Instructions to Fill-in Project Document
A. Project Information:
• Indicate name and location of the project;
• Provide name of District/Province;
• Attach a map of the area, clearly indicating the Project location.
• Contact Person’s information;
• Project Start and end dates;
• Cost of the project;
• Information regarding organizations/authorities responsible for
sponsoring, execution, operation and maintenance.
B. Organizational Background;
• Provide a brief background of the implementing organization;
• Provide collaborative history if any;
• What prior experience the organization has in the project area?
C. Project Description
1. Goal & Objectives:
• The Overall Goal and Objectives of the project be
explained here;
• Indicate objectives of the project and develop a
linkage between proposed project and the sector to
which it contributes;
• Where possible, the project objectives should be
alligned with women development/empowerment,
Govt’s policies concerning gender equality and
attainment of MDGs.
2. Project Rationale, Description & Justification:
• Provide project background and rationale;
• Describe the project and indicate existing facilities (for male &
female separately) in the area and justify the establishment of
the Project;
• Provide estimated number of male & female beneficiary of the
project;
• Provide technical parameters of the project in quantifiable terms.
Also discuss technology aspect of the Project;
• Provide the details of civil works, equipment, I.T infrastructure,
and other physical facilities required for the project.
• Indicate governance issues of the sector relevant to the project
and strategy to resolve them.
3. Project Strategic Relevance:
• Indicate Primary Thematic Area;
• Indicate secondary thematic area.
In addition to above, the following sector
specific information be provided
Social Aspects with Gender Perspective ;
• Effect of project on the quality of life of residents of the
area.
• Gender integration in project goal, purpose, objectives and
activities;
• Gender disaggregated data is given in the project
document;
• Gender based employment opportunities, closely linked to
income distribution;
• Has sufficient budget been assigned for the development of
both men and women;
• Has women participation been given due consideration
during planning and implementation stages.
Education, Training and Manpower
• Give student-teacher ratio for the project and the
national average for the proposed level of education.
• Year-wise proposed enrolment of the institution for 5
years.
• Provide Teachers strength in relevant discipline in
case of expansion of facilities.
• Indicate the extent of library and laboratory facilities
available in case of secondary, college and
university education.
• Provide details of technical staff required for
operation & maintenance of laboratories.
6
Research
• Indicate benefits of the research to the economy.
• Mention number of studies/papers to be produced.
• Indicate whether these studies would result in commercial
application of the process developed (if applicable);
• Linkages with industry.
7
For I.T. project
• Provide Backbone switch & Router specification;
• Distribution & Edge Switches specs;
• Networking cable system and specs;
• Networking/LAN diagram;
• Software requirements;
• Availability of services (DSL, Dial-ups, wireless)
Health and Family Planning Projects
• Indicate whether the proposed facilities are
preventive or curative.
• Population/Patients-Doctor Ratio;
• Beds per ward
• Bifurcate the facilities between:
– In-door
– Out door; and
– Department-wise
Agriculture Sector Projects
• Soils in the region of the project.
• Potential for agricultural development.
• Availability of water, both natural and supplied.
• Crop varieties and livestock species.
• Potential and desirability of mechanization.
• Pests epidemic and the kinds of control .
• Determine the potential yields.
• Cropping pattern & possibilities for multiple
cropping.
• Marketing and storage facilities
Livestock Projects
• Give the livestock situation of the country and
mention any problems connected therewith;
• Potential for Livestock development.
• Present and future herd size;
• Land required per animal for feed.
• Their species age characteristics and production
capacity;
• Determine the potential of livestock breeding.
• Vaccination issues.
Other Production Sector Projects
Fisheries Projects:
Give area for fishing and the legal rights to that
area; the availability of trawlers; amount and type
of fish likely to be available.
Forestry Projects:
Indicate nature and state of existing forests their
growth rate and any problems connected
therewith. Give details of species; rotation and
anticipated rotation and volume yield. Indicate
availability of complementary services, e.g.,
access roads, saw mills etc.
Water Supply & Sewerage Projects
• Present and projected population and water
availability/ demand.
• Indicate source and water availability (mgd) during
next 5,10,20 years.
• For waste water/sewerage, provide present and
future disposal requirements, gaps if any and
proposed treatment methods and capacity.
• Indicate present and proposed per capita water
supply in the project area, comparison be made with
water supply in similar localities.
D. Project Budget & Annual Phasing:
1. Capital cost estimates
• Basis of determining the capital cost be provided. It includes market
survey, estimation on the basis of previous work done;
• Abstract of cost.
2. Physical Phasing:
• Provide year-wise estimation of Physical activities by main
components as per following:
Component-wise, year-wise physical phasing
Items/Description Unit Year I Year II Year III Total
A.
B.
C.
3. Financial Phasing:
Capital cost be worked out on the basis of each item of work as
stated above and provide information as per following.
Year-wise/component-wise financial phasing
Items Year I Year II Year III____ Total_
Total Local FEC Total Local FEC Total Local FEC Total Local FEC
A.
B.
C.
D.
Total
4. Annual Operating Cost;
• Item-wise annual operating cost for 5 years. .
5. Demand Supply Analysis
• Existing capacity of services and its supply
• Projected demand for ten years
• Capacity of projects being implemented both in the
Public & Private sector
• Supply – demand gap
• Designed capacity & output of the proposed project
06. Financial Plan
Sources of financing
(a)Equity:
Indicate the amount of equity to be financed from each source
• Federal Government
• Provincial Government
• Foreign Equity (indicate partner agency)
• NGO’s;
• Beneficiaries
(b) Debt:
• Indicate the Local & Foreign debt, Interest rate, Grace period and
repayment period for each loan separately. The loan repayment
schedule be also annexed.
c) Grants:
• Local and Foreign
07. Project Benefits/Costs Analysis:
• Financial: Income to the Project along with
assumptions.
• Social: Quantify benefit to the target Group
• Environmental: Environmental impact assessment
negative/ positive.
• Quantifiable output of the project
• Unit cost analysis
• Employment generation (direct and indirect)
• Impact of delays on project cost and viability
08.Implementation of the Project
a) Implementation Schedule
• Indicate starting and completion date of the project:
• Implementation time in months.
• Item-wise/year-wise implementation schedule in line
chart correlated with the phasing of physical
activities.
08.Implementation of the Project
b. Result Based Management (RBM) Indicators
• Indicate Result Based Management (RBM) framework indicators
in quantifiable terms in the following table.
Input Output
Outcome
Targeted
ImpactBaseline
Indicator
Targets at
Completion
9.Management Structure and Manpower Requirement
• Administrative arrangements for implementation of
the project.
• Manpower requirements during execution and
operation of the project be provided by
skills/profession.
• Job description, qualification, age and salary of each
job be provided.
10. Certificate
Prepared by _________________________
Name, Designation & Phone#
Checked by _________________________
Name, Designation & Phone#
Approved by _________________________
Name, Designation & Phone#

