CASE STUDY OF VAALPUTS:
South Africa’s National Low
Level Waste Disposal Facility
DEEPENING AND
STRENGTHENING
STAKEHOLDER CONFIDENCE IN
RADWASTE DISPOSAL
Alan Carolissen
Senior Manager: Nuclear Liabilities Management
2
Legal Framework for Radwaste in South Africa
• Approved by Cabinet in
2005
• Establishment of the
National Committee on
Radwaste (NCRWM)
• Radwaste Disposal Inst
(NRWDI)
• Radwaste Fund
3
Core Objectives of Policy and Strategy
• Public and Occupational
Health and Safety
• Environmental
Protection
• Cost Effectiveness
• Safeguards and
Security
4
Radwaste Framework
Radwaste Framework
Minister of
Energy
National RWM
Committee
(NNR, DOE, DPE,
DOH, DEA etc.)
Waste
Generator
On-site waste
• collection
• treatment
• packaging
• storage
• transportation
• plans
Disposal
Institute
• WAC development
• siting
• R&D
• storage
• encapsulation
• disposal
• monitoring
• execution of plans
Disposal Site
Consists of facilities
for:
• storage
• encapsulation
• disposal
W
A
C
delivers waste accepts waste
National RWM
Fund
(National Treasury,
DOE, Board of
Trustees)
evaluates, recommends plans
submits
consults
approves plans
allocates funds
requests for funds
pays user-charges
contributesfunds(levies)
plans
(c/kWh/R/m3)
issues certificates
OtherSourcesofFunds
(loans,donations,salesetc.)
sites, constructs,
operates, decoms
facilities
RADIOACTIVE WASTE
DISPOSAL IN SOUTH
AFRICA
6
Low Level Waste Disposal Repository: Vaalputs
6
7
7
Locality map of South Africa showing Vaalputs, Koeberg and Pelindaba.
8
Vaalputs Commissioning
• Site selection completed in 1985
• Site operating license granted in 1986
• First waste shipment arrived in November 1986
• Only solidified or solid low level waste are
disposed off.
99
Red sand – 0,5 m
Red ‘clay’ – 10m
White ‘clay’ – 5m
Weathered granite – 3m
Fresh granite up to 100m
Aquifer
9
Disposal Concept
Monitoring pipe
Natural Clay
5.2m
8.0m
Drainage layer – 200mm
Backfill
Compacted clay cap
Natural cover
Top soil
Waste packages
50m
Shallow Land Disposal (SLD)
Near surface trenches for LLW
Typical near surface trench
6m
3m
1.5m
3m
X m
11
VAALPUTS WASTE INVENTORY
• Design capacity
- 500 000 metal waste packages
- 50 000 concrete waste packages
• Metal waste packages
- 14 699 disposed of (3% of capacity)
• Concrete waste packages
- 3 769 disposed of (8% of total capacity)
12
Types of Waste:
Only Solid / Solidified Radioactive
Waste
LLW in metal containers
LLW in concrete
containers
Spent fuel racks
13
RECEIVING WASTE
13
14
14
15
15
16
Building Stakeholder Confidence at Vaalputs:
a Case Study
17
17
18
Nuclear (waste) is an Emotional Issue…
• In nuclear (waste) business, people’s
perceptions are driven by their fears.
• Fears caused by
memories/perceptions of:
– Nuclear bomb explosions
– Nuclear reactor accidents
– Health effects associated
 Cancer
 Genetic birth effects
19
19
20
Meriting Trust & Stakeholder Participation
“The disposal strategy and concept is
technically sound, however societal
acceptance is at best non-existent”
Canadian Regulatory committee 1986
“The greatest single obstacle that a successful
waste management programme must
overcome is the severe erosion of public
confidence”
US Office of Technology Assessment 1982
21
Meriting Stakeholder Participation and
Communication
“The disposal strategy and concept is
technically sound, however societal
acceptance is at best non-existent”
Canadian Regulatory committee 1986
22
Communications Pre-1994
• The nuclear operating license was obtained with no
or limited public participation
• No requirement by law for public participation
• Vaalputs Communication Forum (VCF) was originally
created as a public forum for discussing community
related issues.
• During the VCF’s earlier years most of the
communication took place between Necsa and its
immediate neighbours – the sheep farmers - who
attended meetings on an intermittent basis.
• Farming related issues like control of vermin were the
top Agenda items!!!
23
Communications Post-1994
Landscape pertaining to public
participation and communication
have dramatically and drastically
changed directly after the first
democratic election was held
Public participation &Communications are now legal
requirements!!!
24
Communications Post-1994
• Legal requirements: Need to involve interested
and affected parties in EIA and licensing
processes.
• Regulatory requirements: NNR Act requires
establishment of Public Safety Information
Forum
• Policy requirements: Government policies &
strategies.
• Ethical requirements: Need for transparency,
openness, accountable actions & decisions and
respect for values & beliefs
