1. Ajay Kumar Sharma
Contact Information
Address : 123-D, Sector, Reliance Green Township,
Motikhavdi, Jamnagar : 361142
Gujarat, India
Telephone No : +91-0288-6626136(Res)
+91-9725019177 & +91-7043139177 (mobile)
Email ID : ajayksharma.2008@rediffmail.com,
Personal Particulars
Age : 45 years
Date of Birth : 7 December, 1969
Nationality : Indian
Gender : Male
Marital Status : Married
Passport No : M1877480
Validity up to : 09/09/2024
Educational Background
Degree : B.Tech. – Chemical Engineering (1987-1991)
Grade and %age : I st
Class – 78%
Institution : Dept. of Chemical Engineering and Tech.,
Panjab University,Chandigarh.
2. Employment History
RELIANCE INDUSTRIES LIMITED, Jamnagar, Gujarat
Position Level : Sr. Manager
Responsibility : Manage activities for Upcoming Project for IIR production
Industry : Petrochemical- Isobutylene Isoprene Rubber (SIBUR technology)
Duration : June 2014 – Till Date
RELIANCE INDUSTRIES LIMITED, Jamnagar, Gujarat
Position Level : Sr. Manager
Responsibility : Day Shift Manager and Plant safety representative.
Industry : Petrochemical- POLYPROPYLENE UNIT.( Dow Technology)
Duration : April 2007 – June 2014.
RELIANCE INDUSTRIES LIMITED, Patalganga, Maharashtra
Position Level : Astt. Manager to Sr. Manager
Responsibility : Shift Incharge and coordinator for Special Projects.
Industry : Petrochemical- POLYESTER ( PET ) UNIT ( ICI Technology)
Duration : March 1998 to April 2007
JAGJIT COTTON AND TEXTILES LIMITED, Hoshiarpur,Punjab
Position Level : Apprentice Er. to Astt. Manager
Responsibility : Shift Incharge and member of Unit Expansion Team
Industry : Petrochemical- POLYESTER (PET) UNIT (ZIMMER Technology)
Duration : October 1991 to March 1998
3. Present Job Responsibilities
• Lead Manager to coordinate the activities of upcoming project for IIR production
( Isobutylene Isoprene Rubber ) .
Activities so far :
• Review and understand IIR process from Basic Process Design
Package
• Participated in plant and unit HAZOP study.
• Review and update of process documents like PFD’s, PID’s,
PDS, MDS,VDS,
Process control documents for implementation of HAZOP recommendations,
3D model study
• Preparation of Standard Operating Procedures based on Licensor
documents
and vendor package documents
• Training the operations staff about the process, process systems
• Team building and Training the new joiners about the process
details, safety
procedures, pre commissioning and commissioning activities
• Documentation and planning for monitoring and tracking the
progress of
piping and equipment erection.
4. • Update and report the progress of operations preparedness for
the project to
Site Project Lead.
Highlights of the previous experience
• Worked as Shift Suptd. for Polypropylene unit .I was responsible for controlling and
maintaining process conditions for quality production of PP as per set targets.
(2009-2014)
• Co-ordinated planning and execution of emergency shutdown jobs and PM jobs in
Polyester Fibre and Polypropylene units.
• Plant safety representative and responsible for implementing changes in operating
procedures to minimize job risk and preparation of job specific risk assessment
sheets.(2009-2014)
• Plant PSM coordinator for 4 years and plant representative for activities related to
PHA, Operating procedures, MOC, PSSR, Incident investigation and Audits. (2010-
2014) .
• Work place safety and process safety trainer for operations and maintenance work
force. (2010-2014)
• Coordinator for Plant Fire Prevention activities like regular maintenance,training of
personals and audits from fire prevention point of view. (2010-2014)
• Worked as Lead Manager for the erection/testing/pre commissioning and
commissioning of 900 KTA Polypropylene lines (2007-2009).
5. • Worked as team leader for reduction in steam and energy consumption in three PET
fiber units of the site by 30-35 %.(2006)
• Worked for complete shifting / erection / testing / pre commissioning and
commissioning of PET manufacturing unit.(2000-2002)
• Worked for plant capacity expansion for PET production unit from 80 to150 tpd
capacity.(1993-1995)
Additional Trainings
• Completed successfully the course assessment and examination for OH&S
Management systems and Environment Management Systems Lead auditor course
by IRCA .
Training was conducted by Bureau Veritas.
• Completed 5 weeks classroom training and trouble shooting on process simulator
training for Polypropylene process at Dow Technology Licensing and catalyst centre
at Houston, Texas.
• Completed 5 days Fire and Incident command course from Falck Risc
• Completed in house training for 2 months for major operations and activities in
HNUU/Platformer units of Aromatics section as part of preparation for shutdown
activities.