SlideShare a Scribd company logo
1 of 36
Download to read offline
1 
CORPORATE PRESENTATION
TSX: UEX www.uex-corporation.com 
FORWARD-LOOKING INFORMATION AND STATEMENTS: 
Certain statements and other information contained in this presentation may constitute “forward-looking information” within the meaning of applicable Canadian securities legislation or constitute “forward-looking statements” within the meaning of applicable United States securities legislation. Such information and statements are based on UEX's current expectations, estimates, forecasts and projections. These forward-looking statements include statements regarding UEX‘s outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. The words “estimates”, “projects”, “expects”, “intends”, “believes”, “plans”, or their negatives or other comparable words and phrases are intended to identify forward-looking statements. Such forward-looking statements are based on certain factors and assumptions and are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking statements. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, additional drilling results, continuity and grade of deposits, participation in joint ventures, reliance on other companies as operators, public acceptance of uranium as an energy source, fluctuations in uranium prices and currency exchange rates, changes in environmental and other laws affecting uranium exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable securities commissions in Canada. Many of these factors are beyond the control of UEX. Consequently, all forward-looking statements made herein are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking statements. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise. 
NOTICE TO U.S. PERSONS: 
The information in this presentation has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. Information, including scientific or technical information, has been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“N.I. 43-101”). N.I. 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including N.I. 43-101, differ significantly from the requirements of the SEC. For example, the terms “indicated mineral resources” and “inferred mineral resources” are used in this publication to comply with the reporting standards in Canada. While those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Readers should understand that “indicated mineral resources” and “inferred mineral resources” have a great amount of uncertainty as to their existence and as to their economic and legal feasibility. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. In accordance with Canadian rules, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies. In addition, the definitions of proven and probable mineral reserves used in N.I. 43-101 differ from the definitions in the SEC Industry Guide 7. Disclosure of “contained pounds” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this publication describing the Company's mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. 
QUALIFIED PERSON: 
Technical information in this presentation has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX’s Vice-President of Exploration and Roger Lemaitre, P.Eng., P.Geo., UEX’s President and CEO, who are Qualified Persons as defined by N.I. 43-101. 
Forward-Looking Statements 
- 2 -
TSX: UEX www.uex-corporation.com 
Roger Lemaitre, P.Eng., P.Geo., MBA, M.Sc. (Applied), B.Sc. (Applied) – President & CEO 
Mr. Roger Lemaitre is a Professional Engineer and Geologist with more than 20 years of professional experience, with both senior and junior mining companies. Before joining UEX, Mr. Lemaitre held the position of CEO and Executive Director of URU Metals Limited, an AIM-listed junior uranium and base metal exploration company, where he re-organized the company's asset mix by identifying and successfully acquiring significant new exploration projects. Prior to joining URU, Mr. Lemaitre held a variety of senior management positions with Cameco Corporation, one of the world's largest uranium producers, and was Cameco's Director of Worldwide Exploration Projects. 
Ed Boney, CA – Chief Financial Officer & Corporate Secretary 
Mr. Boney held the position of Corporate Controller at a Canadian junior gold mining company with producing mines in Canada and Peru prior to joining UEX. He has also held the position of manager with Deloitte where he supervised the audits of public companies in the mining and natural resource sector and was involved in the asset valuations of several companies in the Canadian oil and gas sector. 
R. Sierd Eriks, P.Geo. – Vice-President, Exploration 
Mr. Eriks, B.A. (Geology), has worked in mineral exploration for over thirty years. From 1979 to 1998, he gained geological and managerial experience with SMDC (now Cameco Corporation), Falconbridge Limited, Noranda Exploration Co. Ltd. and Cogema Resources Inc. (now AREVA Resources Canada Inc.) in base metals, gold, PGE and uranium exploration. 
Nan H. Lee, M.Sc., P.Eng. – Vice-President, Project Development 
Ms. Lee has worked as a Mining and Project Engineer on several projects in Canada and has also worked with Kilborn Engineering where she assisted with project feasibility studies. As an independent consultant she has coordinated, or assisted with the preparation of Environmental Impact Statements for several uranium mine developments in Canada. Previously, Ms. Lee managed the preliminary feasibility studies for tailings management facilities for two uranium operations in northern Saskatchewan. 
Walter Segsworth, P.Eng. – Management Advisory Board Mr. Segsworth previously served on the Board of Directors of UEX from 2002 to 2008. He has managed three large Canadian mines. In 1990 he was appointed President and Director of Westmin Resources Ltd. Upon the takeover of Westmin by Boliden in 1998, Mr. Segsworth joined Homestake Mining Company of California where he was subsequently appointed President, Director and Chief Operating Officer and served until its merger with Barrick in early 2002. He is currently Lead Director of Alterra Power Corporation. David Rhys, M.Sc., P.Geo. – Management Advisory Board Mr. Rhys is a consulting structural geologist specializing in structural controls on mineral deposits and their application to exploration, mining and mine site grade control. He has had a long association with UEX, and has provided technical consulting and guidance to the Company since its inception. He has also been involved in exploration advisory roles to several other junior mining companies. 
UEX Management Team 
UEX Advisory Board 
Left to right: Ed Boney, Nan Lee, Roger Lemaitre and Sierd Eriks 
Walter Segsworth 
David Rhys 
Management 
- 3 -
TSX: UEX www.uex-corporation.com 
Mark P. Eaton, B.A. 
Mr. Eaton is an experienced investment professional with over 20 years of experience in equity capital markets specializing in the resource sector. He has held the position of Managing Director of Global Mining Sales, a division of CIBC World Markets of Toronto, Canada and Manager of U.S. Equity Sales for CIBC World Markets. He was a Partner and Director of Loewen Ondaatje McCutcheon Ltd., a Toronto-based investment dealer, until March 2008. He is currently President and CEO of Belo Sun Mining Corp. 
Suraj P. Ahuja, M.Sc., P.Geo. 
Mr. Ahuja's career as a geologist in the design and management of mineral exploration programs spans over 40 years. From 1978 to 1988 he was employed by SMDC (now Cameco) as a Project Geologist and a Senior Geologist. From 1988 to 2000 he was employed by PNC Exploration (Canada) Co. Ltd., a Japanese-owned uranium exploration company, as VP Exploration. Mr. Ahuja consults for several major and junior uranium exploration companies through his own mineral exploration consulting company. 