More Related Content

Similar to Project document for public sector

Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)hayat alishah
 
Rural Economic Development Application Tips
Rural Economic Development Application TipsRural Economic Development Application Tips
Rural Economic Development Application TipsStephen Morris Ec.D.
 
HRF-HEP request for qualifications for graphic design and other communication...
HRF-HEP request for qualifications for graphic design and other communication...HRF-HEP request for qualifications for graphic design and other communication...
HRF-HEP request for qualifications for graphic design and other communication...Sarah Lipuma
 
Department of City Planning - Community Planning Resources to Manhattan Commu...
Department of City Planning - Community Planning Resources to Manhattan Commu...Department of City Planning - Community Planning Resources to Manhattan Commu...
Department of City Planning - Community Planning Resources to Manhattan Commu...Gale A. Brewer
 
feasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdffeasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdfJainishBhagat2
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce
 
Leadership Essentials: Delivering Your Local Plan
Leadership Essentials: Delivering Your Local PlanLeadership Essentials: Delivering Your Local Plan
Leadership Essentials: Delivering Your Local PlanPAS_Team
 
Your Guide to Grant Writing - Helping your P&C to Attract Funding
Your Guide to Grant Writing - Helping your P&C to Attract FundingYour Guide to Grant Writing - Helping your P&C to Attract Funding
Your Guide to Grant Writing - Helping your P&C to Attract FundingPandCsQld
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility reportJignesh Ruperi
 
Writing an Effective RED Application
Writing an Effective RED ApplicationWriting an Effective RED Application
Writing an Effective RED ApplicationStephen Morris Ec.D.
 
