Your SlideShare is downloading. ×
שרשרת הערך ההנדסית להקמת תחנות כוח סולאריות - ברן רביב
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

שרשרת הערך ההנדסית להקמת תחנות כוח סולאריות - ברן רביב

497
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
497
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Renewable Energy Division E.P.C ServicesPHOTOVOLTAIC POWER PLANT
  • 2. ‫הצגת מבנה תהליכי הנדסי לתכנון והקמת תחנת כוח‬ ‫סולארית בישראל‬
  • 3. ‫ככלל :‬ ‫חברת ‪ EPC‬ישראלית בתחום תחנות‬ ‫הכוח הסולאריות נשענת על‬ ‫חברת ‪EPC‬‬ ‫שלושה יסודות עיקריים :‬ ‫להקמת תחנות כוח‬ ‫סולאריות בישראל‬ ‫ידע הנדסי .‬ ‫1.‬ ‫איתנות פיננסית .‬ ‫2.‬ ‫איתנות פיננסית‬ ‫ובנקאית מוכחת‬ ‫יכולת וניסיון ביצוע פרויקטים‬ ‫3.‬ ‫ידע וניסיון‬ ‫יכולות ביצוע‬ ‫הנדסי‬ ‫במתכונת ‪.EPC‬‬ ‫מוכחות בפרויקטי‬ ‫מוכח בתחום‬‫‪EPC‬גדולים בארץ‬
  • 4. ‫ביצוע סיורי היתכנות הנדסיים בשטח האתר המסוכמים בדוח מפורט הכולל סטאטוס רישוי ,‬ ‫קונסטרוקטיבי , חשמלי , סולארי והערכת קיבולת ייצור משוערת .‬ ‫הכנת בקשה לרישיון מותנה לייצור חשמל והגשתה לרשות החשמל כולל ליווי ובתמיכה‬ ‫בתיק עד קבלת הרישיון.‬‫‪E‬‬ ‫ניהול וביצוע כול תהליכי הרישוי הנדרשים לקבלת היתר בנייה ועבודה‬ ‫נדרשים להקמת התחנה – עד קבלת ההיתר .‬ ‫ביצוע תכנון הנדסי מפורט חתום ע"י מהנדסים מורשים בארץ‬ ‫וע"י מהנדסי חברת הידע המלווה . התכנון הינו קונסטרוקטיבי , חשמלי וסולארי .‬ ‫ביצוע מודל פיננסי למערכת , הכולל הערכת ייצור משוערת על בסיס‬ ‫התכנון ההנדסי המלא ואחריות התפוקות .‬
  • 5. ‫הגדרת אסטרטגיית הרכש בפרויקט וחלוקת אחריות עם הלקוח הסופי‬ ‫הכנת תוכנית רכש מלאה תואמת את המודל הפיננסי והתקציב‬‫‪p‬‬ ‫ביצוע רכש פרויקטי עם כוח קנייה גדול ומשותף‬ ‫חתימה וניהול של הסכמי אספקה ואחריות לכל אורך "חיי המערכת"‬ ‫ניהול לוגיסטי מלא באתר ובמחסנים לוגיסטיים של החברה‬
  • 6. ‫תמיכה וליווי בסגירות הפיננסיות והמימון של הלקוח לפרויקט כולל מתן בטחונות‬ ‫ביצוע ובטחונות לתפוקות עפ"י הנדרש .‬ ‫עבודות הקמה של האתר והמערכת ,משלב חשוף ויישור השטח ועד לחיבור והפעלת‬ ‫המערכת ברשת החשמל הארצית.‬‫‪C‬‬ ‫בדיקות איכות ותפוקות המערכת בתקופת החיים הראשונה כולל מענה "בדק"‬ ‫בשטח האתר לחודשי ההפעלה הראשונים .‬ ‫מסירת ספר הפעלה למערכת כולל הדרכות מקצועיות של צוות ההפעלה‬ ‫והתחזוקה של האתר .‬ ‫‪ O&M‬מתן שירותי משטרי תחזוקה‬
  • 7. www.barangroup.com THANK YOU!For more information, please contact:Ofer FrankoC.E.OBARAN RAVIV LTD.OFRANKO@barviv.co.il
  • 8. Kibbutz Mesuot Izhak Production Reports Baran Raviv Ltd Kibbutz Mesuot Izhak Baran Raviv LtdSite Entrance Locations:The main entrance into the Kibbutsis on the south by Road #3.Non-Constructible areas:Cowsheds F,G and H are with roofs made of asbestos. Kibbutz Mesuot IzhakPV arrays on these roofs will be constructible after a dismantling process of the asbestos Production Reports Baran Raviv Ltd and a new roof erection on the existing structure.Cowshed B is an openable roof .PV arrays on this roof will be constructible only on the fixed part of it.Shading Items:Next to every Henhouse, food tank are placed and cause some shading on these roofs (see the system layout)Noteworthy neighbors:Albad factory (Textile Industry) – 660 meters from PV site.Road #3 – 500m from PV sitePotable water : the site area is covered by potable water.Site Elevation: +70mSite Coordinate : 31°42’ N / 34°41’ E Kibbutz Mesuot Izhak Kibbutz Mesuot Izhak System Production Baran Raviv Ltd Baran Raviv Ltd kWh 140,000 HIGH VOLTAGE SYSTEM kWh 130,000 HIGH VOLTAGE SYSTEM Loads on Cowshed No- A 130,000 120,000 120,000 110,000 110,000 100,000 100,000 90,000 90,000 80,000 80,000 70,000 70,000 60,000 60,000 50,000 50,000 40,000 40,000 