Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Ahmed lashin portfolio
1. A H M E D L A S H I N
A R C H I T E C T
CURRICULUM VITAE
PORTFOLIO SAMPLE
2019
2. Table of Contents :
1. Briefing.
2. Work Experience.
3. Construction Drawings Projects.
4. Fitout Projects.
5. Design Projects.
6. Work Experience certificates.
3. Briefing
Personal information :
• Name: Ahmed Youssry Lashin .
• Nationality: Egyptian.
• Date of birth: 30 / 11 / 1986.
• Military status: Exempted.
• Resident: Heliopolis.
Contacts :
• Mobile: +2 0100 36 40 366
• E-mail: ayzlashin@hotmail.com
ayzlashin@yahoo.com
ayzlashin@gmail.com
Education :
• 2013 – 2016 Master of Science - faculty of engineering ,Ain-Shams university , Architecture department.
• 2003 – 2008 Bachelor of Architecture - faculty of engineering , Ain-Shams university , Architecture department.
Eager to gain experience and to apply my education, skills and short experience,
with the ambition to enhance my skills to be an effective employee inside work organization.
4. Briefing
Career Qualifications :
Master of Engineering, Architecture department, Faculty of Engineering, Ain-Shams University, Cairo, Egypt.
• Over-all grade: Very Good.
Bachelor of Engineering, Architecture department, Faculty of Engineering , Ain-Shams University, Cairo, Egypt.
• Over-all grade: Good.
• Graduation year: 2008.
• Graduation project : Virtual Reality Valley
• Graduation project grade: Very Good.
Graphic Design Diploma, YAT Learning solutions.
• Over-all grade: Very Good.
Personal skills & Competencies :
• Languages :
1- Arabic - mother tongue.
2- English - fluent.
• Professional Photographer for multiple companies & studios.
• Graphic Designer.
• Teacher Assistant at Arab Academy for Science, Technology & maritime transport.
Social skills & Competencies :
• Living & working in multicultural environments thanks to handiness in communicating & strong will to share different experiences.
• Good relational abilities of insertion in new atmospheres of job.
5. Briefing
Technical skills & Competencies :
1- Excellent competencies in AutoCAD .
2- Excellent competencies in 3d studio max .
3- Excellent competencies in Adobe Photoshop .
4- Good competencies in Revit Architecture.
5- Good competencies in Adobe illustrator.
6- Good competencies in Adobe in Design.
Organizational Skills & Competencies :
• Ability to coordinate between different disciplines & administrate architects and activities with an excellent use of time and budget.
Other Skills :
• Excellent presentation skills.
6. Work Experience
Projects Participated in at Pavilion Architects :
Project Manager & Coordinator of Al Alamein Towers.
Projects Participated in at EHAF Consulting Engineers :
Architectural Design Unit Manager for the ministry of Interiors Tactic Village, Police Stations & Administration buildings.
Design Development & Working drawings and Details for Greater Cairo Metro Line 4.
Design Development & Working drawings for Ministry of Justice Building in Riyadh - K.S.A.
Design Development & Working drawings for City Gate & Mivida Compounds In the 5th Settlement - New Cairo – Egypt.
Design Development & Working drawings for Schlumberger Oil and gas services and products Workshops.
Projects Participated in at S.A. Architects :
Developing working drawings , Designing Construction Details & b.o.q. for several architectural
projects ( villas – administration buildings - retail stores ).
Projects Participated in at Cube Consultants :
Design the New master Plan for Greater Cairo Cairo 2050 urban Project.
Working Drawings For the Renovation of the National Theater in Attaba Square, Cairo, Egypt.
Design Development , Working drawings and Details & construction supervision for the Railway Stations Project.
7. New Al-Alamein City’s Beach Towers
Qatar’s Ministry of Electric and Water Resources
Barwa Bank H.Q.
