1
MAY 2015 | Q1 2015
Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to
IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available
to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including
but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and
economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision,
seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any
underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not
assume the obligation to update any forward-looking statement.
The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic
conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which
the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes
to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s
operations; the sufficiency of current working capital and the estimated cost and availability of funding
for the continued exploration and development of the Company’s exploration properties.
This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance
on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of
activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking
statements.
NI43-101 QUALIFIED PERSON
George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the
technical information in this presentation.
Cautionary Statement
2
GROWING
ASSETS
CONTINUOUS
EXPLORATION
PRUDENT
MANAGEMENT
IMPACT Silver is a junior silver producer with low cost operations and a growing
portfolio of silver mines in south-central Mexico.
A cornerstone of IMPACT’s success is systematic exploration leading to rapid mine
development to increase mill throughput and generate near-term cash flow.
Focused on creating value by growth primarily through earnings, in the pursuit of building
a multimillion ounce precious metals producer.
Overview
3
Frederick W. Davidson, CA President, CEO, Director
President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including
holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines.
George Gorzynski, P. Eng. VP Exploration, Director
Over 30 years of exploration and mining experience; current Director of Tirex Resources, Defiance
Silver and Berkwood Resources.
Richard Younker, CA, CMC CFO
Held the senior financial consulting principal position at Woods Gordon; independent financial
consultant in public and private sectors.
Armando Alexandri COO
Over 35 years of mining experience in underground and open-pit mines as well as flotation and
cyanidation processing plants.
H. Walter Sellmer, P. Geo Director Held senior positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp.
Victor Tanaka, P. Geo Director
President and CEO of Bayswater Uranium Corp. Held senior positions at Asamera Inc., Freeport
McMoRan Gold Corp., Aber Resources, Major General Resources, Fjordland Exploration and Pathfinder
Resources.
Richard Mazur, P. Geo, MBA Director
President and CEO of Forum Uranium Corp. and CEO of Alto Ventures Ltd. Held senior positions at
Canamax Resources and IMPACT Minerals.
Peter Tredger, P. Eng., MBA Director
Former Senior Officer of Thompson Creek Metals Company. Held senior positions at Glencairn Gold
(now B2Gold) and Wheaton River Minerals (now Goldcorp).
Jean-Pierre Bourtin, MBA Director
President of a private equity firm in Connecticut, USA. Former Treasurer of Xerox Corp., Latin
American and Emerging Markets.
Directors & Management
4
• Nearly 100% owned and operated 623 km² (62,300 ha)
mineral exploration land package in south-central Mexico.
• Two contiguous mineral districts with mining activities
dating back to the 1500s.
• A three hour drive southwest from Mexico City, with paved
road access to the gate of IMPACT’s Guadalupe Production
Center.
• Excellent infrastructure, with a modern power grid, ample
water supply and a skilled, 99% Mexican workforce.
• Many other significant mining operations within close
proximity.
5
Property Location in Mexico
• The Royal Mines of Zacualpan is one of the oldest
mining districts in the Americas, with nearly 500
years of recorded mining history.
• IMPACT’s 623 km² land package consists of two
large mineral districts and one subdistrict: The
Zacualpan District and the Capire-Mamatla
District, and the Valle de Oro subdistrict.
• IMPACT’s exploration work has catalogued over
3,500 old mine and mill workings, forming an
invaluable basis for modern and effective
exploration.
Prolific Mining History
6
Zacualpan District
Capire District
Valle de Oro
subdistrict
Early stage
exploration area
