SlideShare a Scribd company logo
1 of 10
Download to read offline
Ali Hussain Qureshi
House#123 Street#2 Sector-B Usman Block Bahria Town , Lahore
+92-0345-6247104
alihussain_1627@hotmail.com
WORK
EXPERIENCE
Past Position/Title
SIEMENS- Working as Associate ABAP Consultant
September2010-May2015
Current Position/Title
Excellence Delivered(EXD)- Technical Consultant (ABAP)
June2015-Present
Environment/Tools
SAP GUI, ABAP Editor, SAP R/3 Ver. (4.6C/ 4.7/ ECC 6.0). ABAP/4 Reports, SAP Scripts,
Smart Forms ,LSMW, BDC, BADI, BAPI ,ALV Reporting
SAP Skills
ABAP Programming
Smart forms
SAP Scripts
Dialogue Programming
Data migration using ABAP programs
Function modules (Normal & RFC modules)
Enhancements
BADI Implementation
BAPI Uploads
ABAP Query
LSMW
WEB DYNPRO
ALV and Interactive Lists Reporting
SAP Workflow
Good understanding of business processes in core areas of SAP which includes HCM,
MM, FI, PS, QM, PM, CRM, SD.
Languages
ABAP/4,ECC 6.0
PROJECT EXPERIENCE
Sadaqat Group Implementation Project, Faisalabad, Pakistan
Feb17 - till date
Project : SAP ECC 6.0, Support
Role : Team lead &Technical Consultant (ABAP)
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Create Income tax Program.
 Create New Smart forms as per requirements for PM.
1. Maintenance Request Notification Form SmartForm
2. Malfunctioning Notification Form SmartForm
3. Activity Notification Form SmartForm
4. Work Order Form SmartForm
5. Transportation Maintenance Report
 Create New HCM Reports.
1. Salary Sheets.
2. Attendance Report.
3. Over Time Calculation OT1 & OT2.
4. Audit Application
5. Employee Loan Detail Report.
6. Employee hiring action duplication checks on composite keys of ‘CNIC’,
‘Leaving Action’ and ‘Family Code’ in the employee master data records.
7. Piece Rate Employees’ Script and program
 Time Machine Integration.
 Weight Machine Integration.
 Create New Scripts For SD.
1. Sale Order Script.
2. Packing List & Weight List.
3. Commercial Invoice.
4. Pre Order Costing.
 Integration PP with HCM.
 Create New Scrips for PP.
1. Folding Processing Report.
2. Processing Program.
3. Enhancements in Co11n Confirmation Screen according to requirements.
 Create New Reports for MM.
1. Subcontracting Application.
2. Enhancements in MB51 according to requirements.
3. Enhancements in MIGO according to requirements.
4. Enhancements in MIRO according to requirements.
5. Purchase Workflow (PR and PO).
 Create New Reports for FI.
1. Forward Booking detail Application.
2. Parity Detail Application.
3. Finance Position.
 Product Hierarchy Change from 3rd
level to 9th
level.
 Create ALV reports.
MEPCO Support, Jeddah, KSA
June 1 - till date
Project : SAP ECC 6.0, Support
Role : Technical Consultant (ABAP)
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Modification is done in HCM Reports.
 Create New Smart forms as per requirements.
 Create New HCM Reports.
 Create ALV reports.
Naubahar Bottling Company (NBC Support, Gujranwala, Pakistan)
June 1 - till date
Project : SAP ECC 6.0, Support
Role : Technical Consultant (ABAP)
SAP ECC 6.0 is implemented by internal team. Modification is done in SD Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Modification is done in SD Reports.
 Create New Smart forms as per requirements.
 Create New SD Reports.
 Create ALV reports.
PUNJAB BEVERAGES CO (PBC Support, Faisalabad, Pakistan)
June 1 - till date
Project : SAP ECC 6.0, Support
Role : Technical Consultant (ABAP)
SAP ECC 6.0 is implemented by internal team. Modification is done in SD Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Modification is done in SD Reports.
 Create New Smart forms as per requirements.
 Create New SD Reports.
 Create ALV reports.
University Of Lahore, Pakistan
June 1 - till date
Project : SAP ECC 6.0, Support
Role : Technical Consultant (ABAP)
SAP ECC 6.0 is implemented by internal team. Developed Reports For HCM, MM, FI, PS,
QM, PM, CRM, SD. Developed New SMARTFORMS REPORTS. Developed New ALV
REPORTS.
Responsibilities
 SAP ECC 6.0 is implemented by internal team.
 Create CRM Web Dynpro Application for Application Selection Process.
 Create CRM Web Dynpro Application For Prospectus.
 Create CRM Web Dynpro Application For Patient Feedback Process.
 Create CRM Web Dynpro Application for Student Master Data Using RFC.
 Create CRM Web Dynpro Application for Employee Master Data Using RFC.
 Create New Smart forms as per requirements.
 Create Workflows as per requirement.
 Create New HR Reports.
 Create ALV reports.
 Create New FI Reports.
 Create New MM Reports.
 Create New SD Reports.
 Create New CRM Reports.
 Create New PM Reports.
 Modification done in FI Reports.
 Modification done in Sap scripts.
 Modification is done in SD Reports.
 Create New Smart forms as per requirements.
 Create New SD Reports.
 Create ALV reports.
Pakistan Telecommunication Company Limited (PTCL)
January 15 - June 30
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR, FI, MM & PS
Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Modification is done in HR Reports.
 Create New Smart forms as per requirements.
 Create New HR, FI, MM & PS Reports.
 Create ALV reports.
 Create Enhancements in MM for Migo
 Modification done in FI Reports.
 Modification done in Sap scripts.
PIFRA(Project To Improve Finance Reporting and Auditing)
October 14 to January 15
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 Developed Reports in HCM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
 Developed Sap scripts.
 Modification in FI Module.
 ALV Reports.
 Workflow.
 Screen painter.
 Recordings etc.
Pakistan Telecommunication Company Limited (PTCL)
September 14