Khoriteyat Masjid and Majlis
Tactic Village for Combat Operations
Schlumberger Egypt Workshops Project
Greater Cairo Metro Line 4 Workshops Project
Ministry of Finance in Saudi Arabia
City Gate Residential Compound
Egypt Railway Stations Project
Teegan Residential Compound
Construction Drawings Projects
8. Client : New Urban Communities Authority
Location : Al Alamein City - Egypt
Leed Consultant : Pavilion
Scope of Work : Project Manager and Coordinator
Al Alamein City Beach Towers
11. Construction Drawings Projects
11
AO
AN
AM
AL
AK
AJ
AI
AH
AG
AF
AE
AD
AC
AB
AA
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
A21
B16
B15
B14
B13
B12
B11
B10
B9
B8
B7
B6
B5
B4
B3
B2
B1
BA'
BA
BB
BC
BD
BE
BF
BG
BH
BI
BJ
BK
BL
BM
BN
BO
BQ
BR
BS
C15
C14
C13
C12
C11
C10
C9
C8
C7
C6
C5
C4
C3
C2
C1
CA CB CC CD CE CF CG CH CI CJ CK CL CM CN CO CP CQ CR CS
CT
D22
D21
D20
D19
D18
D17
D16
D15
D14
D13
D12
D11
D10
D9
D8
D7
D6
D5
D4
D3
D2
D1
DA
DB
DC
DD
DE
DF
DG
DH
DI
DJ
DK
DL
DM
DN
DO
DP
DQ
DR
DS
EI
EH
EG
EF
EE
ED
EC
EB
EA
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35
01
AR-300
02
AR-301
03
AR-302-3
04
AR-304-5
E 01
1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.
1.0 GENERAL :
1:500
00
PODIUM ROOF FLOOR - GENERAL ARRANGEMENT LAYOUT
LD00-AR-PD-026
1.1 ABBREVIATIONS :
- F.F.L ( FINISHED FLOOR LEVEL )
- T.O.P ( TOP OF PARAPET )
ROOM FUNCTION
L XY 06
STORY LEVEL
FUNCTION
SPACE ID
ROOM FUNCTION
L.G 01
STORY LEVEL
SPACE ID
ELEVATOR
ELEVATOR
NUMBERDOOR ID DIRECTION
R=RIGHT
L= LIFT
DO3/R
01
-
PODIUM ROOF FLOOR - GENERAL ARRANGEMENT LAYOUT
SCALE 1:500
www com.ecgsa.
PROJECT TITLE :
DRAWING TITLE :
DRAWING NO. REVISION TEAM WORK :
APPROVED BYSCALE DATE
KEY PLAN / SITE LOCATION
Eng. Yasser Zaki
INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
05/09/2018
Sara Ahmed Esraa Sabry
Helana Safwat Rana Sherif
Walaa Farag Aya Khaled
NORTH EDGE TOWERS
NEW ALAMEIN
PLOT (LD00)
Eng :Yasser ZakiTeam Work00 24/06/2018 W.D ISSUED FOR REVIEW
Pavillion Architects S.A.E
Heliopolis Sq. Cairo, Egypt
Building 23 Mohamed Aly El Balky ,
Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com
PAVILLION ARCHITECTS
MAIN CONSULTANT :
STRUCTURE Consultant:
EEngineers & Consultants
Aya Khaled
12. 12
Construction Drawings Projects
F.F.L +30.25
F.F.L +26.65
F.F.L +23.05
4th Floor4th Floor
3rd Floor3rd Floor
2nd Floor2nd Floor
3
1
3
1
353
111
3
1 1
3
1
3
1
353
111
3
1
9102,2204709102,220470910470
2,2209102,220470910470
3,3302703,330270270
3,2603403,260340340
2,220
910
2,220
470
910470
3,3255,1751,9852,2654,2504,2502,2651,9854,2504,250
ACADAEAFAGAHAIAJAKALAM
4th Floor4th Floor
3rd Floor3rd Floor
2nd Floor2nd Floor
22
22
3
1
3
1
353
111
3 5 3
1 1 1
3
1
3
1
353
111
3 5 3
1 1 1
1,2002,4001,2001,070
1,2002,4001,2001,070
3,2603403,260340340
3,2603403,260340340
2,2209102,220470910470
3,2603403,260340340
2,2209102,220470910470
3,2603403,260340340
4,2504,2501,9852,2654,2504,2502,2651,9855,1753,325
AMALAKAJAIAHAGAFAEADAC
D03/R
D03/L
D03/L
D03/R
D03/L
D03/R
D03/R