25
Stakeholder Confidence Post-1994
25
Heighten levels of community opposition against
the disposal of radwaste at Vaalputs
Not in my backyard syndrome
Public demanded shutdown of facility
26
Paradigm Shift
Pre 1994
Post 1994
27
Strategic Objective
Transforming the Vaalputs Communication
Forum (VCF) into a Multi-Stakeholder
Public Communication and Information
Forum to strengthen and deepen
stakeholder confidence and acceptance.
28
Stakeholder Philosophy
28
• Acknowledges that each Stakeholder grouping has it
own set of values, beliefs, needs, goals and
objectives, which may differ from those of the
organization.
• Ensure open, transparent two-way Stakeholder
communication
• Ensure the diversity and inclusivity of stakeholder
base
• Building stakeholder leverage through Corporate
Social Investments programs
• Investments in research surveys, media monitoring &
environmental scanning to ensure the organisation
remains attuned to its Stakeholder needs,
perceptions and misconceptions.
29
Multi-stakeholder Forum
• Department of Energy, Dept of Environmental Affairs, Dept of
Water Affairs
• Northern Cape Provincial Government
• Mayors of the Local Municipalities (Richtersveld, Kamiesberg &
Namakhio)
• Local Councilors
• Eskom, Koeberg, iThemba Labs
• National Nuclear Regulator
• Media
• Namaqualand Action Group for Environmental Justice
• EarthLife Africa (ELA)
• Vaalputs Employees
• Namaqualand Communities
• Agricultural Association (Kliprand Agricultural Union)
• Trade Unions (NUM)
30
Multi-stakeholder Forum Meetings
31
Communication – Yeas
• Listen to view points and objections
• Put yourself in their position – understand
their concerns
• Answer questions directly and concisely
• Talk in layman’s terms
• Provide a way to follow up on issues that
cannot be resolved immediately
• Bring in the expertise needed to develop a
communications program
• Minimize formal presentations & speeches
32
Communication – Neas
• Don’t be judgmental
• Attack those with higher credibility
• Repeat negative statements
• Say “I know how you feel”
• Overreact to emotional outbursts
• Use acronyms or jargon
• Speculate about what you do not know
• Try to turn everyone into an expert in your
subject
33
Communication Tools
• Word of mouth
• Word of mouse
• Printed Media
• Electronic media
• Social Networks
34
Communications…
…Can Help Dispel Myths
CONFIDENCE
BUILDING
INITIATIVES
36
Demonstrate Technical Competence
• Full disclosure of facility operational compliance
• Disseminate information on Nuclear safety,
Radiation & nuclear related matters, including
but not limited to nuclear incidents and
accidents
• Conduct regular third party verification audits
• Invite stakeholders to third party verification
audits as observers
• Investment in R&D activities
36
EMBRACING BEST PRACTICES
ISO 9001 ACCREDITATION ISO 14001 ACCREDITATION
37
BUILDING STAKEHOLDER CAPACITY
38
BUILDING STAKEHOLDER CAPACITY
39
NUCLEAR SCIENCE &TECHNOLOGY
EDUCATION PROGRAMME
Outreach Programs
• National Science
Week
• Brochures &
Posters
• Tours & Visit
• Science and Math
Educator
40
41
CSI Programme
Embraces issues of “Social Development” in terms of
empowerment in:
• Developing SMME’s
• Localization of employment
opportunities
42
Key Learnings
• Demonstrating technical competence and regulatory
compliance are not enough to instill stakeholder confidence
• Accommodate divergent values and beliefs equally,
considering them all when making decisions
• Empower your stakeholders with the necessary knowledge
to enable them to participate in decision making process in
an informed manner
• You can successfully addressed negative public
perceptions by creating a multi-stakeholder platform for
dialogue and collaborative problem-solving.
• These platforms catalyzed innovation, built trust, reduced
conflict and created the conditions necessary for building
sustainable, mutually beneficial long term stakeholder
relationships
43
Concluding Remarks
• Biggest challenge of any radwaste management
related activity is to ensure societal and political
acceptance
• Advancement of enhanced stakeholder participation
and corporate transparency goes hand in glove
• Demonstrating technical competence and safe
operations are key parts of building stakeholder
confidence, however its not enough to ensure
stakeholder acceptability.
• Stakeholder confidence building strategies and
policies must take into account cultural diversities.
44
To Ensure Societal and Political Acceptance…
Make communication, public
participation and stakeholder
engagement
Part of your Radwaste
Management DNA !!!
45 45
Thank You!!!
46

