Parsons Nutritionals Pvt Ltd- Sahibabad
Parsons Nutritionals Pvt Ltd-Sahibabad 1
Team Arjun
Parsons Nutritionals Pvt Ltd-Sahibabad 2
SN Team
Name of Quality circle
team
1 Virender Singh Section Incharge Production-NHC
2 Amar Supervisior Production-NHC
3 Sumit Singh IPQI Production-NHC
4 Amit Kumar Lab attendent Laminate sampling
5 Vinod Singh Foreman Production-NHC
6 Vinod Kumar Operator Production-NHC
7 Pankaj Chaubey Operator Production-NHC
8 Ram Dayal Operator Production-NHC
9 Bablu Helper Production-NHC
10 Gudiya Helper Production-NHC
11 Farha Helper Weightment
12 Tara Wati Helper Production-NHC
13 Pradeep Devidi Helper Production-NHC
Introduction to Quality Circle-
Name of the Quality Circle : Arjuna
Department : Manufacturing
Circle Starting Date : April’ 2014
Meeting day : Every Monday
Meetings : 13
Average Attendance : 90%
Parsons Nutritionals Pvt Ltd-Sahibabad 3
4
1. Problem
Identification
2. Selection of problem
3. Define of problem
4. Analysis of the problem
5. Identification of cause
6. Find the root cause
8. Development of
solution
7. Data analysis
9.Foreseeing probable
resistance
10. Trail implementation
11. Regular
implementation
12. Review
DR. JURAN
12 Step Problem Solving Method-
Parsons Nutritionals Pvt Ltd-Sahibabad
Step 1
String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage
test.
Paper Shifting On Each Machine.
Increased Laminate Wastage Due To Delimitation Of Roll From Inside.
Increased Laminate Wastage Due To Damaged Core Of The Roll.
Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting
Of The Roll.
Increased Laminate Wastage At The Time Of Roll Change Time.
Increased Laminate Wastage Machine Setting.
Increased Laminate Wastage After Change Over/ Wet Cleaning.
Noise Of Vibrators.
Increased Laminate Wastage Seal Powder, Leakage.
Unclosed Cover Of Wraptech Machine.
Holes In A.C Duct.
Open Hole On The Wraptech Machine.
Required Stands For The Tray.
Unproper Wiring Of The Panel.
Spillded Ink On The Nichrome Machine.
Cover On The Wraptech Machine Wiring Tray.
Water Leakage From The Air cylinder Of The Wraptech Machine.
Need To repaire The fioor of taping room.
Uncontrolled Oven Temperature.
Required Tube Light In QA Lab.
Display Board Have To Be Repaired.
Insided Transformer Of The Nichrome Machine Should Be Coverd.
Required Door Mat At The Entrance Of Sechet Section & Filling Room.
Adjoining Wire Of The Packing Table & Conveyer Should Be Covered.
Flat Body Of The Metal Detector.
Stopped Working Of The Emergency Stop OF The Wraptech Machine.
Even In The Low Air Pressure Machine Don’t Stop Working.
Wraptech Machine’s Farmer 'hole Have To Be Closed.
Broken Light Cover Of The Sechet Packing Hall.
Intercom Wire Should Be Placed In Pipe.
Broken Light Cover Of The Filling Room & Taping Machine Room.
The Problem Of Torned Laminate Roll In Running Machine.
Untidy Cleaning Bay.
Increased Laminate Wastage Due To Printing Cutting.
Due To The Wrinkle At The Corner Of The Laminate Roll the Machine’s Photo Sensor Can’t
Work That’s Why Increased Laminate Wastage.
Need To Repair The Refrigerator Of Micro Lab.
Broken Water Tap Pipe In Lab.
Step 2
Step 1
A
B
C
Involvement Of Team Member
Involvement Of Other Departments
Involvement Of Higher Management
SELECTION OF PROBLEMS ( A,B,C CATEGORY)
S.NO Problem Category
 1 String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage test. C
 2 Paper Shifting On Each Machine A
 3 Increased Laminate Wastage Due To Delamination Of Roll From Inside. B
 4 Increased Laminate Wastage Due To Damaged Core Of The Roll. B
 5 Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting Of The
Roll.
B
 6 Increased Laminate Wastage At The Time Of Roll Change Time. A
 7 Increased Laminate Wastage At The Time Of Machine Setting. A
 8 Increased Laminate Wastage After Change Over/ Wet Cleaning. A
 9 Noise Of Vibrators. C
 10 .Increased Laminate Wastage Seal Powder, Leakage. A
S.NO PROBLEM CATAGORY
 11 .Unclosed Cover Of Wraptech Machine. B
 12 .Holes In A.C Duct. B
 13 Open Hole On The Wraptech Machine. B
 14 Unproper Wiring Of The Panel. B
 15 Required Stands For The Tray. C
 16 Spillded Ink On The Nichrome Machine. A
 17 Cover On The Wraptech Machine Wiring Tray. B
 18 Water Leakage From The Air cylinder Of The Wraptech Machine. A
 19 Need To Prepare The Humidity Chamber In Lab. B
 20 Uncontrolled Oven Temperature Of Lab B
SELECTION OF PROBLEMS ( A,B,C CATEGORY)
S.NO PROBLEM CATAGORY
 21 .Required Tube Light In QA Lab. B
 22 Display Board Have To Be Repaired In Packing Hall Of Sechet Section. B
 23 .Inside Transformer Of The Nichrome Machine Should Be Coverd. B
 24 Required Door Mat At The Entrance Of Sechet Section & Filling Room. B
 25 Adjoining Wire Of The Packing Table & Conveyer Should Be Covered. B
 26 Flat Body Of The Metal Detector. C
 27 Stopped Working Of The Emergency Stop OF The Wraptech Machine. A
 28 Even In The Low Air Pressure Machine Don’t Stop Working. B
 29 Wraptech Machine’s Farmer 'hole Have To Be Closed. B
 30 Broken Light Cover Of The Sechet Packing Hall. B
SELECTION OF PROBLEMS ( A,B,C CATEGORY)
S.NO PROBLEM CATAGORY
 31 Intercom Wire Should Be Placed In Pipe. C
 32 Broken Light Cover Of The Filling Room & Taping Machine Room. B
 33 The Problem Of Torned Laminate Roll In Running Machine. A
 34 Untidy Cleaning Bay. A
 35 Increased Laminate Wastage Due To Printing Cutting. A
 36 Due To The Wrinkle At The Corner Of The Laminate Roll the Machine’s Photo Sensor Can’t
Work
B
 37 Need To Repair The Refrigerator Of Micro Lab. C
 38 Broken Water Tap Pipe In Lab. B
SELECTION OF PROBLEMS ( A,B,C CATEGORY)
A B C ANALYSIS
A B C
Involvement of team
member
Involvement of Other
Department’s
Involvement of Higher
Management
12 21 06