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Modification is done in HR Reports.
 Create New Smart forms as per requirements.
 Create New HR Reports.
 Create ALV reports.
 Modification done in FI Reports.
 Modification done in Sap scripts.
Mari Petroleum Company Limited (MPCL)
August 14 to September 14
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Create New HR
Reports and Functionalities.
Responsibilities
 SAP ECC 6.0 is implemented by internal team.
 Modification is done in HR Reports.
 Support for making reports and Smart-forms.
 Modification and enhancements.
 Modifications Done in MM reports.
 Workflow maintenance.
Coca-Cola Beverages Pakistan Limited
July 14 to August 14
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Create New HR
Reports and Functionalities.
Responsibilities
 Developed Reports in HCM, MM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
 Developed ALV Reports.
Pakistan Telecommunication Company Limited (PTCL)
June 14 to July 14
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS.
Responsibilities
 Developed Reports in HCM, MM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
 Developed ALV Reports.
PIFRA Upgrade 4.6c to ECC 6 Kashmir(AG OFFICE)
May 14 - June 14
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG AJK production
servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
Manage and distribute ABAP tasks to resources for effective output.
PIFRA Upgrade 4.6c to ECC 6 Quetta(AG OFFICE)
May 2014
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG Baluchistan
production servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
Manage and distribute ABAP tasks to resources for effective output.
PIFRA Upgrade 4.6c to ECC 6 Karachi(AG OFFICE)
March 2014
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG Sindh
production servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
Manage and distribute ABAP tasks to resources for effective output.
PIFRA Upgrade 4.6c to ECC 6 Peshawar(AG OFFICE)
March 2014
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG KPK production
servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
Manage and distribute ABAP tasks to resources for effective output.
PIFRA Upgrade 4.6c to ECC 6 LAHORE(AG OFFICE)
February 2014
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG PUNJAB
production servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
 Manage and distribute ABAP tasks to resources for effective output.
PIFRA Upgrade 4.6c to ECC 6
October 2013
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
Responsibilities
 ABAP Consultant in Upgrade of PIFRA Project consists of AG PUNJAB
production servers.
 SPAU and SPDD Adjustments.
 Error resolutions after upgrade and Unicode conversion.
 Documentation of all the adjustments made.
 Manage and distribute ABAP tasks to resources for effective output.
Higher Education Commission (HEC)
August 13 to Dec 13
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Developed New SMARTFORMS REPORTS.
Responsibilities
 Developed Reports in HCM, MM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
Coca-Cola Beverages Pakistan Limited
October 12 to Jan 13
Project : SAP ECC 4.6, Support
Role : ABAP Consultant
Coca-Cola Pakistan is Pakistan largest selling beverages company, it produces different
bottles and imports some juices from Global Coca-Cola Company, and SAP ECC 4.6 is
implemented by internal team.
Responsibilities
 Developed Reports of FI, MM, PM, and HCM Module.
 Enhancement in PM Module, (G/L account assignment with respect to Type when
MIGO is done)
PIFRA(Project To Improve Finance Reporting and Auditing)
September 12 to till date
Project : SAP ECC 4.6, Support
Role : ABAP Consultant
Responsibilities
 Developed Reports in HCM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
 Developed Sap scripts.
 ALV Reports.
 Recordings etc.
Mari Gas
August 12 to Sep 12
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports.
Responsibilities
 Developed Reports in HCM Module.
 Modification in HR Module.
 Developed Smart forms.
 ALV Reports.
 Recordings etc.
FBR(Federal Board of Revenue)
March 12 to Jul 12
Project : SAP ECC 6.0, Support
Role : ABAP Consultant
SAP ECC 6.0 is implemented by internal team. Modification is done in MM Reports.
Responsibilities
 Developed Reports in MM Module.
 Modification in MM Module.
 Developed Smart forms.
 ALV Reports.
 Recordings etc.
 Sap Workflow
PIFRA(Project To Improve Finance Reporting and Auditing)
September 10 to Feb 12
Project : SAP ECC 4.6, Support
Role : ABAP Consultant
It is a GOP Project. Its main stakeholders are CGA and MOF. 2 Modules FICO
and HR has been implemented in this project over about 143 different sites. It
is a project with the largest payroll of all government employees and the
accounting of government expenses.SAP ECC 4.6 is implemented by Siemens
Team.
Responsibilities
 Developed Reports in HCM and FI Module.
 Modification in FI Module.
 Modification in HR Module.
 Developed Smart forms.
 Developed Sap scripts.
 ALV Reports.
 Recordings etc.
EDUCATION University of Central Punjab (UCP), BSCS (Honors), Computer Science,
September 2003- August 2007
Punjab College Of Information Technology, Intermediate, Computer Science,
September 2001- August 2003
Oxford Public School, Matriculation,
March 1999 - March 2001
PROGRAMMING
LANGUAGES
1 = some exposure
2 = working knowledge
3 = good experience
4=Excellent
C/C++ - ( 2 )
C# .NET 2.0- ( 1 )
HTML - ( 1 )
Java - ( 2 )
GW Basic - ( 2 )
Assembly - (1)
SAP(ABAP) - (4)
PLATFORMS Windows 10/ 8/7/2000/ XP/2003
REFERENCES Personal and professional references are available upon demand.