Mine and Production Center Location Map
• The 500-tpd Guadalupe Production Center is located
within the Zacualpan District.
• The Guadalupe Production Center receives ore from
three underground silver mines located within close
proximity:
• San Ramon Mine
• Noche Buena Mine
• Cuchara-Oscar Mine
• The 200-tpd Capire Production Centre is located
within the Capire-Mamatla District.
• The Capire Production Center commenced pilot
production in March 2013, with test operations
continuing with mineral feed from the adjacent
open-pit Capire Mine.
7
Long Term Goal and Mine Development Process
To build a profitable, mid-tier, multimillion ounce precious metals producing company with multiple
mines feeding multiple processing centres.
Exploration and Mine Development Process Flowchart
Over 3,000 old mine
workings and
prospects catalogued
in IMPACT’s ArcGIS
database
RESEARCH
Compile old mines
and prospects from
historic maps
FIELD WORK
Geological mapping,
surface and
underground rock
sampling
Select and prioritize
favorable areas and
prospects and design
the drill program
DRILLING
Drill program will
be results-driven and
implemented in
phases
Current targets:
• Capire (south)
• Mirasol
• La Condesa
• Santa Efigenia
• San Juan
MINE
DEVELOPMENT
Mine design, planning,
permitting and
construction
PRODUCTION
&
CASH FLOW
Pilot operations at
Capire Plant with plans
to expand to larger
scale production in the
future
• San Ramon
• Noche Buena
• Cuchara-Oscar
• Capire
8
Guadalupe Production
Centre
Zacualpan District
500 TPD
Flotation circuit
Operating near
capacity
Mill feed from
San Ramon, Noche
Buena & Cuchara-Oscar
Mines
(underground)
Capire Production
Centre
Capire-Mamatla District
200 TPD
Pilot plant with
expansion plans
Mill feed from
Capire Mine
(open-pit)
9
Guadalupe Production
Centre
Zacualpan District
500 TPD
Flotation circuit
operating near capacity
Mill feed from
San Ramon, Noche Buena &
Cuchara-Oscar Mines
(epithermal, underground)
Capire Production Centre
Capire-Mamatla District
200 TPD
Pilot plant operation with
expansion plans
Mill feed from
Capire Mine
(VMS, open-pit)
Two Production Centres
10
Guadalupe Production Centre
• Guadalupe Production Centre (500 tpd) • Flotation circuit produces silver-lead and zinc-silver
concentrates
11
Capire Mine and Production Centre
• Capire Mine (VMS, open-pit)• Capire Production Centre (200 tpd pilot plant)
Mirasol
Began production in Q2/2014
Epithermal silver veins
Part of production transition
to mining of higher grade
silver veins in response to
lower silver prices
Contribution to total
production in Q4 2014: 4%
and expanding
San Ramon
Began production in 2004;
currently expanding on new
high grade vein system
discovery at depth
High grade epithermal silver
veins
Contribution to total
production in Q4 2014: 29%
and expanding
Cuchara-Oscar
Began production in 2013
Corridor of epithermal veins
linking new and legacy
mines; in 2014 ramped up to
become the principal
producing mine in the
Zacualpan District
Contribution to total
production in Q4 2014: 53%
Gallega
Closing: end of mine life
Equipment and personnel
being reassigned to expand
production at other mines
Epithermal silver veins in
historic Guadalupe Mine
Contribution to total
production in Q4 2014: 14%
One Property – Multiple Producing Mines
12
13
San Ramon Deeps High Grade Silver Discovery
• Recent drilling has begun
outlining a new deep high grade
silver zone at the San Ramon Mine
• Recent mining is averaging
263g/t Silver (recovered) from
Levels 18, 19 and 20
• The zone remains open for
expansion to the south, north,
down dip and up dip with
additional drilling in progress
New high grade
silver discoveries
(in red)
Open for expansion;
drilling underway
Geology of Epithermal Vein Systems
Silver-rich at top of vein
200 – 1,000+ g/t Ag
Lead and Zinc-rich at
bottom of vein
60 – 150 g/t Ag
Gold-copper at depths
of 300 m+
Metal Zoning in Ore Shoots
Strike Length
150 – 420 m (500 – 1,400 ft)
Metal Level in Producing Mines
Surface – 0 m (0 ft)
150 m (500 ft)
300 m (1,000 ft)
Depth
14
Noche Buena Mine
San Ramon Mine
Valle de Oro subdistrict
Exploration property, includes Carlos Pacheco
gold-copper zone and San Juan Project
Cuchara-Oscar Mine
Exploration Targets
Zacualpan District
• Mirasol
• La Condesa
• Santa Efigenia
Capire-Mamatla District
• Manto Rico
• Guadalupe
• Aurora II
Valle de Oro Subdistrict
• Carlos Pacheco
• San Juan Project
• Huatescosco
Dominican Republic
• Early stage exploration on legacy
claims
623 km²
land package*
