A Utility-Based
Analysis for Lexington
Avenue Subway
Ridership Rebalancing
Michael Frajman
doobneek
Nicholas Hudanich
2
Background
● Lexington Ave Subway = Most congested
subway line in North America
● Alternatives (2AS, M15, M1)
● Alleviation of 2AS Extension
● Crowded conditions consequences
○ Dwell times
○ Accident risk (3/day)
○ Crime
○ Public health: disease vector
https://comptroller.nyc.gov/wp-c ontent/uploa ds/documents/The-Human-C ost-of-Subway-Delays.pdf
3
Background
● Project: transit
improvements/investments on UES, and
the resulting mode shifts induced
○ Example: More frequent buses =
shift from subway?
● Create a model for current conditions
● Use model to anticipate changes under
these improvements
4
Model Summary
● Find rebalancing solutions to mitigate congestion on the Lexington Avenue
Subway. Consider the AM peak hour.
● Consider the utility of existing modes, perturb utilities as needed
● M15 bus, M1 bus, 2nd Avenue Subway, and the Lexington Avenue Subway
● Phase I: Collect data, formulate model for existing conditions
○ MTA entry data
○ Census population data
● User time cost coefficient determination
○ Utility function formulation
○ Chi Square minimization function
● Phase II: Use set constants to assess changes
○ Headway changes
○ Cost changes
○ New infrastructure
○ Less travel time to core
5
Data Collection
● Census block aggregation for single point
zone-based utility consideration
6
Data Collection
● Zones created to best represent set of
selections for transit that zone users have
● Example:
7
Data Collection
8
Data Collection
● Scaled to entries
9
Data Collection
● Subway entries
○ MTA daily weekday average
○ Halvorsen et al: L train estimate for
12% of daily load in peak hour, 8AM-
9AM
● Bus entries
○ Limited data
○ Use full line ridership, allocate to our
stations by population / total line
NTA population
10
Formulation
● Utility functions for each of the six zones, for each alternative
● Consider
○ Walking time cost (α)
○ Bus waiting time cost (β)
○ Bus travel time cost (γ)
○ Subway waiting time cost (δ)
○ Subway travel time cost (ε)
● Example: Zone 1
11
Formulation
● Excel optimization program
● Using given constants and “transit takers”, calculate Ps for each alternative in each
zone.
● Multiply by transit takers for total usage
● Calculate Chi Square of each of the 25 stations
● Minimize Chi Square as the objective
12
Solution (Current Conditions)
● Solved
13
Alternative 1
● M1 Bus headway reduced to 4 minutes (from 15)
14
Alternative 2
● M1 Bus headway reduced to 8 minutes (from 15)
15
Alternative 3
● M1/M15 Better Bus Lane Enforcement (-30% Ma, -20% M15)
16
Alternative 4
● M1 Bus headway reduced to 4 minutes (from 15)
+ Better Bus Lane Enforcement (-30% Ma, -20% M15)
17
Alternative 5
● 25% Improvement to Waiting Time Cost (Facilities)
18
Alternative 6
● 25% Improvement to Waiting Time Cost (Facilities)
+ Better Bus Lane Enforcement (-30% Ma, -20% M15)
19
Alternative 7
● 2nd Avenue Subway 2nd Phase Full Build
20
Alternative 8
● 2nd Avenue Subway 2nd Phase Full Build + Better Bus Lane Enforcement
21
Insights
● Short term: Better Bus Lane Enforcement
● Short term: Facilities improvement (Even
just M1 only)
● Long term: Second Avenue Subway Phase 2
● Not considered in this study / future study:
○ Rideshare
○ Cycling
○ Temporal variation (we assume flat
arrival for 1 hour)
https://www.cbsnews.com/pictures/building-nycs-second-ave-subwa y/
https://www.nyc.gov/html/brt/html/about/bus -lanes.shtml
22
Thank you!