Emmet McGrath, CA 
Mr. McGrath, a member of the Canadian Institute of Chartered Accountants, was an audit partner with KPMG from 1981 to 2002. He has a thorough understanding of the regulatory and statutory reporting requirements of publicly listed companies and is well versed in corporate governance matters. He has extensive experience in mergers and acquisitions, and currently sits on the Board of Directors of several publicly listed companies in the mining industry. He is a Director and former Chairman of the Board of Westminster Credit Union, the fourth largest credit union in British Columbia. 
Roger Lemaitre, P.Eng., P.Geo., MBA, M.Sc. (Applied), B.Sc. (Applied) – President & Chief Executive Officer 
Colin C. Macdonald, M.Sc. Chairman of the Board Mr. Macdonald held the position of Vice-President, Exploration, for Cameco Corporation until his retirement on June 30, 2011. He had worked for Cameco Corporation and its predecessor companies since 1981 and was responsible for Cameco's worldwide uranium exploration activities. Graham C. Thody, CA Mr. Thody was a Partner of NTA, Chartered Accountants from 1979 until his retirement from public practice in 2007. He was a Director of Pioneer Metals Corporation at the time of the adoption of the Plan of Arrangement which created UEX Corporation and has been a Director of UEX since its inception. He served as Chairman of the Board of UEX until June 2010, and as its President and CEO from November 2009 to January 2014. Mr. Thody continues in a consulting role with UEX for two years and will continue as a member of the UEX Board. 
UEX Board of Directors 
Left to right: Emmet McGrath, Graham Thody, Colin Macdonald, 
Suraj Ahuja, Roger Lemaitre and Mark Eaton 
Board of Directors 
- 4 -
TSX: UEX www.uex-corporation.com 
Corporate Overview 
UEX Corporation is an industry leader in the discovery and advancement of new uranium resources in Canada’s Athabasca Basin. 
UEX is amongst a small group of companies with existing N.I. 43-101 resources at the Indicated stage. 
UEX’s enduring success in uranium exploration is enhanced by: 
Early acquisition of highly prospective land positions in the prolific Athabasca Basin 
Strong relationships with Cameco Corporation and AREVA, the world’s largest uranium companies 
Progress continues on our advanced resource development projects at Shea Creek and Hidden Bay. 
The Athabasca Basin is located in northern Saskatchewan, Canada and yields approximately 15% of the world’s mined uranium annually. 
- 5 -
TSX: UEX www.uex-corporation.com 
Shares 
Issued and outstanding 227,838,679 
Fully diluted 244,884,679 Options 17,046,000 Weighted Average Exercise Price for Options $ 0.93 Warrants Nil 
Share Price (September 5, 2014) $ 0.415 
Market Capitalization $ 94,553,052 
Daily Trading Volume (3 month average) 361,379 Significant shareholders 
Cameco Corporation 21.95% 
Global X Uranium ETF 6.70% 
BlackRock Fund Managers Limited 3.84% 
Current/Retired Management & Directors 1.53% Cash position as at September 8, 2014 (estimated) $ 6.7 million 
Corporate Summary 
- 6 -
TSX: UEX www.uex-corporation.com 
UEX Major Assets 
- 7 -
TSX: UEX www.uex-corporation.com 
Total Resources 
N.I. 43-101 Mineral Resource Estimates 
69.84 
16.56 
0 
5 
10 
15 
20 
25 
30 
35 
40 
Shea Creek (UEX's 49.1% share) 
Hidden Bay 
33.22 
36.62 
13.84 
2.72 
Millions of pounds of U3O8 
Millions of Pounds of U3O8 by Category and by Project 
Indicated Mineral Resource (UEX’s share) 
Inferred Mineral Resource (UEX’s share) 
Deposit 
SHEA CREEK - Indicated Category 
at 0.30% U3O8 Cut-off 
SHEA CREEK - Inferred Category 
at 0.30% U3O8 Cut-off 
Tonnes 
Grade U3O8 (%) 
U3O8 
(lbs) 
Tonnes 
Grade U3O8 (%) 
U3O8 
(lbs) 
Kianna* 
1,034,500 
1.526 
34,805,000 
560,700 
1.364 
16,867,000 
Anne* 
564,000 
1.992 
24,760,000 
134,900 
0.880 
2,617,000 
Colette* 
327,800 
0.786 
5,680,000 
493,200 
0.716 
7,780,000 
58B* 
141,600 
0.774 
2,417,000 
83,400 
0.505 
928,000 
Total* 
2,067,900 
1.484 
67,663,000 
1,272,200 
1.005 
28,192,000 
Deposit 
HIDDEN BAY - Indicated Category 
at 0.05% U3O8 Cut-off 
HIDDEN BAY - Inferred Category 
at 0.05% U3O8 Cut-off 
Tonnes 
Grade U3O8 (%) 
U3O8 
(lbs) 
Tonnes 
Grade U3O8 (%) 
U3O8 
(lbs) 
Horseshoe 
5,119,700 
0.203 
22,895,000 
287,000 
0.166 
1,049,000 
Raven 
5,173,900 
0.107 
12,149,000 
822,200 
0.092 
1,666,000 
West Bear 
78,900 
0.908 
1,579,000 
- 
- 
- 
Total 
10,372,500 
0.160 
36,623,000 
1,109,200 
0.111 
2,715,000 
* Joint venture with 49.1% UEX / 50.9% AREVA ownership 
- 8 -
TSX: UEX www.uex-corporation.com 
Project Expenditures 
$44.1M 
$59.9M 
$37.8M 
$7.4M 
$6.8M 
0 
10 
20 
30 
40 
50 
60 
70 
Shea Creek 
Hidden Bay 
Other 
Cumulative Expenditures 
(C$ millions) 
Exploration 
Development 
0 
1 
2 
3 
4 
Shea Creek 
Hidden Bay 
Other 
$3.07M 
$1.25M 
$0.09M 
- 
$1.09M 
- 
$3.75M 
$0.11M 
$0.04M 
- 
$0.61M 
- 
UEX Expenditures 2012-2013 
(C$ millions) 
Exploration 2012 
Development 2012 
Exploration 2013 
Development 2013 
To December 31, 2013 
2012 
2013 
2012 
2013 
2012 
2013 
- 9 -
TSX: UEX www.uex-corporation.com 
To December 31, 2013 
19.9 
6.5 
21.1 
24.0 
11.5 
2.9 
12.6 
- 
0 
5 
10 
15 
20 
25 
Shea Creek* 
Hidden Bay 
Annual Drilling 2010-2013 (thousands of metres) 
2010 
2011 
2012 
2013 
99.3 
205.0 
153.9 
282.9 
0 
100 
200 
300 
400 
500 
Shea Creek* 
Hidden Bay 
Historical Drilling 
(thousands of metres) 
Pre-UEX 
UEX 
* Utilizing directional drilling, whereby several wedge cuts are made from a single pilot hole, has significantly reduced the total number of drilling metres required to attain the desired number of unconformity impacts. 
2010 
2011 
2012 
2013 
2010 
2011 
2012 
2013 
Exploration Drilling 
- 10 -
TSX: UEX www.uex-corporation.com 
Experienced world-class joint venture partner AREVA is a global uranium miner with Athabasca experience. 
UEX has the ability to direct future exploration activities through additional funding. 
Second largest undeveloped uranium resource in the Athabasca Basin. 
Impressive potential for resource expansion: 
‒Current resources are open in almost every direction. 
‒Only 3 km of the 33 km prospective Saskatoon Lake Conductor has been adequately explored. 
‒Several conductors on the property remain untested. 
- 11 - 
49.1% 
50.9%
TSX: UEX www.uex-corporation.com 
Located in northwest Saskatchewan, the Shea Creek property hosts the second largest undeveloped uranium resource in the Athabasca Basin. 
AREVA’s former Cluff Lake uranium mine is located approximately 15 km to the north of the Shea Creek deposits and produced over 62 million lbs(1) of U3O8 during its successful 22 years of operation. 
Access is provided year-round by Provincial Highway 955, allowing for easy transport of crews, equipment and supplies to the project site. (1) Source: Saskatchewan Mining Association 
SHEA CREEK PROJECT 
- 12 - 
Shea Creek Exploration Camp
TSX: UEX www.uex-corporation.com 
The Shea Creek Project is a joint venture 49.1% owned by UEX Corporation and 50.9% owned by AREVA Resources Canada Inc., the project operator. 
The Shea Creek Project contains the second largest undeveloped uranium resource in the Athabasca Basin. 
UEX Cumulative Expenditures 
As at December 31, 2013 
Exploration C$44.1 million 
Development C$ 7.4 million 
2013 Joint Venture Expenditures 
Exploration C$ 3.1 million 
2013 Additional Exploration Expenditures 
Exploration C$ 2.0 million 
2014 Joint Venture Budget 
To be determined 
Shea Creek - Overview 
- 13 -
TSX: UEX www.uex-corporation.com 
The N.I. 43-101 mineral resource estimate for Shea Creek incorporates resources from the Kianna, Anne, Colette and 58B deposits based on drilling information up to December 31, 2012. The Shea Creek mineral resource estimate is included in a technical report on the Shea Creek Project with an effective date of May 31, 2013 which was filed on SEDAR at www.sedar.com on May 31, 2013. 
