The document summarizes details on two proposed transportation and energy projects:
1) A high-speed rail project capable of speeds up to 2500km/hr that would use electric, fuel, or other power sources. It would use two types of trains and have significantly lower energy consumption compared to existing technologies.
2) A wind power plant project where wind energy above 400-500m would be converted to electricity. Power production capacity would range from 100MW for single-stage plants to 10,000MW for three-stage plants. Plants would have a lifetime of over 300 years and require minimal staff to operate and maintain.
1. Summaryof Rail Projects
1) Speedof rail max 2100 – 2500km/hr
2) Type of operation3type
a) Electricpower
b) Fuel or gas
c) XXXXXX
3) EnergyConsumptionwillbe 40 – 50% Compare to existingtechnology,phase 2XXXXXXonly
6% energyconsumption
4) Time for implementation Comparetoexistingtechnologyfor1kmapp 5-7days
5) Passengercapacityintwotype
a) Type 1 :- 100+ Passengercapacity
b) Type 2 :- 1200+ PassengerCapacity
6) Cost Comparisonwithexisting technology10– 15% only
7) Angle of slope rail caneasilyoperated60deg +
8) Rail can be operatedbydriverincabinor fullycentralisedautomatic
9) Train Coach intwotype of operationMonorail coach, Multi coach rail coach
10) Totallydifferentlineforpassengertrain& goodmovements,Can’toperatedinsame line
11) Thistechnology will replace currentrailway&airwaysinveryshortperiod
12) Maintenance will be easy&lessmanpowerrequiredonly
13) Suspensionwill be luxurioustravel withnotiredof travellingbecause inshortperiod
reachinglongerdistance
14) As of safetyfactor95% guaranteed,Natural disasternotassured
15) AirpollutionCompare toexistingtechnologylessthan40% only,In2 phase XXXXXX6 -7%
only
16) Life time ismore than 160 years,onlygeneral replacementspartswill changedperiodically
WindPowerPlantSummary
1) Windenergyisalwaysavailable inelevationabovesealevel 400 – 500m+ mightbe
differentingeographically,Available windenergyconvertedtoelectricenergy
2) Capacityof powerproductionof 1 unit plantis100MW (1stage) – 1000MW (2stage) --
10000MW (3stage) onratio of 1:10:10
3) Land Required40 – 50+ acres
4) 90% assuredsafetyof operation( notapplicable fornatural disaster)
5) Construction,erection,commissioningcanfullycompletedin6-8monthsof periodof time
inbehalf of preparation
6) Employersrequiredtooperate will be 10– lessthan50 only
7) Life time will be 300+years& general partswill replacedperiodof approximate 2 – 3 years
of time
8) Powerrequiredareaunitcanbe implemented,Sotransmissiontower,substationnot
required
9) LongerTransmissionlossof powerapproximately80% will be avoidedhere
10) Cost of powerwill be lessthanrupee perunit