More Related Content

Viewers also liked

AJAY RESUME FINAL
AJAY RESUME FINALAJAY RESUME FINAL
AJAY RESUME FINALAJAY THAKUR
 
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...EFSA EU
 
Kebijakan moneter dan fiskal
Kebijakan moneter dan fiskalKebijakan moneter dan fiskal
Kebijakan moneter dan fiskalmiftakhulkhoiroh
 
How to support decisions with online collaborative models?
How to support decisions with online collaborative models?How to support decisions with online collaborative models?
How to support decisions with online collaborative models?EFSA EU
 
The science of assessment and the assessment of science: new frontiers in foo...
The science of assessment and the assessment of science: new frontiers in foo...The science of assessment and the assessment of science: new frontiers in foo...
The science of assessment and the assessment of science: new frontiers in foo...EFSA EU
 
Livestock disease drivers, ecology and pathogen evolution
Livestock disease drivers, ecology and pathogen evolutionLivestock disease drivers, ecology and pathogen evolution
Livestock disease drivers, ecology and pathogen evolutionEFSA EU
 
Unilever (AXE AND DOVE ) Case Study
Unilever (AXE AND DOVE ) Case StudyUnilever (AXE AND DOVE ) Case Study
Unilever (AXE AND DOVE ) Case StudyAjinkya Pujari
 
Peta konsep Pendapatan Nasional
Peta konsep Pendapatan NasionalPeta konsep Pendapatan Nasional
Peta konsep Pendapatan NasionalOkky Cotrexjelly
 
16. investigation of infection
16. investigation of infection16. investigation of infection
16. investigation of infectionAhmad Hamadi
 
How to use source control with apex?
How to use source control with apex?How to use source control with apex?
How to use source control with apex?Oliver Lemm
 
Cueva de Castañar de Ibor. El tesoro geológico de las Villuercas
Cueva de Castañar de Ibor. El tesoro geológico de las VilluercasCueva de Castañar de Ibor. El tesoro geológico de las Villuercas
Cueva de Castañar de Ibor. El tesoro geológico de las VilluercasEmilio Fernández
 
10 categories
10 categories10 categories
10 categoriesAce Ahmer
 

Viewers also liked (15)

AJAY RESUME FINAL
AJAY RESUME FINALAJAY RESUME FINAL
AJAY RESUME FINAL
 
Acedamic certificates
Acedamic certificatesAcedamic certificates
Acedamic certificates
 
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...
Coming to grips with unfamiliar uncertainties of a new predictive toxicology ...
 
