝒕𝒂𝒍 𝑳𝒂𝒚𝒐𝒖𝒕 𝑬𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚 =
𝒊=𝟏
𝒎
𝒇𝒊𝒋 𝒋=𝟏
𝒎
𝒙𝒊𝒋
𝒊=𝟏
𝒎
𝒋=𝟏
𝒎
𝒇𝒊𝒋
  Selecting the Best Layout
Alternative
  Plot Layout
NEW LAYOUT
Personnel
Requirements
Material
Handling
Health and
Safety
Noise
Air
Contaminant
  Health and Safety
Air Contaminant
Noise
  CONCLUSION & FUTURE WORK
 Summary
 The new one require area 271 x 166 = 44,986 m2
 The efficiency of the alternatives ranged from
76% to 87% and the recommended alternative
efficiency= 76.05%
 Project Impacts
 Recommendations for Future
 Improve the personnel requirement
 Improve the material handling
 Solve the safety problems
 Improve the ventilation system
THANK YOU
Any Questions?

More Related Content

What's hot

What's hot (6)

Regular maintenance
Regular maintenanceRegular maintenance
Regular maintenance
 
Scouring by Zamil
Scouring by ZamilScouring by Zamil
Scouring by Zamil
 
Facility layout
Facility  layoutFacility  layout
Facility layout
 
Safety wear
Safety wearSafety wear
Safety wear
 
Kasliwal Collections reaps the benefits of the HMX-IDECool
Kasliwal Collections reaps the benefits of the HMX-IDECoolKasliwal Collections reaps the benefits of the HMX-IDECool
Kasliwal Collections reaps the benefits of the HMX-IDECool
 
Machinecraft in a NutShell
Machinecraft in a NutShellMachinecraft in a NutShell
Machinecraft in a NutShell
 

Viewers also liked

Eva del carmen ortiz garcia
Eva del carmen ortiz garciaEva del carmen ortiz garcia
Eva del carmen ortiz garciaEfrén Ingledue
 
31806 las tic como instrumento de la educacion sexual
31806 las tic como instrumento de la educacion sexual31806 las tic como instrumento de la educacion sexual
31806 las tic como instrumento de la educacion sexualEfrén Ingledue
 
Relationship Marketing
Relationship MarketingRelationship Marketing
Relationship Marketingneonim
 
Top your marketing game by using right colors
Top your marketing game by using right colorsTop your marketing game by using right colors
Top your marketing game by using right colorsPixels Logo Design
 
LMA Salary Survey - 2016
LMA Salary Survey - 2016 LMA Salary Survey - 2016
LMA Salary Survey - 2016 Ella Robinson
 
Guíade actividades8° sistema_reproductor
Guíade actividades8° sistema_reproductorGuíade actividades8° sistema_reproductor
Guíade actividades8° sistema_reproductorJodansetodos Yluegoyo
 

Viewers also liked (12)

Figuras de palavras
Figuras de palavrasFiguras de palavras
Figuras de palavras
 
Eva del carmen ortiz garcia
Eva del carmen ortiz garciaEva del carmen ortiz garcia
Eva del carmen ortiz garcia
 
29913
2991329913
29913
 
Archivo del proyecto 5
Archivo del proyecto 5Archivo del proyecto 5
Archivo del proyecto 5
 
31806 las tic como instrumento de la educacion sexual
31806 las tic como instrumento de la educacion sexual31806 las tic como instrumento de la educacion sexual
31806 las tic como instrumento de la educacion sexual
 
Relationship Marketing
Relationship MarketingRelationship Marketing
Relationship Marketing
 
Top your marketing game by using right colors
Top your marketing game by using right colorsTop your marketing game by using right colors
Top your marketing game by using right colors
 
LMA Salary Survey - 2016
LMA Salary Survey - 2016 LMA Salary Survey - 2016
LMA Salary Survey - 2016
 
Guíade actividades8° sistema_reproductor
Guíade actividades8° sistema_reproductorGuíade actividades8° sistema_reproductor
Guíade actividades8° sistema_reproductor
 
47071
4707147071
47071
 
Teachersintro Bb2016 walkinweek
Teachersintro Bb2016 walkinweekTeachersintro Bb2016 walkinweek
Teachersintro Bb2016 walkinweek
 
Arrancadores pse abb
Arrancadores pse abbArrancadores pse abb
Arrancadores pse abb
 

