    > Executive summary                                                               Click on a section to jump to it

                                                                                      Introduction                       2
    Data centers today lack a formal system for classifying
    infrastructure management tools. As a result, confu-                              Classification system context      3
    sion exists regarding which management systems are
    necessary and which are optional for secure and                                   Monitoring & Automation            4
    efficient data center operation. This paper divides the
    realm of data center management tools into four                                   Planning & Implementation          8
    distinct subsets and compares the primary and sec-                                Data collection                    11
    ondary functions of key subsystems within these
    subsets. With a classification system in place, data                              Dashboard                          11
    center professionals can begin to determine which
    physical infrastructure management tools they need –                              Conclusion                         13
    and don’t need – to operate their data centers.                                   Resources                          14

                                                                                      Appendix                           15




          by Schneider Electric White Papers are now part of the Schneider Electric
 white paper library produced by Schneider Electric’s Data Center Science Center
 DCSC@Schneider-Electric.com
Classification of Data Center Infrastructure Management (DCIM) Tools




Introduction              The total data center universe that most data center professionals are familiar with principally
                          consists of two realms. The first realm, information technology (IT), refers to all systems that
                          address the information processing aspects of the data center (e.g., servers, storage arrays
                          and network switches). The second realm revolves around the physical infrastructure and
                          controls that allow the IT realm to function. This second realm includes the physical infra-
                          structure systems that support both the IT (“white space”) realm of the data center as well as
                          the larger data center facility itself. This would include facility power, cooling and security
                          systems. The management classification system described in this paper is limited in
                          scope to the physical infrastructure of the data center facility and IT areas.

                          Both realms are interrelated but the subsystems within each are procured, managed, and
                          maintained by separate users. Typically, facilities and engineering departments “own” and
                          operate facility and IT infrastructure systems. IT department personnel “own” the IT equip-
                          ment. In some larger data centers both IT and infrastructure devices share a common
                          communications backbone. As the total data center evolves, these departments will become
                          more intertwined as will the management systems that support them. Table 1 provides
                          definitions of terms utilized in this paper to describe and contrast the data center infrastruc-
                          ture management classification system.



                                                                                                              Data Center
                                Term                               Definition
                                                                                                               Examples
                                                This represents the totality of the material systems
                                                and foundational physical equipment necessary to         • Power systems
                          Facility & IT
                                                facilitate operations of a reliable, controlled and      • Cooling systems
                          infrastructure                                                                 • Security systems
                                                secured IT environment.

                                                The entire spectrum of technologies for infor-
                                                                                                         • Servers
                          Information     mation processing, including software, hardware,
                                                                                                         • Storage systems
                          Technology (IT) communications technologies and related                        • Network systems
                                                services.

                                                The total physical surroundings within a building        • IT room
                          Environment           or facility that house the various pockets of data       • Electrical room
                                                center related hardware and software.                    • Mechanical room
Table 1                                                                                                  • Monitoring & Automation
Terminology definitions                         A logical grouping of physical subsystems with           • Planning & Implementation
                          Subset                similar primary functions (four of these).               • Dashboard
and examples
                                                                                                         • Data Collection
                                                                                                         • Facility power device
                                                A purpose-built software package that addresses a          monitoring subsystem
                          Subsystem             specific need (potentially hundreds of these).           • IT room security monitoring
                                                                                                           subsystem

                                                A software function that is first in order of develop-   • The PowerLogic ION
                          Primary               ment and first in rank or importance when compared        Enterprise software
                          function              to other software functions available within that         package’s electrical room
                                                particular subsystem.                                     power analytics function

                                                                                                         • The PowerLogic ION
                                                A software function that is second in rank of             Enterprise software
                          Secondary             importance or later in order of development coming        package’s facility HVAC
                          function              after the primary function.                               cooling device monitoring
                                                                                                          function


                          Schneider Electric – Data Center Science Center                            White Paper 104          Rev 3    2
Classification of Data Center Infrastructure Management (DCIM) Tools



                                      In an ideal world, data center managers should be able to run one management software
  > A note regarding                  package that addresses all of their basic needs. However, the concept of “one system” does
                                      not exist in any practical sense. While numerous vendors promise a vision of the ultimate
  energy management
                                      “unified” management system, this has been an elusive dream that will be difficult to realize.
  The data center infrastructure      The following points illustrate why “one system” is an unlikely goal in the foreseeable future:
  management context map as
  presented in Figure 1 does not
  specifically call out energy          • A need for simple tools that fulfill specific requirements – IT and facilities employ-
  management in any of its                 ees have different priorities and no one package will meet all of their needs. These em-
  subsets. In fact energy manage-          ployees prefer simple tools that focus on addressing their specific need.
  ment is involved throughout all
  layers of the management              • Investments in pre-existing systems - Most data center professionals already have
  software construct and is not            software in place that performs part of the management function. In many cases, it is
  concentrated in any one subset or        neither feasible nor cost effective to replace existing software.
  subsystem.
                                        • Open protocols enable integration of disparate software – Facility and IT infrastruc-
                                           ture management software is highly specialized. However, when these tools are based
                                           on standardized, open protocols, it becomes quite easy to add new software tools, as
                                           needed, to an existing tool set and have them communicate and work together effective-
                                           ly. This capability, therefore, diminishes the demand or need for a single, unified sys-
                                           tem that covers everything.




Classification                        Figure 1 illustrates a context map of the four subsets within the facility and IT infrastructure
                                      portion of the data center. Depending upon the size of a given data center, the total data
system context                        center (i.e., both realms described above) could consist of hundreds of management software
                                      subsystems. The first step when classifying these subsystems is to group them into general
                                      subsets. Although the focus of this paper is facility and IT infrastructure management
                                      software, the subsets can also be used to classify IT management software.




                                           Data Center
                                           Facility and IT Infrastructure
                                           Management                            Dashboard
                                                                                  Subset
                                                                                Monitoring &
                                                                                Automation
                                                                                  Domain
                                                                              Cross subsystem GUIs
Figure 1
This data center facility
and IT infrastructure                              Monitoring &                                             Planning &
software context map                               Automation                                             Implementation
demonstrates how the                               Monitoring &
                                                     Subset                                                Monitoring &
                                                                                                              Subset
various subsets interact                           Automation                                               Automation
                                                     Domain                                                  Domain
                                                Subsystem specific GUIs                                  Subsystem specific GUIs


                                                                               Data Collection
                                                                                   Subset
                                                                                Monitoring &
                                                                                 Automation
                                                                                  Domain
                                                                             Subsystem specific HMIs




                                      Schneider Electric – Data Center Science Center                  White Paper 104      Rev 3   3
Classification of Data Center Infrastructure Management (DCIM) Tools


                            Note that the subsets in Figure 1 have either graphical user interfaces (GUI) or human
                            machine interfaces (HMI) associated with them. Also note that the Dashboard subset is the
                            primary area within the context map that allows for the visualization of cross subset infor-
                            mation.

                            The first step for data center operators who are evaluating their management software is to
                            examine key data center infrastructure systems such as the power distribution system,
                            building mechanical and cooling facilities, IT room, and security. This will help to determine
                            which subsystem management tools are already in place and, looking forward, which
                            subsystem tools are actually needed. A colocation data center, for example, may not require
                            a subsystem that manages at the IT room level. However, HVAC control and power man-
                            agement subsystems may be essential for that same colocation facility. A small or medium-
                            sized data center with an IT room housing 100 racks might forgo a facility control and power
                            management subsystem, leaving that to the facilities staff. However, the IT staff may wish to
                            directly monitor performance data by investing in an IT room management subsystem.




Monitoring &                Subsystems grouped within the Monitoring & Automation subset ensure that 1) the data
                            center functions as designed, and 2), activities are automated to maintain / maximize the
Automation                  availability and efficiency of the data center. Monitoring & Automation software acts upon
                            user-set thresholds by alarming, logging, or even controlling physical devices. The Monitor-
                            ing & Automation subset of subsystems includes facility power, facility environmental control,
                            facility security subsystems, and IT room management (see Figure 2). Table 2 helps to
                            differentiate the mainstream Monitoring & Automation subsystems in terms of their primary
                            and secondary functions (see side bar “Not all monitoring solutions are created equal”).