Project in punjab
Project in punjabProject in punjab
Project in punjabHuma Ilyas
 
Project Funding - 01-2009
Project Funding - 01-2009Project Funding - 01-2009
Project Funding - 01-2009Waseem Khan, PG
 
Project Proposal Writing.pptx
Project Proposal Writing.pptxProject Proposal Writing.pptx
Project Proposal Writing.pptxmuskanpudasainee
 
Learn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetLearn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetMorris County NJ
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
2013.04.25 Learning Sessions 6 - HITS Theatre
2013.04.25 Learning Sessions 6 - HITS Theatre2013.04.25 Learning Sessions 6 - HITS Theatre
2013.04.25 Learning Sessions 6 - HITS Theatrejvielman
 

Similar to Project document for public sector (20)

Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
Rural Economic Development Application Tips
Rural Economic Development Application TipsRural Economic Development Application Tips
Rural Economic Development Application Tips
 
Red application tips 2019 08
Red application tips 2019 08Red application tips 2019 08
Red application tips 2019 08
 
HRF-HEP request for qualifications for graphic design and other communication...
HRF-HEP request for qualifications for graphic design and other communication...HRF-HEP request for qualifications for graphic design and other communication...
HRF-HEP request for qualifications for graphic design and other communication...
 
Department of City Planning - Community Planning Resources to Manhattan Commu...
Department of City Planning - Community Planning Resources to Manhattan Commu...Department of City Planning - Community Planning Resources to Manhattan Commu...
Department of City Planning - Community Planning Resources to Manhattan Commu...
 
feasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdffeasibilityreport-131027121529-phpapp01 (1).pdf
feasibilityreport-131027121529-phpapp01 (1).pdf
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM ClassJim Proce - 2018 Capital Improvement Planning Process CPM Class
Jim Proce - 2018 Capital Improvement Planning Process CPM Class
 
Leadership Essentials: Delivering Your Local Plan
Leadership Essentials: Delivering Your Local PlanLeadership Essentials: Delivering Your Local Plan
Leadership Essentials: Delivering Your Local Plan
 
Your Guide to Grant Writing - Helping your P&C to Attract Funding
Your Guide to Grant Writing - Helping your P&C to Attract FundingYour Guide to Grant Writing - Helping your P&C to Attract Funding
Your Guide to Grant Writing - Helping your P&C to Attract Funding
 
Mine planning feasibility report
Mine planning feasibility reportMine planning feasibility report
Mine planning feasibility report
 
Writing an Effective RED Application
Writing an Effective RED ApplicationWriting an Effective RED Application
Writing an Effective RED Application
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Project Funding - 01-2009
Project Funding - 01-2009Project Funding - 01-2009
Project Funding - 01-2009
 
Project Proposal Writing.pptx
Project Proposal Writing.pptxProject Proposal Writing.pptx
Project Proposal Writing.pptx
 
Learn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital BudgetLearn About the Morris County NJ Capital Budget
Learn About the Morris County NJ Capital Budget
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
How to Write a Project Proposal
How to Write a Project ProposalHow to Write a Project Proposal
How to Write a Project Proposal
 
2013.04.25 Learning Sessions 6 - HITS Theatre
2013.04.25 Learning Sessions 6 - HITS Theatre2013.04.25 Learning Sessions 6 - HITS Theatre
2013.04.25 Learning Sessions 6 - HITS Theatre
 

More from Suhail Hussain

Participatory approaches to rural development
Participatory approaches to rural developmentParticipatory approaches to rural development
Participatory approaches to rural developmentSuhail Hussain
 