Similar to SDP 2

Pen facility layout
Pen facility layoutPen facility layout
Pen facility layoutmohmedx
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLMd. sirajul Haque Sajib
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityAmr El-Ganainy
 
An Analysis Of Layout Planning
An Analysis Of Layout PlanningAn Analysis Of Layout Planning
An Analysis Of Layout PlanningDereck Downing
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)Asim Aslam
 
Optosem presentation
Optosem presentationOptosem presentation
Optosem presentationxantec
 
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepCh1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepErdi Karaçal
 
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015Amjad Mehmood
 
Final take home exam
Final take home examFinal take home exam
Final take home examSou Tibon
 
Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited Fazle R. Rumman
 
Internship Report on Masco Group
Internship Report on Masco GroupInternship Report on Masco Group
Internship Report on Masco GroupAnthoney45
 
Final plant layout
Final plant layoutFinal plant layout
Final plant layoutradit12
 
SCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxSCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxmolla17
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Gaurab Pant
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 

Similar to SDP 2 (20)

Pen facility layout
Pen facility layoutPen facility layout
Pen facility layout
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCL
 
Micro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing FacilityMicro Project - Design of Can Manufacturing Facility
Micro Project - Design of Can Manufacturing Facility
 
An Analysis Of Layout Planning
An Analysis Of Layout PlanningAn Analysis Of Layout Planning
An Analysis Of Layout Planning
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)
 
Optosem presentation
Optosem presentationOptosem presentation
Optosem presentation
 
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of GaziantepCh1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
Ch1 introduction Erdi Karaçal Mechanical Engineer University of Gaziantep
 
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
HMC Taxila_Internship_Report_Amjad_Faizan_Mohsin_15_July_2015
 
Final take home exam
Final take home examFinal take home exam
Final take home exam
 
Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited
 
Assignment 1 rev1
Assignment 1 rev1Assignment 1 rev1
Assignment 1 rev1
 
Internship Report on Masco Group
Internship Report on Masco GroupInternship Report on Masco Group
Internship Report on Masco Group
 
Final plant layout
Final plant layoutFinal plant layout
Final plant layout
 
PG thesis
PG thesisPG thesis
PG thesis
 
Imtech group presentation
Imtech group presentationImtech group presentation
Imtech group presentation
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
 
SCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptxSCORE implimentation (Blue Nile PP bag).pptx
SCORE implimentation (Blue Nile PP bag).pptx
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 

