1. Ali Naseer
House # 8-D, Street # 2, Park View, Morgah , Rawalpindi Cantt
+92-321-514-8488 (Pakistan)
ali@nasco-av.com
To work in a creative and vibrant environment and to be a responsible member of an organization that
will further enhance my skills and knowledge.
Nasco –Support Engineer Jan 2011 - Till
Designing, implementation & commissioning of TCP/IP (LAN/WAN) based security &
surveillance systems.
Designing, implementation & commissioning of TCP/IP (LAN/WAN) based paging addressing
systems.
Integration of LAN/WAN based Video Conferencing Solutions.
Experience of AV over IP systems for network based AV communication.
Designing, implementation, commissioning of Infrared based language Interpretation systems.
IP network elements knowledge of DHCP, SIP, DNS server.
Experience of Optical fiber & relevant converters for long range network connectivity.
Motorola - Trainee Network Support ( Internship - GSM) Sep 2010- Jan 2011
Complete troubleshooting of Horizon micro/macro cabinets.
Tx / Rx Caliberation.
Drive Testing using TEMS.
Spectrum scan using Spectrum Analyzer.
Events Gathering Analysis.
Site Trouble Shooting.
No audio call testing and Data Gathering
Motorola - Network Support Engineer (Internship -Wimax) June 2009-Sep 2010
Wimax Network hands on experience
RF site physical parameters audit
Motorola Wimax WAP400 configuration and complete troubleshooting.
Drive testing for Motorola RF sites for throughput RSSI and CINR.
Gained hands on Experience of Motorola Elementary Monitory system for RF site Management.
Microwave backhaul troubleshooting.
Objective
WorkExperience
2. ProfessionalAchievement
Lead engineer for the installation, testing & commissioning of fully functional TCP/IP based
intercommunication system for 54 Stations for first ever project of Punjab Metro System Pakistan.
Case Reference : http://www.itc-pa.com.cn/enweb/view/news_details.php?newsid=486&NewsName=ITC
%20Network%20Audio%20System%20Installed%20in%20Pakistan%20Punjab%20Metro%20Bus%20System%205
4%20Stations&ParentId=&ChildId=&ParentSortName=&ChildSortName=
Education
2005 – 2009 Bachelors in Telecom Engineering( PEC Reg # Tele/ 1898)
FinalYear DegreeProject
Simulation and Fabrication of Micro strip Patch Antenna at desired frequency of 1.8 GHz in
HFSS®. Fabrication of antenna and comparison of results from Network Analyzer to those
from the software.
AcademicAchievement
Final degree project for Telecom Engineering batch 2005-2009 was selected among 3 best
projects of the university, and was presented to Pakistan Engineering Council inspection
team.
Co-CurricularActivities
Cricket – ( Member of Motorola / Nasco- Islamabad Cricket Team )
Football
Table Tennis – ( Member of Motorola- Islamabad Table Tennis Team )
Swimming
References
To be furnished on request if required.
Foundation University
Islamabad