Livelihood and rural development
Livelihood and rural developmentLivelihood and rural development
Livelihood and rural developmentSuhail Hussain
 
Perspective on rural development
Perspective on rural developmentPerspective on rural development
Perspective on rural developmentSuhail Hussain
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and AnalysisSuhail Hussain
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of projectSuhail Hussain
 
Hand held Unit (HHU) a Pilot project of USAID
Hand held Unit (HHU) a Pilot project of USAIDHand held Unit (HHU) a Pilot project of USAID
Hand held Unit (HHU) a Pilot project of USAIDSuhail Hussain
 

More from Suhail Hussain (6)

Participatory approaches to rural development
Participatory approaches to rural developmentParticipatory approaches to rural development
Participatory approaches to rural development
 
Livelihood and rural development
Livelihood and rural developmentLivelihood and rural development
Livelihood and rural development
 
Perspective on rural development
Perspective on rural developmentPerspective on rural development
Perspective on rural development
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of project
 
Hand held Unit (HHU) a Pilot project of USAID
Hand held Unit (HHU) a Pilot project of USAIDHand held Unit (HHU) a Pilot project of USAID
Hand held Unit (HHU) a Pilot project of USAID
 

Recently uploaded

VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 

Recently uploaded (20)

VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 

Project document for public sector

  • 1. Instructions to Fill-in Project Document A. Project Information: • Indicate name and location of the project; • Provide name of District/Province; • Attach a map of the area, clearly indicating the Project location. • Contact Person’s information; • Project Start and end dates; • Cost of the project; • Information regarding organizations/authorities responsible for sponsoring, execution, operation and maintenance. B. Organizational Background; • Provide a brief background of the implementing organization; • Provide collaborative history if any; • What prior experience the organization has in the project area?
  • 2. C. Project Description 1. Goal & Objectives: • The Overall Goal and Objectives of the project be explained here; • Indicate objectives of the project and develop a linkage between proposed project and the sector to which it contributes; • Where possible, the project objectives should be alligned with women development/empowerment, Govt’s policies concerning gender equality and attainment of MDGs.
  • 3. 2. Project Rationale, Description & Justification: • Provide project background and rationale; • Describe the project and indicate existing facilities (for male & female separately) in the area and justify the establishment of the Project; • Provide estimated number of male & female beneficiary of the project; • Provide technical parameters of the project in quantifiable terms. Also discuss technology aspect of the Project; • Provide the details of civil works, equipment, I.T infrastructure, and other physical facilities required for the project. • Indicate governance issues of the sector relevant to the project and strategy to resolve them. 3. Project Strategic Relevance: • Indicate Primary Thematic Area; • Indicate secondary thematic area.
  • 4. In addition to above, the following sector specific information be provided Social Aspects with Gender Perspective ; • Effect of project on the quality of life of residents of the area. • Gender integration in project goal, purpose, objectives and activities; • Gender disaggregated data is given in the project document; • Gender based employment opportunities, closely linked to income distribution; • Has sufficient budget been assigned for the development of both men and women; • Has women participation been given due consideration during planning and implementation stages.
  • 5. Education, Training and Manpower • Give student-teacher ratio for the project and the national average for the proposed level of education. • Year-wise proposed enrolment of the institution for 5 years. • Provide Teachers strength in relevant discipline in case of expansion of facilities. • Indicate the extent of library and laboratory facilities available in case of secondary, college and university education. • Provide details of technical staff required for operation & maintenance of laboratories.
  • 6. 6 Research • Indicate benefits of the research to the economy. • Mention number of studies/papers to be produced. • Indicate whether these studies would result in commercial application of the process developed (if applicable); • Linkages with industry.
  • 7. 7 For I.T. project • Provide Backbone switch & Router specification; • Distribution & Edge Switches specs; • Networking cable system and specs; • Networking/LAN diagram; • Software requirements; • Availability of services (DSL, Dial-ups, wireless)
