PataguppaPataguppa
BridgeBridge
Location of the Proposed Bridge
20/6/2016 ACS kumar 4
Ariel View of Project Location
Proposed New
Bridge
Towards Hosanagara
Towards Sagara
20/6/2016 ACS kumar 5
Existing facility:
A Stone masonry arch bridge of 4 spans of
15m in the year 1884 (132year old bridge with open
foundation) .
1940 the bridge was submerged due to the
construction of dam at Hirebhaskara for power
generation.
the height of the bridge was raised to 1783 feet
from 1769 feet by constructing the composite structure
over the arch bridge.
1964 when the Govt. has constructed
Linganamakki dam across Sharavathi River. The
maximum height of water that can be stored at the
Linganamakki dam is 1819 feet leaving the bridge got
completely submerged during full flow of water
20/6/2016 ACS kumar 6
View of Collapsed Bridge
20/6/2016 ACS kumar 7
View of Bridge Location from Hosanagara side during low water
PROPOSED
BRIDGE ALIGNMENT
20/6/2016
8
View of Collapsed Bridge
20/6/2016 ACS kumar 9
20/6/2016 ACS kumar 10
20/6/2016 ACS kumar 11
20/6/2016 ACS kumar 12
Carriageway Live Loads
a) One / Two lanes of IRC Class A loading.
b) One lane of IRC Class 70R loading (Wheeled / Tracked).
Horizontal Forces due to Water Currents
as per clause 213 of IRC: 6-2000.
Seismic Loading
Seismic forces are considered as per IRC: 6-2000.
Wind Loading
wind at right angles to the bridge or 65 % of right angle to the bridge and
35% along the traffic as per clause 212 of IRC: 6—2000.
Temperature Loading
as per Clause 218 of IRC: 6- 2000.
Earth Presuure
Water current
Wave pressure for the substructure based on the flowing water current has
been considered v=2.00m/sec assumed
Buoyancy
Uplift due to buoyancy considered in accordance with cl. 216 of IRC:6
20/6/2016 ACS kumar 13
Height earth pressure in t Moment in t-m Force for 5.50m
6 4.44 23.8 79.92
7 5.1837 48.1 108.8577
8 5.92163 71.6 142.11912
9 6.666 102.1 179.982
10 7.4437 140.1 223.311
12.5 8.33 273.3 312.375
55.82775
Self weight of pier P8 up to pile bottom=147.35t 78.09375
20/6/2016 ACS kumar 14
20/6/2016 ACS kumar 15
VIEW OF LEANED PIER P8
20/6/2016 ACS kumar 16
20/6/2016 ACS kumar 17
OVER ALL VIEW OF P8 PIER WHEN LEANED TOWARDS UPSTREAM SIDE
20/6/2016 ACS kumar 18
Pile work for P8 was completed during may 2013 and Pier was standing and
intact for two years, But on23/06/2015 the pile started tilting and fell down
on 26/06/2015.
20/6/2016 ACS kumar 19
20/6/2016 ACS kumar 20
20/6/2016 ACS kumar 21
20/6/2016 ACS kumar 22
20/6/2016 ACS kumar 23
RL 547.00M
WATER STANDING BELOW PILE CAP
BED LEVEL 541 .852M
20/6/2016 ACS kumar 24
20/6/2016 ACS kumar 25
20/6/2016 ACS kumar 26
20/6/2016 ACS kumar 27
20/6/2016 ACS kumar 28
20/6/2016 ACS kumar 29
Events occurred since 22/06/2015 to 26/06/2015
•Height of embankment constructed for service road (about
10.50mheight at Pier P8 location ie deepest point of river
bed and center of river) and island for facilitating for driving
of pile and movement of man ,machinery and material for
construction activity was intact and pier P8 was standing
and stable for 2 years after casting pier cap.
•The bund has breached on 22/06/2015 at the location of
pier P8 due to following reasons
due to heavy rain fall in the catchment area in the order of
300 to 400mm from 20/06/2015 to 22/06/2016
20/6/2016 ACS kumar 30
Since the embankment for service road is a
temporary structure, normally the
embankment would not be designed for long
service, thereby side slopes were not designed
for the height of embankment constructed at
work site and slope protection work was not
carried out.
Since the bridge across back water of
Linganamakki dam , the minimum water level
at bridge location being 4.00m from lowest
bed level the embankment could not be
compacted as per required specification.
20/6/2016 ACS kumar 31
The vent way provided for inflow was very
much smaller than the required and as
indicated in above table, the 900mm dia of 5
rows were provided during 2011 and there are
more chances of choking up of these vents ,
thereby it leads to rising of water level on U/S
of bund due to heavy rains in the catchment .
The failure/breach of bund may be due to
internal seepage, slope failure at weak zone
where the pipes were laid at gaurge portion of
river .
The piles of this project were designed as
compression piles to transfer the load coming
from the structure.
20/6/2016 ACS kumar 32
Stage1. On 22/06/2015
The bank and the bed of the river erroded due to
breaching of earthen embankment , and from photo it
can be observed that the soil below the pile cap was
also carried awy by the flash floods. Due to this
accidental event , the soil on one side of the pier was
standing for a considerable height in saturated
condition, which caused the pier unstable due to
destabilising moment acting on pier for a width of
6.00m and height of about 8 to 10m. The pile has
started leaning in the direction of destabilising
moment.
20/6/2016 ACS kumar 33
Stage 2. On 23/06/2015
On 23/06/2015 morining it was observed by
the field people that, pile was leaning towards
Pier P7 considerably, thereby the eccentricity
of pier mass is shifted away from the CG of
pile group . Due to this the additional
destabilising moment added to the moment of
earten bund.There by leaning of pier is
increased due to heavy rain fall is continued
on 23/06/2015.
20/6/2016 ACS kumar 34
Stage 2a. On 24/06/2015 and 25/06/2015
Continuity of leaning of pier P8 was in
progress, since the pier was constructed with
pile foundation and reportedly piles were
socketted into the rock, the pier might have
stood for almost 3 days, otherwise there was a
sudden collapse of pier due to reasons
mentioned below.
20/6/2016 ACS kumar 35
Stage3. On 26/06/2016
On 26/06/2015 finally the pier P8 has fell in the river
due to
the erosion of bed below the pile cap , the piles
towards water became unstable,
destabilising moment due to the enormous earth
pressure,
There are no stabilising moments .
Shifting of CG of pier mass due to tilting.
Tendency of flow of soil along with water towards
deep point, ie; from the side of P9 towards deep point
of river, additional force exerted on the P8.
20/6/2016 ACS kumar 36
Conclusion:
Due to above reasons and natural
calamity the pier has fell before loading
with super structure.
20/6/2016 ACS kumar 37
20/6/2016 ACS kumar 38
20/6/2016 ACS kumar 39
Thank you