SELECTION OF PROBLEMS ( A,B,C CATEGORY
31%
54%
15%
A -Involvement of team member
B -Involvement of Other Department’s
C -Involvement of Higher Management
Status of Problems
Problems Identified Problems Solved Problems Pending
NO OF PROBLEMS NO OF PROBLEMS NO OF PROBLEMS
38 20 18
SELECTION OF PROBLEM
PROBLEM SELECTION FROM “A” CATEGORY
S.NO PROBLEM IMPORTENCE
 1 Paper Shifting On Each Machine M I
 2 Increased Laminate Wastage At The Time Of Roll Change Time. M I
 3 Increased Laminate Wastage At The Time Of Machine Setting. I
 4 Increased Laminate Wastage After Change Over/ Wet Cleaning. I
 5 .Increased Laminate Wastage Seal Powder, Leakage. I
 6 Spillded Ink On The Nichrome Machine. LI
 7 Water Leakage From The Air cylinder Of The Wraptech Machine. LI
 8 . Stopped Working Of The Emergency Stop OF The Wraptech Machine. M I
 9 The Problem Of Torned Laminate Roll In Running Machine. I
 10 Untidy Cleaning Bay I
 11 Increased Laminate Wastage Due To Printing Cutting M I
SELECTION OF PROBLEM
PROBLEM SELECTION FROM “A” CATEGORY
 1 Increased Laminate Wastage Due To Printing Cutting..
 2. Stopped Working Of The Emergency Stop OF The
Wraptec Machine.
 3. Paper Shifting On Each Machine .
 4. Increased Laminate Wastage At The Time Of Roll
Change.
SELECTION OF PROBLEM
DATA BASE ANALYSIS
S.NO PROBLEM Amar sumit vinod gudiya Pankaj TOTAL
1. 1. Paper Shifting
On Each Machine
.
12 12 11 10 12 57
2. . Increased
Laminate Wastage
At The Time Of
Roll Change.
11 9 10 12 10 52
3. Stopped
Working Of The
Emergency Stop
OF The
Wrapetech
Machine
.
10 11 9 9 11 49
4. . Increased
Laminate Wastage
Due To Printing
Cutting
4 7 12 11 9 43
SELECTION OF PROBLEM
SELECTION OF MAJOR PROBLEM
(Pareto Analysis)
0
50
100
150
200
250
0
10
20
30
40
50
60
4. Increased Laminate
Wastage Due To Printing
Cutting
3. Stopped Working Of The
Emergency Stop OF The
Wrapetec Mavchine
2.Increased Laminate
Wastage At The Time Of Roll
change
1. Paper Shifting On Each
Machine
Total No
Percentage
cumilative No
28%
55%
79%
100%
Step 1
Step 2
Step 3
DEFINE THE PROBLEM
STEP 3
OBSERVATION
PROCESS FLOW DIAGRAM
UN-PROPER
SETTING OF
ROLL
CODING
OUT
PHOTO CELL
OUT
ROLL
CHANGE
CODING+LENGTH-OUT
+OUT-CUTTING POUCH
DEFINE THE PROBLEM
Increased Laminate Wastage At The Time Of Roll Change Due To Paper Shifting
IMPACTS OF THE PROBLEM:-
 Degradation of Pouch Quality
 Dissatisfaction of customer.
 High Laminate and Insert losses.
 Wastage of time in repeated adjustments
DEFINE THE PROBLEM
OBJECTIVES
 To Eliminate The Losses.
 To Improve Product Quality.
 To Improve Packing Quality.
 Ensure Customer Satisfaction.
 To Improve Working Environment.
Step .3
Mile Stone Chart
Mile Stone Chart
Sl.N
o Activity April.14 May.14 June.14 July.14 Aug-14
Week
-1
Week
-2
Week
-3
Week
-4
Week
-5
Week
-1
Week
-2
Week
-3
Week
-4
Week
-1
Week
-2
Week
-3
Week
-4
Week
-1
Week
-2
Week
-3
Week
-4
Week
-5
Week
-1
Week
-2
1
Identify
problem
2
Selection of
Problem
3
Define the
Problem
4
Analysis of
Problem
5
Identify
Causes
6
Identify Root
Causes
7 Data Analysis
8
Development
Solution
9
Forseen
Resistance
10
Trail
Implement
11
Regular
Implement
12
Followup and
Review
Continuous Process
Analyze The Problem
Step 1
Step 2
Step 3
Step 4
STEP 4
4W & 1H ANALYSIS
Laminate wastage
WHERE
PACKING MACHINE
WHEN
WHAT
WHEN
AT THE TIME OF ROLL CHANGE
WHO
OPERATOR,FOREMAN
HOW
UNPROPER SETTING OF ROLL /
PAPER SHIFFTING ON MACHINE
Step 1
Step 2
Step 3
Step 4
Step 5
IDENTIFICATION OF CAUSES
CAUSE & EFFECT DIAGRAM
LAMINATE WASTAGE
MAN
MATERIAL
MAN
METHOD
MACHINE
PAPER SHIFFTING ON MACHINE
CODING OUT
PHOTO CELL OUT
STEP 5
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
STEP 6
S.No Cause Description Analysis Validation
1
 IMPROPER SETTING OF THE
LAMINATE ROLL
 PHYSICALLY CHECKED
LAMINATE ROLL WAS
PROPERLY SET
2
 PAPER SHIFFTING ON
MACHINE
 PHYSICALLY
CHECKED THAT ROLL
WAS SHIFTING ON THE
ROLLER CAUSE OF
VIBRATION OF
RUNNING MACHINE
3
 CODING OUT ON THE
MACHINE
 PHYSICALLY CHECKED
CODING WAS O.K ON
THE POUCH
4
 PHOTO CELL OUT ON THE
MACHINE
 PHYSICALLY
CHECKED PHOTO CELL
FOUND O.K .
5
WRONG CUTTING OF
LAMINATE AT THE
STARTING OF THE ROLL
 PHYSICALLY CHECKED
THAT OPRATOR WAS
CUTTING THE ROLL IN
WRONG MANNER AT
THE STARTING
NOTE:- Gemba analysis done for validation of causes.
Step 6
VALIDATION OF CAUSES
ROOT CAUSE ANALYSIS
Step 5
Step 6
Step 7
DATA ANALYSIS OF THE CAUSES
RANKING METHOD
S.R.NO Root causes SUDHIR SUMIT VINOD I VINOD II PARDEEP TOTAL % age
 1. PAPER SHIFFTING ON
MACHINE 8 7 8 7 8 38 58%
 2 WRONG CUTTING OF
LAMINATE AT THE
STARTING OF THE
ROLL 6 5 6 5 6 28 42%
(Rating 10 being the Highest, 0 being the lowest
Step .7
DATA ANALYSIS OF THE
CAUSES
42 42
42%
0
20
40
60
80
100
120
0
5
10
15
20
25
30
35
40
45
marks cumilative
marks
cumilative %
§WRONG CUTTING OF LAMINATE AT
THE STARTING OF THE ROLL
PAPER SHIFFTING ON MACHINE
42%
SELECTION OF VITAL CAUSE
(Pareto Analysis)
Step .7
DATA ANALYSIS OF THE CAUSES
MOST VITAL CAUSE IDENTIFIED
From pareto analysis in last slide team
members decided to eliminate all two root
causes
1 PAPER SHIFFTING ON MACHINE
 ROOT CAUSE. 2 WRONG CUTTING OF LAMINATE
AT THE
STARTING OF THE ROLL
ROOT CAUSE.
Step 5
Step 6
Step 7
Step 8
Step. 8
Solutions from
Team member
Two operators will
Set the laminate roll
On the machine
Proper cutting
of the
Laminate at the
starting
Of the roll after
the roll
change
To inform the
vender
For the wrinkle
on the
Side of the roll
and for
The core band
Roller mark
must
Be fixed on roll
assembly
Roller mark must
Be fixed on roll
assembly
FORESEEN RESISTENCE
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
FORSEEN RESISTANCE
FORSEEING PROBABLE RESISTANCE
S.No. RESISTANCE SOLUTION RESPONSIBILTY TARGET
DATE
1 Oprator can do mistake to paste