This mineral resource estimate confirms that Shea Creek is the second largest undeveloped uranium resource in the Athabasca Basin. It also ranks as the fourth largest existing uranium resource in the Basin, exceeded in size only by McArthur River, Cigar Lake and Millennium. 
The resources at Shea Creek are open in almost every direction and have excellent potential for significant expansion as exploration continues. 
Deposit 
Indicated Resources at 0.30% U3O8 cut-off 
Inferred Resources at 0.30% U3O8 cut-off 
Tonnes 
U3O8 (%) 
U3O8 (lbs) 
Tonnes 
U3O8 (%) 
U3O8 (lbs) 
Kianna* 
1,034,500 
1.526 
34,805,000 
560,700 
1.364 
16,867,000 
Anne* 
564,000 
1.992 
24,760,000 
134,900 
0.880 
2,617,000 
Colette* 
327,800 
0.786 
5,680,000 
493,200 
0.716 
7,780,000 
58B* 
141,600 
0.774 
2,417,000 
83,400 
0.505 
928,000 
Total* 
2,067,900 
1.484 
67,663,000 
1,272,200 
1.005 
28,192,000 
* Joint venture with 49.1% UEX / 50.9% AREVA ownership 
Shea Creek - Resources 
- 14 -
TSX: UEX www.uex-corporation.com 
The Shea Creek Project contains four known uranium deposits: 
Kianna 
Anne 
The deposits are distributed along a strike length of over 3 km at the north end of the 33-km long Saskatoon Lake Conductor. 
Mineralization is largely open and large parts of the Saskatoon Lake Conductor remain untested; the potential for resource expansion is extremely high. 
UEX signed an agreement that allows the Company to increase its interest in the Western Athabasca Joint Venture (including Shea Creek). 
The Company has the option but no obligation to spend up to $18.0 million over a six-year period to earn an additional 0.9% interest in the project. UEX will gain not only a further interest of 0.9% in the existing resource, but also up to 49.9% of any further resources discovered. UEX has already earned 0.1% of the 0.9% interest to date. 
Colette 
58B 
Shea Creek - Deposits 
- 15 -
TSX: UEX www.uex-corporation.com 
The uranium mineralization in a deposit can occur in three styles: 
Perched (P) mineralization is found in sandstone at shallower depths. 
Unconformity (UC) mineralization is found at the contact of the sandstone and the underlying basement rock. 
Basement (B) mineralization is found in the gneissic rock beneath the unconformity. 
A wireframe model of the Kianna Deposit depicting stacked mineralization is shown to the left. 
Perched 
Unconformity 
Basement 
New Basement Zone 
Kianna Deposit 
Shea Creek - Mineralization 
- 16 -
TSX: UEX www.uex-corporation.com 
Kianna SHE-114-05 
Perched (P) mineralization grading 27.7% eU3O8 over 7.6 m 
Kianna SHE-115-03 
Unconformity (UC) mineralization grading 21.2% U3O8 over 4.3 m 
Kianna SHE-115-11 
Basement (B) mineralization grading 13.2% U3O8 over 4.5 m 
Shea Creek - Mineralization 
- 17 -
TSX: UEX www.uex-corporation.com 
Selected High-Grade Drilling Results 
Colette 
SHE-111-06 
(B) 23.9% U3O8 over 0.5 m 
Kianna 
SHE-114-19 
(P) 33.6% eU3O8 over 1.3 m 
SHE-115-10 
(B) 24.3% U3O8 over 2.5 m 
SHE-123-06 
(UC) 32.3% U3O8 over 1.1 m 
Anne 
SHE-087 
(B) 34.7% U3O8 over 1.9 m 
SHE-096-03 
(UC) 29.2% U3O8 over 3.4 m 
SHE-099 
(UC) 60.6% U3O8 over 1.2 m 
Shea Creek - Mineralization 
- 18 -
TSX: UEX www.uex-corporation.com 
Kianna Deposit: Wireframe Model 
Side view facing SW: perched, unconformity and basement mineralization are clearly visible. 
SHE-115-03: GT 114 
9.34% U3O8/12.2 m 
SHE-115-05: GT 73 
7.83% U3O8/7.2 m 
SHE-115-08: GT 91 
6.17% U3O8/6.7 m 
SHE-114-05: GT 224 
20.7% eU3O8/10.2 m 
SHE-118: GT 50 
6.30% U3O8/7.9 m 
SHE-115-10: GT 144 
8.58% U3O8/15.0 m 
SHE-115-11: GT 88 
5.36% U3O8/16.5 m 
SHE-114-11: GT 254 
4.09% eU3O8/45.0 m 
SHE-114-19: GT 71 
5.94% eU3O8/12.0 m 
SHE-115-04: GT 48 
2.55% U3O8/19.0 m 
SHE-114-20: GT 145 
1.02% eU3O8/141 m 
SHE-114-09: GT 144 
4.64% eU3O8/22.2 m 
SHE-115-18: GT 115 
8.42% eU3O8/12.6 m 
SHE-114-07: GT 70 
7.37% U3O8/9.5 m 
GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. 
Perched 
Unconformity 
Basement 
Basement Zone 
(2011) 
Basement Zone 
Upper Kianna East (2012) 
Basement Zone 
Kianna East (2012) 
Shea Creek - Kianna Deposit 
- 19 -
TSX: UEX www.uex-corporation.com 
Anne Deposit: Wireframe Model 
Side view facing NE: perched, unconformity and basement mineralization are clearly visible. 
SHE-095-03: GT 86 
4.41% U3O8/14.9 m 
SHE-099-02: GT 101 
5.65% U3O8/17.9 m 
SHE-087: GT 70 
11.6% U3O8/6.0 m 
SHE-099: GT 84 
10.0% U3O8/8.4 m 
SHE-099-03: GT 36 
2.61% U3O8/13.6 m 
SHE-100-01: GT 110 
3.32% U3O8/25.1 m 
SHE-122-05: GT 75 
3.64% U3O8/20.5 m 
SHE-122-01: GT 163 
4.21% U3O8/36.0 m 
SHE-096-03: GT 143 
5.42% U3O8/19.0 m 
SHE-101-02: GT 32 
3.75% U3O8/8.6 m 
SHE-016: GT 39 
4.32% U3O8/9.1 m 
GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. 
SHE-109-05: GT 79 
7.24% U3O8/8.7 m 
SHE-109-06: GT 40 
4.51% U3O8/8.9 m 
Unconformity 
Perched 
Basement 
Shea Creek - Anne Deposit 
- 20 -
TSX: UEX www.uex-corporation.com 
Colette Deposit: Wireframe Model 
View from above the unconformity facing SE with 58B, Kianna and Anne visible in the distance. 
SHE-052: GT 39 
2.34% U3O8/16.8 m 
SHE-065: GT 21 
1.73% U3O8/11.9 m 
SHE-111-06: GT 26 
3.23% U3O8/8.0 m 
SHE-059: GT 27 
4.10% U3O8/6.6 m 
GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. 
SHE-066-2: GT 33 
1.28% eU3O8/26.0 m 
SHE-066-3: GT 34 
1.22% eU3O8/27.9 m 
Unconformity 
mineralization 
ANNE 
KIANNA 
58B 
Basement mineralization 
COLETTE 
KIANNA 
EAST 
Shea Creek - Colette Deposit 
- 21 -
TSX: UEX www.uex-corporation.com 
58B Deposit: Wireframe Model 
View from above the unconformity facing SE with Kianna and Anne visible in the distance. 
Mineralization at 58B has now been traced over a strike length of 400 metres and occurs over a width of up to 110 metres in plan view. 
Broad areas of the highly prospective structural corridor hosting 58B remain sparsely tested and open in several directions. 
SHE-133-5: GT 19.5 
6.53% eU3O8/1.6 m 
SHE-133-6: GT 11.8 
6.17% eU3O8/1.6 m 
SHE-133-7: GT 22.7 
2.13% eU3O8/10.6 m 
GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. 
SHE-133-3: GT 20.2 
1.81% eU3O8/7.6 m 
SHE-133-4: GT 21.2 
6.55% eU3O8/2.4 m 
Unconformity 
mineralization 
KIANNA 
Basement mineralization 
58B 
KIANNA 
EAST 
ANNE 
Shea Creek - 58B Deposit 
- 22 -
TSX: UEX www.uex-corporation.com 
Hosts the sixth largest undeveloped uranium resource in the Athabasca Basin. 
Known deposits: 
‒Horseshoe, Raven and West Bear 
Horseshoe-Raven Camp 
The 2010 N.I. 43-101 preliminary economic assessment report (PA) indicates that the project could yield EBIT of C$246M, pre-tax NPV of C$163M and IRR of 42%(1)(2) at a price of US$60/lb U3O8. 
HIDDEN BAY PROJECT 
- 23 - 
100% owned 
(1)These results are included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. 
(2)Projects in the mining sector have experienced rising costs, including rising capital and operating costs, during the past few years. Rising capital and operating costs would, in the absence of other changes, negatively impact EBIT, NPV and IRR which have been calculated based upon historical costs. Accordingly, readers should bear these factors in mind when reading the PA and should not place undue reliance on the PA. 
Aerial view of Horseshoe-Raven Camp
TSX: UEX www.uex-corporation.com 
Horseshoe and Raven are approximately 4 km from Cameco’s Rabbit Lake Mill and 22 km from AREVA’s McClean Lake Mill. This proximity creates the opportunity for toll milling arrangements to be negotiated. 
Hydroelectric transmission lines that service both of these facilities pass 3 km to the north of the deposits. 
Provincial Highway 905 provides access to the deposits and the local uranium mills. 
- 24 - 
HIDDEN BAY PROJECT
TSX: UEX www.uex-corporation.com 