                                                                  Monitoring &
                                                                  Automation
                                                                    Subset




                                         Sub-systems                             Functions
Figure 2                                 Facility Power
                                                                               Alarming & Notification
The Monitoring & Automa-
tion subset contains                                                                       Status
                                    Facility
several sub-systems each            Environmental
                                    Control                                    Control
of which provide a number
of functions                                                                                Configuration
                                                Facility
                                                Security                 Visualization

                                         IT Room
                                                                               Reporting & Analytics




                            Four sub-system groupings exist within the Monitoring & Automation subset:




                            Schneider Electric – Data Center Science Center                 White Paper 104    Rev 3   4
Classification of Data Center Infrastructure Management (DCIM) Tools



                                       Facility power
                                       The facility power management subsystem provides detailed insight into the status and
                                       operation of the entire electrical distribution network (from utility feeds, to transformers, to
                                       PDUs, to racks) within a building, often including the data center. Electrical engineering staff
                                       and consultants utilize this subsystem to manage the electrical distribution network. The key
                                       functions provided by this type of subsystem include power monitoring of current conditions
                                       (critical and non-critical load), power alarming, and “power analytics”. These functions
                                       support critical activities such as notification of and response to electrical network problems,
                                       maintenance (planned and unplanned), capacity planning, facility expansion / retro-fit
                                       projects, energy efficiency projects, power quality analysis, and power reliability analysis.




Figure 3
Monitoring of facility
power utilizing
Schneider Electric’s
StruxureWare Power
Monitoring Expert GUI




  > Not all monitoring
  software solutions
  are created equal
  Monitoring subsystems are built
  with a primary function in mind.     The facility power management subsystem offers a clear and complete view of facility power
  Schneider Electric’s                 distribution. Also provided is actionable information based on detailed electrical data such as
  StruxureWare Central IT room
  monitoring system, for example,      power, energy, power factor, amperage, voltage, frequency, harmonics, and waveforms. The
  has as its primary function the      subsystem’s output includes 3-D graphical views of the facility, electrical one-lines, and
  ability to monitor power and         equipment detail. The facility power management subsystem also provides visual alarm
  cooling in the IT room.
  However, many monitoring             indicators and alarm notification, data analysis tools, and the ability to schedule and distribute
  systems expand their capabili-       reports.
  ties over time.
                                       Facility power management subsystems can either provide a fairly simple, primary electrical
  These secondary functions are
  typically less robust than those     monitoring function for smaller data centers, or can provide extremely high speed and high
  found in a purpose-built system.     performance feedback for large sites. Schneider Electric’s StruxureWare Power Monitoring
  StruxureWare Central, for            Expert is an example of a facility power monitoring subsystem (see Figure 3).
  example, has a secondary ability
  to monitor Modbus devices
  outside the IT room. While not
  its primary function, that ability
  may be enough for data center
                                       Facility environmental control
  operators with simple Modbus
                                       Facility environmental control subsystems traditionally support the requirements of corporate
  device monitoring requirements.
  Table 2 shows examples of the        facilities departments. In addition to facility heat, ventilation, and air conditioning (HVAC)
  primary and secondary functions      control, facility environmental subsystems can also encompass fire systems, water, steam,
  of physical infrastructure           and gas systems. The preferred communication protocols for facility environmental control
  monitoring systems.
                                       systems include BACnet, LONworks, and Modbus.



                                       Schneider Electric – Data Center Science Center                   White Paper 104     Rev 3   5
Classification of Data Center Infrastructure Management (DCIM) Tools


                                      Everyday functions of facility environmental control systems include the opening and closing
                                      of valves and dampers, the spinning up fans, initialization of pumps, and the controlled
                                      cooling and heating of targeted spaces within the facility.

                                      Schneider Electric’s StruxureWare Building Expert is an example of a mainstream facility
                                      environmental control subsystem. Facility environmental control subsystems are also
                                      differentiated from facility power management subsystems in that facility environmental
                                      control handles the coordination, control and reporting for all energies, not just electrical
                                      power.




                                                                                                                     Power Monitor-


                                                                                                                                      Building Expert


                                                                                                                                                          Pelco Digital
                                                                   Primary function




                                                                                                                      ing Expert**
                                                                                                    Data Center
                                                                                                      Expert*




                                                                                                                                                             Sentry
                                                                                                                                           (BMS)
                                                                   Secondary Function

Table 2                                                            No Function
Comparison of Monitoring &
Automation primary and
                                                                                             Facility Power
secondary functions using
Schneider Electric’s
StruxureWare for Data                                           Power device monitoring
Centers suite as an example
                                                                Power analytics

                                                                PUE monitoring

 > Note regarding                                                                 Facility Environmental Control
 tables 2 and 3
                                                                Automation and control
 Many physical infrastructure
 software products from multiple
 manufacturers exist in the                                F    Cooling device monitoring
 marketplace today. Most offer a
 wide variety of functions.                                U
 Tables 2 and 3 compare the                                N                                Facility Security
 functions of only a partial                               C
 sampling of the Schneider                                 T
 Electric products that fit within                              Surveillance
 the Operations Technology (OT)
                                                           I
 universe.                                                 O
                                                           N    Access control
 Tables 2 and 3 are not meant                              S
 to be a comprehensive                                                                           IT Room
 representation of what is
 available in the marketplace. In
 fact, it is not Schneider                                      Power device monitoring
 Electric’s role to represent other
 manufacturer’s products in
 these tables. The functions of                                 Cooling device monitoring
 other manufacturer’s products
 are often in a state of flux and
 could easily be misrepresented.                                Environmental monitoring
 Therefore these tables are
 restricted to a portion of the
 Schneider Electric current suite                               Security monitoring
 of products.

 Generic tables are located in                                  Partial PUE monitoring
 the Appendix which allow for
 data center operators to enter
 their own personal suite of          Facility power devices include: breakers, trip units, medium voltage and low voltage metering (i.e.,
 management software products          transformers, switches), programmable logic controllers (PLCs), remote terminal units (RTUs), auto-
 for comparison purposes.              matic transfer switches (ATS), generator controls, UPS controls.


                                      Schneider Electric – Data Center Science Center                             White Paper 104                 Rev 3        6
Classification of Data Center Infrastructure Management (DCIM) Tools


                                        IT power devices include: UPS controls, power distribution units (PDUs) and branch circuit metering,
                                          rack power strip metering


                                        * Includes security add- ons such as NetBotz, and PUE monitoring tools such as StruxureWare Data
                                          Center Operation : Energy Efficiency
                                        ** Works in coordination with installed meters for data collection




                                        Facility security
                                        As new technologies such as advanced optical video management systems, biometric
                                        identification, and remote management systems become more widely available, traditional
                                        card-and-guard security is being supplanted by facility security subsystems that can provide
                                        positive identification and tracking of human activity in and around the data center. Identifica-
                                        tion technology is changing as fast as the facilities, information, and communication it
                                        protects. Schneider Electric Pelco is an example of a facility security subsystem capable of
                                        providing both indoor and outdoor video security support.




Figure 4
Typical data center IT
room security interface




  > A note regarding
  subsystem users
  Subsystems throughout the data
  center are managed by
  individuals with differing job
                                        IT room
  responsibilities. On the IT side,
                                        IT room management subsystems monitor the power and cooling systems on the IT room
  operators tend to focus on a
  series of individual subsystem        floor so that uptime of servers, communication equipment, and storage equipment can be
  GUIs whereas management               maintained. Data center IT room management subsystems are developed around the needs
  focuses on the consolidated           and requirements of the computer room operators (a need for faster speed and real-time
  information reported on the
  dashboard.                            information). The IT environment is characterized by frequent changes, intelligent devices,
                                        and a management philosophy based on exception. These subsystems can also integrate
  On the facilities side, a similar     with security cameras within rows of racks such as Schneider Electric’s NetBotz cameras.
  situation occurs. Engineers
  monitor individual building HVAC
  systems, for example, and the         IT room management subsystems are designed to accommodate simultaneous firmware
  facilities management tends to        upgrades to multiple systems, and to monitor battery health by identifying exceptions that
  interact with the dashboards that
  display cross facility information.
                                        indicate behavioral characteristics beyond pre-programmed thresholds. IT room manage-
                                        ment subsystems are built around the expectation that power and cooling monitoring
                                        operates in a manner similar to other IT applications. That is, the software can be self


                                        Schneider Electric – Data Center Science Center                       White Paper 104      Rev 3   7
Classification of Data Center Infrastructure Management (DCIM) Tools


                        installed, and the software performs auto discovery of linked components. In essence,
                        everything just “works” out of the box, with the ability to change the configuration. These
                        subsystems generally utilize an IP network communication protocol. Schneider Electric’s
                        StruxureWare Data Center Expert is an example of an IT room management subsystem.