D03/L
F.F.L++26.65
A
AR-304
AL
AK
AJ
AI
AH
AG
AF
AE
AD
AC
A8
A8
A9
A9
A10
A10
AM
4930
3735
2360
3770
2380
2330
2330
2330
2330
2380
2360
3770
4175
4175
3785
4930
3150
BEDROOM
03|07|14
TERRACE
03 | 07 |16
M.BEDROOM
03|07|12
BEDROOM
03|07|13
CLOSET
03|07|11
BEDROOM
03|06|14
TERRACE
03 | 06 | 16
M.BEDROOM
03|06|12
BEDROOM
03|06|13
CLOSET
03|06|11
DCW
DCW
D03/L
D03/R
W01
A
AR-304
AL
AK
AJ
AI
AH
AG
AF
AE
AD
AC
A1A2
AM
BEDROOM
03|02|14
BEDROOM
03|02|13
TERRACE
03|02|16
M.BEDROOM
03|02|12
CLOSET
03|02|11
BEDROOM
03|03|14
BEDROOM
03|03|13
TERRACE
03|03|16
M.BEDROOM
03|03|12
CLOSET
03|03|11
F.F.L +30.25
F.F.L +26.65
F.F.L +23.05
4th Floor
3rd Floor
2nd Floor
F.F.L +30.25
F.F.L +26.65
F.F.L +23.05
4th Floor
3rd Floor
2nd Floor
CURTAIN WALL GLAZING
SPANDREL
COMPOSIT PANNEL CLADDING
GRC CLADDING
ELEVATION FINISH LEGEND
CURTAIN WALL GLAZING
SPANDREL
COMPOSIT PANNEL CLADDING
GRC CLADDING
ELEVATION FINISH LEGEND
F 01 E 01
FLAT FLAT NUMBER ELEVATOR
ELEVATOR
NUMBER
DOOR ID DIRECTION
R=RIGHT
L= LIFT
DO3/R
1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.
1.0 GENERAL :
1:100
00
Helana Safwat
Tower A 2nd Floor Plan - Elevation Finishes -2
LD00-LD01
1.1 ABBREVIATIONS :
- F.F.L ( FINISHED FLOOR LEVEL )
- T.O.P ( TOP OF PARAPET )
www com.ecgsa.
PROJECT TITLE :
DRAWING TITLE :
DRAWING NO. REVISION TEAM WORK :
APPROVED BYSCALE DATE
KEY PLAN / SITE LOCATION
Eng. Ahmed Gamal
INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
24/03/2019
Sara Ahmed Esraa Sabry
Helana Safwat Rana Sherif
Walaa Farag Aya Khaled
NORTH EDGE TOWERS
NEW ALAMEIN
PLOT (LD00 - LD01)
Eng :Yasser ZakiTeam Work00 24/06/2018 W.D ISSUED FOR REVIEW
Pavillion Architects S.A.E
Heliopolis Sq. Cairo, Egypt
Building 23 Mohamed Aly El Balky ,
Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com
PAVILLION ARCHITECTS
MAIN CONSULTANT :
STRUCTURE Consultant:
EEngineers & Consultants
17. Client : Qatary Ministry of Electric and water resources
Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and coordination as a senior architect
Ministry of Electric and Water Resources
18. 18
Construction Drawings Projects
CONSULTING ENGINEERS
P.O. BOX1876, DOHA-QATAR
TEL : (974) 402037 77 / 88 /
99FAX : (974) 402037 66
www.ehaf .com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
01-10-2017A ISSUE FOR APPROVAL
000000 A
N/2017/0002775
PROJECT
DRAWN BY:
JOB NO.:
TITLE:
SCALE:
CLIENT:
LOCATION:
DESIGNED BY:
DRAWING NO.:
DATE:
CHECKED BY:
CONSULTANT STAMP & SIGNATURE :
REVISION
DESCRIPTIONREV. DATE BY
U.D.D STAMP MUNICIPALITY STAMP
SIGNATURE SIGNATURE
REGISTRATION No. : REGISTRATION No. :CAD FILE:
SUB-CONSULTANT STAMP & SIGNATURE :
TECHNICAL MANAGER :
GRADE : GRADE :CONSULTANT REG. No : CONSULTANT REG. No :
REGISTRATION No. :
TECHNICAL MANAGER
REGISTRATION No :
Enquiry No. : Application No :
@A1
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
QATAR ELECTRICITY & WATER CO.
LUSAIL CITY - MARINA COM 53
0321
---------------
99/M A
Shereif Ahmed
6120
38814265
H.O./M.A. O.M.M.S./S.M.
