2. PROJECT ON CONSUMER SIDE OF METER
• Only one project of 500 KWp Rooftop Solar PV Project was installed at the Kalinga Institute of
Social Sciences.
• The State targets a capacity of 50 MW through such solar projects during the policy control period.
• 100 kW to 500 kW wherein aggregation of capacity from smaller roofs is allowed. 30% of the cost
would be provided as subsidy and 70% to be met by the consumer. Systems are to be grid
connected and do not have battery back-up. Surplus solar power from the project is fed to the grid.
• GRIDCO shall procure power from such projects in accordance with the OERC regulations for
net-metering/gross metering from time to time.
• Eligible developers are allowed to avail the relevant subsidies and incentives from MNRE under
JNNSM scheme. Further, State Government shall give incentive of 50 paise per unit of gross
generation from systems installed by residential consumers under this scheme
4. TOTAL NO. OF HOUSE HOLDS
2898947
1990498
908450
12330265
10394052
1936212
23.51%
19.15%
46.92%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
TOTAL RURAL URBAN
CONCRETE HOUSES
TOTAL NO. OF HOUSES
PERCENTAGE
SOURCE 2011 CENSUS
INCREASED BY CAGR OF 1% AS
PER POPULATION RISE IN
STATE
5. URBAN HOUSEHOLD TO ELECTRIFIED
HOUSE
0
50000
100000
150000
200000
250000
300000
TOTAL NO. HOUSE HOLD
ELECTRICITY
SOURCE 2011 CENSUS INCREASED BY CAGR
OF 1% AS PER POPULATION RISE IN STATE
6. URBAN HOUSE ELECTRIFIED BY SOLAR
48 48
79
7
257
89
55
94 89
21
104
161
44
17
102
22
441
63
234
18 23
11 15
123
17
80
43 41
87
32
0
50
100
150
200
250
300
350
400
450
500
SOLAR ENERGYSOLAR ENERGY
SOURCE 2011 CENSUS INCREASED BY CAGR
OF 1% AS PER POPULATION RISE IN STATE
7. RURAL HOUSEHOLD TO ELECTRIFIED
HOUSE
0
100000
200000
300000
400000
500000
600000
700000
TOTAL NO. HOUSE HOLD
ELECTRICITY
8. RURAL HOUSES ELECTRIFIED BY SOLAR
868
210
385
252
2309
2036
1604
1896
885
1449
1098
969 1045
456
948 984
538
844
1518
492
781
287 312
1581
1173
3515
890
16201542
1010
0
500
1000
1500
2000
2500
3000
3500
4000
SOLAR ENERGY
SOLAR ENERGY
SOURCE 2011 CENSUS INCREASED BY CAGR
OF 1% AS PER POPULATION RISE IN STATE
9. ODISHA ROOFTOP MARKET POTENTIAL
• TOTAL HOUSE HOLD IN ODISHA.
– %Having flat, concrete house
– Average Area per roof
• Total roof top area suitable for PV
• Size of one PV panel
• No. of Panel that can fit the total roof top area
• Power per panel
• Total MW Potential = No. of Panels * Power Per panel
• Calculation Based on 2011 Census
• As population increase is 1% per year a growth of 7%
to be added to 2011 census.
10. AREA REQUIRED
Size of system No. of panels Panel area (m2)
Roof area required
(m2)
2.50kW 10 14.4 19.4
2.75kW 11 15.8 21.2
3.00kW 12 17.3 22.9
3.25kW 13 18.7 24.6
3.50kW 14 20.2 26.4
3.75kW 15 21.6 28.1
4.00kW 16 23.0 29.8
Size of system versus roof space
13. ASSUMPTION FOR FINANCIAL
MODELING
INSTALLATION CAPACITY(KW) 10
CAPITAL COST 1.2 Lacs per kW for kW scale system
O&M COST 0.75% Of capital cost
ESCALATION IN O&M COST 5.72% Annually
INVERTER REPLACEMENT YEAR 13TH year
INVERTER COST DURING REPLACEMENT 3.81% Of capital cost
CUF 18% Annually
PERFORMANCE DEGRADATION 1% Of energy generation
AUXILARY CONSUMPTION 0.25% Years
USEFUL LIFE 25 year
DEB TO EQUITY RATION 70:30:00
LOAN T 70%
EQUITY 30%
LOAN TENURE 10 YEARS
INTREST RATE ON LOAN 13% ANNUALLY
INSURANCE COST 0.35% Annually
INTREST ON WORKING CAPITAL 12% Annually
WORKING CAPITAL 1 Month’s O&M Expense
1 Month’s Energy charge at normative CUF
RATE OF DEPRECIATION 6% FOR 1ST 10 YEAR
MINIMUM ALTERNATE TAX 20.01% Annually for 1st 10 year
CORPORATE TAX 32.45% Annually
ROE POST TAX 16% as per cerc
DISCOUNT FACTOR 10.95% Annually
14. COST SAVING PER 2KW
• System capacity = 2 kWp
• CUF :19%
• Capital Expenditure = INR 88,000/KW
• Monthly generation in Bhubaneswar = 330units
• Energy loss due to grid outage in Bhubaneswar = 10 units
• Net generation = 320 units/month
• Grid electricity rate = INR 5.4 /unit
• Waived off electricity bill = INR 1728 /month
• Total benefit per year = INR 20736
• Tax Benefit = 20.008%
• Total Benefit =INR 24883.60
• Payback period for the investment = 7.07 years
• Grant/subsidy/bulk purchasing will help in reducing the capital cost
of the system and then reduce the payback period.
• TARIFF CALCULATION
15. CONCLUSION:
• Roof top solar PV systems have great potential.
• There is a need for awareness creation both about rooftop solar PV
systems/ technology packages as well as about the financing
avenues available.
• There is need for standardization.
• The policy support is essential in terms of regulations for net
metering, grid interconnection, and energy accounting.
• There is a need for promoting large scale, local manufacturing of
dual function inverters (functionality of both grid-tied and hybrid
inverters) to reduce cost.
• There is need for technical innovations in storage technologies -
mainly to reduce costs and improve efficiency.
• Roof tops solar PV systems can play an important role in providing
reliable and assured power for buildings and establishments.