More Related Content

What's hot (18)

Resume - Namrata Pawar
Resume - Namrata PawarResume - Namrata Pawar
Resume - Namrata Pawar
 
Rossini sap abap freelance resume
Rossini sap abap freelance resumeRossini sap abap freelance resume
Rossini sap abap freelance resume
 
Venkatesh_SAP_ABAP_resume
Venkatesh_SAP_ABAP_resumeVenkatesh_SAP_ABAP_resume
Venkatesh_SAP_ABAP_resume
 
Goutam_Sahoo_Resume
Goutam_Sahoo_ResumeGoutam_Sahoo_Resume
Goutam_Sahoo_Resume
 
CV LATEST
CV LATESTCV LATEST
CV LATEST
 
Resume (Ronnie B. Pedarios)
Resume (Ronnie B. Pedarios)Resume (Ronnie B. Pedarios)
Resume (Ronnie B. Pedarios)
 
ArunCV_May_2015
ArunCV_May_2015ArunCV_May_2015
ArunCV_May_2015
 
Resume_SAP_ABAP_Certified
Resume_SAP_ABAP_CertifiedResume_SAP_ABAP_Certified
Resume_SAP_ABAP_Certified
 
Santhosha Kumara KN_SAP_ABAP_resume -ext
Santhosha Kumara KN_SAP_ABAP_resume -extSanthosha Kumara KN_SAP_ABAP_resume -ext
Santhosha Kumara KN_SAP_ABAP_resume -ext
 