The Hidden Bay Project is 100% owned by UEX and contains three known uranium deposits: 
Horseshoe 
Raven 
West Bear 
The Hidden Bay Project contains the sixth largest undeveloped uranium resource in the Athabasca Basin. 
Cumulative Expenditures 
As at December 31, 2013 
Exploration C$59.9 million 
Development C$ 6.8 million 
Future Work 
Additional greenfields drilling exploration at Hidden Bay has been deferred temporarily until market conditions improve. 
Hidden Bay - Overview 
- 25 -
TSX: UEX www.uex-corporation.com 
The February 2011 N.I. 43-101 Preliminary Assessment Technical Report (“PA”) prepared by SRK Consulting (Canada) Inc. recommends that the project be advanced to a preliminary feasibility level, and that this next phase of study also include UEX’s West Bear Deposit. 
These results are included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. 
The PA utilized cut-off grades calculated on the basis of $60 (US) per lb of U3O8 and estimated 16.6 million lbs of U3O8 could be extracted over a seven-year mine life. 
Base Case economics at $60 (US) per lb of U3O8: 
Price U3O8 
(per lb) 
Pre-Tax (Base Case) (1) 
EBIT 
(C$ millions) 
NPV5% 
(C$ millions) 
IRR 
(%) 
$60 (US) 
246 
163 
42 
“EBIT” Earnings before interest and taxes “IRR” Internal rate of return “NPV5%” Net present value (5% discount rate) 
The Preliminary Assessment Technical Report is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. (1) Projects in the mining sector have experienced rising costs, including rising capital and operating costs, during the past few years. Rising capital and operating costs would, in the absence of other changes, negatively impact EBIT, NPV and IRR which have been calculated based upon historical costs. Accordingly, readers should bear these factors in mind when reading the PA and should not place undue reliance on the PA. 
Horseshoe and Raven Economics 
- 26 -
TSX: UEX www.uex-corporation.com 
Uranium processing and tailings management, as envisioned in the PA, would be conducted through a toll arrangement* at one of two milling facilities located near Horseshoe and Raven: 
The Rabbit Lake Mill within 4 km, operated by Cameco 
The McClean Lake Mill within 22 km, operated by AREVA 
The PA has focused on Cameco’s Rabbit Lake Mill as it has excess capacity and is the closer of the two facilities. 
The Hidden Bay Project has opportunities for the improvement of economics, including: 
Expansion of mineable tonnes due to an increase in U3O8 price which would result in a lower cut-off grade and thus the conversion of a higher proportion of the existing resource base to reserves; 
Expansion of mineable tonnes through discovery of additional resources at other locations on the Hidden Bay property; and 
Inclusion of UEX’s West Bear Deposit in the overall project mine plan and economics. * Toll milling utilizes the excess capacity of an existing mill to process uranium ore, and is often a cost-effective alternative to constructing a new milling facility. 
Horseshoe and Raven Economics 
- 27 -
TSX: UEX www.uex-corporation.com 
UEX is focused on advancing the deposits at Horseshoe and Raven through pre-feasibility and ultimately to feasibility level to assess the potential economics and viability of mining the deposits. 
Results from the July 2009 N.I. 43-101 mineral resource estimate prepared by Golder Associates Ltd. are shown in the table below. 
This resource is included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. 
Deposit 
Indicated Resources at 0.05% U3O8 cut-off 
Inferred Resources at 0.05% U3O8 cut-off 
Tonnes 
U3O8 (%) 
U3O8 (lbs) 
Tonnes 
U3O8 (%) 
U3O8 (lbs) 
Horseshoe 
5,119,700 
0.203 
22,895,000 
287,000 
0.166 
1,049,000 
Raven 
5,173,900 
0.107 
12,149,000 
822,200 
0.092 
1,666,000 
Total 
10,293,600 
0.155 
35,044,000 
1,109,200 
0.111 
2,715,000 
Horseshoe and Raven Resources 
- 28 -
TSX: UEX www.uex-corporation.com 
Horseshoe and Raven Deposits 
The Horseshoe and Raven Deposits lie in overall competent and impermeable quartzite, arkosic quartzite and calc-arkosic gneiss host rocks with no overlying Athabasca sandstone cover, highly favourable conditions for mining in the Athabasca Basin. 
Vertical cross sections of the Horseshoe and Raven Deposits are shown above. 
- 29 -
TSX: UEX www.uex-corporation.com 
Horseshoe and Raven Mineralization 
Nodular pitchblende 
rimmed by boltwoodite 
Pitchblende in 
hematite-clay 
Late yellow boltwoodite-uranophane 
HU-16 high grade intercept: 12.35 m @ 4.53% U3O8 
- 30 -
TSX: UEX www.uex-corporation.com 
Results from the January 2009 N.I. 43-101 mineral resource estimate for the West Bear Deposit prepared by Golder Associates Ltd. are as follows: 
‒78,900 tonnes grading 0.908% U3O8 in the Indicated category containing 1,579,000 pounds U3O8 at a cut-off grade of 0.05% U3O8. 
‒All resources are within 35 m of surface. 
This resource is included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. 
WEST BEAR RESOURCES 
- 31 - 
100% owned
TSX: UEX www.uex-corporation.com 
The West Bear Deposit is a classic, unconformity-hosted uranium deposit developed under shallow Athabasca sandstone cover above a conductive graphitic gneiss unit. 
The near-surface nature of the mineralization is amenable to shallow open-pit mining. 
WEST BEAR DEPOSIT 
- 32 - 
35 m
TSX: UEX www.uex-corporation.com 
Second largest undeveloped uranium resource in Canada’s Athabasca Basin 
49.1% owned by UEX in partnership with AREVA Resources Canada Inc. 
Kianna, Anne, Colette and 58B contain an estimated 67.7 million lbs U3O8 Indicated and 28.2 million lbs U3O8 Inferred mineral resources(1) 
Potential to grow our interest in known resources by up to 0.9% and our interest by up to 49.9% in future resources discovered by funding additional exploration at Shea Creek beyond the budgets proposed by the project operator 
Shea Creek resources are open in almost every direction and have excellent potential for significant expansion as exploration continues 
Sixth largest undeveloped uranium resource in the Athabasca Basin 
100% owned by UEX Corporation 
Positive Preliminary Assessment 
Project will be advanced further when uranium commodity price justifies 
Horseshoe, Raven and West Bear are host to an estimated 36.6 million lbs U3O8 Indicated and 2.7 million lbs U3O8 Inferred mineral resources(2) 
Infrastructure near Hidden Bay is well developed, with two operating uranium ore processing facilities in the local area 
Shea Creek 
Hidden Bay 
(1) See “Shea Creek - Resources” on page 14 for % U3O8 grades and % U3O8 cut-off. 
(2) See “Horseshoe & Raven Resources” on page 28 for % U3O8 grades and % U3O8 cut-off. 
Project Summary 
- 33 -
TSX: UEX www.uex-corporation.com 
Our primary objectives: 
To continue the exploration and development work required to delineate and develop economic uranium resources at the Shea Creek Project; 
To advance the development process at the Horseshoe, Raven and West Bear uranium deposits to a production decision; 
To maintain, explore and advance to discovery our other uranium projects; and 
To pursue a diversified portfolio of uranium projects from early exploration through to development and production, which may include outright property acquisitions or other business combinations. 
Growth Strategy 
- 34 -
TSX: UEX www.uex-corporation.com 
Shea Creek 
Expansion of mineral resources 
into deposits of global significance 
Hidden Bay 
Advancing toward a 
production decision 
Looking Ahead 
- 35 -
PRESENTATION ELEMENTS 
For more information: 
UEX Corporation 
Suite 1007 – 808 Nelson Street 
Vancouver, BC V6Z 2H2 
www.uex-corporation.com 
Investor and Media Inquiries Contact: 
Roger Lemaitre, President & CEO 
+1 (604) 669-2349 
uex@uex-corporation.com 
TSX: UEX 
UEXCF.PK 
Frankfurt: UXO.F 
International OTC Markets

