CO-DEVELOPMENT MANUFACTURING INNOVATION & SUPPORT
Akbar Pamungkas Sukasdi
Final Internship Presentation
Agenda
 3T BV Company Profile
 Introduction
 Assignment
 Project Summary
 Design Block Diagram
 Design Layout
 Results
 Recommendations
25 October 2015www.3t.eu 2
 Founded in 1982, 3T since 1994
 45 – 50 employees (mainly MSc/BSc)
 Offices in Enschede (HQ) & Eindhoven
 Does co-development, product innovation & support
25 October 2015www.3t.eu 3
Introduction
 Born in Batam, Riau Islands, Indonesia
 3rd year student of EPA Elektrotechniek
 Sep 2014 – Jan 2015 : 1st Internship Period in 3T BV
 2012 – 2016 : Bachelor of Electrical & Electronic
Engineering in Saxion University of Applied Sciences
25 October 2015www.3t.eu 4
Assignment
 Construct and test a DC/DC Converter using push pull
topology scheme (incorporating galvanic isolation).
 Topology : Push Pull Topology
 Input : 18 – 36 VDC
 Output : +/- 15 VDC
 Output Voltage Ripple : 150 mV peak-to-peak
 Efficiency : ≥ 89 %
 Output Power : 40 W
 Isolation
25 October 2015www.3t.eu 5
Project Summary
 The project has investigated why custom DC-DC
converter should be made
 The project has considered that high efficiency and low
noise operation should be part of the final design
 The project has recommended to give more attention to
the components selection and careful PCB layout
25 October 2015www.3t.eu 6
Design (Block Diagram)
25 October 2015www.3t.eu 7
Design (PCB Layout)
25 October 2015www.3t.eu 8
 All components are on the top
 Short traces
 Compact size (143 mm x 56.5 mm)
 Most SMD components are used
 Provides heatsink
 Isolation
Design (PCB Layout)
 Component top:
 Top Layer (Signal Layer):
25 October 2015www.3t.eu 9
Design (PCB Layout)
 Second Layer (Ground Plane):
• Barrier width : 1.5 mm
 Third Layer (Power Plane)
25 October 2015www.3t.eu 10
Design (PCB Layout)
25 October 2015www.3t.eu 11
 Bottom Layer (Signal Layer):
Results
 Stable +/- 15 VDC dual output voltages
 Low ripple output voltages (17.60 mV p-p)
 High efficiency up to 92% (Full Load)
25 October 2015www.3t.eu 12
Results
 Thermal picture:
25 October 2015www.3t.eu 13
Recommendations
 Integrated Heatsink (Thermal Management)
 Use Thermal Blind / Buried Vias (Thermal Management)
 Package Development (Thermal Management)
 MOSFETs w/ ultra low gate charge (Qg) (Efficiency)
 Ultra low forward voltage Schottky diodes (Efficiency)
 Use lead wire instead of solid copper wire (Efficiency)
25 October 2015www.3t.eu 14
3T B.V.
Institutenweg 6 Esp 401
7521 PK Enschede 5633 AJ Eindhoven
The Netherlands The Netherlands
T. +31 53 4 33 66 33
F. +31 53 4 33 68 69
E. info@3t.nl
W. www.3t.eu

More Related Content

Similar to Co-Development Manufacturing Innovation & Support

PEL Report(Submitted to Engr. Hasnain Raza)
PEL Report(Submitted to Engr. Hasnain Raza)PEL Report(Submitted to Engr. Hasnain Raza)
PEL Report(Submitted to Engr. Hasnain Raza)Asif Ali
 
VTU-15ecschsyll cbcs
VTU-15ecschsyll cbcsVTU-15ecschsyll cbcs
VTU-15ecschsyll cbcsEce Rljit
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
Hcd 70 Split Waveguide
Hcd 70 Split WaveguideHcd 70 Split Waveguide
Hcd 70 Split Waveguideguest36ea6a77
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang You sin
 
Presentation Abb Carrer
Presentation Abb CarrerPresentation Abb Carrer
Presentation Abb Carrerwojciechg23
 