SAP ABAP Resume
SAP ABAP ResumeSAP ABAP Resume
SAP ABAP Resume
 
Venkat-08-2016
Venkat-08-2016Venkat-08-2016
Venkat-08-2016
 
Ganesh_Apps_Resume
Ganesh_Apps_ResumeGanesh_Apps_Resume
Ganesh_Apps_Resume
 
Farhan Ahmed
Farhan AhmedFarhan Ahmed
Farhan Ahmed
 
raman_resume
raman_resumeraman_resume
raman_resume
 
Lanny resume 190804
Lanny resume 190804Lanny resume 190804
Lanny resume 190804
 
Cv
CvCv
Cv
 
CV Helder Goncalves
CV Helder GoncalvesCV Helder Goncalves
CV Helder Goncalves
 
Sudipta Ghosh
Sudipta GhoshSudipta Ghosh
Sudipta Ghosh
 

Viewers also liked

Lucie fejkova 2014 selection
Lucie fejkova 2014 selection Lucie fejkova 2014 selection
Lucie fejkova 2014 selection LucieFejkova
 
GORC EB-5 April Updates
GORC EB-5 April UpdatesGORC EB-5 April Updates
GORC EB-5 April Updatessnairgorc
 
1 MCMAP_eng
1 MCMAP_eng1 MCMAP_eng
1 MCMAP_engmafled
 
Vehicle Lighting & Accessories: Lighting the Way to Better Driving
Vehicle Lighting & Accessories: Lighting the Way to Better DrivingVehicle Lighting & Accessories: Lighting the Way to Better Driving
Vehicle Lighting & Accessories: Lighting the Way to Better Drivingoutbackequipmentcomau
 
Worli bdd chawl case study in detail
Worli bdd chawl case study in detailWorli bdd chawl case study in detail
Worli bdd chawl case study in detailshafayeeshaikh
 
Hadž vrhunac bogobojaznosti
Hadž   vrhunac bogobojaznostiHadž   vrhunac bogobojaznosti
Hadž vrhunac bogobojaznostiAlmoouu
 

Viewers also liked (11)

Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
gautham CV updated
gautham CV updatedgautham CV updated
gautham CV updated
 
Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
Lucie fejkova 2014 selection
Lucie fejkova 2014 selection Lucie fejkova 2014 selection
Lucie fejkova 2014 selection
 
Itr forum 1
Itr forum 1Itr forum 1
Itr forum 1
 
GORC EB-5 April Updates
GORC EB-5 April UpdatesGORC EB-5 April Updates
GORC EB-5 April Updates
 
1 MCMAP_eng
1 MCMAP_eng1 MCMAP_eng
1 MCMAP_eng
 
Vehicle Lighting & Accessories: Lighting the Way to Better Driving
Vehicle Lighting & Accessories: Lighting the Way to Better DrivingVehicle Lighting & Accessories: Lighting the Way to Better Driving
Vehicle Lighting & Accessories: Lighting the Way to Better Driving
 
Worli bdd chawl case study in detail
Worli bdd chawl case study in detailWorli bdd chawl case study in detail
Worli bdd chawl case study in detail
 
CV - Talha
CV - TalhaCV - Talha
CV - Talha
 
Hadž vrhunac bogobojaznosti
Hadž   vrhunac bogobojaznostiHadž   vrhunac bogobojaznosti
Hadž vrhunac bogobojaznosti
 

Similar to Ali_Resume_new

Similar to Ali_Resume_new (20)

Prachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_Consultant
 
Anand gupta
Anand guptaAnand gupta
Anand gupta
 
Vivek - FICO Consultant - Trainer
Vivek - FICO Consultant - TrainerVivek - FICO Consultant - Trainer
Vivek - FICO Consultant - Trainer
 
Vivek fico consultant - trainer
Vivek   fico consultant - trainerVivek   fico consultant - trainer
Vivek fico consultant - trainer
 
Jibin SAP ABAP Consultant
Jibin SAP ABAP ConsultantJibin SAP ABAP Consultant
Jibin SAP ABAP Consultant
 
Vinoth kumar ravi sap abap technical consultant
Vinoth kumar ravi sap abap technical consultantVinoth kumar ravi sap abap technical consultant
Vinoth kumar ravi sap abap technical consultant
 
Narayana Reddy new resume
Narayana Reddy new resumeNarayana Reddy new resume
Narayana Reddy new resume
 