* Does not include the Dominican Republic claims
• An abundance of attractive exploration targets across Zacualpan and Capire districts to drive organic growth and
potentially advance into mine development and production.
15
Above: Statue of miner in Zacualpan’s town square, Mexico
Production Summary
Production Highlights Q1 2015 YE 2014 YE 2013 YE 2012
Silver production (oz) 220,961 725,733 682,526 620,515
Gold production (oz) 989 989 1269 629
Average mill head grade (silver
grams per tonne)
189
159 (Q4
180)
158 138
Total tonnes produced (t) 41,046 162,266 159,270 168,826
Tonnes produced per day 456 445 436 463
Revenue per production tonne
sold
$88 $74 $84 $94
Direct costs per production
tonne
$71 $69 $68 $62
16
Silver-Focused Producer
Revenue Breakdown by Metals
(2014)
Silver
Gold
Lead
Zinc
Silver 80%
(CDN$000’000’s except EPS) Q1 2015 YE 2014 YE 2013 YE 2012
Revenues $3.9 $12.0 $14.1 $15.9
Operating expenses $3.7 $12.0 11.4 $10.3
Mine operating earnings (loss) $0.2 $0.0 $0.5 $4.0
EBITDA $0.26 ($2.1) ($4.6) $1.6
Net earnings (loss) ($0.3) ($3.5) ($8.5) ($1.1)
Operating cash flow* $0.43 ($0.7) $0.6 $3.3
Debt Nil Nil Nil Nil
Earnings (loss) per share – basic $0.00 ($0.05) ($0.13) ($0.02)
Cash and cash equivalents $0.5 $0.6 $3.5 $16.0
Working capital $3.9 $3.8 $6.9 $21.4
17
*Before changes in non-cash working capital
Financial Highlights
The Company’s working capital and cash position decreased from the year ended December 31, 2014, as the Company continued to invest in
the development of the Capire Mine and Production Centre, as well as continued exploration in the Zacualpan District.
All prices in Canadian Dollars As of May 5, 2015
Common shares – Issued & Outstanding 68.1 M
Fully Diluted 74.6 M
Share Price $0.20
52wk Range $0.15 - $0.70
90-Day Average Daily Volume 35,132 Shares
Market Capitalization 13.6M
Insider and Institutional Ownership 14.9%
Options Issued 6.4 M
Warrants Nil
Corporate Summary (TSX-V: IPT)
18
Source: Yahoo Finance
1-Year Chart Summary
2013
• 30,000 meter exploration drill program (completed)
• Increase average silver mill feed grade (completed: Q1-146 g/t Ag; Q2 – 163 g/t Ag; Q3 – 171 g/t Ag)
• Complete drilling at Mirasol Prospect and determine its potential as next producing mine (completed)
2014
• Continue drilling on the VMS targets in the Capire district
• Advance towards graduation from the TSX-V to the TSX
2015
• Consider the location of an additional production center in the Zacualpan District
• Define the size of the planned expansion at the Capire Processing Centre and to initiate construction the
larger processing plant
Plans for Growth
19
Contact Us
IMPACT Silver Corp.
TSX-V: IPT Frankfurt: IKL
Telephone 1-604-681-0172
Fax 1-604-681-6813
Email inquiries@impactsilver.com
Investor Relations Manager Jerry Huang MBA
Website www.impactsilver.com
Twitter @IMPACT_Silver
Corporate Address
Suite1100 - 543 Granville Street
Vancouver, BC, Canada V6C 1X8
20
Appendix I: Capire NI 43-101 Resource Estimate
Completed February 2011
Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs)
Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820
Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173
Measured & Indicated (M&I) 7,224,035 30,446 7,083,007 37,264,478 95,662,993
Inferred 435,959 1,919 475,594 2,260,089 5,823,490
Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred
Zone Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%)
Capire M&I 3,104,944 46.46 0.19 0.06 0.33 0.93
Aurora 1 M&I 1,807,302 44.50 0.199 0.07 0.36 0.80
Total
M&I 4,912,246 45.74 0.193 0.06 0.34 0.88
Inferred 371,066 36.54 0.161 0.06 0.28 0.71
• Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire
• See National Instrument 43-101 Resource Estimate on the Company website at www.impactsilver.com
21
Appendix II: Capire Drill Highlights
A Selection of Capire Drill Highlights
Drill Hole From (m)
To
(m)
Interval
(m)
Ag (g/t) Au (g/t)
Pb
(%)
Zn
(%)
Cu
(%)
C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41
including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63
and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13
C12-21 83.35 100.10 16.75 153 0.40 1.14 2.71 0.21
including 92.40 97.00 4.60 435 0.71 3.13 5.99 0.48
C12-25 13.20 23.35 10.15 107 0.58 0.90 2.43 0.10
including 13.20 15.25 2.05 315 0.91 2.93 8.19 0.25
• Drill holes listed above were drilled vertically and all intersections are estimated to be close to true width
• See IMPACT Silver News Release dated October 25, 2012
22