The taplone guide
Foremem & incharge will guide
Operator to fix the taplone guide on
farmer
Vinod Singh/
Pankaj Choubey
15.07.14
 2 Two Operator will set the laminate
roll on the machine
It will be scheduled properly to
avoid the problems
Sechet incharge 15.07.14
 3 Proper cutting of the
Laminate at the starting
Of the roll after the roll
change
Operator will instruct before the
starting of each roll
Supervisior/forem
en
16.07.14
 4 Roller mark must
Be fixed on roll
assembly
To check by the supervisior &
foremen that roller mark is fixed
properly
Amar Nath Singh/
Vinod Singh
16.07.14
 5 To inform the vender
For the wrinkle on the
Side of the roll and for
The core band
It is physically checked before fixing
the laminate roll on machine
Vinod/Pankaj
chouby
29.04.14
HENCE NO RESISTENCE TO IMPLEMENT THE SOLUTIONSTEP 9
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
TRIAL IMPLEMENTATION
SOLUTION NUMBER-01
Tapelone Guide On Farmer
Step 10
TRIAL IMPLEMENTATION
SOLUTION NUMBER-03
Proper cutting of the
Laminate at the starting
Of the roll after the roll
changeStep 10
TRIAL IMPLEMENTATION
SOLUTION NUMBER-04
Rollar Mark on Roll Assembly
Before
After
Step 10
TRIAL IMPLEMENTATION
RESULT OF TRIAL IMPLEMENTATION
TRIAL RUN CONDUCTED BY MR. PANKAJ CHOUBY
1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20%
0
0.002
0.004
0.006
0.008
0.01
0.012
0.014
LAMINATE
WASTAGE
18.JULY 19.JULU 20.JULY 21.JULY 22.JULY 23.JULY 24.JULY 25.JULY 26.JULY
Trial SuccessfulStep 10
REGULAR
IMPLEMENTATION
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
STEP 11
REGULAR IMPLEMENTATION
TANGIBLE GAINS
Date SKU Daily Production
Laminate
Wastage
08.02.14 Bt0015s 581760 2.78
09.02.14 Bt0015s 584640 2.09
10.2.14 Bt0015s 391104 1.18
11.02.14 Bt0015s 570240 2.04
12.02.14 Bt0015s 587520 2.73
13.02.14 Bt0015s 587520 1.81
14.02.14 Bt0015s 587520 1.41
15.02.14 Bt0015s 587520 1.45
16.02.14 Bt0015s 588672 1.41
17.02.14 Bt0015s 587520 1.6
18.02.14 Bt0015s 587520 1.48
19.02.14 Bt0015s 587520 1.18
20.02.14 Bt0015s 524960 1.5
21.02.14 Bt0015s 302400 2.13
21.02.14 Bt0010s 331680 1.59
22.02.14 Bt0015s 691200 1.47
23.02.14 Bt0015s 685440 1.36
24.02.14 Bt0015s 685440 1.49
25.02.14 Bt0015s 685440 1.81
26.02.14 Bt0015s 685440 1.39
27.02.14 Bt0015s 345600 1.46
Date SKU Daily Production Laminate Wastage
02.05.14 Bt0015s 293760 2.75
03.05.14 Bt0015s 414720 1.28
04.05.14 Bt0015s 250560 1.2
05.05.14 Bt0015s 443520 1.2
06.05.14 Bt0015s 414720 1.25
07.05.14 Bt0015s 593280 1.04
08.05.14 Bt0015s 570240 0.91
09.05.14 Bt0015s 639360 1.01
10.05.14 Bt0010s 600000 1.55
11.05.14 Bt0010s 193440 1.01
11.05.14 Bt0015s 230400 0.93
12.05.14 Bt0015s 641664 0.99
13.05.14 Bt0015s 656640 1.04
14.05.14 Bt0015s 656640 1.02
15.05.14 Bt0015s 228240 0.54
21.05.14 SH18s 471600 1.46
22.05.14 SH18s 525600 1.1
23.05.14 SH18s 583200 1.3
24.05.14 SH18s 532800 1.29
25.05.14 SH18s 594400 1.11
26.05.14 SH18s 586800 1.07
27.05.14 SH18s 539280 1.22
28.05.14 Bt0015s 565200 1.32
Before Quality Circle Laminate Wastage After Quality Circle Laminate Wastage
REGULAR
IMPLEMENTATION
TANGIBLE GAINS
1.50%
1.20% 1.20% 1.20%
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
1.20%
1.40%
1.60%
feb may june july
laminate wastage
before quality
circle
laminate wastage
after quality circle
laminate wastage
after quality circle
laminate wastage
after quality circle
Series1
Before Quality Circle in Feb 2014 Laminate Wastage Target = 1.51%
r After Quality Circle in May 2014 Laminate Wastage = 1.21%
After Quality Circle in jUNE 2014 Laminate Wastage = 0.99%
After Quality Circle in jULY 2014 Laminate Wastage = 1.44%
Approx Saving of Laminate Wastage per month = .29%
Its Worth Near About = 1,40000
REGULAR IMPLENTATION
INTANGIBLE GAINS
 Money Saving
 Reduced Wastage
 Healthy Environment
 INCREASED STAFF CONFIDENCE
STEP 11
FOLLOW UP & REVIEW
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Step 12
STEP 12
PARSONS NUTRITIONALS PRIVATE LIMITED
NO OF PROBLEMS SOLVED
S. No Problem
1 String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage test.
2 Increased Laminate Wastage Due To Delimitation Of Roll From Inside.
3 Increased Laminate Wastage Due To Damaged Core Of The Roll.
4 5.Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting Of The Roll
5 Unclosed Cover Of Wraptech Machine.
6 Holes In A.C Duct.
7 Opon Hole On The Wraptech Machine.
8 Unproper Wiring Of The Panel.
9 Spillded Ink On The Nichrome Machine.
10 Water Leakage From The Air cylinder Of The Wraptech Machine.
11 Need To repaire The fioor of taping room
12 Uncontrolled Oven Temperature.
13 Required Tube Light In QA Lab
14 Display Board Have To Be Repaired.
15 Insided Transformer Of The Nichrome Machine Should Be Coverd.
PARSONS NUTRITIONALS PRIVATE LIMITED
NO OF PROBLEMS SOLVED
S. No Problem
16 .Required Door Mat At The Entrance Of Sechet Section & Filling Room
17 Adjoining Wire Of The Packing Table & Conveyer Should Be Covered
18 .Stopped Working Of The Emergency Stop OF The Wraptech Machine. Even In The Low Air Pressure
Machine Don’t Stop Working.
19 Wraptech Machine’S FarMer 'hole have to Be cloSeD
20 Untidy Cleaning Bay
21 even in the loW air preSSure Machine Don’t Stop Working.
22 Due to the Wrinkle at the corner oF the laMinate roll the Machine’S photo SenSor can’t Work that’S
Why Increased Laminate Wastage.
23 Broken Water Tap Pipe In Lab.
THE TOOLS AND TECNIQUES FOR
PROBLEM SOLVING
Stratification
Cause And Effect Diagram
Pareto Chart
Pie Chart
Ranking Method
4 W & 1 H
Brainstorming
CONCLUSION
Lessons Learnt:-
• Innovations and working as a team towards achieving target.
•Systematic Problem Solving approach.
•Keep regular watch on key area after project implementation
Arjun_Lam. wastage-NHC-April-2014 (5)