SANGAMESWAR_SAP CV_17072016
SANGAMESWAR_SAP CV_17072016SANGAMESWAR_SAP CV_17072016
SANGAMESWAR_SAP CV_17072016
 
P.N.SWAPNA
P.N.SWAPNAP.N.SWAPNA
P.N.SWAPNA
 
Word Version_Doungporn_2015070N
Word Version_Doungporn_2015070NWord Version_Doungporn_2015070N
Word Version_Doungporn_2015070N
 
SAP_ABAP_RESUME.DOCX
SAP_ABAP_RESUME.DOCXSAP_ABAP_RESUME.DOCX
SAP_ABAP_RESUME.DOCX
 
U THANT
U THANTU THANT
U THANT
 
Faizan khalil
Faizan khalilFaizan khalil
Faizan khalil
 
Kandhan G
Kandhan GKandhan G
Kandhan G
 
Srinivasulu Nettem Resume
Srinivasulu Nettem ResumeSrinivasulu Nettem Resume
Srinivasulu Nettem Resume
 
CV - Panuwat_Jirapatsakul
CV - Panuwat_JirapatsakulCV - Panuwat_Jirapatsakul
CV - Panuwat_Jirapatsakul
 
Practitioner perspective-erp-on-hana-and-fi-analytics 2015
Practitioner perspective-erp-on-hana-and-fi-analytics 2015Practitioner perspective-erp-on-hana-and-fi-analytics 2015
Practitioner perspective-erp-on-hana-and-fi-analytics 2015
 
Buddhasanjeev_ABAPCRM_UI(Fiori)_Consultant
Buddhasanjeev_ABAPCRM_UI(Fiori)_ConsultantBuddhasanjeev_ABAPCRM_UI(Fiori)_Consultant
Buddhasanjeev_ABAPCRM_UI(Fiori)_Consultant
 