More Related Content

What's hot (17)

Presentation
PresentationPresentation
Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Presentation
PresentationPresentation
Presentation
 
Corporate Presentation - August 2015
Corporate Presentation - August 2015Corporate Presentation - August 2015
Corporate Presentation - August 2015
 
Corporate Presentation - August 2015
Corporate Presentation - August 2015Corporate Presentation - August 2015
Corporate Presentation - August 2015
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
Corporate Presentation March 2014
Corporate Presentation March 2014Corporate Presentation March 2014
Corporate Presentation March 2014
 
Corporate Presentation March 2014
Corporate Presentation March 2014Corporate Presentation March 2014
Corporate Presentation March 2014
 
Corporate Presentation - May 2015
Corporate Presentation - May 2015Corporate Presentation - May 2015
Corporate Presentation - May 2015
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Corporate Presentation - Jan 2012
Corporate Presentation - Jan 2012Corporate Presentation - Jan 2012
Corporate Presentation - Jan 2012
 

Viewers also liked (20)

Cxb corp-profile
Cxb corp-profileCxb corp-profile
Cxb corp-profile
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
CorporatePresentation
CorporatePresentationCorporatePresentation
CorporatePresentation
 
Cxb cor pres_may2014
Cxb cor pres_may2014Cxb cor pres_may2014
Cxb cor pres_may2014
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentation
 
Probe-mines-presentation-september-2014
Probe-mines-presentation-september-2014Probe-mines-presentation-september-2014
Probe-mines-presentation-september-2014
 
Presentation
PresentationPresentation
Presentation
 
Corporatepresentation
CorporatepresentationCorporatepresentation
Corporatepresentation
 
Corporatepresentation
CorporatepresentationCorporatepresentation
Corporatepresentation
 
Presentation - June 2014
Presentation - June 2014Presentation - June 2014
Presentation - June 2014
 
Presentation September
Presentation SeptemberPresentation September
Presentation September
 
Corporatepresentation
CorporatepresentationCorporatepresentation
Corporatepresentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation Q2 2014
Presentation Q2 2014Presentation Q2 2014
Presentation Q2 2014
 
Corporate Presentation May 2014
Corporate Presentation May 2014Corporate Presentation May 2014
Corporate Presentation May 2014
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation June 2014
Corporate Presentation June 2014Corporate Presentation June 2014
Corporate Presentation June 2014
 
Corporatepresentation
CorporatepresentationCorporatepresentation
Corporatepresentation
 
Energold Presentation
Energold PresentationEnergold Presentation
Energold Presentation
 

Similar to Corporate Presentation

Similar to Corporate Presentation (14)

Presentation
PresentationPresentation
Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate presentation eng
Corporate presentation engCorporate presentation eng
Corporate presentation eng
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
Corporate presentation new for website
Corporate presentation new   for websiteCorporate presentation new   for website
Corporate presentation new for website
 
Corporate presentation updated nov 12, 2015
Corporate presentation updated   nov 12, 2015Corporate presentation updated   nov 12, 2015
Corporate presentation updated nov 12, 2015
 
Cp
Cp Cp
Cp
 
Corporate presentation-june-30-2016
Corporate presentation-june-30-2016Corporate presentation-june-30-2016
Corporate presentation-june-30-2016
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
Corporate presentation may 18, 2016
Corporate presentation   may 18, 2016Corporate presentation   may 18, 2016
Corporate presentation may 18, 2016
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015
 

More from Adnet Communications

20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdfAdnet Communications
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources PresentationAdnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfAdnet Communications
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdfAdnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentationAdnet Communications
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/Adnet Communications
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Adnet Communications
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024Adnet Communications
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor PresentationAdnet Communications
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024Adnet Communications
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfAdnet Communications
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentationAdnet Communications
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Adnet Communications
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdfAdnet Communications
 

More from Adnet Communications (20)

20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdf
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentation
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf
 