Kebijakan moneter dan fiskal
Kebijakan moneter dan fiskalKebijakan moneter dan fiskal
Kebijakan moneter dan fiskal
 
Perancangan Bahasa
Perancangan Bahasa Perancangan Bahasa
Perancangan Bahasa
 
How to support decisions with online collaborative models?
How to support decisions with online collaborative models?How to support decisions with online collaborative models?
How to support decisions with online collaborative models?
 
The science of assessment and the assessment of science: new frontiers in foo...
The science of assessment and the assessment of science: new frontiers in foo...The science of assessment and the assessment of science: new frontiers in foo...
The science of assessment and the assessment of science: new frontiers in foo...
 
Livestock disease drivers, ecology and pathogen evolution
Livestock disease drivers, ecology and pathogen evolutionLivestock disease drivers, ecology and pathogen evolution
Livestock disease drivers, ecology and pathogen evolution
 
Unilever (AXE AND DOVE ) Case Study
Unilever (AXE AND DOVE ) Case StudyUnilever (AXE AND DOVE ) Case Study
Unilever (AXE AND DOVE ) Case Study
 
Peta konsep Pendapatan Nasional
Peta konsep Pendapatan NasionalPeta konsep Pendapatan Nasional
Peta konsep Pendapatan Nasional
 
16. investigation of infection
16. investigation of infection16. investigation of infection
16. investigation of infection
 
How to use source control with apex?
How to use source control with apex?How to use source control with apex?
How to use source control with apex?
 
Cueva de Castañar de Ibor. El tesoro geológico de las Villuercas
Cueva de Castañar de Ibor. El tesoro geológico de las VilluercasCueva de Castañar de Ibor. El tesoro geológico de las Villuercas
Cueva de Castañar de Ibor. El tesoro geológico de las Villuercas
 
10 categories
10 categories10 categories
10 categories
 
Hardware y software
Hardware y softwareHardware y software
Hardware y software
 

Similar to DEEPENING AND STRENGTHENING STAKEHOLDER CONFIDENCE IN RADWASTE DISPOSAL

Business Overview of the Nuclear Liabilities Management Department of Necsa
Business Overview of the Nuclear Liabilities Management Department of NecsaBusiness Overview of the Nuclear Liabilities Management Department of Necsa
Business Overview of the Nuclear Liabilities Management Department of NecsaAlan Carolissen
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Association for Project Management
 
CIWM New Members' Network Report
CIWM New Members' Network ReportCIWM New Members' Network Report
CIWM New Members' Network ReportAmanda Forni
 
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...MEOPAR
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Society of Petroleum Engineers
 
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...Global Risk Forum GRFDavos
 
Community Based Adaptation as a Pillar of National Adaptation Efforts
Community Based Adaptation as a Pillar of National Adaptation Efforts Community Based Adaptation as a Pillar of National Adaptation Efforts
Community Based Adaptation as a Pillar of National Adaptation Efforts NAP Events
 
Webinar: An overview and explanation of the creation of the communication res...
Webinar: An overview and explanation of the creation of the communication res...Webinar: An overview and explanation of the creation of the communication res...
Webinar: An overview and explanation of the creation of the communication res...Global CCS Institute
 
Data for Development in the Caribbean
Data for Development in the CaribbeanData for Development in the Caribbean
Data for Development in the CaribbeanLEARN Project
 
Climate change and development project iucn - regional workshop
Climate change and development project   iucn - regional workshopClimate change and development project   iucn - regional workshop
Climate change and development project iucn - regional workshopStrengthening Climate Resilience
 
Clinton Foundation - Jackson Kimani
Clinton Foundation - Jackson KimaniClinton Foundation - Jackson Kimani
Clinton Foundation - Jackson Kimanicenafrica
 

Similar to DEEPENING AND STRENGTHENING STAKEHOLDER CONFIDENCE IN RADWASTE DISPOSAL (20)

Business Overview of the Nuclear Liabilities Management Department of Necsa
Business Overview of the Nuclear Liabilities Management Department of NecsaBusiness Overview of the Nuclear Liabilities Management Department of Necsa
Business Overview of the Nuclear Liabilities Management Department of Necsa
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...
 