More Related Content

Viewers also liked

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
Ashwath Sriram
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
Ashwath Sriram
 

Viewers also liked (8)

Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
Interlinking rivers 2 - Interlinking Indian Rivers - Short Presentation 1 - R...
 
River interlinking
River interlinkingRiver interlinking
River interlinking
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
Interlinking of rivers in India
Interlinking of rivers in IndiaInterlinking of rivers in India
Interlinking of rivers in India
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 

Similar to PPT For P8 (7)

Sbhep vivek kumar
Sbhep vivek kumarSbhep vivek kumar
Sbhep vivek kumar
 
Bridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnnBridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnn
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
Project report
Project reportProject report
Project report
 
Safety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete coreSafety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete core
 
injo slip update
injo slip updateinjo slip update
injo slip update
 
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptxANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
 

PPT For P8

  • 2. 20/6/2016 ACS kumar 2 PRESENTED BY A.C.SHIVAKUMAR
  • 3. 20/6/2016 ACS kumar 3 PataguppaPataguppa BridgeBridge Location of the Proposed Bridge
  • 4. 20/6/2016 ACS kumar 4 Ariel View of Project Location Proposed New Bridge Towards Hosanagara Towards Sagara
  • 5. 20/6/2016 ACS kumar 5 Existing facility: A Stone masonry arch bridge of 4 spans of 15m in the year 1884 (132year old bridge with open foundation) . 1940 the bridge was submerged due to the construction of dam at Hirebhaskara for power generation. the height of the bridge was raised to 1783 feet from 1769 feet by constructing the composite structure over the arch bridge. 1964 when the Govt. has constructed Linganamakki dam across Sharavathi River. The maximum height of water that can be stored at the Linganamakki dam is 1819 feet leaving the bridge got completely submerged during full flow of water
  • 6. 20/6/2016 ACS kumar 6 View of Collapsed Bridge
  • 7. 20/6/2016 ACS kumar 7 View of Bridge Location from Hosanagara side during low water PROPOSED BRIDGE ALIGNMENT
  • 12. 20/6/2016 ACS kumar 12 Carriageway Live Loads a) One / Two lanes of IRC Class A loading. b) One lane of IRC Class 70R loading (Wheeled / Tracked). Horizontal Forces due to Water Currents as per clause 213 of IRC: 6-2000. Seismic Loading Seismic forces are considered as per IRC: 6-2000. Wind Loading wind at right angles to the bridge or 65 % of right angle to the bridge and 35% along the traffic as per clause 212 of IRC: 6—2000. Temperature Loading as per Clause 218 of IRC: 6- 2000. Earth Presuure Water current Wave pressure for the substructure based on the flowing water current has been considered v=2.00m/sec assumed Buoyancy Uplift due to buoyancy considered in accordance with cl. 216 of IRC:6
  • 13. 20/6/2016 ACS kumar 13 Height earth pressure in t Moment in t-m Force for 5.50m 6 4.44 23.8 79.92 7 5.1837 48.1 108.8577 8 5.92163 71.6 142.11912 9 6.666 102.1 179.982 10 7.4437 140.1 223.311 12.5 8.33 273.3 312.375 55.82775 Self weight of pier P8 up to pile bottom=147.35t 78.09375
  • 15. 20/6/2016 ACS kumar 15 VIEW OF LEANED PIER P8
  • 17. 20/6/2016 ACS kumar 17 OVER ALL VIEW OF P8 PIER WHEN LEANED TOWARDS UPSTREAM SIDE
  • 18. 20/6/2016 ACS kumar 18 Pile work for P8 was completed during may 2013 and Pier was standing and intact for two years, But on23/06/2015 the pile started tilting and fell down on 26/06/2015.