Planning &              Planning & Implementation, the second subset of subsystems (see Figure 1), ensures
                        1) efficient deployment of new equipment, 2) execution of planning in order to facilitate
Implementation          changes in the data center, 3) tracking of assets within the data center, and 4) simulation of
                        potential changes in order to analyze the future impact on the data center. Functions within
                        Planning & Implementation involve prediction and modeling (“What happens if I do this?”),
                        change tracking (“At what point does my system get obsolete?”), inventory tracking (“How do
                        I track the history and movements of this piece of equipment?”), and dependency analysis (“If
                        I change the contents of this rack, how will it impact my cooling?”).

                        Five subsystem groupings exist within the Planning & Implementation subset:

                        Facility asset management – This subsystem allows for management of asset
                        deployment, generation of facility-related parts specifications, calibration, costing and
                        tracking of building equipment assets.

                        Facility capacity management – This subsystem aids facilities staff to plan both
                        moves and changes within the mechanical and electrical rooms, by providing real-time
                        measurements of energy consumption and water flows in addition to the project impact of
                        changes to the power and cooling infrastructure.



                                                               Planning &
                                                             Implementation
                                                                 Subset




Figure 5                             Sub-systems                              Functions
                                   Facility asset
The Planning & Imple-              management                          Change tracking
mentation subset
contains several sub-         Facility capacity                                  Inventory tracking
                              management
systems each of which
provide a number of                 IT room workflow
                                    management                     Dependency analysis
functions
                                IT room capacity                                         Visualization
                                management

                                      IT room asset &
                                      lifecycle management                Prediction & modeling




                        IT room workflow management – This subsystem facilitates the execution of
                        equipment additions, moves, and changes by presenting a hierarchical overview of data
                        center locations, including global and local views and from groups to single assets.




                        Schneider Electric – Data Center Science Center                 White Paper 104     Rev 3     8
Classification of Data Center Infrastructure Management (DCIM) Tools



                              IT room capacity management – From a power consumption efficiency perspec-
       Link to resource       tive, the system identifies the optimal physical location for power, cooling, and rack-based IT
       White Paper 150        equipment. User defined requirements such as redundancy, network use, and line of
Power and Cooling Capacity    business groupings are also factored in. Live data is utilized to create simulations which
Management for Data Centers   analyze the impact of changes before they occur. This level of planning allows for reductions
                              in stranded cooling and power capacity. For more information on the subject of stranded
                              capacity, please see White Paper 150, Power and Cooling Capacity Management for Data
                              Centers.



                              IT room asset & lifecycle management – This subsystem allows for the man-
                              agement of IT room inventory. Visual models of the data center layout enable tracking of IT
                              assets and available space. The rendering of the data center physical layout also allows for
                              visualization of power consumption per rack as well as identification and location of power
                              failures.




Figure 6
Planning &
Implementation for the
IT room environment
utilizing the Schneider
Electric StruxureWare
Data Center Operation
GUI




                              Table 3 helps to differentiate some of the mainstream planning and implementation subsys-
                              tems in terms of their primary and secondary functions.




                              Schneider Electric – Data Center Science Center                 White Paper 104    Rev 3   9
Classification of Data Center Infrastructure Management (DCIM) Tools




                                                                      Power Monitor-


                                                                                       Building Expert


                                                                                                         Data Center



                                                                                                                       Data Center



                                                                                                                                     Data Center
                                                                                                                       Operation -



                                                                                                                                     Operation -
                                             Primary function




                                                                        ing Expert




                                                                                                          Operation


                                                                                                                        Capacity



                                                                                                                                       Change
                                                                                            (BMS)
                                             Secondary Function

                                             No Function

                                                                 FACILITY ASSET MANAGEMENT

                                          Inventory tracking

                                          Maintenance tracking

                                                                FACILITY CAPACITY MANAGEMENT
                                          Impact and dependen-
                                          cy analysis - Power
Table 3
                                          Impact and dependen-
Comparison of                             cy analysis - Cooling
Planning & Implementation
                                      F
primary and secondary functions                             IT ROOM WORKFLOW MANAGEMENT
                                      U
using Schneider Electric’s
StruxureWare for Data Centers         N   Prediction and model-
suite as an example                   C   ing
                                      T
                                      I   Workflow tracking
                                      O
                                      N                         IT ROOM CAPACITY MANAGEMENT
                                      S
                                          Impact and dependen-
                                          cy analysis - Power
                                          Impact and dependen-
                                          cy analysis - Cooling
                                          Impact and dependen-
                                          cy analysis - Network
                                                         IT ROOM ASSET & LIFECYCLE MANAGEMENT

                                          Inventory tracking

                                          Change tracking




                                  Schneider Electric – Data Center Science Center                                 White Paper 104       Rev 3      10
Classification of Data Center Infrastructure Management (DCIM) Tools




Data collection                The data collection subset represents devices such as meters, power protection devices,
                               embedded cards, programmable logic controllers (PLCs), sensors and other such devices.
                               These devices perform the fundamental function of gathering data and forwarding it to
                               management software for processing.




Figure 7
Human machine interface
(HMI) provides configuration
and operation
information for individual
UPS device




Dashboard                      Data center managers all require some means for consolidating critical information about the
                               performance of their data center. Not only does the critical information need to be aggregat-
                               ed, but the user needs to visualize the data in a manner that is meaningful and actionable. In
                               fact, this visualization of the data via a dashboard is a key function that allows a view across
                               the four main subsystem subsets.

                               Operational dashboard data may include the following: average temperature and humidity,
                               high temperature and humidity for a determined period, IT load, total data center load, and a
                               summary of the last 10 critical alerts. From a security perspective the dashboard could also
                               highlight the last 10 physical entries into the data center and the times when these entries
                               took place. Some operators, who are responsible for controlling their own energy costs, may
                               also require PUE data on their dashboard.

                               Some data center operators may choose to access data in its raw form without the benefit of
                               a dashboard. For example, queries from SQL tables may be generated and transferred to an
                               Excel file so that a report can be produced that meets the immediate requirement for
                               performance information. Various monitoring subsystems can also highlight urgent issues.
                               But as data centers become more complex, the information required needs to be easily
                               formatted and presented into a formal dashboard. A dashboard represents a third subset
                               which captures data from the three other subsets and then updates to a management
                               package, providing KPIs and data summaries, over the existing network.

                               Some dashboards are more focused on the performance of the IT equipment while others
                               provide summary views into the physical infrastructure (cooling, power, security). Dash-
                               boards draw their information from monitoring & automation and planning & implementation,




                               Schneider Electric – Data Center Science Center                  White Paper 104    Rev 3   11
Classification of Data Center Infrastructure Management (DCIM) Tools


                             and data collection subsets. Some dashboards are custom built or are purchased from third
                             parties (see Figure 8 for sample dashboard).



                             Visualization software
                             Although the dashboard is the key centerpiece for aggregation of actionable data, various
                             levels of human machine interface (HMI) and graphical user interface (GUI) exist and enable
                             meaningful data to be visualized by specific users via the various subsystems across the data
                             center (see GUI and HMI in Figure 1). Although the HMI used by the facilities engineer may
                             not resemble the GUI utilized by the IT operator, both extract information from the system
                             based upon the individual user’s preferences and priorities.




Figure 8
Sample dashboard collects
data across OT subsets
and centralizes infor-
mation in one or more user
interfaces




                             Schneider Electric – Data Center Science Center               White Paper 104    Rev 3   12
Classification of Data Center Infrastructure Management (DCIM) Tools




Conclusion   By sharing key data points, alarm notifications, historical data, and asset tracking information,
             data center facility and IT infrastructure management software allows users to make informed
             decisions based upon real-time power and cooling capacity and redundancy data.

             The classification system presented in this paper takes the first step in laying the groundwork
             for a logical approach which can be summarized as follows:

             A Whole Data Center, from which is selected the

                   Facility and IT infrastructure portion, which is divided into

                       Subsets, each of which consists of multiple

                           Subsystems, which are compared and contrasted by illustrating

                             Primary and Secondary functions, which enable

                                 Efficient investment in management software

             …with key steps supported by visualization software



             Today multiple management applications across the principle domains of IT room manage-
             ment, building control, security, and power address various parts of the enterprise suite, but
             no one application does it all. The segmented approach will continue for the foreseeable
             future. However, innovative dashboards are being developed that will facilitate prudent,
             informed operational decisions that consolidate information from these sources and enhance
             uptime and reduce energy costs.