More Related Content

Viewers also liked

Tasty misfits office box
Tasty misfits office boxTasty misfits office box
Tasty misfits office boxdeepakbgl
 
Tackling Complex Texts II.pptx
Tackling Complex Texts II.pptxTackling Complex Texts II.pptx
Tackling Complex Texts II.pptxmquackenbush
 
Paper 7 direct taxation - june-2015
Paper 7  direct taxation - june-2015Paper 7  direct taxation - june-2015
Paper 7 direct taxation - june-2015Jaipal P
 
Caldo Privat Security - invata femeile sa se apere
Caldo Privat Security - invata femeile sa se apereCaldo Privat Security - invata femeile sa se apere
Caldo Privat Security - invata femeile sa se apereCALDO PRIVAT SECURITY
 
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...vivineno
 
Paper6 laws, ethics and governance - june-2015
Paper6   laws, ethics and governance - june-2015Paper6   laws, ethics and governance - june-2015
Paper6 laws, ethics and governance - june-2015Jaipal P
 
Sims Isaac PPP
Sims Isaac PPPSims Isaac PPP
Sims Isaac PPPi77sims
 
Quality Circle (Lack of Creativity and Innovation)
Quality Circle (Lack of Creativity and Innovation)Quality Circle (Lack of Creativity and Innovation)
Quality Circle (Lack of Creativity and Innovation)Ujjwal Patel
 
LEGISLACIÓN EMPRESARIAL
LEGISLACIÓN EMPRESARIALLEGISLACIÓN EMPRESARIAL
LEGISLACIÓN EMPRESARIALfrancisco moran
 
AnimatedCharacterPPT
AnimatedCharacterPPTAnimatedCharacterPPT
AnimatedCharacterPPTTyler Totten
 
Educational Technology Report
Educational Technology ReportEducational Technology Report
Educational Technology Reportnapcaruz
 

Viewers also liked (14)

Resume
ResumeResume
Resume
 
Tasty misfits office box
Tasty misfits office boxTasty misfits office box
Tasty misfits office box
 
Tackling Complex Texts II.pptx
Tackling Complex Texts II.pptxTackling Complex Texts II.pptx
Tackling Complex Texts II.pptx
 
ANPO
ANPOANPO
ANPO
 
Paper 7 direct taxation - june-2015
Paper 7  direct taxation - june-2015Paper 7  direct taxation - june-2015
Paper 7 direct taxation - june-2015
 
Caldo Privat Security - invata femeile sa se apere
Caldo Privat Security - invata femeile sa se apereCaldo Privat Security - invata femeile sa se apere
Caldo Privat Security - invata femeile sa se apere
 
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...
[Hot!] crowd funding complete step by-step set up guide anyone can do it $4.9...
 