Recently uploaded

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

Corporate Presentation

  • 2. TSX: UEX www.uex-corporation.com FORWARD-LOOKING INFORMATION AND STATEMENTS: Certain statements and other information contained in this presentation may constitute “forward-looking information” within the meaning of applicable Canadian securities legislation or constitute “forward-looking statements” within the meaning of applicable United States securities legislation. Such information and statements are based on UEX's current expectations, estimates, forecasts and projections. These forward-looking statements include statements regarding UEX‘s outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. The words “estimates”, “projects”, “expects”, “intends”, “believes”, “plans”, or their negatives or other comparable words and phrases are intended to identify forward-looking statements. Such forward-looking statements are based on certain factors and assumptions and are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking statements. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, additional drilling results, continuity and grade of deposits, participation in joint ventures, reliance on other companies as operators, public acceptance of uranium as an energy source, fluctuations in uranium prices and currency exchange rates, changes in environmental and other laws affecting uranium exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable securities commissions in Canada. Many of these factors are beyond the control of UEX. Consequently, all forward-looking statements made herein are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking statements. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise. NOTICE TO U.S. PERSONS: The information in this presentation has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. Information, including scientific or technical information, has been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“N.I. 43-101”). N.I. 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including N.I. 43-101, differ significantly from the requirements of the SEC. For example, the terms “indicated mineral resources” and “inferred mineral resources” are used in this publication to comply with the reporting standards in Canada. While those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Readers should understand that “indicated mineral resources” and “inferred mineral resources” have a great amount of uncertainty as to their existence and as to their economic and legal feasibility. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves. In accordance with Canadian rules, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies. In addition, the definitions of proven and probable mineral reserves used in N.I. 43-101 differ from the definitions in the SEC Industry Guide 7. Disclosure of “contained pounds” is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves as in place tonnage and grade without reference to unit measures. Accordingly, information contained in this publication describing the Company's mineral properties may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. QUALIFIED PERSON: Technical information in this presentation has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX’s Vice-President of Exploration and Roger Lemaitre, P.Eng., P.Geo., UEX’s President and CEO, who are Qualified Persons as defined by N.I. 43-101. Forward-Looking Statements - 2 -
  • 3. TSX: UEX www.uex-corporation.com Roger Lemaitre, P.Eng., P.Geo., MBA, M.Sc. (Applied), B.Sc. (Applied) – President & CEO Mr. Roger Lemaitre is a Professional Engineer and Geologist with more than 20 years of professional experience, with both senior and junior mining companies. Before joining UEX, Mr. Lemaitre held the position of CEO and Executive Director of URU Metals Limited, an AIM-listed junior uranium and base metal exploration company, where he re-organized the company's asset mix by identifying and successfully acquiring significant new exploration projects. Prior to joining URU, Mr. Lemaitre held a variety of senior management positions with Cameco Corporation, one of the world's largest uranium producers, and was Cameco's Director of Worldwide Exploration Projects. Ed Boney, CA – Chief Financial Officer & Corporate Secretary Mr. Boney held the position of Corporate Controller at a Canadian junior gold mining company with producing mines in Canada and Peru prior to joining UEX. He has also held the position of manager with Deloitte where he supervised the audits of public companies in the mining and natural resource sector and was involved in the asset valuations of several companies in the Canadian oil and gas sector. R. Sierd Eriks, P.Geo. – Vice-President, Exploration Mr. Eriks, B.A. (Geology), has worked in mineral exploration for over thirty years. From 1979 to 1998, he gained geological and managerial experience with SMDC (now Cameco Corporation), Falconbridge Limited, Noranda Exploration Co. Ltd. and Cogema Resources Inc. (now AREVA Resources Canada Inc.) in base metals, gold, PGE and uranium exploration. Nan H. Lee, M.Sc., P.Eng. – Vice-President, Project Development Ms. Lee has worked as a Mining and Project Engineer on several projects in Canada and has also worked with Kilborn Engineering where she assisted with project feasibility studies. As an independent consultant she has coordinated, or assisted with the preparation of Environmental Impact Statements for several uranium mine developments in Canada. Previously, Ms. Lee managed the preliminary feasibility studies for tailings management facilities for two uranium operations in northern Saskatchewan. Walter Segsworth, P.Eng. – Management Advisory Board Mr. Segsworth previously served on the Board of Directors of UEX from 2002 to 2008. He has managed three large Canadian mines. In 1990 he was appointed President and Director of Westmin Resources Ltd. Upon the takeover of Westmin by Boliden in 1998, Mr. Segsworth joined Homestake Mining Company of California where he was subsequently appointed President, Director and Chief Operating Officer and served until its merger with Barrick in early 2002. He is currently Lead Director of Alterra Power Corporation. David Rhys, M.Sc., P.Geo. – Management Advisory Board Mr. Rhys is a consulting structural geologist specializing in structural controls on mineral deposits and their application to exploration, mining and mine site grade control. He has had a long association with UEX, and has provided technical consulting and guidance to the Company since its inception. He has also been involved in exploration advisory roles to several other junior mining companies. UEX Management Team UEX Advisory Board Left to right: Ed Boney, Nan Lee, Roger Lemaitre and Sierd Eriks Walter Segsworth David Rhys Management - 3 -
  • 4. TSX: UEX www.uex-corporation.com Mark P. Eaton, B.A. Mr. Eaton is an experienced investment professional with over 20 years of experience in equity capital markets specializing in the resource sector. He has held the position of Managing Director of Global Mining Sales, a division of CIBC World Markets of Toronto, Canada and Manager of U.S. Equity Sales for CIBC World Markets. He was a Partner and Director of Loewen Ondaatje McCutcheon Ltd., a Toronto-based investment dealer, until March 2008. He is currently President and CEO of Belo Sun Mining Corp. Suraj P. Ahuja, M.Sc., P.Geo. Mr. Ahuja's career as a geologist in the design and management of mineral exploration programs spans over 40 years. From 1978 to 1988 he was employed by SMDC (now Cameco) as a Project Geologist and a Senior Geologist. From 1988 to 2000 he was employed by PNC Exploration (Canada) Co. Ltd., a Japanese-owned uranium exploration company, as VP Exploration. Mr. Ahuja consults for several major and junior uranium exploration companies through his own mineral exploration consulting company. Emmet McGrath, CA Mr. McGrath, a member of the Canadian Institute of Chartered Accountants, was an audit partner with KPMG from 1981 to 2002. He has a thorough understanding of the regulatory and statutory reporting requirements of publicly listed companies and is well versed in corporate governance matters. He has extensive experience in mergers and acquisitions, and currently sits on the Board of Directors of several publicly listed companies in the mining industry. He is a Director and former Chairman of the Board of Westminster Credit Union, the fourth largest credit union in British Columbia. Roger Lemaitre, P.Eng., P.Geo., MBA, M.Sc. (Applied), B.Sc. (Applied) – President & Chief Executive Officer Colin C. Macdonald, M.Sc. Chairman of the Board Mr. Macdonald held the position of Vice-President, Exploration, for Cameco Corporation until his retirement on June 30, 2011. He had worked for Cameco Corporation and its predecessor companies since 1981 and was responsible for Cameco's worldwide uranium exploration activities. Graham C. Thody, CA Mr. Thody was a Partner of NTA, Chartered Accountants from 1979 until his retirement from public practice in 2007. He was a Director of Pioneer Metals Corporation at the time of the adoption of the Plan of Arrangement which created UEX Corporation and has been a Director of UEX since its inception. He served as Chairman of the Board of UEX until June 2010, and as its President and CEO from November 2009 to January 2014. Mr. Thody continues in a consulting role with UEX for two years and will continue as a member of the UEX Board. UEX Board of Directors Left to right: Emmet McGrath, Graham Thody, Colin Macdonald, Suraj Ahuja, Roger Lemaitre and Mark Eaton Board of Directors - 4 -
  • 5. TSX: UEX www.uex-corporation.com Corporate Overview UEX Corporation is an industry leader in the discovery and advancement of new uranium resources in Canada’s Athabasca Basin. UEX is amongst a small group of companies with existing N.I. 43-101 resources at the Indicated stage. UEX’s enduring success in uranium exploration is enhanced by: Early acquisition of highly prospective land positions in the prolific Athabasca Basin Strong relationships with Cameco Corporation and AREVA, the world’s largest uranium companies Progress continues on our advanced resource development projects at Shea Creek and Hidden Bay. The Athabasca Basin is located in northern Saskatchewan, Canada and yields approximately 15% of the world’s mined uranium annually. - 5 -