                      About the author
                 Kevin Brown is the Vice President of Data Center Global Solution Offer & Strategy at
                 Schneider Electric. Kevin holds a BS in mechanical engineering from Cornell University.
                 Prior to this position at Schneider Electric, Kevin served as Director of Market Development
                 at Airxchange, a manufacturer of energy recovery ventilation products and components in the
                 HVAC industry. Before joining Airxchange, Kevin held numerous senior management roles
                 at Schneider Electric, including Director, Software Development Group.

                 Dennis Bouley is a Senior Research Analyst at Schneider Electric's Data Center Science
                 Center. He holds bachelor’s degrees in journalism and French from the University of Rhode
                 Island and holds the Certificat Annuel from the Sorbonne in Paris, France. He has published
                 multiple articles in global journals focused on data center IT and physical infra-structure
                 environments and has authored several white papers for The Green Grid.




             Schneider Electric – Data Center Science Center                     White Paper 104      Rev 3     13
Classification of Data Center Infrastructure Management (DCIM) Tools




Resources
Click on icon to link to resource

                                        Power and Cooling Capacity
                                        Management for Data Centers
                                        White Paper 150


                                        Browse all
                                        white papers
                                        whitepapers.apc.com



                                        Browse all
                                        TradeOff Tools™
                                        tools.apc.com




                                             Contact us
                                       For feedback and comments about the content of this white paper:

                                           Data Center Science Center
                                           DCSC@Schneider-Electric.com

                                       If you are a customer and have questions specific to your data center project:

                                       Contact your Schneider Electric representative at
                                       www.apc.com/support/contact/index.cfm



                                    Schneider Electric – Data Center Science Center             White Paper 104   Rev 3   14
Classification of Data Center Infrastructure Management (DCIM) Tools



Appendix
Table A1
Monitoring & Automation
product comparison worksheet




                                                               Power Monitor-


                                                                                Building Expert
              Primary function




                                                                                                  Pelco Digital


                                                                                                                  Name of product



                                                                                                                                    Name of product



                                                                                                                                                      Name of product



                                                                                                                                                                        Name of product



                                                                                                                                                                                               Name of product
                                                                ing Expert**
                                               Data Center
                                                 Expert*




                                                                                                     Sentry
                                                                                     (BMS)
              Secondary Function

              No Function


                                                                          FACILITY POWER

            Power device monitoring

            Power analytics

            Efficiency monitoring

                                                    FACILITY ENVIRONMENTAL CONTROL

            Cooling device monitoring

        F
            Automation and control
        U
        N                                                              FACILITY SECURITY
        C
        T
        I   Surveillance
        O
        N   Access control
        S
                                                                                IT ROOM

            Power device monitoring

            Cooling device monitoring

            Environmental monitoring

            Security monitoring

            Partial PUE monitoring


                                 * Includes security add- ons such as NetBotz, and PUE monitoring tools such as InfraStruxure                                                             Energy
                                   Efficiency
                                 ** Works in coordination with installed meters for data collection




                                 Schneider Electric – Data Center Science Center                                                    White Paper 104                     Rev 3                15
Classification of Data Center Infrastructure Management (DCIM) Tools


Table A2
Planning & Implementation
product comparison worksheet




                                           Power Monitor-


                                                              Building Expert




                                                                                                                          Name of product



                                                                                                                                            Name of product



                                                                                                                                                              Name of product



                                                                                                                                                                                 Name of product
                                                                                Data Center
           Primary function




                                             ing Expert




                                                                                 Operation




                                                                                              Data Center



                                                                                                            Data Center
                                                                                              Operation -



                                                                                                            Operation -
                                                                                               Capacity
                                                                   (BMS)




                                                                                                              Change
           Secondary Function

           No Function

                                                     FACILITY ASSET MANAGEMENT

        Inventory tracking

        Maintenance tracking

                                                FACILITY CAPACITY MANAGEMENT
        Impact and dependency
        analysis - Power
        Impact dependency
        analysis - Cooling
    F
                                             IT ROOM WORKFLOW MANAGEMENT
    U
    N
    C   Prediction and modeling
    T
    I   Workflow tracking
    O
    N                                            IT ROOM CAPACITY MANAGEMENT
    S
        Impact and dependency
        analysis - Power
        Impact and dependency
        analysis - Cooling
        Impact and dependency
        analysis - Network ports
                                        IT ROOM ASSET & LIFECYCLE MANAGEMENT

        Inventory tracking

        Change tracking




                                Schneider Electric – Data Center Science Center                                           White Paper 104                     Rev 3             16

More Related Content

What's hot

Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaInternap
 
DCIM: An Integral Part of the Software Defined Data Centre
DCIM: An Integral Part of the Software Defined Data CentreDCIM: An Integral Part of the Software Defined Data Centre
DCIM: An Integral Part of the Software Defined Data CentreConcurrentThinking
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesSchneider Electric
 
NER & Emerson Infrastructure Optimization Capabilties Storyboard
NER & Emerson   Infrastructure Optimization Capabilties StoryboardNER & Emerson   Infrastructure Optimization Capabilties Storyboard
NER & Emerson Infrastructure Optimization Capabilties StoryboardGreg Stover
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersSchneider Electric
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT ConvergenceSchneider Electric
 
Data center proposal
Data center proposalData center proposal
Data center proposalMuhammad Ahad
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)SP Home Run Inc.
 
Best Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelBest Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelSchneider Electric
 
Power Protection for Digital Medical Imaging and Diagnostic Equipment
Power Protection for Digital Medical Imaging and Diagnostic EquipmentPower Protection for Digital Medical Imaging and Diagnostic Equipment
Power Protection for Digital Medical Imaging and Diagnostic EquipmentSchneider Electric
 
Cyber security: A roadmap to secure solutions
Cyber security: A roadmap to secure solutionsCyber security: A roadmap to secure solutions
Cyber security: A roadmap to secure solutionsSchneider Electric
 
Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Schneider Electric
 
CERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCPCERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCPAPEXMarCom
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centersTyrone Systems
 
Logicalis - Data Centre Overview
Logicalis - Data Centre OverviewLogicalis - Data Centre Overview
Logicalis - Data Centre OverviewLogicalis
 

What's hot (20)

Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
DCIM: An Integral Part of the Software Defined Data Centre
DCIM: An Integral Part of the Software Defined Data CentreDCIM: An Integral Part of the Software Defined Data Centre
DCIM: An Integral Part of the Software Defined Data Centre
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
 
DCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center ManagerDCIM: ERP for the Data Center Manager
DCIM: ERP for the Data Center Manager
 
DCIM
DCIMDCIM
DCIM
 
NER & Emerson Infrastructure Optimization Capabilties Storyboard
NER & Emerson   Infrastructure Optimization Capabilties StoryboardNER & Emerson   Infrastructure Optimization Capabilties Storyboard
NER & Emerson Infrastructure Optimization Capabilties Storyboard
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control Centers
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
Data center proposal
Data center proposalData center proposal
Data center proposal
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
Executive DCIM
Executive DCIMExecutive DCIM
Executive DCIM
 
Best Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelBest Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network Model
 
Power Protection for Digital Medical Imaging and Diagnostic Equipment
Power Protection for Digital Medical Imaging and Diagnostic EquipmentPower Protection for Digital Medical Imaging and Diagnostic Equipment
Power Protection for Digital Medical Imaging and Diagnostic Equipment
 
Cyber security: A roadmap to secure solutions
Cyber security: A roadmap to secure solutionsCyber security: A roadmap to secure solutions
Cyber security: A roadmap to secure solutions
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
project report on DATACENTER
project report on DATACENTERproject report on DATACENTER
project report on DATACENTER
 
Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?
 
CERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCPCERTIFIED Data Center Professional - CDCP
CERTIFIED Data Center Professional - CDCP
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
 
Logicalis - Data Centre Overview
Logicalis - Data Centre OverviewLogicalis - Data Centre Overview
Logicalis - Data Centre Overview
 

Similar to Classification of data center operations technology management tools

WP107 How Data Center Management Software Improves Planning and Cuts OPEX
WP107   How Data Center Management Software Improves Planning and Cuts OPEXWP107   How Data Center Management Software Improves Planning and Cuts OPEX
WP107 How Data Center Management Software Improves Planning and Cuts OPEXSE_NAM_Training
 
Cio data center definition and solutions
Cio   data center definition and solutionsCio   data center definition and solutions
Cio data center definition and solutionsrami20122
 
Data Centre Overview
Data Centre OverviewData Centre Overview
Data Centre OverviewLogicalis
 
01. 02. introduction (13 slides)
01.   02. introduction (13 slides)01.   02. introduction (13 slides)
01. 02. introduction (13 slides)Muhammad Ahad
 
Research Paper  Find a peer reviewed article in the following d.docx
Research Paper  Find a peer reviewed article in the following d.docxResearch Paper  Find a peer reviewed article in the following d.docx
Research Paper  Find a peer reviewed article in the following d.docxeleanorg1
 
Software engg. pressman_ch-10
Software engg. pressman_ch-10Software engg. pressman_ch-10
Software engg. pressman_ch-10Dhairya Joshi
 
NIST Definition for Cloud Computing
NIST Definition for Cloud ComputingNIST Definition for Cloud Computing
NIST Definition for Cloud ComputingAjay Ohri
 
NIST 2011 Cloud Computing definitions
NIST 2011 Cloud Computing definitionsNIST 2011 Cloud Computing definitions
NIST 2011 Cloud Computing definitionsi-SCOOP
 
Res Software In Healthcare
Res Software In HealthcareRes Software In Healthcare
Res Software In Healthcarejckirby
 
Res Software In Healthcare
Res Software In HealthcareRes Software In Healthcare
Res Software In Healthcarejckirby
 
Research Paper  Find a peer reviewed article in the following dat.docx
Research Paper  Find a peer reviewed article in the following dat.docxResearch Paper  Find a peer reviewed article in the following dat.docx
Research Paper  Find a peer reviewed article in the following dat.docxaudeleypearl
 
Fedramp developing-system-security-plan-slides
Fedramp developing-system-security-plan-slidesFedramp developing-system-security-plan-slides
Fedramp developing-system-security-plan-slidesTuan Phan
 
01. 03.-introduction-to-infrastructure
01. 03.-introduction-to-infrastructure01. 03.-introduction-to-infrastructure
01. 03.-introduction-to-infrastructureMuhammad Ahad
 
«Определение понятия «облачные вычисления» (от National Institute of Standard...
«Определение понятия «облачные вычисления» (от National Institute of Standard...«Определение понятия «облачные вычисления» (от National Institute of Standard...
«Определение понятия «облачные вычисления» (от National Institute of Standard...Victor Gridnev
 
The United States National Institute of Standards and Technology (NIST) has p...
The United States National Institute of Standards and Technology (NIST) has p...The United States National Institute of Standards and Technology (NIST) has p...
The United States National Institute of Standards and Technology (NIST) has p...Michael Hudak
 
Grid computing [2005]
Grid computing [2005]Grid computing [2005]
Grid computing [2005]Raul Soto
 

Similar to Classification of data center operations technology management tools (20)

WP107 How Data Center Management Software Improves Planning and Cuts OPEX
WP107   How Data Center Management Software Improves Planning and Cuts OPEXWP107   How Data Center Management Software Improves Planning and Cuts OPEX
WP107 How Data Center Management Software Improves Planning and Cuts OPEX
 
Data center
Data centerData center
Data center
 
Cio data center definition and solutions
Cio   data center definition and solutionsCio   data center definition and solutions
Cio data center definition and solutions
 
Data Centre Overview
Data Centre OverviewData Centre Overview
Data Centre Overview
 
01. 02. introduction (13 slides)
01.   02. introduction (13 slides)01.   02. introduction (13 slides)
01. 02. introduction (13 slides)
 
Research Paper  Find a peer reviewed article in the following d.docx
Research Paper  Find a peer reviewed article in the following d.docxResearch Paper  Find a peer reviewed article in the following d.docx
Research Paper  Find a peer reviewed article in the following d.docx
 
Ispe Article
Ispe ArticleIspe Article
Ispe Article
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
Software engg. pressman_ch-10
Software engg. pressman_ch-10Software engg. pressman_ch-10
Software engg. pressman_ch-10
 
NIST Definition for Cloud Computing
NIST Definition for Cloud ComputingNIST Definition for Cloud Computing
NIST Definition for Cloud Computing
 
NIST 2011 Cloud Computing definitions
NIST 2011 Cloud Computing definitionsNIST 2011 Cloud Computing definitions
NIST 2011 Cloud Computing definitions
 
Nist cloud comp
Nist cloud compNist cloud comp
Nist cloud comp
 
Res Software In Healthcare
Res Software In HealthcareRes Software In Healthcare
Res Software In Healthcare
 
Res Software In Healthcare
Res Software In HealthcareRes Software In Healthcare
Res Software In Healthcare
 
Research Paper  Find a peer reviewed article in the following dat.docx
Research Paper  Find a peer reviewed article in the following dat.docxResearch Paper  Find a peer reviewed article in the following dat.docx
Research Paper  Find a peer reviewed article in the following dat.docx
 
Fedramp developing-system-security-plan-slides
Fedramp developing-system-security-plan-slidesFedramp developing-system-security-plan-slides
Fedramp developing-system-security-plan-slides
 
01. 03.-introduction-to-infrastructure
01. 03.-introduction-to-infrastructure01. 03.-introduction-to-infrastructure
01. 03.-introduction-to-infrastructure
 
«Определение понятия «облачные вычисления» (от National Institute of Standard...
«Определение понятия «облачные вычисления» (от National Institute of Standard...«Определение понятия «облачные вычисления» (от National Institute of Standard...
«Определение понятия «облачные вычисления» (от National Institute of Standard...
 
The United States National Institute of Standards and Technology (NIST) has p...
The United States National Institute of Standards and Technology (NIST) has p...The United States National Institute of Standards and Technology (NIST) has p...
The United States National Institute of Standards and Technology (NIST) has p...
 
Grid computing [2005]
Grid computing [2005]Grid computing [2005]
Grid computing [2005]
 

More from Schneider Electric India

Smart City - Cornerstone of Efficiency - V2
Smart City - Cornerstone of Efficiency - V2Smart City - Cornerstone of Efficiency - V2
Smart City - Cornerstone of Efficiency - V2Schneider Electric India
 
LIDAR cinemometers for detecting speed limit violations
LIDAR cinemometers for detecting speed limit violationsLIDAR cinemometers for detecting speed limit violations
LIDAR cinemometers for detecting speed limit violationsSchneider Electric India
 
Designing a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsDesigning a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsSchneider Electric India
 
Delivering urban efficiency through collaboration. Today
Delivering urban efficiency through collaboration. TodayDelivering urban efficiency through collaboration. Today
Delivering urban efficiency through collaboration. TodaySchneider Electric India
 
The Smart City Cornerstone: Urban Efficiency by Charbel Aoun
The Smart City Cornerstone: Urban Efficiency by Charbel AounThe Smart City Cornerstone: Urban Efficiency by Charbel Aoun
The Smart City Cornerstone: Urban Efficiency by Charbel AounSchneider Electric India
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric India
 
Schneider Electric Smart City Success Stories (Worldwide)
Schneider Electric Smart City  Success Stories (Worldwide)Schneider Electric Smart City  Success Stories (Worldwide)
Schneider Electric Smart City Success Stories (Worldwide)Schneider Electric India
 
Making Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealityMaking Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealitySchneider Electric India
 
Urban Efficiency as the Cornerstone of Attractive Cities
Urban Efficiency as the Cornerstone of Attractive CitiesUrban Efficiency as the Cornerstone of Attractive Cities
Urban Efficiency as the Cornerstone of Attractive CitiesSchneider Electric India
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centersSchneider Electric India
 
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationEco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationSchneider Electric India
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersSchneider Electric India
 

More from Schneider Electric India (20)

Smart City - Cornerstone of Efficiency
Smart City - Cornerstone of EfficiencySmart City - Cornerstone of Efficiency
Smart City - Cornerstone of Efficiency
 
Smart City - Cornerstone of Efficiency - V2
Smart City - Cornerstone of Efficiency - V2Smart City - Cornerstone of Efficiency - V2
Smart City - Cornerstone of Efficiency - V2
 
LIDAR cinemometers for detecting speed limit violations
LIDAR cinemometers for detecting speed limit violationsLIDAR cinemometers for detecting speed limit violations
LIDAR cinemometers for detecting speed limit violations
 
Designing a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildingsDesigning a metering system for small and mid sized buildings
Designing a metering system for small and mid sized buildings
 
SEI Smart City Offers Catalogue
SEI Smart City Offers CatalogueSEI Smart City Offers Catalogue
SEI Smart City Offers Catalogue
 
Delivering urban efficiency through collaboration. Today
Delivering urban efficiency through collaboration. TodayDelivering urban efficiency through collaboration. Today
Delivering urban efficiency through collaboration. Today
 
The Smart City Cornerstone: Urban Efficiency by Charbel Aoun
The Smart City Cornerstone: Urban Efficiency by Charbel AounThe Smart City Cornerstone: Urban Efficiency by Charbel Aoun
The Smart City Cornerstone: Urban Efficiency by Charbel Aoun
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domains
 