A
PERSPECTIVES
GR-006-00
03/08/2017
AERIAL PERSPECTIVENIGHT PERSPECTIVE
19. Construction Drawings Projects
19
DN
DN
DNDN
1
2
4
3
3
1 2
1 2
3
4
4
1
2
4
3
3
1 2
1 2
3
4
4
PL.
PL.
PL.
Planter
Planter
W.FEATURE
Planter
Planter
Planter
Planter
PL.
PL.
PL.
Planter
Planter
Planter
Planter
Planter
Planter
PL.
PL.
Planter
PL.
PL.
PL.
PL.
PL.
W.FEATURE
PL.
W.FEATURE
Planter
PL.
W
.F
EATURE
W.wall
PL.
PL.
PL.
PL.
PL.
PL.
PL.
PL.
PL.
W.wall
PL.
PL.
Planter
W.wall
Planter
W.wall
PL.
PL.
PL.
Planter
Planter
W.FEATURE
Planter
Planter
Planter
Planter
PL.
PL.
PL.
Planter
Planter
Planter
Planter
Planter
Planter
PL.
PL.
Planter
PL.
PL.
PL.
PL.
PL.
W.FEATURE
PL.
W.FEATURE
Planter
PL.
W
.F
EATURE
W.wall
PL.
PL.
PL.
PL.
PL.
PL.
PL.
PL.
PL.
W.wall
PL.
PL.
Planter
W.wall
Planter
W.wall
SHADE ABOVE
SHADE ABOVESHADE ABOVE
1.0m
1.0m
1.0m
1.0m
1.0m
1.0m
T2.9
T2.4
T2.4
T2.3
T2.3
T2.5
T2.5
T2.6
T2.6
T2.2
T2.2
T2.1
T2.1
T2.7
T2.7
T2.10
T2.10
T2.8
T2.8
C2.1
C2.1
R2.4
R2.3
R2.1
R2.2
R2.5
R2.6
R2.8
R2.7
C2.2
C2.2
T1.1
T1.1
T1.2
T1.2
T1.3
T1.3
T1.4
T1.4
T1.5
T1.5
T1.6
T1.6
T1.7
T1.7
C1.1
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
Y.1
Y.1
Y.2
Y.2
Y.3
Y.3
Y.4
Y.4
X.1
X.2
X.3
X.4
X.5
X.6
X.7
X.8
T2.9
T2.9
T2.4
T2.4
T2.3
T2.3
T2.5
T2.5
T2.6
T2.6
T2.2
T2.2
T2.1
T2.1
T2.7
T2.7
T2.10
T2.10
T2.8
T2.8
C2.1
C2.1
R2.4
R2.3
R2.1
R2.2
R2.5
R2.6
R2.8
R2.7
C2.2
C2.2
T1.1
T1.1
T1.2
T1.2
T1.3
T1.3
T1.4
T1.4
T1.5
T1.5
T1.6
T1.6
T1.7
T1.7
C1.1
C1.1
AR-203-00
1
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
Y1.1
Y1.1
Y1.2
Y1.2
X.8
X.8
X.7
X.7
X.6
X.6
X.5
X.5
X.4
X.4
T2.7
T2.7
T2.6
T2.6
T2.5
T2.5
T2.4
T2.4
T2.3
T2.3
T2.2
T2.2
T2.1
T2.1
X.3
X.3
X.2
X.2
X.1
X.1
Y.1
Y.1
Y.2
Y.2
Y.3
Y.3
Y.4
Y.4
----------AR-201-00
1
N 403219.8104
E 231012.2602
B
A
D
C
N 403121.4988
E 230892.5049
N 402975.5278
E 230941.1565
N 403036.6818
E 231073.3011
5000
10000
5000
10000
15000
15000
10000
5000
42000
47000
5000
CONSULTING ENGINEERS
P.O. BOX1876, DOHA-QATAR
TEL : (974) 402037 77 / 88 /
99FAX : (974) 402037 66
www.ehaf .com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
01-10-2017A ISSUE FOR APPROVAL
000000 A
N/2017/0002775
PROJECT
DRAWN BY:
JOB NO.:
TITLE:
SCALE:
CLIENT:
LOCATION:
DESIGNED BY:
DRAWING NO.:
DATE:
CHECKED BY:
CONSULTANT STAMP & SIGNATURE :
REVISION
DESCRIPTIONREV. DATE BY
U.D.D STAMP MUNICIPALITY STAMP
SIGNATURE SIGNATURE
REGISTRATION No. : REGISTRATION No. :CAD FILE:
SUB-CONSULTANT STAMP & SIGNATURE :
TECHNICAL MANAGER :
GRADE : GRADE :CONSULTANT REG. No : CONSULTANT REG. No :
REGISTRATION No. :
TECHNICAL MANAGER
REGISTRATION No :
Enquiry No. : Application No :
@A1
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
QATAR ELECTRICITY & WATER CO.