  • 23. 20/6/2016 ACS kumar 23 RL 547.00M WATER STANDING BELOW PILE CAP BED LEVEL 541 .852M
  • 29. 20/6/2016 ACS kumar 29 Events occurred since 22/06/2015 to 26/06/2015 •Height of embankment constructed for service road (about 10.50mheight at Pier P8 location ie deepest point of river bed and center of river) and island for facilitating for driving of pile and movement of man ,machinery and material for construction activity was intact and pier P8 was standing and stable for 2 years after casting pier cap. •The bund has breached on 22/06/2015 at the location of pier P8 due to following reasons due to heavy rain fall in the catchment area in the order of 300 to 400mm from 20/06/2015 to 22/06/2016
  • 30. 20/6/2016 ACS kumar 30 Since the embankment for service road is a temporary structure, normally the embankment would not be designed for long service, thereby side slopes were not designed for the height of embankment constructed at work site and slope protection work was not carried out. Since the bridge across back water of Linganamakki dam , the minimum water level at bridge location being 4.00m from lowest bed level the embankment could not be compacted as per required specification.
  • 31. 20/6/2016 ACS kumar 31 The vent way provided for inflow was very much smaller than the required and as indicated in above table, the 900mm dia of 5 rows were provided during 2011 and there are more chances of choking up of these vents , thereby it leads to rising of water level on U/S of bund due to heavy rains in the catchment . The failure/breach of bund may be due to internal seepage, slope failure at weak zone where the pipes were laid at gaurge portion of river . The piles of this project were designed as compression piles to transfer the load coming from the structure.
  • 32. 20/6/2016 ACS kumar 32 Stage1. On 22/06/2015 The bank and the bed of the river erroded due to breaching of earthen embankment , and from photo it can be observed that the soil below the pile cap was also carried awy by the flash floods. Due to this accidental event , the soil on one side of the pier was standing for a considerable height in saturated condition, which caused the pier unstable due to destabilising moment acting on pier for a width of 6.00m and height of about 8 to 10m. The pile has started leaning in the direction of destabilising moment.
  • 33. 20/6/2016 ACS kumar 33 Stage 2. On 23/06/2015 On 23/06/2015 morining it was observed by the field people that, pile was leaning towards Pier P7 considerably, thereby the eccentricity of pier mass is shifted away from the CG of pile group . Due to this the additional destabilising moment added to the moment of earten bund.There by leaning of pier is increased due to heavy rain fall is continued on 23/06/2015.
  • 34. 20/6/2016 ACS kumar 34 Stage 2a. On 24/06/2015 and 25/06/2015 Continuity of leaning of pier P8 was in progress, since the pier was constructed with pile foundation and reportedly piles were socketted into the rock, the pier might have stood for almost 3 days, otherwise there was a sudden collapse of pier due to reasons mentioned below.
  • 35. 20/6/2016 ACS kumar 35 Stage3. On 26/06/2016 On 26/06/2015 finally the pier P8 has fell in the river due to the erosion of bed below the pile cap , the piles towards water became unstable, destabilising moment due to the enormous earth pressure, There are no stabilising moments . Shifting of CG of pier mass due to tilting. Tendency of flow of soil along with water towards deep point, ie; from the side of P9 towards deep point of river, additional force exerted on the P8.
  • 36. 20/6/2016 ACS kumar 36 Conclusion: Due to above reasons and natural calamity the pier has fell before loading with super structure.