  • 8. Health and Family Planning Projects • Indicate whether the proposed facilities are preventive or curative. • Population/Patients-Doctor Ratio; • Beds per ward • Bifurcate the facilities between: – In-door – Out door; and – Department-wise
  • 9. Agriculture Sector Projects • Soils in the region of the project. • Potential for agricultural development. • Availability of water, both natural and supplied. • Crop varieties and livestock species. • Potential and desirability of mechanization. • Pests epidemic and the kinds of control . • Determine the potential yields. • Cropping pattern & possibilities for multiple cropping. • Marketing and storage facilities
  • 10. Livestock Projects • Give the livestock situation of the country and mention any problems connected therewith; • Potential for Livestock development. • Present and future herd size; • Land required per animal for feed. • Their species age characteristics and production capacity; • Determine the potential of livestock breeding. • Vaccination issues.
  • 11. Other Production Sector Projects Fisheries Projects: Give area for fishing and the legal rights to that area; the availability of trawlers; amount and type of fish likely to be available. Forestry Projects: Indicate nature and state of existing forests their growth rate and any problems connected therewith. Give details of species; rotation and anticipated rotation and volume yield. Indicate availability of complementary services, e.g., access roads, saw mills etc.
  • 12. Water Supply & Sewerage Projects • Present and projected population and water availability/ demand. • Indicate source and water availability (mgd) during next 5,10,20 years. • For waste water/sewerage, provide present and future disposal requirements, gaps if any and proposed treatment methods and capacity. • Indicate present and proposed per capita water supply in the project area, comparison be made with water supply in similar localities.
  • 13. D. Project Budget & Annual Phasing: 1. Capital cost estimates • Basis of determining the capital cost be provided. It includes market survey, estimation on the basis of previous work done; • Abstract of cost. 2. Physical Phasing: • Provide year-wise estimation of Physical activities by main components as per following: Component-wise, year-wise physical phasing Items/Description Unit Year I Year II Year III Total A. B. C.
  • 14. 3. Financial Phasing: Capital cost be worked out on the basis of each item of work as stated above and provide information as per following. Year-wise/component-wise financial phasing Items Year I Year II Year III____ Total_ Total Local FEC Total Local FEC Total Local FEC Total Local FEC A. B. C. D. Total
  • 15. 4. Annual Operating Cost; • Item-wise annual operating cost for 5 years. . 5. Demand Supply Analysis • Existing capacity of services and its supply • Projected demand for ten years • Capacity of projects being implemented both in the Public & Private sector • Supply – demand gap • Designed capacity & output of the proposed project
  • 16. 06. Financial Plan Sources of financing (a)Equity: Indicate the amount of equity to be financed from each source • Federal Government • Provincial Government • Foreign Equity (indicate partner agency) • NGO’s; • Beneficiaries (b) Debt: • Indicate the Local & Foreign debt, Interest rate, Grace period and repayment period for each loan separately. The loan repayment schedule be also annexed. c) Grants: • Local and Foreign
  • 17. 07. Project Benefits/Costs Analysis: • Financial: Income to the Project along with assumptions. • Social: Quantify benefit to the target Group • Environmental: Environmental impact assessment negative/ positive. • Quantifiable output of the project • Unit cost analysis • Employment generation (direct and indirect) • Impact of delays on project cost and viability
  • 18. 08.Implementation of the Project a) Implementation Schedule • Indicate starting and completion date of the project: • Implementation time in months. • Item-wise/year-wise implementation schedule in line chart correlated with the phasing of physical activities.
  • 19. 08.Implementation of the Project b. Result Based Management (RBM) Indicators • Indicate Result Based Management (RBM) framework indicators in quantifiable terms in the following table. Input Output Outcome Targeted ImpactBaseline Indicator Targets at Completion
  • 20. 9.Management Structure and Manpower Requirement • Administrative arrangements for implementation of the project. • Manpower requirements during execution and operation of the project be provided by skills/profession. • Job description, qualification, age and salary of each job be provided.
  • 21. 10. Certificate Prepared by _________________________ Name, Designation & Phone# Checked by _________________________ Name, Designation & Phone# Approved by _________________________ Name, Designation & Phone#