Leaving the platform: branching for independent systems at thetrainline
Leaving the platform: branching for independent systems at thetrainlineLeaving the platform: branching for independent systems at thetrainline
Leaving the platform: branching for independent systems at thetrainlineOwain Perry
 
Virtual Pcb Fjelstad With Audio
Virtual Pcb   Fjelstad With AudioVirtual Pcb   Fjelstad With Audio
Virtual Pcb Fjelstad With Audiobendueker
 
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docx
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docxECE321322 Electronics I & Lab Spring 2015 1 Final P.docx
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docxjack60216
 
aditya wadkar resume_18.04.2016
aditya wadkar resume_18.04.2016aditya wadkar resume_18.04.2016
aditya wadkar resume_18.04.2016aditya wadkar
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...Joseph Uken
 

Similar to Co-Development Manufacturing Innovation & Support (20)

PEL Report(Submitted to Engr. Hasnain Raza)
PEL Report(Submitted to Engr. Hasnain Raza)PEL Report(Submitted to Engr. Hasnain Raza)
PEL Report(Submitted to Engr. Hasnain Raza)
 
VTU-15ecschsyll cbcs
VTU-15ecschsyll cbcsVTU-15ecschsyll cbcs
VTU-15ecschsyll cbcs
 
Slides - Day 10.pdf
Slides - Day 10.pdfSlides - Day 10.pdf
Slides - Day 10.pdf
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Hcd 70 Split Waveguide
Hcd 70 Split WaveguideHcd 70 Split Waveguide
Hcd 70 Split Waveguide
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Ekachai_ResumeRev05
Ekachai_ResumeRev05Ekachai_ResumeRev05
Ekachai_ResumeRev05
 
Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016Pang YS Resumes Jan_ 2016
Pang YS Resumes Jan_ 2016
 
ANIRUDDHA DEV_CV
ANIRUDDHA DEV_CVANIRUDDHA DEV_CV
ANIRUDDHA DEV_CV
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
Presentation Abb Carrer
Presentation Abb CarrerPresentation Abb Carrer
Presentation Abb Carrer
 
Leaving the platform: branching for independent systems at thetrainline
Leaving the platform: branching for independent systems at thetrainlineLeaving the platform: branching for independent systems at thetrainline
Leaving the platform: branching for independent systems at thetrainline
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
 
My CV Update 0515
My CV  Update 0515My CV  Update 0515
My CV Update 0515
 
Virtual Pcb Fjelstad With Audio
Virtual Pcb   Fjelstad With AudioVirtual Pcb   Fjelstad With Audio
Virtual Pcb Fjelstad With Audio
 
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docx
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docxECE321322 Electronics I & Lab Spring 2015 1 Final P.docx
ECE321322 Electronics I & Lab Spring 2015 1 Final P.docx
 
3S Solar- May 2010 Study Tour
3S Solar- May 2010 Study Tour3S Solar- May 2010 Study Tour
3S Solar- May 2010 Study Tour
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
aditya wadkar resume_18.04.2016
aditya wadkar resume_18.04.2016aditya wadkar resume_18.04.2016
aditya wadkar resume_18.04.2016
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
 

More from Akbar Pamungkas Sukasdi

More from Akbar Pamungkas Sukasdi (8)

[ppt] MPM Self-Introduction - AKBAR SUKASDI
[ppt] MPM Self-Introduction - AKBAR SUKASDI[ppt] MPM Self-Introduction - AKBAR SUKASDI
[ppt] MPM Self-Introduction - AKBAR SUKASDI
 
POSA-powerfactor-1
POSA-powerfactor-1POSA-powerfactor-1
POSA-powerfactor-1
 
Ride Through Systems V1_00_jan2008_PPT
Ride Through Systems V1_00_jan2008_PPTRide Through Systems V1_00_jan2008_PPT
Ride Through Systems V1_00_jan2008_PPT
 
Hitec Brochure QPS English_LR
Hitec Brochure QPS English_LRHitec Brochure QPS English_LR
Hitec Brochure QPS English_LR
 