LUSAIL CITY - MARINA COM 53
0321
---------------
99/M A
Shereif Ahmed
6120
38814265
H.O./M.A. O.M.M.S./S.M.
1 : 500
A
SITE DEVELOPMENT PLAN / POLICY PLAN &
AREA STATEMENT
GR-001-00
03/08/2017
AREA STATEMENT
POLICY PLAN
1 : 500GR-001-00
SITE DEVELOPMENT PLAN1
TOWER-1
TOWER-2
PODIUM ROOF
MAIN ENTRANCE
RETAIL ENTRANCE
TOWER-2
ENTRANCE
TOWER-1
ENTRANCE
PODIUM PARKING
ENTRANCE
BASEMENT PARKING
ENTRANCE
RETAIL PARKING
ENTRANCE
NOTES:
QND= +3.00 M ( + 0.00 M ROAD LEVEL )
29. Client : Barwa Group
Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and Coordination as a senior architect.
Barwa Bank H.Q.
30. 30
Construction Drawings Projects
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
GENERAL NOTES :
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
PROJECT NAME AND
LOCATION
KEY PLAN
PLANNING NO.
PIN NO.
13-2015-00295
69060005
NORTH
ISSUED FOR DC1 APPROVAL
OWNER
LEAD CONSULTANT
LOCAL CONSULTANT
MEP CONSULTANT
MARINA COM-02, LUSAIL CITY - QATAR
BARWA BANK HQ TOWER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200www.perkinswill.com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
DRAWING TITLE
DRAWING. NO.
DRAWN BY:
VERIFIED BY:
CHECKED BY:
APPROVED BY:
STAGE:
PLOT DATE:
REVISION:
PROJECT. NO:SCALE:
FILE NAME:
PART:
390142
DD
O
C:Usersmahmoud.fathyDocuments390142.000_Barwa
Bank_mahmoud.fathy.rvt
G00-00
COVER SHEET
DL
GD
15/06/16
AG
ISSUE DESCRIPTION DATE CHECKED QA / QC
O FOR DC1 APPROVAL 27 JUN. 2016
31. Construction Drawings Projects
31
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
12
12
13
13
C C
D D
E E
F F
1
AR-301-00
PARKING
B5-001
A A
B B
14
14
G G
H H
1
AR-302-00
11
11
1730013950130001395017342
75542
123880
4999 5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950 17230
1
AR-303-00
DOWN FROM
BASEMENT 4
UP TO
BASEMENT 4
MEP RISER
AREA
B5-005
LIFT LOBBY
B5-018
STORE
B5-008
MEP RISER
AREA
B5-010
SUMP PUMP
ROOM
B5-006
FM ROOM
B5-011
CARPARK
SUPPLY FAN
ROOM
B5-025
CARPARK
EXTRACT FAN
ROOM
B5-020
CARPARK
SUPPLY FAN
ROOM
B5-033
PARKING
SHUTTLE
LOBBY
B5-002
TL-4
TL-3
TL-2
TL-1
TL-5
TL-6
TL-7
TL-8
FL-1 FL-2
RL-4
RL-3
RL-2
RL-1
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.100 FFL FFL
-20.600 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
1250 27006550 4950
6500
-19.100 FFL FFL/SSL-19.100 FFL FFL/SSL
-19.100 FFL FFL/SSL
-19.100 FFL FFL/SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.100 FFL FFL/SSL
DRAINAGE
PUMP ROOM
B5-014