Schneider Electric Smart City Success Stories (Worldwide)
Schneider Electric Smart City  Success Stories (Worldwide)Schneider Electric Smart City  Success Stories (Worldwide)
Schneider Electric Smart City Success Stories (Worldwide)
 
What is a Green Building
What is a Green BuildingWhat is a Green Building
What is a Green Building
 
Making Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealityMaking Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a Reality
 
Urban Efficiency as the Cornerstone of Attractive Cities
Urban Efficiency as the Cornerstone of Attractive CitiesUrban Efficiency as the Cornerstone of Attractive Cities
Urban Efficiency as the Cornerstone of Attractive Cities
 
Smart Energy Systems of Future
Smart Energy Systems of FutureSmart Energy Systems of Future
Smart Energy Systems of Future
 
Innovate Something Wonderful
Innovate Something Wonderful Innovate Something Wonderful
Innovate Something Wonderful
 
Energy management
Energy managementEnergy management
Energy management
 
Energy STEP
Energy STEPEnergy STEP
Energy STEP
 
Trinity success
Trinity successTrinity success
Trinity success
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centers
 
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS OperationEco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centers
 

Classification of data center operations technology management tools

  • 1. Classification of Data Center Infrastructure Management (DCIM) Tools White Paper 104 Revision 3 by Kevin Brown Dennis Bouley Contents > Executive summary Click on a section to jump to it Introduction 2 Data centers today lack a formal system for classifying infrastructure management tools. As a result, confu- Classification system context 3 sion exists regarding which management systems are necessary and which are optional for secure and Monitoring & Automation 4 efficient data center operation. This paper divides the realm of data center management tools into four Planning & Implementation 8 distinct subsets and compares the primary and sec- Data collection 11 ondary functions of key subsystems within these subsets. With a classification system in place, data Dashboard 11 center professionals can begin to determine which physical infrastructure management tools they need – Conclusion 13 and don’t need – to operate their data centers. Resources 14 Appendix 15 by Schneider Electric White Papers are now part of the Schneider Electric white paper library produced by Schneider Electric’s Data Center Science Center DCSC@Schneider-Electric.com
  • 2. Classification of Data Center Infrastructure Management (DCIM) Tools Introduction The total data center universe that most data center professionals are familiar with principally consists of two realms. The first realm, information technology (IT), refers to all systems that address the information processing aspects of the data center (e.g., servers, storage arrays and network switches). The second realm revolves around the physical infrastructure and controls that allow the IT realm to function. This second realm includes the physical infra- structure systems that support both the IT (“white space”) realm of the data center as well as the larger data center facility itself. This would include facility power, cooling and security systems. The management classification system described in this paper is limited in scope to the physical infrastructure of the data center facility and IT areas. Both realms are interrelated but the subsystems within each are procured, managed, and maintained by separate users. Typically, facilities and engineering departments “own” and operate facility and IT infrastructure systems. IT department personnel “own” the IT equip- ment. In some larger data centers both IT and infrastructure devices share a common communications backbone. As the total data center evolves, these departments will become more intertwined as will the management systems that support them. Table 1 provides definitions of terms utilized in this paper to describe and contrast the data center infrastruc- ture management classification system. Data Center Term Definition Examples This represents the totality of the material systems and foundational physical equipment necessary to • Power systems Facility & IT facilitate operations of a reliable, controlled and • Cooling systems infrastructure • Security systems secured IT environment. The entire spectrum of technologies for infor- • Servers Information mation processing, including software, hardware, • Storage systems Technology (IT) communications technologies and related • Network systems services. The total physical surroundings within a building • IT room Environment or facility that house the various pockets of data • Electrical room center related hardware and software. • Mechanical room Table 1 • Monitoring & Automation Terminology definitions A logical grouping of physical subsystems with • Planning & Implementation Subset similar primary functions (four of these). • Dashboard and examples • Data Collection • Facility power device A purpose-built software package that addresses a monitoring subsystem Subsystem specific need (potentially hundreds of these). • IT room security monitoring subsystem A software function that is first in order of develop- • The PowerLogic ION Primary ment and first in rank or importance when compared Enterprise software function to other software functions available within that package’s electrical room particular subsystem. power analytics function • The PowerLogic ION A software function that is second in rank of Enterprise software Secondary importance or later in order of development coming package’s facility HVAC function after the primary function. cooling device monitoring function Schneider Electric – Data Center Science Center White Paper 104 Rev 3 2
  • 3. Classification of Data Center Infrastructure Management (DCIM) Tools In an ideal world, data center managers should be able to run one management software > A note regarding package that addresses all of their basic needs. However, the concept of “one system” does not exist in any practical sense. While numerous vendors promise a vision of the ultimate energy management “unified” management system, this has been an elusive dream that will be difficult to realize. The data center infrastructure The following points illustrate why “one system” is an unlikely goal in the foreseeable future: management context map as presented in Figure 1 does not specifically call out energy • A need for simple tools that fulfill specific requirements – IT and facilities employ- management in any of its ees have different priorities and no one package will meet all of their needs. These em- subsets. In fact energy manage- ployees prefer simple tools that focus on addressing their specific need. ment is involved throughout all layers of the management • Investments in pre-existing systems - Most data center professionals already have software construct and is not software in place that performs part of the management function. In many cases, it is concentrated in any one subset or neither feasible nor cost effective to replace existing software. subsystem. • Open protocols enable integration of disparate software – Facility and IT infrastruc- ture management software is highly specialized. However, when these tools are based on standardized, open protocols, it becomes quite easy to add new software tools, as needed, to an existing tool set and have them communicate and work together effective- ly. This capability, therefore, diminishes the demand or need for a single, unified sys- tem that covers everything. Classification Figure 1 illustrates a context map of the four subsets within the facility and IT infrastructure portion of the data center. Depending upon the size of a given data center, the total data system context center (i.e., both realms described above) could consist of hundreds of management software subsystems. The first step when classifying these subsystems is to group them into general subsets. Although the focus of this paper is facility and IT infrastructure management software, the subsets can also be used to classify IT management software. Data Center Facility and IT Infrastructure Management Dashboard Subset Monitoring & Automation Domain Cross subsystem GUIs Figure 1 This data center facility and IT infrastructure Monitoring & Planning & software context map Automation Implementation demonstrates how the Monitoring & Subset Monitoring & Subset various subsets interact Automation Automation Domain Domain Subsystem specific GUIs Subsystem specific GUIs Data Collection Subset Monitoring & Automation Domain Subsystem specific HMIs Schneider Electric – Data Center Science Center White Paper 104 Rev 3 3
  • 4. Classification of Data Center Infrastructure Management (DCIM) Tools Note that the subsets in Figure 1 have either graphical user interfaces (GUI) or human machine interfaces (HMI) associated with them. Also note that the Dashboard subset is the primary area within the context map that allows for the visualization of cross subset infor- mation. The first step for data center operators who are evaluating their management software is to examine key data center infrastructure systems such as the power distribution system, building mechanical and cooling facilities, IT room, and security. This will help to determine which subsystem management tools are already in place and, looking forward, which subsystem tools are actually needed. A colocation data center, for example, may not require a subsystem that manages at the IT room level. However, HVAC control and power man- agement subsystems may be essential for that same colocation facility. A small or medium- sized data center with an IT room housing 100 racks might forgo a facility control and power management subsystem, leaving that to the facilities staff. However, the IT staff may wish to directly monitor performance data by investing in an IT room management subsystem. Monitoring & Subsystems grouped within the Monitoring & Automation subset ensure that 1) the data center functions as designed, and 2), activities are automated to maintain / maximize the Automation availability and efficiency of the data center. Monitoring & Automation software acts upon user-set thresholds by alarming, logging, or even controlling physical devices. The Monitor- ing & Automation subset of subsystems includes facility power, facility environmental control, facility security subsystems, and IT room management (see Figure 2). Table 2 helps to differentiate the mainstream Monitoring & Automation subsystems in terms of their primary and secondary functions (see side bar “Not all monitoring solutions are created equal”). Monitoring & Automation Subset Sub-systems Functions Figure 2 Facility Power Alarming & Notification The Monitoring & Automa- tion subset contains Status Facility several sub-systems each Environmental Control Control of which provide a number of functions Configuration Facility Security Visualization IT Room Reporting & Analytics Four sub-system groupings exist within the Monitoring & Automation subset: Schneider Electric – Data Center Science Center White Paper 104 Rev 3 4