  • 6. TSX: UEX www.uex-corporation.com Shares Issued and outstanding 227,838,679 Fully diluted 244,884,679 Options 17,046,000 Weighted Average Exercise Price for Options $ 0.93 Warrants Nil Share Price (September 5, 2014) $ 0.415 Market Capitalization $ 94,553,052 Daily Trading Volume (3 month average) 361,379 Significant shareholders Cameco Corporation 21.95% Global X Uranium ETF 6.70% BlackRock Fund Managers Limited 3.84% Current/Retired Management & Directors 1.53% Cash position as at September 8, 2014 (estimated) $ 6.7 million Corporate Summary - 6 -
  • 7. TSX: UEX www.uex-corporation.com UEX Major Assets - 7 -
  • 8. TSX: UEX www.uex-corporation.com Total Resources N.I. 43-101 Mineral Resource Estimates 69.84 16.56 0 5 10 15 20 25 30 35 40 Shea Creek (UEX's 49.1% share) Hidden Bay 33.22 36.62 13.84 2.72 Millions of pounds of U3O8 Millions of Pounds of U3O8 by Category and by Project Indicated Mineral Resource (UEX’s share) Inferred Mineral Resource (UEX’s share) Deposit SHEA CREEK - Indicated Category at 0.30% U3O8 Cut-off SHEA CREEK - Inferred Category at 0.30% U3O8 Cut-off Tonnes Grade U3O8 (%) U3O8 (lbs) Tonnes Grade U3O8 (%) U3O8 (lbs) Kianna* 1,034,500 1.526 34,805,000 560,700 1.364 16,867,000 Anne* 564,000 1.992 24,760,000 134,900 0.880 2,617,000 Colette* 327,800 0.786 5,680,000 493,200 0.716 7,780,000 58B* 141,600 0.774 2,417,000 83,400 0.505 928,000 Total* 2,067,900 1.484 67,663,000 1,272,200 1.005 28,192,000 Deposit HIDDEN BAY - Indicated Category at 0.05% U3O8 Cut-off HIDDEN BAY - Inferred Category at 0.05% U3O8 Cut-off Tonnes Grade U3O8 (%) U3O8 (lbs) Tonnes Grade U3O8 (%) U3O8 (lbs) Horseshoe 5,119,700 0.203 22,895,000 287,000 0.166 1,049,000 Raven 5,173,900 0.107 12,149,000 822,200 0.092 1,666,000 West Bear 78,900 0.908 1,579,000 - - - Total 10,372,500 0.160 36,623,000 1,109,200 0.111 2,715,000 * Joint venture with 49.1% UEX / 50.9% AREVA ownership - 8 -
  • 9. TSX: UEX www.uex-corporation.com Project Expenditures $44.1M $59.9M $37.8M $7.4M $6.8M 0 10 20 30 40 50 60 70 Shea Creek Hidden Bay Other Cumulative Expenditures (C$ millions) Exploration Development 0 1 2 3 4 Shea Creek Hidden Bay Other $3.07M $1.25M $0.09M - $1.09M - $3.75M $0.11M $0.04M - $0.61M - UEX Expenditures 2012-2013 (C$ millions) Exploration 2012 Development 2012 Exploration 2013 Development 2013 To December 31, 2013 2012 2013 2012 2013 2012 2013 - 9 -
  • 10. TSX: UEX www.uex-corporation.com To December 31, 2013 19.9 6.5 21.1 24.0 11.5 2.9 12.6 - 0 5 10 15 20 25 Shea Creek* Hidden Bay Annual Drilling 2010-2013 (thousands of metres) 2010 2011 2012 2013 99.3 205.0 153.9 282.9 0 100 200 300 400 500 Shea Creek* Hidden Bay Historical Drilling (thousands of metres) Pre-UEX UEX * Utilizing directional drilling, whereby several wedge cuts are made from a single pilot hole, has significantly reduced the total number of drilling metres required to attain the desired number of unconformity impacts. 2010 2011 2012 2013 2010 2011 2012 2013 Exploration Drilling - 10 -
  • 11. TSX: UEX www.uex-corporation.com Experienced world-class joint venture partner AREVA is a global uranium miner with Athabasca experience. UEX has the ability to direct future exploration activities through additional funding. Second largest undeveloped uranium resource in the Athabasca Basin. Impressive potential for resource expansion: ‒Current resources are open in almost every direction. ‒Only 3 km of the 33 km prospective Saskatoon Lake Conductor has been adequately explored. ‒Several conductors on the property remain untested. - 11 - 49.1% 50.9%
  • 12. TSX: UEX www.uex-corporation.com Located in northwest Saskatchewan, the Shea Creek property hosts the second largest undeveloped uranium resource in the Athabasca Basin. AREVA’s former Cluff Lake uranium mine is located approximately 15 km to the north of the Shea Creek deposits and produced over 62 million lbs(1) of U3O8 during its successful 22 years of operation. Access is provided year-round by Provincial Highway 955, allowing for easy transport of crews, equipment and supplies to the project site. (1) Source: Saskatchewan Mining Association SHEA CREEK PROJECT - 12 - Shea Creek Exploration Camp
  • 13. TSX: UEX www.uex-corporation.com The Shea Creek Project is a joint venture 49.1% owned by UEX Corporation and 50.9% owned by AREVA Resources Canada Inc., the project operator. The Shea Creek Project contains the second largest undeveloped uranium resource in the Athabasca Basin. UEX Cumulative Expenditures As at December 31, 2013 Exploration C$44.1 million Development C$ 7.4 million 2013 Joint Venture Expenditures Exploration C$ 3.1 million 2013 Additional Exploration Expenditures Exploration C$ 2.0 million 2014 Joint Venture Budget To be determined Shea Creek - Overview - 13 -
  • 14. TSX: UEX www.uex-corporation.com The N.I. 43-101 mineral resource estimate for Shea Creek incorporates resources from the Kianna, Anne, Colette and 58B deposits based on drilling information up to December 31, 2012. The Shea Creek mineral resource estimate is included in a technical report on the Shea Creek Project with an effective date of May 31, 2013 which was filed on SEDAR at www.sedar.com on May 31, 2013. This mineral resource estimate confirms that Shea Creek is the second largest undeveloped uranium resource in the Athabasca Basin. It also ranks as the fourth largest existing uranium resource in the Basin, exceeded in size only by McArthur River, Cigar Lake and Millennium. The resources at Shea Creek are open in almost every direction and have excellent potential for significant expansion as exploration continues. Deposit Indicated Resources at 0.30% U3O8 cut-off Inferred Resources at 0.30% U3O8 cut-off Tonnes U3O8 (%) U3O8 (lbs) Tonnes U3O8 (%) U3O8 (lbs) Kianna* 1,034,500 1.526 34,805,000 560,700 1.364 16,867,000 Anne* 564,000 1.992 24,760,000 134,900 0.880 2,617,000 Colette* 327,800 0.786 5,680,000 493,200 0.716 7,780,000 58B* 141,600 0.774 2,417,000 83,400 0.505 928,000 Total* 2,067,900 1.484 67,663,000 1,272,200 1.005 28,192,000 * Joint venture with 49.1% UEX / 50.9% AREVA ownership Shea Creek - Resources - 14 -
  • 15. TSX: UEX www.uex-corporation.com The Shea Creek Project contains four known uranium deposits: Kianna Anne The deposits are distributed along a strike length of over 3 km at the north end of the 33-km long Saskatoon Lake Conductor. Mineralization is largely open and large parts of the Saskatoon Lake Conductor remain untested; the potential for resource expansion is extremely high. UEX signed an agreement that allows the Company to increase its interest in the Western Athabasca Joint Venture (including Shea Creek). The Company has the option but no obligation to spend up to $18.0 million over a six-year period to earn an additional 0.9% interest in the project. UEX will gain not only a further interest of 0.9% in the existing resource, but also up to 49.9% of any further resources discovered. UEX has already earned 0.1% of the 0.9% interest to date. Colette 58B Shea Creek - Deposits - 15 -
  • 16. TSX: UEX www.uex-corporation.com The uranium mineralization in a deposit can occur in three styles: Perched (P) mineralization is found in sandstone at shallower depths. Unconformity (UC) mineralization is found at the contact of the sandstone and the underlying basement rock. Basement (B) mineralization is found in the gneissic rock beneath the unconformity. A wireframe model of the Kianna Deposit depicting stacked mineralization is shown to the left. Perched Unconformity Basement New Basement Zone Kianna Deposit Shea Creek - Mineralization - 16 -
  • 17. TSX: UEX www.uex-corporation.com Kianna SHE-114-05 Perched (P) mineralization grading 27.7% eU3O8 over 7.6 m Kianna SHE-115-03 Unconformity (UC) mineralization grading 21.2% U3O8 over 4.3 m Kianna SHE-115-11 Basement (B) mineralization grading 13.2% U3O8 over 4.5 m Shea Creek - Mineralization - 17 -
  • 18. TSX: UEX www.uex-corporation.com Selected High-Grade Drilling Results Colette SHE-111-06 (B) 23.9% U3O8 over 0.5 m Kianna SHE-114-19 (P) 33.6% eU3O8 over 1.3 m SHE-115-10 (B) 24.3% U3O8 over 2.5 m SHE-123-06 (UC) 32.3% U3O8 over 1.1 m Anne SHE-087 (B) 34.7% U3O8 over 1.9 m SHE-096-03 (UC) 29.2% U3O8 over 3.4 m SHE-099 (UC) 60.6% U3O8 over 1.2 m Shea Creek - Mineralization - 18 -
  • 19. TSX: UEX www.uex-corporation.com Kianna Deposit: Wireframe Model Side view facing SW: perched, unconformity and basement mineralization are clearly visible. SHE-115-03: GT 114 9.34% U3O8/12.2 m SHE-115-05: GT 73 7.83% U3O8/7.2 m SHE-115-08: GT 91 6.17% U3O8/6.7 m SHE-114-05: GT 224 20.7% eU3O8/10.2 m SHE-118: GT 50 6.30% U3O8/7.9 m SHE-115-10: GT 144 8.58% U3O8/15.0 m SHE-115-11: GT 88 5.36% U3O8/16.5 m SHE-114-11: GT 254 4.09% eU3O8/45.0 m SHE-114-19: GT 71 5.94% eU3O8/12.0 m SHE-115-04: GT 48 2.55% U3O8/19.0 m SHE-114-20: GT 145 1.02% eU3O8/141 m SHE-114-09: GT 144 4.64% eU3O8/22.2 m SHE-115-18: GT 115 8.42% eU3O8/12.6 m SHE-114-07: GT 70 7.37% U3O8/9.5 m GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. Perched Unconformity Basement Basement Zone (2011) Basement Zone Upper Kianna East (2012) Basement Zone Kianna East (2012) Shea Creek - Kianna Deposit - 19 -
  • 20. TSX: UEX www.uex-corporation.com Anne Deposit: Wireframe Model Side view facing NE: perched, unconformity and basement mineralization are clearly visible. SHE-095-03: GT 86 4.41% U3O8/14.9 m SHE-099-02: GT 101 5.65% U3O8/17.9 m SHE-087: GT 70 11.6% U3O8/6.0 m SHE-099: GT 84 10.0% U3O8/8.4 m SHE-099-03: GT 36 2.61% U3O8/13.6 m SHE-100-01: GT 110 3.32% U3O8/25.1 m SHE-122-05: GT 75 3.64% U3O8/20.5 m SHE-122-01: GT 163 4.21% U3O8/36.0 m SHE-096-03: GT 143 5.42% U3O8/19.0 m SHE-101-02: GT 32 3.75% U3O8/8.6 m SHE-016: GT 39 4.32% U3O8/9.1 m GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. SHE-109-05: GT 79 7.24% U3O8/8.7 m SHE-109-06: GT 40 4.51% U3O8/8.9 m Unconformity Perched Basement Shea Creek - Anne Deposit - 20 -
  • 21. TSX: UEX www.uex-corporation.com Colette Deposit: Wireframe Model View from above the unconformity facing SE with 58B, Kianna and Anne visible in the distance. SHE-052: GT 39 2.34% U3O8/16.8 m SHE-065: GT 21 1.73% U3O8/11.9 m SHE-111-06: GT 26 3.23% U3O8/8.0 m SHE-059: GT 27 4.10% U3O8/6.6 m GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. SHE-066-2: GT 33 1.28% eU3O8/26.0 m SHE-066-3: GT 34 1.22% eU3O8/27.9 m Unconformity mineralization ANNE KIANNA 58B Basement mineralization COLETTE KIANNA EAST Shea Creek - Colette Deposit - 21 -