Appendix III: Mirasol Drill Highlights
A Selection of Mirasol Drill Highlights
Drill Hole Vein Name From (m)
To
(m)
Interval
(m)
Ag (g/t) Au (g/t)
Pb
(%)
Zn
(%)
Z12-71 Mirasol Central 73.9 82.9 8.98 183 0.030 0.07 0.14
including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16
Z12-79 Mirasol Arriba 4 111.22 113.36 2.14 119 0.014 0.07 0.18
and Mirasol Arriba 3 127.25 128.40 1.15 400 0.034 0.13 0.08
and Mirasol Arriba 1 162.60 164.48 1.88 529 0.283 0.37 1.31
Z12-80 El Deshuesadero 83.45 85.15 1.70 931 0.30 1.03 2.10
Z12-85 Mirasol Arriba 3 114.65 116.00 1.35 792 0.143 0.48 0.16
Z12-86 Mirasol 176.56 177.60 1.04 337 0.023 0.15 0.76
• Discovered in November 2012, located 5.5km from Guadalupe Production Center, in Zacualpan
• Several high grade silver values discovered, with drill hole Z12-79 encountering seven distinct veins, all of which are contributing potentially economic silver
intersections. See IMPACT Silver News Releases dated January 28, 2013 and November 26, 2012
23
Appendix IV: Cuchara-Oscar Drill Highlights
A Selection of Cuchara-Oscar Drill Highlights
Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1
including 96.70 97.75 1.05 4,580 0.26 1.70 4.0
and 108.95 111.70 2.75 1,128 0.51 0.90 1.4
Z11-55 21.80 22.85 1.05 435 0.01 0.15 0.24
Z11-64 36.60 43.20 6.60 223 0.08 0.18 0.52
Z11-69 0.70 3.35 2.65 408 0.62 0.73 1.12
Z11-74 21.35 22.35 1.00 1,875 0.74 2.65 6.88
Z12-05 92.50 97.60 5.10 234 0.05 0.14 0.49
Z12-08 22.36 45.75 23.39 115 0.02 0.12 0.36
• See IMPACT Silver News Releases dated October 26, 2011 and April 23, 2012
24
Appendix V: Valle de Oro Drill Highlights
A Selection of Carlos Pacheco Drill Highlights
Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%)
Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29
including Top of intercept - 85.74 1.0 49.7 59 0.31
Z12-13 192.30 199.00 6.70 3.84 28 0.54
including 192.30 195.05 2.75 8.47 56 1.12
Z12-23 229.85 230.95 1.10 3.82 84 0.54
A Selection of Intermediate Vein Drill Highlights
Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Pb (%) Zn (%)
Z12-16 100.00 114.30 14.30 0.04 82 0.09 0.19
including 100.00 106.50 6.50 0.06 119 0.06 0.14
Z12-18 57.00 59.00 2.00 0.20 337 0.23 0.43
Z12-23 26.10 28.10 2.00 0.22 207 0.10 0.15
• In addition to the gold-copper mineralization in the Carlos Pacheco vein, other drill holes intersected Ag-Pb-Zn mineralization in the Intermediate vein cluster, located midway between the
Carlos Pacheco and Noche Buena veins. See IMPACT Silver News Releases dated December 4, 2008 and July 11, 2012
25
Appendix VI: La Condesa Drill Highlights
A Selection of La Condesa Drill Highlights
Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90
Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37
Z12-45 177.90 179.00 1.10 1,655 0.010 0.25 0.08
Z12-46 151.40 154.25 2.85 255 0.111 0.22 0.46
Z12-55 57.80 59.60 1.80 245 0.030 0.12 0.36
Z12-63 106.50 108.85 2.35 231 0.010 0.16 0.26
Z12-64 101.10 105.55 4.45 200 0.035 0.21 0.49
Z12-68 46.40 50.30 3.90 250 0.009 0.07 0.16
• La Condesa accessed through the underground workings of the historic Cuchara Mine, which is also used to access the Cuchara-Oscar Mine
• Mineralization from La Condesa is planned to augment the production from Cuchara-Oscar
• See IMPACT Silver News Release dated November 19, 2012
26
Appendix VII: San Juan Project Drill Highlights
A Selection of San Juan Project Area Drill Highlights
Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
Z13-40 61.70 63.15 1.31 7.9 3.956 0.10 0.19
Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28
including Carlos Pacheco 127.65 128.60 0.92 73.3 33.630 4.09 12.02
Z13-43 Carlos Pacheco 92.05 98.95 6.63 152.4 0.412 0.28 0.75
Z13-44 Noche Buena 11.60 14.00 2.07 1,409.8 0.963 0.29 0.34
including Carlos Pacheco 158.05 162.40 4.03 30.9 4.070 0.18 0.83
Z13-45 Carlos Pacheco 14.60 22.55 7.47 41.64 0.050 0.18 0.25
and Carlos Pacheco 169.00 173.00 3.78 18.3 9.350 0.04 0.08
• These first phase drill results are from the San Juan Project Area, located in the Valle de Oro subdistrict, adjacent to the producing Noche Buena Mine
• The San Juan Project Area encompasses a series of old mine workings containing multiple working levels located 150m to the north of the Noche
Buena Mine. These old working lie along the northern extension of the Carlos Pacheco Vein, where previous drilling intersected 19.6g/t gold across
2.9m and 3.84g/t gold across 6.7m. See IMPACT Silver News Release dated October 30, 2013 for details.
27
28