More Related Content

Similar to Mitigating Crowding on the Lexington Avenue Subway

Data driven public_transportation_operation_by_trips_jaehong_min
Data driven public_transportation_operation_by_trips_jaehong_minData driven public_transportation_operation_by_trips_jaehong_min
Data driven public_transportation_operation_by_trips_jaehong_minJaehong MIN
 
3rd Conference on Sustainable Urban Mobility
3rd Conference on Sustainable Urban Mobility3rd Conference on Sustainable Urban Mobility
3rd Conference on Sustainable Urban MobilityLIFE GreenYourMove
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Hossam Shafiq I
 
Webinar: Linear bus holding model for real time traffic network control
Webinar: Linear bus holding model for real time traffic network controlWebinar: Linear bus holding model for real time traffic network control
Webinar: Linear bus holding model for real time traffic network controlBRTCoE
 
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...GreenYourMove
 
Hess and Rube Paper M15 SBS FINAL UPDATED
Hess and Rube Paper M15 SBS FINAL UPDATEDHess and Rube Paper M15 SBS FINAL UPDATED
Hess and Rube Paper M15 SBS FINAL UPDATEDMatthias Hess
 
TRBAM2020 Public Transit posters - University of Twente.
TRBAM2020 Public Transit posters - University of Twente.TRBAM2020 Public Transit posters - University of Twente.
TRBAM2020 Public Transit posters - University of Twente.Konstantinos Gkiotsalitis
 
Dispatching taxi cabs with passenger pool
Dispatching taxi cabs with passenger poolDispatching taxi cabs with passenger pool
Dispatching taxi cabs with passenger poolBogusz Jelinski
 
Public Transport Reform in Seoul
Public Transport Reformin SeoulPublic Transport Reformin Seoul
Public Transport Reform in Seoulurbanbairam
 
When and where are bus express services justified?
When and where are bus express services justified?When and where are bus express services justified?
When and where are bus express services justified?BRTCoE
 
HOTS model-Pouryousef-Hay seminar UIUC
HOTS model-Pouryousef-Hay seminar UIUCHOTS model-Pouryousef-Hay seminar UIUC
HOTS model-Pouryousef-Hay seminar UIUCHamed Pouryousef
 
Prediction of taxi rides ETA
Prediction of taxi rides ETAPrediction of taxi rides ETA
Prediction of taxi rides ETADaniel Marcous
 
Updated-Traffic Simulation of Construction zone for Baranagar -.pptx
Updated-Traffic Simulation of Construction zone for Baranagar -.pptxUpdated-Traffic Simulation of Construction zone for Baranagar -.pptx
Updated-Traffic Simulation of Construction zone for Baranagar -.pptxJitendraWadhwani7
 

Similar to Mitigating Crowding on the Lexington Avenue Subway (20)

Data driven public_transportation_operation_by_trips_jaehong_min
Data driven public_transportation_operation_by_trips_jaehong_minData driven public_transportation_operation_by_trips_jaehong_min
Data driven public_transportation_operation_by_trips_jaehong_min
 
3rd Conference on Sustainable Urban Mobility
3rd Conference on Sustainable Urban Mobility3rd Conference on Sustainable Urban Mobility
3rd Conference on Sustainable Urban Mobility
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)
 
Webinar: Linear bus holding model for real time traffic network control
Webinar: Linear bus holding model for real time traffic network controlWebinar: Linear bus holding model for real time traffic network control
Webinar: Linear bus holding model for real time traffic network control
 
Presentation 3rd CSUM
Presentation 3rd CSUM Presentation 3rd CSUM
Presentation 3rd CSUM
 
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...
Presentation of GreenYourMove's hybrid approach in the 3rd Conference on Sust...
 
Hess and Rube Paper M15 SBS FINAL UPDATED
Hess and Rube Paper M15 SBS FINAL UPDATEDHess and Rube Paper M15 SBS FINAL UPDATED
Hess and Rube Paper M15 SBS FINAL UPDATED
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
 
TRBAM2020 Public Transit posters - University of Twente.
TRBAM2020 Public Transit posters - University of Twente.TRBAM2020 Public Transit posters - University of Twente.
TRBAM2020 Public Transit posters - University of Twente.
 
muhsina
muhsinamuhsina
muhsina
 
Dispatching taxi cabs with passenger pool
Dispatching taxi cabs with passenger poolDispatching taxi cabs with passenger pool
Dispatching taxi cabs with passenger pool
 
Public Transport Reform in Seoul
Public Transport Reformin SeoulPublic Transport Reformin Seoul
Public Transport Reform in Seoul
 
robotaxi2023.pdf
robotaxi2023.pdfrobotaxi2023.pdf
robotaxi2023.pdf
 
When and where are bus express services justified?
When and where are bus express services justified?When and where are bus express services justified?
When and where are bus express services justified?
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
HOTS model-Pouryousef-Hay seminar UIUC
HOTS model-Pouryousef-Hay seminar UIUCHOTS model-Pouryousef-Hay seminar UIUC
HOTS model-Pouryousef-Hay seminar UIUC
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
Prediction of taxi rides ETA
Prediction of taxi rides ETAPrediction of taxi rides ETA
Prediction of taxi rides ETA
 