(NuClean) Introduction to NuClean: A Center of Excellence for Nuclear Waste S...
(NuClean) Introduction to NuClean: A Center of Excellence for Nuclear Waste S...(NuClean) Introduction to NuClean: A Center of Excellence for Nuclear Waste S...
(NuClean) Introduction to NuClean: A Center of Excellence for Nuclear Waste S...
 
CIWM New Members' Network Report
CIWM New Members' Network ReportCIWM New Members' Network Report
CIWM New Members' Network Report
 
Advancing Your Energy Project
Advancing Your Energy ProjectAdvancing Your Energy Project
Advancing Your Energy Project
 
Implementation Network Meeting 11th November
Implementation Network Meeting 11th NovemberImplementation Network Meeting 11th November
Implementation Network Meeting 11th November
 
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...
Marine Environmental Observation Prediction and Response (MEOPAR) Network Ori...
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License
 
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
 
Community Based Adaptation as a Pillar of National Adaptation Efforts
Community Based Adaptation as a Pillar of National Adaptation Efforts Community Based Adaptation as a Pillar of National Adaptation Efforts
Community Based Adaptation as a Pillar of National Adaptation Efforts
 
Coral bay presentation final
Coral bay presentation finalCoral bay presentation final
Coral bay presentation final
 
WOCAT (World Overview of Conservation Approaches and Technologies)
WOCAT (World Overview of Conservation Approaches and Technologies)WOCAT (World Overview of Conservation Approaches and Technologies)
WOCAT (World Overview of Conservation Approaches and Technologies)
 
Watts hypoxia task force
Watts   hypoxia task forceWatts   hypoxia task force
Watts hypoxia task force
 
Webinar: An overview and explanation of the creation of the communication res...
Webinar: An overview and explanation of the creation of the communication res...Webinar: An overview and explanation of the creation of the communication res...
Webinar: An overview and explanation of the creation of the communication res...
 
Data for Development in the Caribbean
Data for Development in the CaribbeanData for Development in the Caribbean
Data for Development in the Caribbean
 
An introduction to The National Innovation Centre for Rural Enterprise and it...
An introduction to The National Innovation Centre for Rural Enterprise and it...An introduction to The National Innovation Centre for Rural Enterprise and it...
An introduction to The National Innovation Centre for Rural Enterprise and it...
 
Module One
Module OneModule One
Module One
 
Climate change and development project iucn - regional workshop
Climate change and development project   iucn - regional workshopClimate change and development project   iucn - regional workshop
Climate change and development project iucn - regional workshop
 
August 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare LindahlAugust 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare Lindahl
 
Clinton Foundation - Jackson Kimani
Clinton Foundation - Jackson KimaniClinton Foundation - Jackson Kimani
Clinton Foundation - Jackson Kimani
 

More from Alan Carolissen

NECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATIONNECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATIONAlan Carolissen
 
Management of Disused Sealed Radioactive Sources
Management of Disused Sealed Radioactive SourcesManagement of Disused Sealed Radioactive Sources
Management of Disused Sealed Radioactive SourcesAlan Carolissen
 
Overview Radioactive Waste Management in RSA
Overview Radioactive Waste Management in RSAOverview Radioactive Waste Management in RSA
Overview Radioactive Waste Management in RSAAlan Carolissen
 
Radioactive Waste management Policies-Strategies-Waste Management Plans
Radioactive Waste management Policies-Strategies-Waste Management PlansRadioactive Waste management Policies-Strategies-Waste Management Plans
Radioactive Waste management Policies-Strategies-Waste Management PlansAlan Carolissen
 
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...Alan Carolissen
 
Trends in disposal and disposal DESIGN concepts FOR LLW
Trends in disposal  and disposal DESIGN concepts  FOR LLWTrends in disposal  and disposal DESIGN concepts  FOR LLW
Trends in disposal and disposal DESIGN concepts FOR LLWAlan Carolissen
 