More Related Content

What's hot

20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentationAdnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021AdnetNew
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015Adnet Communications
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation SeptemberCarolynGraham14
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Adnet Communications
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD
 
GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Mining Corp.
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020Adnet Communications
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Adnet Communications
 

What's hot (19)

20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation20130524 impact-silver-corporate-presentation
20130524 impact-silver-corporate-presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
November 2021 mnd ir ppt
November 2021 mnd ir pptNovember 2021 mnd ir ppt
November 2021 mnd ir ppt
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
201307 presentation
201307 presentation201307 presentation
201307 presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015
 
September 2021 mnd gf
September 2021 mnd gfSeptember 2021 mnd gf
September 2021 mnd gf
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation September
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project Update
 
GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020
 
Presentation
PresentationPresentation
Presentation
 

Similar to IMPACT Silver Q1 2015 Highlights

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Impact Silver June 2015 Presentation
Impact Silver June 2015 PresentationImpact Silver June 2015 Presentation
Impact Silver June 2015 PresentationAdnet Communications
 
Impact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationImpact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationAdnet Communications
 
2018 March Impact Silver Presentation
2018 March Impact Silver Presentation2018 March Impact Silver Presentation
2018 March Impact Silver PresentationAdnet Communications
 
Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Adnet Communications
 
Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017Adnet Communications
 
Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019Adnet Communications
 
Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Adnet Communications
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015Adnet Communications
 

Similar to IMPACT Silver Q1 2015 Highlights (20)

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Silver Corp. Presentation
IMPACT Silver Corp. PresentationIMPACT Silver Corp. Presentation
IMPACT Silver Corp. Presentation
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
Presentation Q2 2014
Presentation Q2 2014Presentation Q2 2014
Presentation Q2 2014
 
IMPACT Corporate Presentation
IMPACT Corporate PresentationIMPACT Corporate Presentation
IMPACT Corporate Presentation
 
Impact Silver Presentation
Impact Silver PresentationImpact Silver Presentation
Impact Silver Presentation
 
Nov2019 ipt
Nov2019 iptNov2019 ipt
Nov2019 ipt
 
Impact Silver June 2015 Presentation
Impact Silver June 2015 PresentationImpact Silver June 2015 Presentation
Impact Silver June 2015 Presentation
 
Impact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationImpact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate Presentation
 
Presentation
PresentationPresentation
Presentation
 
2018 March Impact Silver Presentation
2018 March Impact Silver Presentation2018 March Impact Silver Presentation
2018 March Impact Silver Presentation
 
Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018
 
2017 aug-ipt-q2
2017 aug-ipt-q22017 aug-ipt-q2
2017 aug-ipt-q2
 
Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017Impact Silver Corporate Presentation November 2017
Impact Silver Corporate Presentation November 2017
 
Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019Impact Silver Corporate Presentation June 2019
Impact Silver Corporate Presentation June 2019
 
Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 

More from Adnet Communications

Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Adnet Communications
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdfAdnet Communications
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources PresentationAdnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfAdnet Communications
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdfAdnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentationAdnet Communications
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/Adnet Communications
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Adnet Communications
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024Adnet Communications
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor PresentationAdnet Communications
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024Adnet Communications
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfAdnet Communications
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentationAdnet Communications
 

More from Adnet Communications (20)

Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdf
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentation
 

Recently uploaded

/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 

Recently uploaded (20)