Paper6 laws, ethics and governance - june-2015
Paper6   laws, ethics and governance - june-2015Paper6   laws, ethics and governance - june-2015
Paper6 laws, ethics and governance - june-2015
 
Sims Isaac PPP
Sims Isaac PPPSims Isaac PPP
Sims Isaac PPP
 
MOGENI CV
MOGENI CVMOGENI CV
MOGENI CV
 
Quality Circle (Lack of Creativity and Innovation)
Quality Circle (Lack of Creativity and Innovation)Quality Circle (Lack of Creativity and Innovation)
Quality Circle (Lack of Creativity and Innovation)
 
LEGISLACIÓN EMPRESARIAL
LEGISLACIÓN EMPRESARIALLEGISLACIÓN EMPRESARIAL
LEGISLACIÓN EMPRESARIAL
 
AnimatedCharacterPPT
AnimatedCharacterPPTAnimatedCharacterPPT
AnimatedCharacterPPT
 
Educational Technology Report
Educational Technology ReportEducational Technology Report
Educational Technology Report
 

Similar to Arjun_Lam. wastage-NHC-April-2014 (5)

Industrial attachment of uttara knitting & dyeing ltd.
Industrial attachment of uttara knitting & dyeing ltd.Industrial attachment of uttara knitting & dyeing ltd.
Industrial attachment of uttara knitting & dyeing ltd.Md. Mazadul Hasan Shishir
 
Automatic packaging machine
Automatic packaging machineAutomatic packaging machine
Automatic packaging machineDarani Daran
 
OPM500 EMC Additional InformationA. EMC—Background Information.docx
OPM500 EMC Additional InformationA.  EMC—Background Information.docxOPM500 EMC Additional InformationA.  EMC—Background Information.docx
OPM500 EMC Additional InformationA. EMC—Background Information.docxhopeaustin33688
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLMd. sirajul Haque Sajib
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013Aamer Pathan
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfMizan Rahman
 
Mold Flow Analysys project
Mold Flow Analysys projectMold Flow Analysys project
Mold Flow Analysys projectKeerthi Bandara
 
Internship Report Arslan
Internship Report ArslanInternship Report Arslan
Internship Report ArslanArslan Shaukat
 
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON Supervisin...
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON     Supervisin...PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON     Supervisin...
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON Supervisin...Bangladesh University of Textiles (BUTEX)
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Gaurab Pant
 

Similar to Arjun_Lam. wastage-NHC-April-2014 (5) (20)

JSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptxJSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptx
 
Industrial attachment of uttara knitting & dyeing ltd.
Industrial attachment of uttara knitting & dyeing ltd.Industrial attachment of uttara knitting & dyeing ltd.
Industrial attachment of uttara knitting & dyeing ltd.
 
Alpla_EKTHA.pptx
Alpla_EKTHA.pptxAlpla_EKTHA.pptx
Alpla_EKTHA.pptx
 
sapl-presentation
sapl-presentationsapl-presentation
sapl-presentation
 
Automatic packaging machine
Automatic packaging machineAutomatic packaging machine
Automatic packaging machine
 
The delta composite knitting ind. ltd.
The delta composite knitting ind. ltd.The delta composite knitting ind. ltd.
The delta composite knitting ind. ltd.
 
OPM500 EMC Additional InformationA. EMC—Background Information.docx
OPM500 EMC Additional InformationA.  EMC—Background Information.docxOPM500 EMC Additional InformationA.  EMC—Background Information.docx
OPM500 EMC Additional InformationA. EMC—Background Information.docx
 
Noman Composite Textile Ltd
Noman Composite Textile LtdNoman Composite Textile Ltd
Noman Composite Textile Ltd
 
Coining QCC R1.pptx
Coining QCC R1.pptxCoining QCC R1.pptx
Coining QCC R1.pptx
 
Case study
Case studyCase study
Case study
 
Industrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCLIndustrial report on dyeing-finishing section MKCL
Industrial report on dyeing-finishing section MKCL
 
Project ITC New
Project ITC NewProject ITC New
Project ITC New
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Mold Flow Analysys project
Mold Flow Analysys projectMold Flow Analysys project
Mold Flow Analysys project
 
Dyeing Faults
 Dyeing Faults Dyeing Faults
Dyeing Faults
 
ROTARYPRESS_EN
ROTARYPRESS_ENROTARYPRESS_EN
ROTARYPRESS_EN
 
Internship Report Arslan
Internship Report ArslanInternship Report Arslan
Internship Report Arslan
 
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON Supervisin...
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON     Supervisin...PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON     Supervisin...
PRESENTATION OF SQUARE KNIT FABRICS LTD. BY MILON,MAMUN,PLABON Supervisin...
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)
 

Arjun_Lam. wastage-NHC-April-2014 (5)