30,000 30,000 20,000 20,000 10,000 10,000 0 0 Jan Feb Apr May Jun Jul Aug Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Time Period 1/ 1/ - 31/12/ Time Period 1/ 1/ - 31/12/ Energy from Inverter (AC) 1,246,660 kWh Energy Produced (AC) 1. TG 820,564 kWh Energy from Inverter (AC) 1,151,218 kWh Energy Produced (AC) 1. TG 258,437 kWh Energy Produced (AC) 2. TG 120,671 kWh Energy Produced (AC) 3. TG 305,425 kWh Energy Produced (AC) 2. TG 281,931 kWh Energy Produced (AC) 3. TG 610,850 kWh HIGH VOLTAGE SYSTEM Cowshed E, I, &J kWh Cowshed A, C, &D 130,000 120,000 110,000 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Time Period 1/ 1/ - 31/12/ Energy from Inverter (AC) 1,205,358 kWh Energy Produced (AC) 1. TG 337,879 kWh Energy Produced (AC) 2. TG 289,611 kWh Energy Produced (AC) 3. TG 289,611 kWh Energy Produced (AC) 4. TG 288,257 kWh Henhouse 3,4,5,&6
  • 9. Ground Mounted PV System Baran Raviv Ltd Baran Raviv Ltd ISRAEL Ground Mounted PV SystemExisting Structures with roof-mounted PV System Baran Raviv Ltd Baran Raviv Ltd Baran Raviv Ltd. Baran Raviv Ltd. Example of Loads Calculation on a roof-mounted PV System - For the example we will assume that the building is empty (φ=0) α = 10º (Roof angle) ZONE A: Cp,net = +0.7/-0.7 ZONE B: Cp,net = +1.8/-1.5 ZONE C: Cp,net = +1.4/-1.4 ZONE D: Cp,net = +0.4/-1.4 From here we have the following Loads: W(A) = +469/-469 N/m^2 W(B) = +1205/-1004 N/m^2 W(C) = +973/-937 N/m^2 W(D) = +268/-937 N/m^2
  • 10. Corporate Record Baran Group Ltd. Worldwide PresenceIsrael’s largest engineering firm, leading the Israeli EPCM Market  Baran Group Ltd.Established 1979  EUROPE ASIA AFRICA AMERICA Israel• Thailand• South Africa• USA – •Core Business – EPCM (Engineering, Procurement, Construction and  Russia• Vietnam• Congo Barzaville• Coast to coast nationwide Management) Germany• Uzbekistan• Congo DRC• deployment.Public company: traded on TASE - since 1992  Romania• Nepal• Uganda• Canada – Toronto, Montreal• Bulgaria• Kenya•1995 – 2006: Average revenue growth per annum - 15%  Hungary•1,850 Employees worldwide in over 1,000 projects and more than 250  customersTurnovers – 2007: $402, 2008: $366M, 2009: $271M ($309M) Shareholders Equity (Dec. 2009): $64,000,000 US Ranking 1st by D&B as the largest Project Management  Engineering Firms in Israel for 2007, 2008, 2009 Organization Chart Baran Group Ltd. Revenue in $M US BARAN $400 April, 2010 GROUP LTD $350 $300 $250 Engineering & $200 Communication Russia Petro $150 Division Projects Holdings Division Division $100 Division $50 $0 Est. 2010 Foodstuff Technologies Real Estate BARAN is Qualified for the highest quality standards in all • Marketing & Segment Recycling Segment Segment three categories - ISO 9001 ISO 14001 Israeli Standard 18001 Quality Management Environment Management Safety Management System System System
  • 11. Westmontage Kabel und Netzwerk GmbH Introduction January 2011
  • 12. Westmontage Hannover/ Munster Berlin-Schönefeld Essen Königs WusterhausenVerviers Rhein Main Weinheim Headquarter Regional-Office Project-Office 12
  • 13. Westmontage * after elimination of the mobile division 13
  • 14. Westmontage business fields Photovoltaic Site acquisition  Property development  Project management  Planning & Design  Turnkey photovoltaic plant solutions  Turnkey access to the energy provider network  Maintenance 
  • 15. Greenfield Power Plant Mimon CZRam foundation Ram foundation
  • 16. Greenfield Power Plant Mimon CZModule tables