/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 

IMPACT Silver Q1 2015 Highlights

  • 1. 1 MAY 2015 | Q1 2015
  • 2. Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking statements. NI43-101 QUALIFIED PERSON George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the technical information in this presentation. Cautionary Statement 2
  • 3. GROWING ASSETS CONTINUOUS EXPLORATION PRUDENT MANAGEMENT IMPACT Silver is a junior silver producer with low cost operations and a growing portfolio of silver mines in south-central Mexico. A cornerstone of IMPACT’s success is systematic exploration leading to rapid mine development to increase mill throughput and generate near-term cash flow. Focused on creating value by growth primarily through earnings, in the pursuit of building a multimillion ounce precious metals producer. Overview 3
  • 4. Frederick W. Davidson, CA President, CEO, Director President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. George Gorzynski, P. Eng. VP Exploration, Director Over 30 years of exploration and mining experience; current Director of Tirex Resources, Defiance Silver and Berkwood Resources. Richard Younker, CA, CMC CFO Held the senior financial consulting principal position at Woods Gordon; independent financial consultant in public and private sectors. Armando Alexandri COO Over 35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants. H. Walter Sellmer, P. Geo Director Held senior positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp. Victor Tanaka, P. Geo Director President and CEO of Bayswater Uranium Corp. Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Aber Resources, Major General Resources, Fjordland Exploration and Pathfinder Resources. Richard Mazur, P. Geo, MBA Director President and CEO of Forum Uranium Corp. and CEO of Alto Ventures Ltd. Held senior positions at Canamax Resources and IMPACT Minerals. Peter Tredger, P. Eng., MBA Director Former Senior Officer of Thompson Creek Metals Company. Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp). Jean-Pierre Bourtin, MBA Director President of a private equity firm in Connecticut, USA. Former Treasurer of Xerox Corp., Latin American and Emerging Markets. Directors & Management 4
  • 5. • Nearly 100% owned and operated 623 km² (62,300 ha) mineral exploration land package in south-central Mexico. • Two contiguous mineral districts with mining activities dating back to the 1500s. • A three hour drive southwest from Mexico City, with paved road access to the gate of IMPACT’s Guadalupe Production Center. • Excellent infrastructure, with a modern power grid, ample water supply and a skilled, 99% Mexican workforce. • Many other significant mining operations within close proximity. 5 Property Location in Mexico
  • 6. • The Royal Mines of Zacualpan is one of the oldest mining districts in the Americas, with nearly 500 years of recorded mining history. • IMPACT’s 623 km² land package consists of two large mineral districts and one subdistrict: The Zacualpan District and the Capire-Mamatla District, and the Valle de Oro subdistrict. • IMPACT’s exploration work has catalogued over 3,500 old mine and mill workings, forming an invaluable basis for modern and effective exploration. Prolific Mining History 6 Zacualpan District Capire District Valle de Oro subdistrict Early stage exploration area
  • 7. Mine and Production Center Location Map • The 500-tpd Guadalupe Production Center is located within the Zacualpan District. • The Guadalupe Production Center receives ore from three underground silver mines located within close proximity: • San Ramon Mine • Noche Buena Mine • Cuchara-Oscar Mine • The 200-tpd Capire Production Centre is located within the Capire-Mamatla District. • The Capire Production Center commenced pilot production in March 2013, with test operations continuing with mineral feed from the adjacent open-pit Capire Mine. 7
  • 8. Long Term Goal and Mine Development Process To build a profitable, mid-tier, multimillion ounce precious metals producing company with multiple mines feeding multiple processing centres. Exploration and Mine Development Process Flowchart Over 3,000 old mine workings and prospects catalogued in IMPACT’s ArcGIS database RESEARCH Compile old mines and prospects from historic maps FIELD WORK Geological mapping, surface and underground rock sampling Select and prioritize favorable areas and prospects and design the drill program DRILLING Drill program will be results-driven and implemented in phases Current targets: • Capire (south) • Mirasol • La Condesa • Santa Efigenia • San Juan MINE DEVELOPMENT Mine design, planning, permitting and construction PRODUCTION & CASH FLOW Pilot operations at Capire Plant with plans to expand to larger scale production in the future • San Ramon • Noche Buena • Cuchara-Oscar • Capire 8
  • 9. Guadalupe Production Centre Zacualpan District 500 TPD Flotation circuit Operating near capacity Mill feed from San Ramon, Noche Buena & Cuchara-Oscar Mines (underground) Capire Production Centre Capire-Mamatla District 200 TPD Pilot plant with expansion plans Mill feed from Capire Mine (open-pit) 9 Guadalupe Production Centre Zacualpan District 500 TPD Flotation circuit operating near capacity Mill feed from San Ramon, Noche Buena & Cuchara-Oscar Mines (epithermal, underground) Capire Production Centre Capire-Mamatla District 200 TPD Pilot plant operation with expansion plans Mill feed from Capire Mine (VMS, open-pit) Two Production Centres