  • 1. Parsons Nutritionals Pvt Ltd- Sahibabad Parsons Nutritionals Pvt Ltd-Sahibabad 1
  • 2. Team Arjun Parsons Nutritionals Pvt Ltd-Sahibabad 2 SN Team Name of Quality circle team 1 Virender Singh Section Incharge Production-NHC 2 Amar Supervisior Production-NHC 3 Sumit Singh IPQI Production-NHC 4 Amit Kumar Lab attendent Laminate sampling 5 Vinod Singh Foreman Production-NHC 6 Vinod Kumar Operator Production-NHC 7 Pankaj Chaubey Operator Production-NHC 8 Ram Dayal Operator Production-NHC 9 Bablu Helper Production-NHC 10 Gudiya Helper Production-NHC 11 Farha Helper Weightment 12 Tara Wati Helper Production-NHC 13 Pradeep Devidi Helper Production-NHC
  • 3. Introduction to Quality Circle- Name of the Quality Circle : Arjuna Department : Manufacturing Circle Starting Date : April’ 2014 Meeting day : Every Monday Meetings : 13 Average Attendance : 90% Parsons Nutritionals Pvt Ltd-Sahibabad 3
  • 4. 4 1. Problem Identification 2. Selection of problem 3. Define of problem 4. Analysis of the problem 5. Identification of cause 6. Find the root cause 8. Development of solution 7. Data analysis 9.Foreseeing probable resistance 10. Trail implementation 11. Regular implementation 12. Review DR. JURAN 12 Step Problem Solving Method- Parsons Nutritionals Pvt Ltd-Sahibabad
  • 6. String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage test. Paper Shifting On Each Machine. Increased Laminate Wastage Due To Delimitation Of Roll From Inside. Increased Laminate Wastage Due To Damaged Core Of The Roll. Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting Of The Roll. Increased Laminate Wastage At The Time Of Roll Change Time. Increased Laminate Wastage Machine Setting. Increased Laminate Wastage After Change Over/ Wet Cleaning. Noise Of Vibrators. Increased Laminate Wastage Seal Powder, Leakage. Unclosed Cover Of Wraptech Machine. Holes In A.C Duct. Open Hole On The Wraptech Machine. Required Stands For The Tray. Unproper Wiring Of The Panel. Spillded Ink On The Nichrome Machine. Cover On The Wraptech Machine Wiring Tray.
  • 7. Water Leakage From The Air cylinder Of The Wraptech Machine. Need To repaire The fioor of taping room. Uncontrolled Oven Temperature. Required Tube Light In QA Lab. Display Board Have To Be Repaired. Insided Transformer Of The Nichrome Machine Should Be Coverd. Required Door Mat At The Entrance Of Sechet Section & Filling Room. Adjoining Wire Of The Packing Table & Conveyer Should Be Covered. Flat Body Of The Metal Detector. Stopped Working Of The Emergency Stop OF The Wraptech Machine. Even In The Low Air Pressure Machine Don’t Stop Working. Wraptech Machine’s Farmer 'hole Have To Be Closed. Broken Light Cover Of The Sechet Packing Hall. Intercom Wire Should Be Placed In Pipe. Broken Light Cover Of The Filling Room & Taping Machine Room. The Problem Of Torned Laminate Roll In Running Machine. Untidy Cleaning Bay. Increased Laminate Wastage Due To Printing Cutting. Due To The Wrinkle At The Corner Of The Laminate Roll the Machine’s Photo Sensor Can’t Work That’s Why Increased Laminate Wastage. Need To Repair The Refrigerator Of Micro Lab. Broken Water Tap Pipe In Lab.
  • 9. A B C Involvement Of Team Member Involvement Of Other Departments Involvement Of Higher Management
  • 10. SELECTION OF PROBLEMS ( A,B,C CATEGORY) S.NO Problem Category  1 String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage test. C  2 Paper Shifting On Each Machine A  3 Increased Laminate Wastage Due To Delamination Of Roll From Inside. B  4 Increased Laminate Wastage Due To Damaged Core Of The Roll. B  5 Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting Of The Roll. B  6 Increased Laminate Wastage At The Time Of Roll Change Time. A  7 Increased Laminate Wastage At The Time Of Machine Setting. A  8 Increased Laminate Wastage After Change Over/ Wet Cleaning. A  9 Noise Of Vibrators. C  10 .Increased Laminate Wastage Seal Powder, Leakage. A
  • 11. S.NO PROBLEM CATAGORY  11 .Unclosed Cover Of Wraptech Machine. B  12 .Holes In A.C Duct. B  13 Open Hole On The Wraptech Machine. B  14 Unproper Wiring Of The Panel. B  15 Required Stands For The Tray. C  16 Spillded Ink On The Nichrome Machine. A  17 Cover On The Wraptech Machine Wiring Tray. B  18 Water Leakage From The Air cylinder Of The Wraptech Machine. A  19 Need To Prepare The Humidity Chamber In Lab. B  20 Uncontrolled Oven Temperature Of Lab B SELECTION OF PROBLEMS ( A,B,C CATEGORY)
  • 12. S.NO PROBLEM CATAGORY  21 .Required Tube Light In QA Lab. B  22 Display Board Have To Be Repaired In Packing Hall Of Sechet Section. B  23 .Inside Transformer Of The Nichrome Machine Should Be Coverd. B  24 Required Door Mat At The Entrance Of Sechet Section & Filling Room. B  25 Adjoining Wire Of The Packing Table & Conveyer Should Be Covered. B  26 Flat Body Of The Metal Detector. C  27 Stopped Working Of The Emergency Stop OF The Wraptech Machine. A  28 Even In The Low Air Pressure Machine Don’t Stop Working. B  29 Wraptech Machine’s Farmer 'hole Have To Be Closed. B  30 Broken Light Cover Of The Sechet Packing Hall. B SELECTION OF PROBLEMS ( A,B,C CATEGORY)
  • 13. S.NO PROBLEM CATAGORY  31 Intercom Wire Should Be Placed In Pipe. C  32 Broken Light Cover Of The Filling Room & Taping Machine Room. B  33 The Problem Of Torned Laminate Roll In Running Machine. A  34 Untidy Cleaning Bay. A  35 Increased Laminate Wastage Due To Printing Cutting. A  36 Due To The Wrinkle At The Corner Of The Laminate Roll the Machine’s Photo Sensor Can’t Work B  37 Need To Repair The Refrigerator Of Micro Lab. C  38 Broken Water Tap Pipe In Lab. B SELECTION OF PROBLEMS ( A,B,C CATEGORY)
  • 14. A B C ANALYSIS A B C Involvement of team member Involvement of Other Department’s Involvement of Higher Management 12 21 06