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)Vaalputs Post Closure Radiological Safety Assessment (PCRSA)
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)Alan Carolissen
 
Presentation to IAEA Disponet- Improving Disposal Practises at Vaalputs
Presentation to IAEA Disponet- Improving Disposal Practises at VaalputsPresentation to IAEA Disponet- Improving Disposal Practises at Vaalputs
Presentation to IAEA Disponet- Improving Disposal Practises at VaalputsAlan Carolissen
 
CV Alan Carolissen Dec 2016 Rev0
CV Alan Carolissen Dec 2016 Rev0CV Alan Carolissen Dec 2016 Rev0
CV Alan Carolissen Dec 2016 Rev0Alan Carolissen
 
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016Alan Carolissen
 

More from Alan Carolissen (13)

NECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATIONNECSA SMELTER FACILITY PRESENTATION
NECSA SMELTER FACILITY PRESENTATION
 
Management of Disused Sealed Radioactive Sources
Management of Disused Sealed Radioactive SourcesManagement of Disused Sealed Radioactive Sources
Management of Disused Sealed Radioactive Sources
 
Overview Radioactive Waste Management in RSA
Overview Radioactive Waste Management in RSAOverview Radioactive Waste Management in RSA
Overview Radioactive Waste Management in RSA
 
Radioactive Waste management Policies-Strategies-Waste Management Plans
Radioactive Waste management Policies-Strategies-Waste Management PlansRadioactive Waste management Policies-Strategies-Waste Management Plans
Radioactive Waste management Policies-Strategies-Waste Management Plans
 
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...
RADIOACTIVE WASTE DISPOSAL IN SOUTH AFRICA IN 2015 STATUS AND RESEARCH AND DE...
 
Trends in disposal and disposal DESIGN concepts FOR LLW
Trends in disposal  and disposal DESIGN concepts  FOR LLWTrends in disposal  and disposal DESIGN concepts  FOR LLW
Trends in disposal and disposal DESIGN concepts FOR LLW
 
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)Vaalputs Post Closure Radiological Safety Assessment (PCRSA)
Vaalputs Post Closure Radiological Safety Assessment (PCRSA)
 
Presentation to IAEA Disponet- Improving Disposal Practises at Vaalputs
Presentation to IAEA Disponet- Improving Disposal Practises at VaalputsPresentation to IAEA Disponet- Improving Disposal Practises at Vaalputs
Presentation to IAEA Disponet- Improving Disposal Practises at Vaalputs
 
CV Alan Carolissen Dec 2016 Rev0
CV Alan Carolissen Dec 2016 Rev0CV Alan Carolissen Dec 2016 Rev0
CV Alan Carolissen Dec 2016 Rev0
 
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016
The Management of Used Fuel-Key Mandate of NRWDI AC 14 DEC 2016
 