  • 5. Classification of Data Center Infrastructure Management (DCIM) Tools Facility power The facility power management subsystem provides detailed insight into the status and operation of the entire electrical distribution network (from utility feeds, to transformers, to PDUs, to racks) within a building, often including the data center. Electrical engineering staff and consultants utilize this subsystem to manage the electrical distribution network. The key functions provided by this type of subsystem include power monitoring of current conditions (critical and non-critical load), power alarming, and “power analytics”. These functions support critical activities such as notification of and response to electrical network problems, maintenance (planned and unplanned), capacity planning, facility expansion / retro-fit projects, energy efficiency projects, power quality analysis, and power reliability analysis. Figure 3 Monitoring of facility power utilizing Schneider Electric’s StruxureWare Power Monitoring Expert GUI > Not all monitoring software solutions are created equal Monitoring subsystems are built with a primary function in mind. The facility power management subsystem offers a clear and complete view of facility power Schneider Electric’s distribution. Also provided is actionable information based on detailed electrical data such as StruxureWare Central IT room monitoring system, for example, power, energy, power factor, amperage, voltage, frequency, harmonics, and waveforms. The has as its primary function the subsystem’s output includes 3-D graphical views of the facility, electrical one-lines, and ability to monitor power and equipment detail. The facility power management subsystem also provides visual alarm cooling in the IT room. However, many monitoring indicators and alarm notification, data analysis tools, and the ability to schedule and distribute systems expand their capabili- reports. ties over time. Facility power management subsystems can either provide a fairly simple, primary electrical These secondary functions are typically less robust than those monitoring function for smaller data centers, or can provide extremely high speed and high found in a purpose-built system. performance feedback for large sites. Schneider Electric’s StruxureWare Power Monitoring StruxureWare Central, for Expert is an example of a facility power monitoring subsystem (see Figure 3). example, has a secondary ability to monitor Modbus devices outside the IT room. While not its primary function, that ability may be enough for data center Facility environmental control operators with simple Modbus Facility environmental control subsystems traditionally support the requirements of corporate device monitoring requirements. Table 2 shows examples of the facilities departments. In addition to facility heat, ventilation, and air conditioning (HVAC) primary and secondary functions control, facility environmental subsystems can also encompass fire systems, water, steam, of physical infrastructure and gas systems. The preferred communication protocols for facility environmental control monitoring systems. systems include BACnet, LONworks, and Modbus. Schneider Electric – Data Center Science Center White Paper 104 Rev 3 5
  • 6. Classification of Data Center Infrastructure Management (DCIM) Tools Everyday functions of facility environmental control systems include the opening and closing of valves and dampers, the spinning up fans, initialization of pumps, and the controlled cooling and heating of targeted spaces within the facility. Schneider Electric’s StruxureWare Building Expert is an example of a mainstream facility environmental control subsystem. Facility environmental control subsystems are also differentiated from facility power management subsystems in that facility environmental control handles the coordination, control and reporting for all energies, not just electrical power. Power Monitor- Building Expert Pelco Digital Primary function ing Expert** Data Center Expert* Sentry (BMS) Secondary Function Table 2 No Function Comparison of Monitoring & Automation primary and Facility Power secondary functions using Schneider Electric’s StruxureWare for Data Power device monitoring Centers suite as an example Power analytics PUE monitoring > Note regarding Facility Environmental Control tables 2 and 3 Automation and control Many physical infrastructure software products from multiple manufacturers exist in the F Cooling device monitoring marketplace today. Most offer a wide variety of functions. U Tables 2 and 3 compare the N Facility Security functions of only a partial C sampling of the Schneider T Electric products that fit within Surveillance the Operations Technology (OT) I universe. O N Access control Tables 2 and 3 are not meant S to be a comprehensive IT Room representation of what is available in the marketplace. In fact, it is not Schneider Power device monitoring Electric’s role to represent other manufacturer’s products in these tables. The functions of Cooling device monitoring other manufacturer’s products are often in a state of flux and could easily be misrepresented. Environmental monitoring Therefore these tables are restricted to a portion of the Schneider Electric current suite Security monitoring of products. Generic tables are located in Partial PUE monitoring the Appendix which allow for data center operators to enter their own personal suite of Facility power devices include: breakers, trip units, medium voltage and low voltage metering (i.e., management software products transformers, switches), programmable logic controllers (PLCs), remote terminal units (RTUs), auto- for comparison purposes. matic transfer switches (ATS), generator controls, UPS controls. Schneider Electric – Data Center Science Center White Paper 104 Rev 3 6
  • 7. Classification of Data Center Infrastructure Management (DCIM) Tools IT power devices include: UPS controls, power distribution units (PDUs) and branch circuit metering, rack power strip metering * Includes security add- ons such as NetBotz, and PUE monitoring tools such as StruxureWare Data Center Operation : Energy Efficiency ** Works in coordination with installed meters for data collection Facility security As new technologies such as advanced optical video management systems, biometric identification, and remote management systems become more widely available, traditional card-and-guard security is being supplanted by facility security subsystems that can provide positive identification and tracking of human activity in and around the data center. Identifica- tion technology is changing as fast as the facilities, information, and communication it protects. Schneider Electric Pelco is an example of a facility security subsystem capable of providing both indoor and outdoor video security support. Figure 4 Typical data center IT room security interface > A note regarding subsystem users Subsystems throughout the data center are managed by individuals with differing job IT room responsibilities. On the IT side, IT room management subsystems monitor the power and cooling systems on the IT room operators tend to focus on a series of individual subsystem floor so that uptime of servers, communication equipment, and storage equipment can be GUIs whereas management maintained. Data center IT room management subsystems are developed around the needs focuses on the consolidated and requirements of the computer room operators (a need for faster speed and real-time information reported on the dashboard. information). The IT environment is characterized by frequent changes, intelligent devices, and a management philosophy based on exception. These subsystems can also integrate On the facilities side, a similar with security cameras within rows of racks such as Schneider Electric’s NetBotz cameras. situation occurs. Engineers monitor individual building HVAC systems, for example, and the IT room management subsystems are designed to accommodate simultaneous firmware facilities management tends to upgrades to multiple systems, and to monitor battery health by identifying exceptions that interact with the dashboards that display cross facility information. indicate behavioral characteristics beyond pre-programmed thresholds. IT room manage- ment subsystems are built around the expectation that power and cooling monitoring operates in a manner similar to other IT applications. That is, the software can be self Schneider Electric – Data Center Science Center White Paper 104 Rev 3 7
  • 8. Classification of Data Center Infrastructure Management (DCIM) Tools installed, and the software performs auto discovery of linked components. In essence, everything just “works” out of the box, with the ability to change the configuration. These subsystems generally utilize an IP network communication protocol. Schneider Electric’s StruxureWare Data Center Expert is an example of an IT room management subsystem. Planning & Planning & Implementation, the second subset of subsystems (see Figure 1), ensures 1) efficient deployment of new equipment, 2) execution of planning in order to facilitate Implementation changes in the data center, 3) tracking of assets within the data center, and 4) simulation of potential changes in order to analyze the future impact on the data center. Functions within Planning & Implementation involve prediction and modeling (“What happens if I do this?”), change tracking (“At what point does my system get obsolete?”), inventory tracking (“How do I track the history and movements of this piece of equipment?”), and dependency analysis (“If I change the contents of this rack, how will it impact my cooling?”). Five subsystem groupings exist within the Planning & Implementation subset: Facility asset management – This subsystem allows for management of asset deployment, generation of facility-related parts specifications, calibration, costing and tracking of building equipment assets. Facility capacity management – This subsystem aids facilities staff to plan both moves and changes within the mechanical and electrical rooms, by providing real-time measurements of energy consumption and water flows in addition to the project impact of changes to the power and cooling infrastructure. Planning & Implementation Subset Figure 5 Sub-systems Functions Facility asset The Planning & Imple- management Change tracking mentation subset contains several sub- Facility capacity Inventory tracking management systems each of which provide a number of IT room workflow management Dependency analysis functions IT room capacity Visualization management IT room asset & lifecycle management Prediction & modeling IT room workflow management – This subsystem facilitates the execution of equipment additions, moves, and changes by presenting a hierarchical overview of data center locations, including global and local views and from groups to single assets. Schneider Electric – Data Center Science Center White Paper 104 Rev 3 8