ELECT. ROOM
B5-009
ELECT. ROOM
B5-004
PUBLIC_HEALTH_RISER
FM ROOM
B5-007
-19.000 FFL FFL
-19.100 SSL SSL
ELECT. ROOM
B5-027
ELECT. ROOM
B5-026
B5-11
B5-10
B5-09 B5-23
B5-22
B5-40
B5-41
B5-160B5-161 B5-159
B5-108
B5-112 B5-113 B5-114B5-110 B5-111
B5-131
B5-130
B5-133
B5-132
B5-128
B5-127
B5-126
B5-125
B5-122
B5-121
B5-06
B5-05
B5-07
B5-08
B5-03
B5-04
B5-02
B5-20 B5-43
B5-123
B5-124
B5-109
B5-74
B5-75
B5-21 B5-42
B5-167B5-168 B5-164B5-166 B5-165
B5-163
B5-12
B5-01
B5-62
B5-162
B5-157B5-158 B5-151B5-154 B5-148B5-156 B5-155 B5-153 B5-152 B5-150 B5-149 B5-147
B5-14B5-13 B5-17B5-15 B5-16
B5-18
B5-144
B5-143
B5-142
B5-145
B5-134
B5-135
B5-136
B5-137
B5-140
B5-141
B5-139
B5-138
B5-84B5-83 B5-90B5-87 B5-93B5-85 B5-86 B5-88 B5-89 B5-91 B5-92 B5-94
B5-28
B5-29
B5-35
B5-34
B5-31 B5-32
B5-30 B5-33
B5-37
B5-36
B5-26
B5-27
B5-38
B5-39
B5-25
B5-24
B5-47
B5-46
B5-44
B5-45
B5-52
B5-53
B5-55
B5-54
B5-50
B5-51
B5-49
B5-48
B5-61
B5-56
B5-58
B5-57
B5-59
B5-60
B5-64
B5-63
B5-69
B5-67
B5-68
B5-66
B5-65
B5-73
B5-77
B5-76
B5-78
B5-79
B5-116B5-115 B5-117
B5-107
B5-103 B5-102 B5-101B5-105 B5-104B5-106 B5-99B5-100 B5-98B5-81B5-82 B5-80
B5-19
B5-71
B5-70 B5-72
B5-97 B5-96
B5-129
B5-118 B5-119
B5-120
AR-501-01
1
AR-502-01
1
AR-503-01
1
AR-503-01
1
1
B
3.503.50
INTAKE SHAFT
A1250
EXHAUST
SHAFT
A1257
12800
B5-95
B5-146
6500
1500
1500 5800 6280 5800
STORE
B5-021
STORE
B5-022
STORE
B5-023
STORE
B5-024
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
-19.000 FFL FFL
-19.100 SSL SSL
STAIR PRESS.
A1278
STAIR PRESS.
A1279
LOBBY PRESS.
A1280
LOBBY PRESS.
A1281
STAIR PRESS.
A1282
STAIR PRESS.
A1283
LOBBYPRESS.
SUPPLY/
EXTRACT
SUPPLY/EXTRACT
BASEMENT SETBACK
FM TOILETS
B5-013
AR-401-00
1
-19.000 FFL FFL
-19.100 SSL SSL
STORE
B5-032
SERVICE LOBBY
B5-003
FIRE CORRIDOR
B5-016
ST-01A
B5-015
LIFT LOBBY
B5-017 ST-02
B5-019
ST-03
B5-028
STAIRCASE
LOBBY
B5-029
STAIRCASE
LOBBY
B5-030
ST-04
B5-031
CARPARK
SUPPLY FAN
ROOM
B5-034
1
AR-204-00
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
GENERAL NOTES :
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
PROJECT NAME AND
LOCATION
KEY PLAN
PLANNING NO.
PIN NO.
13-2015-00295
69060005
NORTH
ISSUED FOR DC1 APPROVAL
OWNER
LEAD CONSULTANT
LOCAL CONSULTANT
MEP CONSULTANT
MARINA COM-02, LUSAIL CITY - QATAR
BARWA BANK HQ TOWER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200www.perkinswill.com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
DRAWING TITLE
DRAWING. NO.