BSC DEGREE
BSC DEGREEBSC DEGREE
BSC DEGREE
 
MBA
MBAMBA
MBA
 
MBA DEGREE
MBA DEGREEMBA DEGREE
MBA DEGREE
 

DEEPENING AND STRENGTHENING STAKEHOLDER CONFIDENCE IN RADWASTE DISPOSAL

  • 1. CASE STUDY OF VAALPUTS: South Africa’s National Low Level Waste Disposal Facility DEEPENING AND STRENGTHENING STAKEHOLDER CONFIDENCE IN RADWASTE DISPOSAL Alan Carolissen Senior Manager: Nuclear Liabilities Management
  • 2. 2 Legal Framework for Radwaste in South Africa • Approved by Cabinet in 2005 • Establishment of the National Committee on Radwaste (NCRWM) • Radwaste Disposal Inst (NRWDI) • Radwaste Fund
  • 3. 3 Core Objectives of Policy and Strategy • Public and Occupational Health and Safety • Environmental Protection • Cost Effectiveness • Safeguards and Security
  • 4. 4 Radwaste Framework Radwaste Framework Minister of Energy National RWM Committee (NNR, DOE, DPE, DOH, DEA etc.) Waste Generator On-site waste • collection • treatment • packaging • storage • transportation • plans Disposal Institute • WAC development • siting • R&D • storage • encapsulation • disposal • monitoring • execution of plans Disposal Site Consists of facilities for: • storage • encapsulation • disposal W A C delivers waste accepts waste National RWM Fund (National Treasury, DOE, Board of Trustees) evaluates, recommends plans submits consults approves plans allocates funds requests for funds pays user-charges contributesfunds(levies) plans (c/kWh/R/m3) issues certificates OtherSourcesofFunds (loans,donations,salesetc.) sites, constructs, operates, decoms facilities
  • 6. 6 Low Level Waste Disposal Repository: Vaalputs 6
  • 7. 7 7 Locality map of South Africa showing Vaalputs, Koeberg and Pelindaba.
  • 8. 8 Vaalputs Commissioning • Site selection completed in 1985 • Site operating license granted in 1986 • First waste shipment arrived in November 1986 • Only solidified or solid low level waste are disposed off.
  • 9. 99 Red sand – 0,5 m Red ‘clay’ – 10m White ‘clay’ – 5m Weathered granite – 3m Fresh granite up to 100m Aquifer 9 Disposal Concept Monitoring pipe Natural Clay 5.2m 8.0m Drainage layer – 200mm Backfill Compacted clay cap Natural cover Top soil Waste packages 50m Shallow Land Disposal (SLD) Near surface trenches for LLW
  • 10. Typical near surface trench 6m 3m 1.5m 3m X m
  • 11. 11 VAALPUTS WASTE INVENTORY • Design capacity - 500 000 metal waste packages - 50 000 concrete waste packages • Metal waste packages - 14 699 disposed of (3% of capacity) • Concrete waste packages - 3 769 disposed of (8% of total capacity)
  • 12. 12 Types of Waste: Only Solid / Solidified Radioactive Waste LLW in metal containers LLW in concrete containers Spent fuel racks
  • 14. 14 14
  • 15. 15 15
  • 16. 16 Building Stakeholder Confidence at Vaalputs: a Case Study
  • 17. 17 17
  • 18. 18 Nuclear (waste) is an Emotional Issue… • In nuclear (waste) business, people’s perceptions are driven by their fears. • Fears caused by memories/perceptions of: – Nuclear bomb explosions – Nuclear reactor accidents – Health effects associated  Cancer  Genetic birth effects
  • 19. 19 19
  • 20. 20 Meriting Trust & Stakeholder Participation “The disposal strategy and concept is technically sound, however societal acceptance is at best non-existent” Canadian Regulatory committee 1986 “The greatest single obstacle that a successful waste management programme must overcome is the severe erosion of public confidence” US Office of Technology Assessment 1982
  • 21. 21 Meriting Stakeholder Participation and Communication “The disposal strategy and concept is technically sound, however societal acceptance is at best non-existent” Canadian Regulatory committee 1986
  • 22. 22 Communications Pre-1994 • The nuclear operating license was obtained with no or limited public participation • No requirement by law for public participation • Vaalputs Communication Forum (VCF) was originally created as a public forum for discussing community related issues. • During the VCF’s earlier years most of the communication took place between Necsa and its immediate neighbours – the sheep farmers - who attended meetings on an intermittent basis. • Farming related issues like control of vermin were the top Agenda items!!!
  • 23. 23 Communications Post-1994 Landscape pertaining to public participation and communication have dramatically and drastically changed directly after the first democratic election was held Public participation &Communications are now legal requirements!!!
  • 24. 24 Communications Post-1994 • Legal requirements: Need to involve interested and affected parties in EIA and licensing processes. • Regulatory requirements: NNR Act requires establishment of Public Safety Information Forum • Policy requirements: Government policies & strategies. • Ethical requirements: Need for transparency, openness, accountable actions & decisions and respect for values & beliefs