FG Work
FG WorkFG Work
FG Work
 
AKHIL_CV
AKHIL_CVAKHIL_CV
AKHIL_CV
 

Ali_Resume_new

  • 1. Ali Hussain Qureshi House#123 Street#2 Sector-B Usman Block Bahria Town , Lahore +92-0345-6247104 alihussain_1627@hotmail.com WORK EXPERIENCE Past Position/Title SIEMENS- Working as Associate ABAP Consultant September2010-May2015 Current Position/Title Excellence Delivered(EXD)- Technical Consultant (ABAP) June2015-Present Environment/Tools SAP GUI, ABAP Editor, SAP R/3 Ver. (4.6C/ 4.7/ ECC 6.0). ABAP/4 Reports, SAP Scripts, Smart Forms ,LSMW, BDC, BADI, BAPI ,ALV Reporting SAP Skills ABAP Programming Smart forms SAP Scripts Dialogue Programming Data migration using ABAP programs Function modules (Normal & RFC modules) Enhancements BADI Implementation BAPI Uploads ABAP Query LSMW WEB DYNPRO ALV and Interactive Lists Reporting SAP Workflow Good understanding of business processes in core areas of SAP which includes HCM, MM, FI, PS, QM, PM, CRM, SD. Languages ABAP/4,ECC 6.0
  • 2. PROJECT EXPERIENCE Sadaqat Group Implementation Project, Faisalabad, Pakistan Feb17 - till date Project : SAP ECC 6.0, Support Role : Team lead &Technical Consultant (ABAP) SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Create Income tax Program.  Create New Smart forms as per requirements for PM. 1. Maintenance Request Notification Form SmartForm 2. Malfunctioning Notification Form SmartForm 3. Activity Notification Form SmartForm 4. Work Order Form SmartForm 5. Transportation Maintenance Report  Create New HCM Reports. 1. Salary Sheets. 2. Attendance Report. 3. Over Time Calculation OT1 & OT2. 4. Audit Application 5. Employee Loan Detail Report. 6. Employee hiring action duplication checks on composite keys of ‘CNIC’, ‘Leaving Action’ and ‘Family Code’ in the employee master data records. 7. Piece Rate Employees’ Script and program  Time Machine Integration.  Weight Machine Integration.  Create New Scripts For SD. 1. Sale Order Script. 2. Packing List & Weight List. 3. Commercial Invoice. 4. Pre Order Costing.  Integration PP with HCM.  Create New Scrips for PP. 1. Folding Processing Report. 2. Processing Program. 3. Enhancements in Co11n Confirmation Screen according to requirements.  Create New Reports for MM. 1. Subcontracting Application. 2. Enhancements in MB51 according to requirements. 3. Enhancements in MIGO according to requirements. 4. Enhancements in MIRO according to requirements. 5. Purchase Workflow (PR and PO).  Create New Reports for FI. 1. Forward Booking detail Application. 2. Parity Detail Application. 3. Finance Position.  Product Hierarchy Change from 3rd level to 9th level.  Create ALV reports.
  • 3. MEPCO Support, Jeddah, KSA June 1 - till date Project : SAP ECC 6.0, Support Role : Technical Consultant (ABAP) SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Modification is done in HCM Reports.  Create New Smart forms as per requirements.  Create New HCM Reports.  Create ALV reports. Naubahar Bottling Company (NBC Support, Gujranwala, Pakistan) June 1 - till date Project : SAP ECC 6.0, Support Role : Technical Consultant (ABAP) SAP ECC 6.0 is implemented by internal team. Modification is done in SD Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Modification is done in SD Reports.  Create New Smart forms as per requirements.  Create New SD Reports.  Create ALV reports. PUNJAB BEVERAGES CO (PBC Support, Faisalabad, Pakistan) June 1 - till date Project : SAP ECC 6.0, Support Role : Technical Consultant (ABAP) SAP ECC 6.0 is implemented by internal team. Modification is done in SD Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Modification is done in SD Reports.  Create New Smart forms as per requirements.  Create New SD Reports.  Create ALV reports.
  • 4. University Of Lahore, Pakistan June 1 - till date Project : SAP ECC 6.0, Support Role : Technical Consultant (ABAP) SAP ECC 6.0 is implemented by internal team. Developed Reports For HCM, MM, FI, PS, QM, PM, CRM, SD. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  SAP ECC 6.0 is implemented by internal team.  Create CRM Web Dynpro Application for Application Selection Process.  Create CRM Web Dynpro Application For Prospectus.  Create CRM Web Dynpro Application For Patient Feedback Process.  Create CRM Web Dynpro Application for Student Master Data Using RFC.  Create CRM Web Dynpro Application for Employee Master Data Using RFC.  Create New Smart forms as per requirements.  Create Workflows as per requirement.  Create New HR Reports.  Create ALV reports.  Create New FI Reports.  Create New MM Reports.  Create New SD Reports.  Create New CRM Reports.  Create New PM Reports.  Modification done in FI Reports.  Modification done in Sap scripts.  Modification is done in SD Reports.  Create New Smart forms as per requirements.  Create New SD Reports.  Create ALV reports. Pakistan Telecommunication Company Limited (PTCL) January 15 - June 30 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR, FI, MM & PS Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Modification is done in HR Reports.  Create New Smart forms as per requirements.  Create New HR, FI, MM & PS Reports.  Create ALV reports.  Create Enhancements in MM for Migo  Modification done in FI Reports.  Modification done in Sap scripts.