Updated-Traffic Simulation of Construction zone for Baranagar -.pptx
Updated-Traffic Simulation of Construction zone for Baranagar -.pptxUpdated-Traffic Simulation of Construction zone for Baranagar -.pptx
Updated-Traffic Simulation of Construction zone for Baranagar -.pptx
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Mitigating Crowding on the Lexington Avenue Subway

  • 1. A Utility-Based Analysis for Lexington Avenue Subway Ridership Rebalancing Michael Frajman doobneek Nicholas Hudanich
  • 2. 2 Background ● Lexington Ave Subway = Most congested subway line in North America ● Alternatives (2AS, M15, M1) ● Alleviation of 2AS Extension ● Crowded conditions consequences ○ Dwell times ○ Accident risk (3/day) ○ Crime ○ Public health: disease vector https://comptroller.nyc.gov/wp-c ontent/uploa ds/documents/The-Human-C ost-of-Subway-Delays.pdf
  • 3. 3 Background ● Project: transit improvements/investments on UES, and the resulting mode shifts induced ○ Example: More frequent buses = shift from subway? ● Create a model for current conditions ● Use model to anticipate changes under these improvements
  • 4. 4 Model Summary ● Find rebalancing solutions to mitigate congestion on the Lexington Avenue Subway. Consider the AM peak hour. ● Consider the utility of existing modes, perturb utilities as needed ● M15 bus, M1 bus, 2nd Avenue Subway, and the Lexington Avenue Subway ● Phase I: Collect data, formulate model for existing conditions ○ MTA entry data ○ Census population data ● User time cost coefficient determination ○ Utility function formulation ○ Chi Square minimization function ● Phase II: Use set constants to assess changes ○ Headway changes ○ Cost changes ○ New infrastructure ○ Less travel time to core
  • 5. 5 Data Collection ● Census block aggregation for single point zone-based utility consideration
  • 6. 6 Data Collection ● Zones created to best represent set of selections for transit that zone users have ● Example:
  • 9. 9 Data Collection ● Subway entries ○ MTA daily weekday average ○ Halvorsen et al: L train estimate for 12% of daily load in peak hour, 8AM- 9AM ● Bus entries ○ Limited data ○ Use full line ridership, allocate to our stations by population / total line NTA population
  • 10. 10 Formulation ● Utility functions for each of the six zones, for each alternative ● Consider ○ Walking time cost (α) ○ Bus waiting time cost (β) ○ Bus travel time cost (γ) ○ Subway waiting time cost (δ) ○ Subway travel time cost (ε) ● Example: Zone 1
  • 11. 11 Formulation ● Excel optimization program ● Using given constants and “transit takers”, calculate Ps for each alternative in each zone. ● Multiply by transit takers for total usage ● Calculate Chi Square of each of the 25 stations ● Minimize Chi Square as the objective
  • 13. 13 Alternative 1 ● M1 Bus headway reduced to 4 minutes (from 15)
  • 14. 14 Alternative 2 ● M1 Bus headway reduced to 8 minutes (from 15)
  • 15. 15 Alternative 3 ● M1/M15 Better Bus Lane Enforcement (-30% Ma, -20% M15)
  • 16. 16 Alternative 4 ● M1 Bus headway reduced to 4 minutes (from 15) + Better Bus Lane Enforcement (-30% Ma, -20% M15)
  • 17. 17 Alternative 5 ● 25% Improvement to Waiting Time Cost (Facilities)
  • 18. 18 Alternative 6 ● 25% Improvement to Waiting Time Cost (Facilities) + Better Bus Lane Enforcement (-30% Ma, -20% M15)
  • 19. 19 Alternative 7 ● 2nd Avenue Subway 2nd Phase Full Build
  • 20. 20 Alternative 8 ● 2nd Avenue Subway 2nd Phase Full Build + Better Bus Lane Enforcement
  • 21. 21 Insights ● Short term: Better Bus Lane Enforcement ● Short term: Facilities improvement (Even just M1 only) ● Long term: Second Avenue Subway Phase 2 ● Not considered in this study / future study: ○ Rideshare ○ Cycling ○ Temporal variation (we assume flat arrival for 1 hour) https://www.cbsnews.com/pictures/building-nycs-second-ave-subwa y/ https://www.nyc.gov/html/brt/html/about/bus -lanes.shtml