  • 10. 10 Guadalupe Production Centre • Guadalupe Production Centre (500 tpd) • Flotation circuit produces silver-lead and zinc-silver concentrates
  • 11. 11 Capire Mine and Production Centre • Capire Mine (VMS, open-pit)• Capire Production Centre (200 tpd pilot plant)
  • 12. Mirasol Began production in Q2/2014 Epithermal silver veins Part of production transition to mining of higher grade silver veins in response to lower silver prices Contribution to total production in Q4 2014: 4% and expanding San Ramon Began production in 2004; currently expanding on new high grade vein system discovery at depth High grade epithermal silver veins Contribution to total production in Q4 2014: 29% and expanding Cuchara-Oscar Began production in 2013 Corridor of epithermal veins linking new and legacy mines; in 2014 ramped up to become the principal producing mine in the Zacualpan District Contribution to total production in Q4 2014: 53% Gallega Closing: end of mine life Equipment and personnel being reassigned to expand production at other mines Epithermal silver veins in historic Guadalupe Mine Contribution to total production in Q4 2014: 14% One Property – Multiple Producing Mines 12
  • 13. 13 San Ramon Deeps High Grade Silver Discovery • Recent drilling has begun outlining a new deep high grade silver zone at the San Ramon Mine • Recent mining is averaging 263g/t Silver (recovered) from Levels 18, 19 and 20 • The zone remains open for expansion to the south, north, down dip and up dip with additional drilling in progress New high grade silver discoveries (in red) Open for expansion; drilling underway
  • 14. Geology of Epithermal Vein Systems Silver-rich at top of vein 200 – 1,000+ g/t Ag Lead and Zinc-rich at bottom of vein 60 – 150 g/t Ag Gold-copper at depths of 300 m+ Metal Zoning in Ore Shoots Strike Length 150 – 420 m (500 – 1,400 ft) Metal Level in Producing Mines Surface – 0 m (0 ft) 150 m (500 ft) 300 m (1,000 ft) Depth 14 Noche Buena Mine San Ramon Mine Valle de Oro subdistrict Exploration property, includes Carlos Pacheco gold-copper zone and San Juan Project Cuchara-Oscar Mine
  • 15. Exploration Targets Zacualpan District • Mirasol • La Condesa • Santa Efigenia Capire-Mamatla District • Manto Rico • Guadalupe • Aurora II Valle de Oro Subdistrict • Carlos Pacheco • San Juan Project • Huatescosco Dominican Republic • Early stage exploration on legacy claims 623 km² land package* * Does not include the Dominican Republic claims • An abundance of attractive exploration targets across Zacualpan and Capire districts to drive organic growth and potentially advance into mine development and production. 15 Above: Statue of miner in Zacualpan’s town square, Mexico
  • 16. Production Summary Production Highlights Q1 2015 YE 2014 YE 2013 YE 2012 Silver production (oz) 220,961 725,733 682,526 620,515 Gold production (oz) 989 989 1269 629 Average mill head grade (silver grams per tonne) 189 159 (Q4 180) 158 138 Total tonnes produced (t) 41,046 162,266 159,270 168,826 Tonnes produced per day 456 445 436 463 Revenue per production tonne sold $88 $74 $84 $94 Direct costs per production tonne $71 $69 $68 $62 16 Silver-Focused Producer Revenue Breakdown by Metals (2014) Silver Gold Lead Zinc Silver 80%
  • 17. (CDN$000’000’s except EPS) Q1 2015 YE 2014 YE 2013 YE 2012 Revenues $3.9 $12.0 $14.1 $15.9 Operating expenses $3.7 $12.0 11.4 $10.3 Mine operating earnings (loss) $0.2 $0.0 $0.5 $4.0 EBITDA $0.26 ($2.1) ($4.6) $1.6 Net earnings (loss) ($0.3) ($3.5) ($8.5) ($1.1) Operating cash flow* $0.43 ($0.7) $0.6 $3.3 Debt Nil Nil Nil Nil Earnings (loss) per share – basic $0.00 ($0.05) ($0.13) ($0.02) Cash and cash equivalents $0.5 $0.6 $3.5 $16.0 Working capital $3.9 $3.8 $6.9 $21.4 17 *Before changes in non-cash working capital Financial Highlights The Company’s working capital and cash position decreased from the year ended December 31, 2014, as the Company continued to invest in the development of the Capire Mine and Production Centre, as well as continued exploration in the Zacualpan District.
  • 18. All prices in Canadian Dollars As of May 5, 2015 Common shares – Issued & Outstanding 68.1 M Fully Diluted 74.6 M Share Price $0.20 52wk Range $0.15 - $0.70 90-Day Average Daily Volume 35,132 Shares Market Capitalization 13.6M Insider and Institutional Ownership 14.9% Options Issued 6.4 M Warrants Nil Corporate Summary (TSX-V: IPT) 18 Source: Yahoo Finance 1-Year Chart Summary
  • 19. 2013 • 30,000 meter exploration drill program (completed) • Increase average silver mill feed grade (completed: Q1-146 g/t Ag; Q2 – 163 g/t Ag; Q3 – 171 g/t Ag) • Complete drilling at Mirasol Prospect and determine its potential as next producing mine (completed) 2014 • Continue drilling on the VMS targets in the Capire district • Advance towards graduation from the TSX-V to the TSX 2015 • Consider the location of an additional production center in the Zacualpan District • Define the size of the planned expansion at the Capire Processing Centre and to initiate construction the larger processing plant Plans for Growth 19
  • 20. Contact Us IMPACT Silver Corp. TSX-V: IPT Frankfurt: IKL Telephone 1-604-681-0172 Fax 1-604-681-6813 Email inquiries@impactsilver.com Investor Relations Manager Jerry Huang MBA Website www.impactsilver.com Twitter @IMPACT_Silver Corporate Address Suite1100 - 543 Granville Street Vancouver, BC, Canada V6C 1X8 20