  • 9. Classification of Data Center Infrastructure Management (DCIM) Tools IT room capacity management – From a power consumption efficiency perspec- Link to resource tive, the system identifies the optimal physical location for power, cooling, and rack-based IT White Paper 150 equipment. User defined requirements such as redundancy, network use, and line of Power and Cooling Capacity business groupings are also factored in. Live data is utilized to create simulations which Management for Data Centers analyze the impact of changes before they occur. This level of planning allows for reductions in stranded cooling and power capacity. For more information on the subject of stranded capacity, please see White Paper 150, Power and Cooling Capacity Management for Data Centers. IT room asset & lifecycle management – This subsystem allows for the man- agement of IT room inventory. Visual models of the data center layout enable tracking of IT assets and available space. The rendering of the data center physical layout also allows for visualization of power consumption per rack as well as identification and location of power failures. Figure 6 Planning & Implementation for the IT room environment utilizing the Schneider Electric StruxureWare Data Center Operation GUI Table 3 helps to differentiate some of the mainstream planning and implementation subsys- tems in terms of their primary and secondary functions. Schneider Electric – Data Center Science Center White Paper 104 Rev 3 9
  • 10. Classification of Data Center Infrastructure Management (DCIM) Tools Power Monitor- Building Expert Data Center Data Center Data Center Operation - Operation - Primary function ing Expert Operation Capacity Change (BMS) Secondary Function No Function FACILITY ASSET MANAGEMENT Inventory tracking Maintenance tracking FACILITY CAPACITY MANAGEMENT Impact and dependen- cy analysis - Power Table 3 Impact and dependen- Comparison of cy analysis - Cooling Planning & Implementation F primary and secondary functions IT ROOM WORKFLOW MANAGEMENT U using Schneider Electric’s StruxureWare for Data Centers N Prediction and model- suite as an example C ing T I Workflow tracking O N IT ROOM CAPACITY MANAGEMENT S Impact and dependen- cy analysis - Power Impact and dependen- cy analysis - Cooling Impact and dependen- cy analysis - Network IT ROOM ASSET & LIFECYCLE MANAGEMENT Inventory tracking Change tracking Schneider Electric – Data Center Science Center White Paper 104 Rev 3 10
  • 11. Classification of Data Center Infrastructure Management (DCIM) Tools Data collection The data collection subset represents devices such as meters, power protection devices, embedded cards, programmable logic controllers (PLCs), sensors and other such devices. These devices perform the fundamental function of gathering data and forwarding it to management software for processing. Figure 7 Human machine interface (HMI) provides configuration and operation information for individual UPS device Dashboard Data center managers all require some means for consolidating critical information about the performance of their data center. Not only does the critical information need to be aggregat- ed, but the user needs to visualize the data in a manner that is meaningful and actionable. In fact, this visualization of the data via a dashboard is a key function that allows a view across the four main subsystem subsets. Operational dashboard data may include the following: average temperature and humidity, high temperature and humidity for a determined period, IT load, total data center load, and a summary of the last 10 critical alerts. From a security perspective the dashboard could also highlight the last 10 physical entries into the data center and the times when these entries took place. Some operators, who are responsible for controlling their own energy costs, may also require PUE data on their dashboard. Some data center operators may choose to access data in its raw form without the benefit of a dashboard. For example, queries from SQL tables may be generated and transferred to an Excel file so that a report can be produced that meets the immediate requirement for performance information. Various monitoring subsystems can also highlight urgent issues. But as data centers become more complex, the information required needs to be easily formatted and presented into a formal dashboard. A dashboard represents a third subset which captures data from the three other subsets and then updates to a management package, providing KPIs and data summaries, over the existing network. Some dashboards are more focused on the performance of the IT equipment while others provide summary views into the physical infrastructure (cooling, power, security). Dash- boards draw their information from monitoring & automation and planning & implementation, Schneider Electric – Data Center Science Center White Paper 104 Rev 3 11
  • 12. Classification of Data Center Infrastructure Management (DCIM) Tools and data collection subsets. Some dashboards are custom built or are purchased from third parties (see Figure 8 for sample dashboard). Visualization software Although the dashboard is the key centerpiece for aggregation of actionable data, various levels of human machine interface (HMI) and graphical user interface (GUI) exist and enable meaningful data to be visualized by specific users via the various subsystems across the data center (see GUI and HMI in Figure 1). Although the HMI used by the facilities engineer may not resemble the GUI utilized by the IT operator, both extract information from the system based upon the individual user’s preferences and priorities. Figure 8 Sample dashboard collects data across OT subsets and centralizes infor- mation in one or more user interfaces Schneider Electric – Data Center Science Center White Paper 104 Rev 3 12
  • 13. Classification of Data Center Infrastructure Management (DCIM) Tools Conclusion By sharing key data points, alarm notifications, historical data, and asset tracking information, data center facility and IT infrastructure management software allows users to make informed decisions based upon real-time power and cooling capacity and redundancy data. The classification system presented in this paper takes the first step in laying the groundwork for a logical approach which can be summarized as follows: A Whole Data Center, from which is selected the Facility and IT infrastructure portion, which is divided into Subsets, each of which consists of multiple Subsystems, which are compared and contrasted by illustrating Primary and Secondary functions, which enable Efficient investment in management software …with key steps supported by visualization software Today multiple management applications across the principle domains of IT room manage- ment, building control, security, and power address various parts of the enterprise suite, but no one application does it all. The segmented approach will continue for the foreseeable future. However, innovative dashboards are being developed that will facilitate prudent, informed operational decisions that consolidate information from these sources and enhance uptime and reduce energy costs. About the author Kevin Brown is the Vice President of Data Center Global Solution Offer & Strategy at Schneider Electric. Kevin holds a BS in mechanical engineering from Cornell University. Prior to this position at Schneider Electric, Kevin served as Director of Market Development at Airxchange, a manufacturer of energy recovery ventilation products and components in the HVAC industry. Before joining Airxchange, Kevin held numerous senior management roles at Schneider Electric, including Director, Software Development Group. Dennis Bouley is a Senior Research Analyst at Schneider Electric's Data Center Science Center. He holds bachelor’s degrees in journalism and French from the University of Rhode Island and holds the Certificat Annuel from the Sorbonne in Paris, France. He has published multiple articles in global journals focused on data center IT and physical infra-structure environments and has authored several white papers for The Green Grid. Schneider Electric – Data Center Science Center White Paper 104 Rev 3 13
  • 14. Classification of Data Center Infrastructure Management (DCIM) Tools Resources Click on icon to link to resource Power and Cooling Capacity Management for Data Centers White Paper 150 Browse all white papers whitepapers.apc.com Browse all TradeOff Tools™ tools.apc.com Contact us For feedback and comments about the content of this white paper: Data Center Science Center DCSC@Schneider-Electric.com If you are a customer and have questions specific to your data center project: Contact your Schneider Electric representative at www.apc.com/support/contact/index.cfm Schneider Electric – Data Center Science Center White Paper 104 Rev 3 14
  • 15. Classification of Data Center Infrastructure Management (DCIM) Tools Appendix Table A1 Monitoring & Automation product comparison worksheet Power Monitor- Building Expert Primary function Pelco Digital Name of product Name of product Name of product Name of product Name of product ing Expert** Data Center Expert* Sentry (BMS) Secondary Function No Function FACILITY POWER Power device monitoring Power analytics Efficiency monitoring FACILITY ENVIRONMENTAL CONTROL Cooling device monitoring F Automation and control U N FACILITY SECURITY C T I Surveillance O N Access control S IT ROOM Power device monitoring Cooling device monitoring Environmental monitoring Security monitoring Partial PUE monitoring * Includes security add- ons such as NetBotz, and PUE monitoring tools such as InfraStruxure Energy Efficiency ** Works in coordination with installed meters for data collection Schneider Electric – Data Center Science Center White Paper 104 Rev 3 15
  • 16. Classification of Data Center Infrastructure Management (DCIM) Tools Table A2 Planning & Implementation product comparison worksheet Power Monitor- Building Expert Name of product Name of product Name of product Name of product Data Center Primary function ing Expert Operation Data Center Data Center Operation - Operation - Capacity (BMS) Change Secondary Function No Function FACILITY ASSET MANAGEMENT Inventory tracking Maintenance tracking FACILITY CAPACITY MANAGEMENT Impact and dependency analysis - Power Impact dependency analysis - Cooling F IT ROOM WORKFLOW MANAGEMENT U N C Prediction and modeling T I Workflow tracking O N IT ROOM CAPACITY MANAGEMENT S Impact and dependency analysis - Power Impact and dependency analysis - Cooling Impact and dependency analysis - Network ports IT ROOM ASSET & LIFECYCLE MANAGEMENT Inventory tracking Change tracking Schneider Electric – Data Center Science Center White Paper 104 Rev 3 16