Hitec Brochure Diesel UPS-CPS Engels
Hitec Brochure Diesel UPS-CPS EngelsHitec Brochure Diesel UPS-CPS Engels
Hitec Brochure Diesel UPS-CPS Engels
 
Report_AKbar_PDF
Report_AKbar_PDFReport_AKbar_PDF
Report_AKbar_PDF
 
Power Quality - Dips and Interrutions
Power Quality - Dips and InterrutionsPower Quality - Dips and Interrutions
Power Quality - Dips and Interrutions
 
POSA-3phase-systems-intro
POSA-3phase-systems-introPOSA-3phase-systems-intro
POSA-3phase-systems-intro
 

Co-Development Manufacturing Innovation & Support

  • 1. CO-DEVELOPMENT MANUFACTURING INNOVATION & SUPPORT Akbar Pamungkas Sukasdi Final Internship Presentation
  • 2. Agenda  3T BV Company Profile  Introduction  Assignment  Project Summary  Design Block Diagram  Design Layout  Results  Recommendations 25 October 2015www.3t.eu 2
  • 3.  Founded in 1982, 3T since 1994  45 – 50 employees (mainly MSc/BSc)  Offices in Enschede (HQ) & Eindhoven  Does co-development, product innovation & support 25 October 2015www.3t.eu 3
  • 4. Introduction  Born in Batam, Riau Islands, Indonesia  3rd year student of EPA Elektrotechniek  Sep 2014 – Jan 2015 : 1st Internship Period in 3T BV  2012 – 2016 : Bachelor of Electrical & Electronic Engineering in Saxion University of Applied Sciences 25 October 2015www.3t.eu 4
  • 5. Assignment  Construct and test a DC/DC Converter using push pull topology scheme (incorporating galvanic isolation).  Topology : Push Pull Topology  Input : 18 – 36 VDC  Output : +/- 15 VDC  Output Voltage Ripple : 150 mV peak-to-peak  Efficiency : ≥ 89 %  Output Power : 40 W  Isolation 25 October 2015www.3t.eu 5
  • 6. Project Summary  The project has investigated why custom DC-DC converter should be made  The project has considered that high efficiency and low noise operation should be part of the final design  The project has recommended to give more attention to the components selection and careful PCB layout 25 October 2015www.3t.eu 6
  • 7. Design (Block Diagram) 25 October 2015www.3t.eu 7
  • 8. Design (PCB Layout) 25 October 2015www.3t.eu 8  All components are on the top  Short traces  Compact size (143 mm x 56.5 mm)  Most SMD components are used  Provides heatsink  Isolation
  • 9. Design (PCB Layout)  Component top:  Top Layer (Signal Layer): 25 October 2015www.3t.eu 9
  • 10. Design (PCB Layout)  Second Layer (Ground Plane): • Barrier width : 1.5 mm  Third Layer (Power Plane) 25 October 2015www.3t.eu 10
  • 11. Design (PCB Layout) 25 October 2015www.3t.eu 11  Bottom Layer (Signal Layer):
  • 12. Results  Stable +/- 15 VDC dual output voltages  Low ripple output voltages (17.60 mV p-p)  High efficiency up to 92% (Full Load) 25 October 2015www.3t.eu 12
  • 13. Results  Thermal picture: 25 October 2015www.3t.eu 13
  • 14. Recommendations  Integrated Heatsink (Thermal Management)  Use Thermal Blind / Buried Vias (Thermal Management)  Package Development (Thermal Management)  MOSFETs w/ ultra low gate charge (Qg) (Efficiency)  Ultra low forward voltage Schottky diodes (Efficiency)  Use lead wire instead of solid copper wire (Efficiency) 25 October 2015www.3t.eu 14
  • 15. 3T B.V. Institutenweg 6 Esp 401 7521 PK Enschede 5633 AJ Eindhoven The Netherlands The Netherlands T. +31 53 4 33 66 33 F. +31 53 4 33 68 69 E. info@3t.nl W. www.3t.eu