DRAWN BY:
VERIFIED BY:
CHECKED BY:
APPROVED BY:
STAGE:
PLOT DATE:
REVISION:
PROJECT. NO:SCALE:
FILE NAME:
PART:
390142
DD
1 : 200
O
C:Usersmahmoud.fathyDocuments390142.000_Barwa
Bank_mahmoud.fathy.rvt
AR-101-00
BASEMENT 5 FLOOR PLAN
DL
GD
15/06/16
AG
1 : 2001 BASEMENT LEVEL 5 PLAN
A B
D C
ISSUE DESCRIPTION DATE CHECKED QA / QC
O FOR DC1 APPROVAL 27 JUN. 2016
32. 32
Construction Drawings Projects
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
12
12
13
13
C C
D D
E E
F F
1
AR-201-00
1
AR-203-00
790013950130001395079007400
5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950 12230
CORPORATE
CONSUMER
BANKING
G-015
RECEPTION
G-014
FIRST FINANCE
COMPANY
G-013
RETAIL 1
G-007
VESTIBULE
G-038
SERVICE LIFT
LOBBY
G-009
RL-4
RL-3
RL-2
RL-1
TL-4
TL-3
TL-2
PL-1
TL-5
TL-6
TL-7
TL-8
FL-1 FL-2
TERRACE
OUTDOOR CAFE
MAINENTRY
MAIN
ENTRY
OUT
IN
0.000 FFL FFL
-0.100 SSL SSL
0.000 FFL FFL
-0.100 SSL SSL
0.000 FFL FFL
-0.100 SSL SSL
A A
B B
14
14
G G
H H
7400
-0.100 FFL FFL/SSL
-0.100 FFL FFL/SSL
0.000 FFL FFL
-0.100 SSL SSL
UP FROM BASEMENT 1
55003095670024670508300
200
1140020059006750205670030955500
DOWN TO BASEMENT 1
SL-1
PSL-1
PSL-2
1
AR-202-00
18000
11
11
5800 19000 4000
.
SLOPE 20%
.
SLOPE2%
.
SLOPE 20%
.
SLOPE 2%
.
SLOPE2%
G-12
G-11
G-10
G-09
G-08
G-07
G-06
G-05
G-04
G-03
G-02
1.200 FFL SL
1.200 FFL SL
(FLOOR FINISH BY
INTERIOR DESIGN
CONSULTANT)
BUILDING LINE ABOVE
G-14
WASTE ROOM
G-008
4500
G-01
G-13
G-15 G-16 G-17 G-18
G-19 G-20 G-21 G-22 G-23
STAIR PRESS.
A1278
STAIR
PRESS.
STAIR PRESS.
A1282
STAIRPRESS.
SUPPLY/
EXTRACT
SUPPLY/
EXTRACT
A1286
LOBBYPRESS.
FIRE
ALARM
RISER
CARPARK EXHAUST
LOUVERS
CAPARK INTAKE
LOUVERS
BASEMENT SETBACK
PLINTH SETBACK
TOWER SETBACK
-0.100
57299
4650 6700 4650
KHAARAMA
ACCESS STAIR
G-027
1
AR-204-00
71500
113880
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
GENERAL NOTES :
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
PROJECT NAME AND
LOCATION
KEY PLAN
PLANNING NO.
PIN NO.
13-2015-00295
69060005
NORTH
ISSUED FOR DC1 APPROVAL
OWNER
LEAD CONSULTANT
LOCAL CONSULTANT
MEP CONSULTANT
MARINA COM-02, LUSAIL CITY - QATAR
BARWA BANK HQ TOWER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200www.perkinswill.com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
DRAWING TITLE
DRAWING. NO.
DRAWN BY:
VERIFIED BY:
CHECKED BY:
APPROVED BY:
STAGE:
PLOT DATE:
REVISION:
PROJECT. NO:SCALE:
FILE NAME:
PART:
390142
DD
1 : 200
O
C:Usersmahmoud.fathyDocuments390142.000_Barwa
Bank_mahmoud.fathy.rvt
AR-106-00
GROUND FLOOR - LEVEL.00
PLAN
DL
GD
15/06/16
AG
1 : 2001 GROUND PLAN
0.000 ARCHITECTURAL FFL IS EQUIVALENT TO 3.08 QNDH LEVEL
A B
ISSUE DESCRIPTION DATE CHECKED QA / QC
O FOR DC1 APPROVAL 27 JUN. 2016
33. Construction Drawings Projects
33
8
8
9
9
10
10
12
12
13
13
C C
D D
E E
F F
11
11
OFFICE
T2-001
ELECT. ROOM
T2-017
F.T
T2-012
M.T
T2-011
FIRE LOBBY
T2-020
ELECT. ROOM
T2-010
PANTRY
T2-006
H.T
T2-004
OFFICE
T2-001
200250
M.T
T2-003
WASTE
T2-009
F.T
T2-002
PANTRY
T2-014
H.T.