  • 25. 25 Stakeholder Confidence Post-1994 25 Heighten levels of community opposition against the disposal of radwaste at Vaalputs Not in my backyard syndrome Public demanded shutdown of facility
  • 27. 27 Strategic Objective Transforming the Vaalputs Communication Forum (VCF) into a Multi-Stakeholder Public Communication and Information Forum to strengthen and deepen stakeholder confidence and acceptance.
  • 28. 28 Stakeholder Philosophy 28 • Acknowledges that each Stakeholder grouping has it own set of values, beliefs, needs, goals and objectives, which may differ from those of the organization. • Ensure open, transparent two-way Stakeholder communication • Ensure the diversity and inclusivity of stakeholder base • Building stakeholder leverage through Corporate Social Investments programs • Investments in research surveys, media monitoring & environmental scanning to ensure the organisation remains attuned to its Stakeholder needs, perceptions and misconceptions.
  • 29. 29 Multi-stakeholder Forum • Department of Energy, Dept of Environmental Affairs, Dept of Water Affairs • Northern Cape Provincial Government • Mayors of the Local Municipalities (Richtersveld, Kamiesberg & Namakhio) • Local Councilors • Eskom, Koeberg, iThemba Labs • National Nuclear Regulator • Media • Namaqualand Action Group for Environmental Justice • EarthLife Africa (ELA) • Vaalputs Employees • Namaqualand Communities • Agricultural Association (Kliprand Agricultural Union) • Trade Unions (NUM)
  • 31. 31 Communication – Yeas • Listen to view points and objections • Put yourself in their position – understand their concerns • Answer questions directly and concisely • Talk in layman’s terms • Provide a way to follow up on issues that cannot be resolved immediately • Bring in the expertise needed to develop a communications program • Minimize formal presentations & speeches
  • 32. 32 Communication – Neas • Don’t be judgmental • Attack those with higher credibility • Repeat negative statements • Say “I know how you feel” • Overreact to emotional outbursts • Use acronyms or jargon • Speculate about what you do not know • Try to turn everyone into an expert in your subject
  • 33. 33 Communication Tools • Word of mouth • Word of mouse • Printed Media • Electronic media • Social Networks
  • 36. 36 Demonstrate Technical Competence • Full disclosure of facility operational compliance • Disseminate information on Nuclear safety, Radiation & nuclear related matters, including but not limited to nuclear incidents and accidents • Conduct regular third party verification audits • Invite stakeholders to third party verification audits as observers • Investment in R&D activities 36
  • 37. EMBRACING BEST PRACTICES ISO 9001 ACCREDITATION ISO 14001 ACCREDITATION 37
  • 40. NUCLEAR SCIENCE &TECHNOLOGY EDUCATION PROGRAMME Outreach Programs • National Science Week • Brochures & Posters • Tours & Visit • Science and Math Educator 40
  • 41. 41 CSI Programme Embraces issues of “Social Development” in terms of empowerment in: • Developing SMME’s • Localization of employment opportunities
  • 42. 42 Key Learnings • Demonstrating technical competence and regulatory compliance are not enough to instill stakeholder confidence • Accommodate divergent values and beliefs equally, considering them all when making decisions • Empower your stakeholders with the necessary knowledge to enable them to participate in decision making process in an informed manner • You can successfully addressed negative public perceptions by creating a multi-stakeholder platform for dialogue and collaborative problem-solving. • These platforms catalyzed innovation, built trust, reduced conflict and created the conditions necessary for building sustainable, mutually beneficial long term stakeholder relationships
  • 43. 43 Concluding Remarks • Biggest challenge of any radwaste management related activity is to ensure societal and political acceptance • Advancement of enhanced stakeholder participation and corporate transparency goes hand in glove • Demonstrating technical competence and safe operations are key parts of building stakeholder confidence, however its not enough to ensure stakeholder acceptability. • Stakeholder confidence building strategies and policies must take into account cultural diversities.
  • 44. 44 To Ensure Societal and Political Acceptance… Make communication, public participation and stakeholder engagement Part of your Radwaste Management DNA !!!
  • 45. 45 45