  • 15. SELECTION OF PROBLEMS ( A,B,C CATEGORY 31% 54% 15% A -Involvement of team member B -Involvement of Other Department’s C -Involvement of Higher Management
  • 16. Status of Problems Problems Identified Problems Solved Problems Pending NO OF PROBLEMS NO OF PROBLEMS NO OF PROBLEMS 38 20 18
  • 17. SELECTION OF PROBLEM PROBLEM SELECTION FROM “A” CATEGORY S.NO PROBLEM IMPORTENCE  1 Paper Shifting On Each Machine M I  2 Increased Laminate Wastage At The Time Of Roll Change Time. M I  3 Increased Laminate Wastage At The Time Of Machine Setting. I  4 Increased Laminate Wastage After Change Over/ Wet Cleaning. I  5 .Increased Laminate Wastage Seal Powder, Leakage. I  6 Spillded Ink On The Nichrome Machine. LI  7 Water Leakage From The Air cylinder Of The Wraptech Machine. LI  8 . Stopped Working Of The Emergency Stop OF The Wraptech Machine. M I  9 The Problem Of Torned Laminate Roll In Running Machine. I  10 Untidy Cleaning Bay I  11 Increased Laminate Wastage Due To Printing Cutting M I
  • 18. SELECTION OF PROBLEM PROBLEM SELECTION FROM “A” CATEGORY  1 Increased Laminate Wastage Due To Printing Cutting..  2. Stopped Working Of The Emergency Stop OF The Wraptec Machine.  3. Paper Shifting On Each Machine .  4. Increased Laminate Wastage At The Time Of Roll Change.
  • 19. SELECTION OF PROBLEM DATA BASE ANALYSIS S.NO PROBLEM Amar sumit vinod gudiya Pankaj TOTAL 1. 1. Paper Shifting On Each Machine . 12 12 11 10 12 57 2. . Increased Laminate Wastage At The Time Of Roll Change. 11 9 10 12 10 52 3. Stopped Working Of The Emergency Stop OF The Wrapetech Machine . 10 11 9 9 11 49 4. . Increased Laminate Wastage Due To Printing Cutting 4 7 12 11 9 43
  • 20. SELECTION OF PROBLEM SELECTION OF MAJOR PROBLEM (Pareto Analysis) 0 50 100 150 200 250 0 10 20 30 40 50 60 4. Increased Laminate Wastage Due To Printing Cutting 3. Stopped Working Of The Emergency Stop OF The Wrapetec Mavchine 2.Increased Laminate Wastage At The Time Of Roll change 1. Paper Shifting On Each Machine Total No Percentage cumilative No 28% 55% 79% 100%
  • 22. DEFINE THE PROBLEM STEP 3 OBSERVATION PROCESS FLOW DIAGRAM UN-PROPER SETTING OF ROLL CODING OUT PHOTO CELL OUT ROLL CHANGE CODING+LENGTH-OUT +OUT-CUTTING POUCH
  • 23. DEFINE THE PROBLEM Increased Laminate Wastage At The Time Of Roll Change Due To Paper Shifting IMPACTS OF THE PROBLEM:-  Degradation of Pouch Quality  Dissatisfaction of customer.  High Laminate and Insert losses.  Wastage of time in repeated adjustments
  • 24. DEFINE THE PROBLEM OBJECTIVES  To Eliminate The Losses.  To Improve Product Quality.  To Improve Packing Quality.  Ensure Customer Satisfaction.  To Improve Working Environment. Step .3
  • 25. Mile Stone Chart Mile Stone Chart Sl.N o Activity April.14 May.14 June.14 July.14 Aug-14 Week -1 Week -2 Week -3 Week -4 Week -5 Week -1 Week -2 Week -3 Week -4 Week -1 Week -2 Week -3 Week -4 Week -1 Week -2 Week -3 Week -4 Week -5 Week -1 Week -2 1 Identify problem 2 Selection of Problem 3 Define the Problem 4 Analysis of Problem 5 Identify Causes 6 Identify Root Causes 7 Data Analysis 8 Development Solution 9 Forseen Resistance 10 Trail Implement 11 Regular Implement 12 Followup and Review Continuous Process
  • 26. Analyze The Problem Step 1 Step 2 Step 3 Step 4 STEP 4
  • 27. 4W & 1H ANALYSIS Laminate wastage WHERE PACKING MACHINE WHEN WHAT
  • 28. WHEN AT THE TIME OF ROLL CHANGE WHO OPERATOR,FOREMAN HOW UNPROPER SETTING OF ROLL / PAPER SHIFFTING ON MACHINE
  • 29. Step 1 Step 2 Step 3 Step 4 Step 5
  • 30. IDENTIFICATION OF CAUSES CAUSE & EFFECT DIAGRAM LAMINATE WASTAGE MAN MATERIAL MAN METHOD MACHINE PAPER SHIFFTING ON MACHINE CODING OUT PHOTO CELL OUT STEP 5
  • 31. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 STEP 6
  • 32. S.No Cause Description Analysis Validation 1  IMPROPER SETTING OF THE LAMINATE ROLL  PHYSICALLY CHECKED LAMINATE ROLL WAS PROPERLY SET 2  PAPER SHIFFTING ON MACHINE  PHYSICALLY CHECKED THAT ROLL WAS SHIFTING ON THE ROLLER CAUSE OF VIBRATION OF RUNNING MACHINE 3  CODING OUT ON THE MACHINE  PHYSICALLY CHECKED CODING WAS O.K ON THE POUCH 4  PHOTO CELL OUT ON THE MACHINE  PHYSICALLY CHECKED PHOTO CELL FOUND O.K . 5 WRONG CUTTING OF LAMINATE AT THE STARTING OF THE ROLL  PHYSICALLY CHECKED THAT OPRATOR WAS CUTTING THE ROLL IN WRONG MANNER AT THE STARTING NOTE:- Gemba analysis done for validation of causes. Step 6 VALIDATION OF CAUSES ROOT CAUSE ANALYSIS
  • 34. DATA ANALYSIS OF THE CAUSES RANKING METHOD S.R.NO Root causes SUDHIR SUMIT VINOD I VINOD II PARDEEP TOTAL % age  1. PAPER SHIFFTING ON MACHINE 8 7 8 7 8 38 58%  2 WRONG CUTTING OF LAMINATE AT THE STARTING OF THE ROLL 6 5 6 5 6 28 42% (Rating 10 being the Highest, 0 being the lowest Step .7
  • 35. DATA ANALYSIS OF THE CAUSES 42 42 42% 0 20 40 60 80 100 120 0 5 10 15 20 25 30 35 40 45 marks cumilative marks cumilative % §WRONG CUTTING OF LAMINATE AT THE STARTING OF THE ROLL PAPER SHIFFTING ON MACHINE 42% SELECTION OF VITAL CAUSE (Pareto Analysis) Step .7
  • 36. DATA ANALYSIS OF THE CAUSES MOST VITAL CAUSE IDENTIFIED From pareto analysis in last slide team members decided to eliminate all two root causes 1 PAPER SHIFFTING ON MACHINE  ROOT CAUSE. 2 WRONG CUTTING OF LAMINATE AT THE STARTING OF THE ROLL ROOT CAUSE.
  • 37. Step 5 Step 6 Step 7 Step 8 Step. 8
  • 38. Solutions from Team member Two operators will Set the laminate roll On the machine Proper cutting of the Laminate at the starting Of the roll after the roll change To inform the vender For the wrinkle on the Side of the roll and for The core band Roller mark must Be fixed on roll assembly Roller mark must Be fixed on roll assembly
  • 39. FORESEEN RESISTENCE Step 4 Step 5 Step 6 Step 7 Step 8 Step 9