T2-013
FIRE CORRIDOR
T2-018
SPR
T2-025
W.M
T2-024
T.E RISER
T2-023 LOBBY
T2-007
40900
6950 9000 18000 6950
200 40000 200
AR-501-01
7
AR-502-01
7
STAIRPRESS.
STAIR PRESS.
A1283
SUPPLY/
EXTRACT
A1286
SUPPLY/
EXTRACT
A1285
LOBBY PRESS.
A1284
SUPPLY/
EXTRACT
11300
TELECOM
RISER
A1301
TELECOM
RISER
A1302
F.A.
RISER
CHW
RISER
DRAINAGE
A1305
DRAINAGE
A1306
TOWER SETBACK
42500
800139501300013950800
9300
16EQUALPANELS
239009300
4550475074509000745047504550
1100365011003650
1050
800 250
800
42500
800 6950 9000 9000 9000 6950 800
9300
16 EQUAL PANELS
23900 9300
4550 4750 4750 4550
3650 1100 1100 3650
1050
800250
800
SD34
SD01
SD34
SD37
SD16
SD36 SD36
SD10
WD04
WD03
WD02
WD02WD02
WD03
WD02
WD04
WD04WD04
SD26
SD36 SD36
SD15
SD12
SD15
SD15
SD19
SD19
SD10
SD10
FHC
FHC
ST-01A
T2-019
ST-02
T2-021
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
CORRIDOR
T2-015
CORRIDOR
T2-005
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
FFL/SSL = X
FFL/SSL = X
4600 19800 2600
8000249008000
400 5950 200 700 300 2700 200 900 200 1500 200 2400 200 1550 2200 200
400420020016502004750200
300
200615020027504002900400
200240020055010001002002000200195020018002850
2600 200 2200 1550 200 2400 200 2600 200 2700 300 6850 400
450 1800 450
200440020016502004800200
250
300595030027503003000400
33501000100
745
6550
200
600200
950 200 2900
31002001650200900
900 1000 400 1000 1350 1000 700
200 2200 2500 300 2700 300 2500 300 1900 200
100020024759001395018003975
100 900 900
1145
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
FFL = X
SSL = X - 200
CW-11
BH01
W-01
CW-11
BH01
BH01
BF02
BF02
BF02
BF02
BF02
BF02
BF02
CW-11
CW-11
BF02
BF02
BF02
BF02
BF02
BF02
BH01
BH01
BH01
BH01
BH01
BH01
BF02
BF02
BF02
BF02
BF02
BF02
BF02
BF01
BH01
BH01
BF02
BF02
BH01
BH01
BH01
BF02 BF02
BH01
BH01
BF02
BH01
BF02
BF02
BF02
BF02
BF02
BH01
BH01
BH01
BH01
BF02
BH01
BH01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
BH02
BH02
BH02
BF01
BF02
BH01
BH01
BF02
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
GENERAL NOTES :
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
PROJECT NAME AND
LOCATION
KEY PLAN
PLANNING NO.
PIN NO.
13-2015-00295
69060005
NORTH
ISSUED FOR DC1 APPROVAL
OWNER
LEAD CONSULTANT
LOCAL CONSULTANT
MEP CONSULTANT
MARINA COM-02, LUSAIL CITY - QATAR
BARWA BANK HQ TOWER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200www.perkinswill.com
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
DRAWING TITLE
DRAWING. NO.
DRAWN BY:
VERIFIED BY:
CHECKED BY:
APPROVED BY:
STAGE:
PLOT DATE:
REVISION:
PROJECT. NO:SCALE:
FILE NAME:
PART:
390142
DD
1 : 100
C:Usersmahmoud.fathyDocuments390142.000_Barwa
Bank_mahmoud.fathy.rvt
AR-110-00
TYPICAL TOWER PLAN
(LEVELS 2-7)
Approver
Checker
12/07/16
Author
1 : 1001 LEVELS 2-7 FLOOR PLAN
ISSUE DESCRIPTION DATE CHECKED QA / QC