  • 22. TSX: UEX www.uex-corporation.com 58B Deposit: Wireframe Model View from above the unconformity facing SE with Kianna and Anne visible in the distance. Mineralization at 58B has now been traced over a strike length of 400 metres and occurs over a width of up to 110 metres in plan view. Broad areas of the highly prospective structural corridor hosting 58B remain sparsely tested and open in several directions. SHE-133-5: GT 19.5 6.53% eU3O8/1.6 m SHE-133-6: GT 11.8 6.17% eU3O8/1.6 m SHE-133-7: GT 22.7 2.13% eU3O8/10.6 m GT is presented for the entire drill hole along with the Grade/Thickness of the major intercept. SHE-133-3: GT 20.2 1.81% eU3O8/7.6 m SHE-133-4: GT 21.2 6.55% eU3O8/2.4 m Unconformity mineralization KIANNA Basement mineralization 58B KIANNA EAST ANNE Shea Creek - 58B Deposit - 22 -
  • 23. TSX: UEX www.uex-corporation.com Hosts the sixth largest undeveloped uranium resource in the Athabasca Basin. Known deposits: ‒Horseshoe, Raven and West Bear Horseshoe-Raven Camp The 2010 N.I. 43-101 preliminary economic assessment report (PA) indicates that the project could yield EBIT of C$246M, pre-tax NPV of C$163M and IRR of 42%(1)(2) at a price of US$60/lb U3O8. HIDDEN BAY PROJECT - 23 - 100% owned (1)These results are included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. (2)Projects in the mining sector have experienced rising costs, including rising capital and operating costs, during the past few years. Rising capital and operating costs would, in the absence of other changes, negatively impact EBIT, NPV and IRR which have been calculated based upon historical costs. Accordingly, readers should bear these factors in mind when reading the PA and should not place undue reliance on the PA. Aerial view of Horseshoe-Raven Camp
  • 24. TSX: UEX www.uex-corporation.com Horseshoe and Raven are approximately 4 km from Cameco’s Rabbit Lake Mill and 22 km from AREVA’s McClean Lake Mill. This proximity creates the opportunity for toll milling arrangements to be negotiated. Hydroelectric transmission lines that service both of these facilities pass 3 km to the north of the deposits. Provincial Highway 905 provides access to the deposits and the local uranium mills. - 24 - HIDDEN BAY PROJECT
  • 25. TSX: UEX www.uex-corporation.com The Hidden Bay Project is 100% owned by UEX and contains three known uranium deposits: Horseshoe Raven West Bear The Hidden Bay Project contains the sixth largest undeveloped uranium resource in the Athabasca Basin. Cumulative Expenditures As at December 31, 2013 Exploration C$59.9 million Development C$ 6.8 million Future Work Additional greenfields drilling exploration at Hidden Bay has been deferred temporarily until market conditions improve. Hidden Bay - Overview - 25 -
  • 26. TSX: UEX www.uex-corporation.com The February 2011 N.I. 43-101 Preliminary Assessment Technical Report (“PA”) prepared by SRK Consulting (Canada) Inc. recommends that the project be advanced to a preliminary feasibility level, and that this next phase of study also include UEX’s West Bear Deposit. These results are included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. The PA utilized cut-off grades calculated on the basis of $60 (US) per lb of U3O8 and estimated 16.6 million lbs of U3O8 could be extracted over a seven-year mine life. Base Case economics at $60 (US) per lb of U3O8: Price U3O8 (per lb) Pre-Tax (Base Case) (1) EBIT (C$ millions) NPV5% (C$ millions) IRR (%) $60 (US) 246 163 42 “EBIT” Earnings before interest and taxes “IRR” Internal rate of return “NPV5%” Net present value (5% discount rate) The Preliminary Assessment Technical Report is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. (1) Projects in the mining sector have experienced rising costs, including rising capital and operating costs, during the past few years. Rising capital and operating costs would, in the absence of other changes, negatively impact EBIT, NPV and IRR which have been calculated based upon historical costs. Accordingly, readers should bear these factors in mind when reading the PA and should not place undue reliance on the PA. Horseshoe and Raven Economics - 26 -
  • 27. TSX: UEX www.uex-corporation.com Uranium processing and tailings management, as envisioned in the PA, would be conducted through a toll arrangement* at one of two milling facilities located near Horseshoe and Raven: The Rabbit Lake Mill within 4 km, operated by Cameco The McClean Lake Mill within 22 km, operated by AREVA The PA has focused on Cameco’s Rabbit Lake Mill as it has excess capacity and is the closer of the two facilities. The Hidden Bay Project has opportunities for the improvement of economics, including: Expansion of mineable tonnes due to an increase in U3O8 price which would result in a lower cut-off grade and thus the conversion of a higher proportion of the existing resource base to reserves; Expansion of mineable tonnes through discovery of additional resources at other locations on the Hidden Bay property; and Inclusion of UEX’s West Bear Deposit in the overall project mine plan and economics. * Toll milling utilizes the excess capacity of an existing mill to process uranium ore, and is often a cost-effective alternative to constructing a new milling facility. Horseshoe and Raven Economics - 27 -
  • 28. TSX: UEX www.uex-corporation.com UEX is focused on advancing the deposits at Horseshoe and Raven through pre-feasibility and ultimately to feasibility level to assess the potential economics and viability of mining the deposits. Results from the July 2009 N.I. 43-101 mineral resource estimate prepared by Golder Associates Ltd. are shown in the table below. This resource is included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. Deposit Indicated Resources at 0.05% U3O8 cut-off Inferred Resources at 0.05% U3O8 cut-off Tonnes U3O8 (%) U3O8 (lbs) Tonnes U3O8 (%) U3O8 (lbs) Horseshoe 5,119,700 0.203 22,895,000 287,000 0.166 1,049,000 Raven 5,173,900 0.107 12,149,000 822,200 0.092 1,666,000 Total 10,293,600 0.155 35,044,000 1,109,200 0.111 2,715,000 Horseshoe and Raven Resources - 28 -
  • 29. TSX: UEX www.uex-corporation.com Horseshoe and Raven Deposits The Horseshoe and Raven Deposits lie in overall competent and impermeable quartzite, arkosic quartzite and calc-arkosic gneiss host rocks with no overlying Athabasca sandstone cover, highly favourable conditions for mining in the Athabasca Basin. Vertical cross sections of the Horseshoe and Raven Deposits are shown above. - 29 -
  • 30. TSX: UEX www.uex-corporation.com Horseshoe and Raven Mineralization Nodular pitchblende rimmed by boltwoodite Pitchblende in hematite-clay Late yellow boltwoodite-uranophane HU-16 high grade intercept: 12.35 m @ 4.53% U3O8 - 30 -
  • 31. TSX: UEX www.uex-corporation.com Results from the January 2009 N.I. 43-101 mineral resource estimate for the West Bear Deposit prepared by Golder Associates Ltd. are as follows: ‒78,900 tonnes grading 0.908% U3O8 in the Indicated category containing 1,579,000 pounds U3O8 at a cut-off grade of 0.05% U3O8. ‒All resources are within 35 m of surface. This resource is included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX’s profile at www.sedar.com. WEST BEAR RESOURCES - 31 - 100% owned
  • 32. TSX: UEX www.uex-corporation.com The West Bear Deposit is a classic, unconformity-hosted uranium deposit developed under shallow Athabasca sandstone cover above a conductive graphitic gneiss unit. The near-surface nature of the mineralization is amenable to shallow open-pit mining. WEST BEAR DEPOSIT - 32 - 35 m
  • 33. TSX: UEX www.uex-corporation.com Second largest undeveloped uranium resource in Canada’s Athabasca Basin 49.1% owned by UEX in partnership with AREVA Resources Canada Inc. Kianna, Anne, Colette and 58B contain an estimated 67.7 million lbs U3O8 Indicated and 28.2 million lbs U3O8 Inferred mineral resources(1) Potential to grow our interest in known resources by up to 0.9% and our interest by up to 49.9% in future resources discovered by funding additional exploration at Shea Creek beyond the budgets proposed by the project operator Shea Creek resources are open in almost every direction and have excellent potential for significant expansion as exploration continues Sixth largest undeveloped uranium resource in the Athabasca Basin 100% owned by UEX Corporation Positive Preliminary Assessment Project will be advanced further when uranium commodity price justifies Horseshoe, Raven and West Bear are host to an estimated 36.6 million lbs U3O8 Indicated and 2.7 million lbs U3O8 Inferred mineral resources(2) Infrastructure near Hidden Bay is well developed, with two operating uranium ore processing facilities in the local area Shea Creek Hidden Bay (1) See “Shea Creek - Resources” on page 14 for % U3O8 grades and % U3O8 cut-off. (2) See “Horseshoe & Raven Resources” on page 28 for % U3O8 grades and % U3O8 cut-off. Project Summary - 33 -
  • 34. TSX: UEX www.uex-corporation.com Our primary objectives: To continue the exploration and development work required to delineate and develop economic uranium resources at the Shea Creek Project; To advance the development process at the Horseshoe, Raven and West Bear uranium deposits to a production decision; To maintain, explore and advance to discovery our other uranium projects; and To pursue a diversified portfolio of uranium projects from early exploration through to development and production, which may include outright property acquisitions or other business combinations. Growth Strategy - 34 -
  • 35. TSX: UEX www.uex-corporation.com Shea Creek Expansion of mineral resources into deposits of global significance Hidden Bay Advancing toward a production decision Looking Ahead - 35 -
  • 36. PRESENTATION ELEMENTS For more information: UEX Corporation Suite 1007 – 808 Nelson Street Vancouver, BC V6Z 2H2 www.uex-corporation.com Investor and Media Inquiries Contact: Roger Lemaitre, President & CEO +1 (604) 669-2349 uex@uex-corporation.com TSX: UEX UEXCF.PK Frankfurt: UXO.F International OTC Markets