SDP 2

  • 1. Designing A New Layout for a Manufacturing Facility Asma A. Qassemi U00021076 Mahra Al Hammadi U00022069 Doaa Waleed Abuyousef U00022692 Dana A. Abdelrahman U00022873 Senior Design Project II (0405491)
  • 2.   PROJECT OUTLINE ■ INTRODUCTION ■ PROBLEM STATEMENT ■ PROEJECT OBJECTIVES ■ Design CONSTRAINTS ■ METHODOLOGY ■ CURRENT LAYOUTS ■ DEVELOPMENT of A NEW LAYOUT ■ CONCLUSION AND RECOMMENDATIONS
  • 4.   PROBLEM STATEMENT Emirates Metallic Industries Company (EMIC) is an exclusive and unique company, which is manufacturing cans as well as sheets in variety of sizes and shapes using high technology methods. assembly painting printing pressing packaging Production Lines cans Tuna cans coated sheets printed sheets Easy open Ends Running 24 hours to produce different products such as;
  • 5.   PROBLEM STATEMENT Service center EMIC NEW manufacturer company The Company identified that there is a need to design an efficient layout in a new location with the area of 130,000 (260 x 500).
  • 6.   PROEJECT OBJECTIVES The objective of this project is to get hands on experience working on a real life problem, aimed at designing a layout for the combined two branches of EMIC in order to:  To utilize available space most effectively.  Minimize material handling cost.  Minimize overall production time.  Provide for employee convenience, safe, healthy, and comfort workplace.
  • 7.   DESIGN CONSTRAINTS Design Constrains 1) Space Requirements 3) Health and Safety 2) Efficiency Rate
  • 9.   THE CURRENT LAYOUTS ■ ■ Branch#1 (Service Center)
  • 10.   Material Flow (Service Center)
  • 11.  Area Requirement (Service Center) Departm ent NO. Department Name Area( 𝒎 𝟐) Total Area( 𝒎 𝟐) 1 coil storage area (22.70x76.10)+(14.85x24 .30) 2088.3 2 ink storage area 22.9x5.10 116.8 3 new cutting area (8x24.3)+(4x50.4) 396 4 old cutting area 6.9x42.2 291.2 5 coil cutting area 6.9x11.3 78 6 Coating and printing department 51.15x40.40 2066.5 7 food section 51.885x56.6 2936.7 8 food section store 40.2x25.5 1025.1 9 coating store 25.5x16 408 10 design section 15.55x7.2 112 11 Finish good store 40.2x16.2 651.2
  • 12.   THE CURRENT LAYOUTS ■ ■ Branch#2 (EMIC I)
  • 13.   Material Flow (EMIC I)
  • 14. Departm ent NO. Department Name Area( 𝒎 𝟐 ) Total Area( 𝒎 𝟐 ) 1 sheet cutting area 26x34.1 886.6 2 Store1 28x34.1 954.8 3 assembly department 30.7x57.4 1762.2 4 pressing department 17.0x57.4 975.8 5 finish good store 31.7x45.7 1448.7  Area Requirement (EMIC 1)
  • 15.  Personnel Requirements According to analysis and data provided from survey following problems were identified:  There isn’t enough parking for employees.  Employees don’t have any lockers or cabinet where they can put their clothes or any personal staff.  Only few restrooms available for employees and it’s located far away from working environment.  There is only one small kitchen which is far from production area, no vending machines offered along the factory and no specific cafeterias are there.
  • 16.  Material Handling NO. Material Handling Equipment Description Type Quantity Fuel Type 1 Forklift Move the material between departments. (3 tons) 14 Gas (15 tons) 2 Gasoline 2 Trolley Move the materials within department. - 10 - 3 Bridge Crane Move heavy weight of coils in production area. - 2 Gas
  • 17.  Health and Safety Service Center of EMIC Company suffers from two main problems that may affect the health of employees which are noise and air contaminate. 1) Noise
  • 18. 2) Air Contaminate  Coating department due to the painting process. This is because they use thinner to paint without having any ventilation system  The workers don’t wear masks to protect themselves from the bad smell.  Paint thinners emit fumes, which can cause nausea, headache or breathing trouble.  The toxins in the paint thinner can absorbed into the body, so it will causes skin irritation or skin inflammation.  In the long term inhale the thinner for long time will causes Kidney problems, Cancer, Muscle weakness, Lack of coordination and Deaths from heart failure or asphyxiation
  • 19.   DEVELOPMENT OF A NEW LAYOUT Developing Blocks Using SLP Developing Blocks Using CORELAP
  • 20.   Space Requirements Departmen t NO. Department Name Total Area (𝒎 𝟐) 1 Coil storage 9835 2 Coil cutting 1443 3 Printing and Coating 2860 4 Coating and Ink store 1439 5 Store 1 950 6 Food section 6866 7 Store 2 1989 8 Prepress(design) 484 9 Sheet cutting 1439 10 Pressing 1470 11 Assembly 1426 12 Store 3 2966 13 Store 4 2946 Total Area 36113
  • 23.   Block Layout Using SLP for EMIC
  • 24.   Generating Layout Alternatives using CORELAP software
  • 25. Modified block layout (Alternative 1) Modified block layout (Alternative 2)
  • 26.   Calculating the Efficiency NO. Block Layout Efficiency 1 The block layout using SLP 76.05% 2 The block layout Using CORELAP 78.87 % 3 The block layout of alternative (1) 80.28 % 4 The block layout of alternative (2) 87.32 % 𝑻𝒐𝒕𝒂𝒍 𝑳𝒂𝒚𝒐𝒖𝒕 𝑬𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚 = 𝒊=𝟏 𝒎 𝒇𝒊𝒋 𝒋=𝟏 𝒎 𝒙𝒊𝒋 𝒊=𝟏 𝒎 𝒋=𝟏 𝒎 𝒇𝒊𝒋
  • 27.   Selecting the Best Layout Alternative
  • 28.   Plot Layout
  • 30.   Health and Safety Air Contaminant Noise
  • 31.   CONCLUSION & FUTURE WORK  Summary  The new one require area 271 x 166 = 44,986 m2  The efficiency of the alternatives ranged from 76% to 87% and the recommended alternative efficiency= 76.05%
  • 33.  Recommendations for Future  Improve the personnel requirement  Improve the material handling  Solve the safety problems  Improve the ventilation system