  • 5. PIFRA(Project To Improve Finance Reporting and Auditing) October 14 to January 15 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  Developed Reports in HCM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms.  Developed Sap scripts.  Modification in FI Module.  ALV Reports.  Workflow.  Screen painter.  Recordings etc. Pakistan Telecommunication Company Limited (PTCL) September 14 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Modification is done in HR Reports.  Create New Smart forms as per requirements.  Create New HR Reports.  Create ALV reports.  Modification done in FI Reports.  Modification done in Sap scripts. Mari Petroleum Company Limited (MPCL) August 14 to September 14 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Create New HR Reports and Functionalities. Responsibilities  SAP ECC 6.0 is implemented by internal team.  Modification is done in HR Reports.  Support for making reports and Smart-forms.  Modification and enhancements.  Modifications Done in MM reports.  Workflow maintenance.
  • 6. Coca-Cola Beverages Pakistan Limited July 14 to August 14 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Create New HR Reports and Functionalities. Responsibilities  Developed Reports in HCM, MM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms.  Developed ALV Reports. Pakistan Telecommunication Company Limited (PTCL) June 14 to July 14 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Developed New ALV REPORTS. Responsibilities  Developed Reports in HCM, MM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms.  Developed ALV Reports. PIFRA Upgrade 4.6c to ECC 6 Kashmir(AG OFFICE) May 14 - June 14 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG AJK production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made. Manage and distribute ABAP tasks to resources for effective output.
  • 7. PIFRA Upgrade 4.6c to ECC 6 Quetta(AG OFFICE) May 2014 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG Baluchistan production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made. Manage and distribute ABAP tasks to resources for effective output. PIFRA Upgrade 4.6c to ECC 6 Karachi(AG OFFICE) March 2014 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG Sindh production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made. Manage and distribute ABAP tasks to resources for effective output. PIFRA Upgrade 4.6c to ECC 6 Peshawar(AG OFFICE) March 2014 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG KPK production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made. Manage and distribute ABAP tasks to resources for effective output. PIFRA Upgrade 4.6c to ECC 6 LAHORE(AG OFFICE) February 2014 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG PUNJAB production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made.  Manage and distribute ABAP tasks to resources for effective output.
  • 8. PIFRA Upgrade 4.6c to ECC 6 October 2013 Project : SAP ECC 6.0, Support Role : ABAP Consultant Responsibilities  ABAP Consultant in Upgrade of PIFRA Project consists of AG PUNJAB production servers.  SPAU and SPDD Adjustments.  Error resolutions after upgrade and Unicode conversion.  Documentation of all the adjustments made.  Manage and distribute ABAP tasks to resources for effective output. Higher Education Commission (HEC) August 13 to Dec 13 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Developed New SMARTFORMS REPORTS. Responsibilities  Developed Reports in HCM, MM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms. Coca-Cola Beverages Pakistan Limited October 12 to Jan 13 Project : SAP ECC 4.6, Support Role : ABAP Consultant Coca-Cola Pakistan is Pakistan largest selling beverages company, it produces different bottles and imports some juices from Global Coca-Cola Company, and SAP ECC 4.6 is implemented by internal team. Responsibilities  Developed Reports of FI, MM, PM, and HCM Module.  Enhancement in PM Module, (G/L account assignment with respect to Type when MIGO is done) PIFRA(Project To Improve Finance Reporting and Auditing) September 12 to till date Project : SAP ECC 4.6, Support Role : ABAP Consultant Responsibilities  Developed Reports in HCM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms.  Developed Sap scripts.  ALV Reports.  Recordings etc.
  • 9. Mari Gas August 12 to Sep 12 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in HR Reports. Responsibilities  Developed Reports in HCM Module.  Modification in HR Module.  Developed Smart forms.  ALV Reports.  Recordings etc. FBR(Federal Board of Revenue) March 12 to Jul 12 Project : SAP ECC 6.0, Support Role : ABAP Consultant SAP ECC 6.0 is implemented by internal team. Modification is done in MM Reports. Responsibilities  Developed Reports in MM Module.  Modification in MM Module.  Developed Smart forms.  ALV Reports.  Recordings etc.  Sap Workflow PIFRA(Project To Improve Finance Reporting and Auditing) September 10 to Feb 12 Project : SAP ECC 4.6, Support Role : ABAP Consultant It is a GOP Project. Its main stakeholders are CGA and MOF. 2 Modules FICO and HR has been implemented in this project over about 143 different sites. It is a project with the largest payroll of all government employees and the accounting of government expenses.SAP ECC 4.6 is implemented by Siemens Team. Responsibilities  Developed Reports in HCM and FI Module.  Modification in FI Module.  Modification in HR Module.  Developed Smart forms.  Developed Sap scripts.  ALV Reports.  Recordings etc.
  • 10. EDUCATION University of Central Punjab (UCP), BSCS (Honors), Computer Science, September 2003- August 2007 Punjab College Of Information Technology, Intermediate, Computer Science, September 2001- August 2003 Oxford Public School, Matriculation, March 1999 - March 2001 PROGRAMMING LANGUAGES 1 = some exposure 2 = working knowledge 3 = good experience 4=Excellent C/C++ - ( 2 ) C# .NET 2.0- ( 1 ) HTML - ( 1 ) Java - ( 2 ) GW Basic - ( 2 ) Assembly - (1) SAP(ABAP) - (4) PLATFORMS Windows 10/ 8/7/2000/ XP/2003 REFERENCES Personal and professional references are available upon demand.