  • 40. FORSEEN RESISTANCE FORSEEING PROBABLE RESISTANCE S.No. RESISTANCE SOLUTION RESPONSIBILTY TARGET DATE 1 Oprator can do mistake to paste The taplone guide Foremem & incharge will guide Operator to fix the taplone guide on farmer Vinod Singh/ Pankaj Choubey 15.07.14  2 Two Operator will set the laminate roll on the machine It will be scheduled properly to avoid the problems Sechet incharge 15.07.14  3 Proper cutting of the Laminate at the starting Of the roll after the roll change Operator will instruct before the starting of each roll Supervisior/forem en 16.07.14  4 Roller mark must Be fixed on roll assembly To check by the supervisior & foremen that roller mark is fixed properly Amar Nath Singh/ Vinod Singh 16.07.14  5 To inform the vender For the wrinkle on the Side of the roll and for The core band It is physically checked before fixing the laminate roll on machine Vinod/Pankaj chouby 29.04.14 HENCE NO RESISTENCE TO IMPLEMENT THE SOLUTIONSTEP 9
  • 41. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10
  • 43. TRIAL IMPLEMENTATION SOLUTION NUMBER-03 Proper cutting of the Laminate at the starting Of the roll after the roll changeStep 10
  • 44. TRIAL IMPLEMENTATION SOLUTION NUMBER-04 Rollar Mark on Roll Assembly Before After Step 10
  • 45. TRIAL IMPLEMENTATION RESULT OF TRIAL IMPLEMENTATION TRIAL RUN CONDUCTED BY MR. PANKAJ CHOUBY 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 1.20% 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 LAMINATE WASTAGE 18.JULY 19.JULU 20.JULY 21.JULY 22.JULY 23.JULY 24.JULY 25.JULY 26.JULY Trial SuccessfulStep 10
  • 46. REGULAR IMPLEMENTATION Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 STEP 11
  • 47. REGULAR IMPLEMENTATION TANGIBLE GAINS Date SKU Daily Production Laminate Wastage 08.02.14 Bt0015s 581760 2.78 09.02.14 Bt0015s 584640 2.09 10.2.14 Bt0015s 391104 1.18 11.02.14 Bt0015s 570240 2.04 12.02.14 Bt0015s 587520 2.73 13.02.14 Bt0015s 587520 1.81 14.02.14 Bt0015s 587520 1.41 15.02.14 Bt0015s 587520 1.45 16.02.14 Bt0015s 588672 1.41 17.02.14 Bt0015s 587520 1.6 18.02.14 Bt0015s 587520 1.48 19.02.14 Bt0015s 587520 1.18 20.02.14 Bt0015s 524960 1.5 21.02.14 Bt0015s 302400 2.13 21.02.14 Bt0010s 331680 1.59 22.02.14 Bt0015s 691200 1.47 23.02.14 Bt0015s 685440 1.36 24.02.14 Bt0015s 685440 1.49 25.02.14 Bt0015s 685440 1.81 26.02.14 Bt0015s 685440 1.39 27.02.14 Bt0015s 345600 1.46 Date SKU Daily Production Laminate Wastage 02.05.14 Bt0015s 293760 2.75 03.05.14 Bt0015s 414720 1.28 04.05.14 Bt0015s 250560 1.2 05.05.14 Bt0015s 443520 1.2 06.05.14 Bt0015s 414720 1.25 07.05.14 Bt0015s 593280 1.04 08.05.14 Bt0015s 570240 0.91 09.05.14 Bt0015s 639360 1.01 10.05.14 Bt0010s 600000 1.55 11.05.14 Bt0010s 193440 1.01 11.05.14 Bt0015s 230400 0.93 12.05.14 Bt0015s 641664 0.99 13.05.14 Bt0015s 656640 1.04 14.05.14 Bt0015s 656640 1.02 15.05.14 Bt0015s 228240 0.54 21.05.14 SH18s 471600 1.46 22.05.14 SH18s 525600 1.1 23.05.14 SH18s 583200 1.3 24.05.14 SH18s 532800 1.29 25.05.14 SH18s 594400 1.11 26.05.14 SH18s 586800 1.07 27.05.14 SH18s 539280 1.22 28.05.14 Bt0015s 565200 1.32 Before Quality Circle Laminate Wastage After Quality Circle Laminate Wastage
  • 48. REGULAR IMPLEMENTATION TANGIBLE GAINS 1.50% 1.20% 1.20% 1.20% 0.00% 0.20% 0.40% 0.60% 0.80% 1.00% 1.20% 1.40% 1.60% feb may june july laminate wastage before quality circle laminate wastage after quality circle laminate wastage after quality circle laminate wastage after quality circle Series1 Before Quality Circle in Feb 2014 Laminate Wastage Target = 1.51% r After Quality Circle in May 2014 Laminate Wastage = 1.21% After Quality Circle in jUNE 2014 Laminate Wastage = 0.99% After Quality Circle in jULY 2014 Laminate Wastage = 1.44% Approx Saving of Laminate Wastage per month = .29% Its Worth Near About = 1,40000
  • 49. REGULAR IMPLENTATION INTANGIBLE GAINS  Money Saving  Reduced Wastage  Healthy Environment  INCREASED STAFF CONFIDENCE STEP 11
  • 50. FOLLOW UP & REVIEW Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 STEP 12
  • 51. PARSONS NUTRITIONALS PRIVATE LIMITED NO OF PROBLEMS SOLVED S. No Problem 1 String Should Be Hold For At least 3 Hours Which Is Taken For Water Leakage test. 2 Increased Laminate Wastage Due To Delimitation Of Roll From Inside. 3 Increased Laminate Wastage Due To Damaged Core Of The Roll. 4 5.Increased Laminate Wastage Due To Eccsassive Pasting Of Stickers' At Starting Of The Roll 5 Unclosed Cover Of Wraptech Machine. 6 Holes In A.C Duct. 7 Opon Hole On The Wraptech Machine. 8 Unproper Wiring Of The Panel. 9 Spillded Ink On The Nichrome Machine. 10 Water Leakage From The Air cylinder Of The Wraptech Machine. 11 Need To repaire The fioor of taping room 12 Uncontrolled Oven Temperature. 13 Required Tube Light In QA Lab 14 Display Board Have To Be Repaired. 15 Insided Transformer Of The Nichrome Machine Should Be Coverd.
  • 52. PARSONS NUTRITIONALS PRIVATE LIMITED NO OF PROBLEMS SOLVED S. No Problem 16 .Required Door Mat At The Entrance Of Sechet Section & Filling Room 17 Adjoining Wire Of The Packing Table & Conveyer Should Be Covered 18 .Stopped Working Of The Emergency Stop OF The Wraptech Machine. Even In The Low Air Pressure Machine Don’t Stop Working. 19 Wraptech Machine’S FarMer 'hole have to Be cloSeD 20 Untidy Cleaning Bay 21 even in the loW air preSSure Machine Don’t Stop Working. 22 Due to the Wrinkle at the corner oF the laMinate roll the Machine’S photo SenSor can’t Work that’S Why Increased Laminate Wastage. 23 Broken Water Tap Pipe In Lab.
  • 53. THE TOOLS AND TECNIQUES FOR PROBLEM SOLVING Stratification Cause And Effect Diagram Pareto Chart Pie Chart Ranking Method 4 W & 1 H Brainstorming
  • 54. CONCLUSION Lessons Learnt:- • Innovations and working as a team towards achieving target. •Systematic Problem Solving approach. •Keep regular watch on key area after project implementation