  • 21. Appendix I: Capire NI 43-101 Resource Estimate Completed February 2011 Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs) Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820 Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173 Measured & Indicated (M&I) 7,224,035 30,446 7,083,007 37,264,478 95,662,993 Inferred 435,959 1,919 475,594 2,260,089 5,823,490 Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred Zone Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%) Capire M&I 3,104,944 46.46 0.19 0.06 0.33 0.93 Aurora 1 M&I 1,807,302 44.50 0.199 0.07 0.36 0.80 Total M&I 4,912,246 45.74 0.193 0.06 0.34 0.88 Inferred 371,066 36.54 0.161 0.06 0.28 0.71 • Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire • See National Instrument 43-101 Resource Estimate on the Company website at www.impactsilver.com 21
  • 22. Appendix II: Capire Drill Highlights A Selection of Capire Drill Highlights Drill Hole From (m) To (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Cu (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13 C12-21 83.35 100.10 16.75 153 0.40 1.14 2.71 0.21 including 92.40 97.00 4.60 435 0.71 3.13 5.99 0.48 C12-25 13.20 23.35 10.15 107 0.58 0.90 2.43 0.10 including 13.20 15.25 2.05 315 0.91 2.93 8.19 0.25 • Drill holes listed above were drilled vertically and all intersections are estimated to be close to true width • See IMPACT Silver News Release dated October 25, 2012 22
  • 23. Appendix III: Mirasol Drill Highlights A Selection of Mirasol Drill Highlights Drill Hole Vein Name From (m) To (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-71 Mirasol Central 73.9 82.9 8.98 183 0.030 0.07 0.14 including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16 Z12-79 Mirasol Arriba 4 111.22 113.36 2.14 119 0.014 0.07 0.18 and Mirasol Arriba 3 127.25 128.40 1.15 400 0.034 0.13 0.08 and Mirasol Arriba 1 162.60 164.48 1.88 529 0.283 0.37 1.31 Z12-80 El Deshuesadero 83.45 85.15 1.70 931 0.30 1.03 2.10 Z12-85 Mirasol Arriba 3 114.65 116.00 1.35 792 0.143 0.48 0.16 Z12-86 Mirasol 176.56 177.60 1.04 337 0.023 0.15 0.76 • Discovered in November 2012, located 5.5km from Guadalupe Production Center, in Zacualpan • Several high grade silver values discovered, with drill hole Z12-79 encountering seven distinct veins, all of which are contributing potentially economic silver intersections. See IMPACT Silver News Releases dated January 28, 2013 and November 26, 2012 23
  • 24. Appendix IV: Cuchara-Oscar Drill Highlights A Selection of Cuchara-Oscar Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1 including 96.70 97.75 1.05 4,580 0.26 1.70 4.0 and 108.95 111.70 2.75 1,128 0.51 0.90 1.4 Z11-55 21.80 22.85 1.05 435 0.01 0.15 0.24 Z11-64 36.60 43.20 6.60 223 0.08 0.18 0.52 Z11-69 0.70 3.35 2.65 408 0.62 0.73 1.12 Z11-74 21.35 22.35 1.00 1,875 0.74 2.65 6.88 Z12-05 92.50 97.60 5.10 234 0.05 0.14 0.49 Z12-08 22.36 45.75 23.39 115 0.02 0.12 0.36 • See IMPACT Silver News Releases dated October 26, 2011 and April 23, 2012 24
  • 25. Appendix V: Valle de Oro Drill Highlights A Selection of Carlos Pacheco Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29 including Top of intercept - 85.74 1.0 49.7 59 0.31 Z12-13 192.30 199.00 6.70 3.84 28 0.54 including 192.30 195.05 2.75 8.47 56 1.12 Z12-23 229.85 230.95 1.10 3.82 84 0.54 A Selection of Intermediate Vein Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Pb (%) Zn (%) Z12-16 100.00 114.30 14.30 0.04 82 0.09 0.19 including 100.00 106.50 6.50 0.06 119 0.06 0.14 Z12-18 57.00 59.00 2.00 0.20 337 0.23 0.43 Z12-23 26.10 28.10 2.00 0.22 207 0.10 0.15 • In addition to the gold-copper mineralization in the Carlos Pacheco vein, other drill holes intersected Ag-Pb-Zn mineralization in the Intermediate vein cluster, located midway between the Carlos Pacheco and Noche Buena veins. See IMPACT Silver News Releases dated December 4, 2008 and July 11, 2012 25
  • 26. Appendix VI: La Condesa Drill Highlights A Selection of La Condesa Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90 Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37 Z12-45 177.90 179.00 1.10 1,655 0.010 0.25 0.08 Z12-46 151.40 154.25 2.85 255 0.111 0.22 0.46 Z12-55 57.80 59.60 1.80 245 0.030 0.12 0.36 Z12-63 106.50 108.85 2.35 231 0.010 0.16 0.26 Z12-64 101.10 105.55 4.45 200 0.035 0.21 0.49 Z12-68 46.40 50.30 3.90 250 0.009 0.07 0.16 • La Condesa accessed through the underground workings of the historic Cuchara Mine, which is also used to access the Cuchara-Oscar Mine • Mineralization from La Condesa is planned to augment the production from Cuchara-Oscar • See IMPACT Silver News Release dated November 19, 2012 26
  • 27. Appendix VII: San Juan Project Drill Highlights A Selection of San Juan Project Area Drill Highlights Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z13-40 61.70 63.15 1.31 7.9 3.956 0.10 0.19 Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28 including Carlos Pacheco 127.65 128.60 0.92 73.3 33.630 4.09 12.02 Z13-43 Carlos Pacheco 92.05 98.95 6.63 152.4 0.412 0.28 0.75 Z13-44 Noche Buena 11.60 14.00 2.07 1,409.8 0.963 0.29 0.34 including Carlos Pacheco 158.05 162.40 4.03 30.9 4.070 0.18 0.83 Z13-45 Carlos Pacheco 14.60 22.55 7.47 41.64 0.050 0.18 0.25 and Carlos Pacheco 169.00 173.00 3.78 18.3 9.350 0.04 0.08 • These first phase drill results are from the San Juan Project Area, located in the Valle de Oro subdistrict, adjacent to the producing Noche Buena Mine • The San Juan Project Area encompasses a series of old mine workings containing multiple working levels located 150m to the north of the Noche Buena Mine. These old working lie along the northern extension of the Carlos Pacheco Vein, where previous drilling intersected 19.6g/t gold across 2.9m and 3.84g/t gold across 6.7m. See IMPACT Silver News Release dated October 30, 2013 for details. 27
  • 28. 28