Purpose of the Presentation
• Overview of the EA Process
• Describe how Kitselas is engaged
• Overview of LNG projects currently in the EA Process
• How concerns and views about the potential impacts of the proposed
Projects and the Application Review process are addressed
• Discuss how potential impacts to Aboriginal Interests are identified
and assessed in the EA;
• How Kitselas Department of Lands and Resources are working with
proponents and the EA process.
3
Purpose of Environmental Assessment
• Focussed review, early in life cycle of a major proposed
project
• Assess potential significant adverse environmental,
economic, social, heritage & health effects
• Identify ways to prevent or reduce adverse effects
• Specify terms and conditions in an EA Certificate, if issued
• Strategic rather than detailed level of assessment
Public
Comment
Period
Application
Prepared
and
Submitted
Application
Review
Assessment
Report
Project
Decision by
Ministers
Certificate
Issued with set
conditions--
Project
Authorized to
Proceed to
Permitting
Certificate
Refused –
Project Cannot
Proceed
Public
Comment
Period
Application
Information
Requirements
Environmental Assessment Process
Working Group Review
Scope and
Process for
Review
Determined
(Section 11
Order)
Project
Description
Determination
that Project is
Reviewable
(Section 10
Order)
FIRST NATION CONSULTATION
Monitoring,
compliance,
and
enforcement
Approved
Not Approved
Further
Assessment
Required
ED Referral
To Ministers
Compliance
Management
begins here
Develop Requirements
Minister(s) may
consider any other
matters that they
consider relevant to
the public interest in
making their decision
Pre-Application Stage
(no timeline)
(30 days) Application Review Stage
(180 days)
Decision
(45 days)
Application
Evaluated
for
Completeness
4
6
Certificate Issued:
Permitting, C&E,
amendments
Certificate
Refused
AIR
Section
11
Order
Project description
(Section 10 Order)
Application
Developed
Screening
30 days
Application
Review
180 days
Application
Aboriginal Consultation Report
(section 11 order defines timelines)
Aboriginal Consultation
Plan (30-60 d after S11)
Further
study
required
FIRST NATIONS CONSULTATION
Decision
within
45 days
• Kitselas is involved directly in the following EAO working
groups:
– Coastal GasLink
– West Coast Connector Gas Transmission Line
– Prince Rupert Gas Transmission
– Pacific Northern Gas Looping Project
– LNG Canada Export Facility
– Pacific Northwest LNG Export Facility
– Prince Rupert LNG Export Facility
7
8
First Nations Engagement in the EA Process
First Nations consultation is a key
component of EA:
• EAO engages in direct government-to-
government consultation with First Nations; and
• EAO requires proponents to conduct meaningful
consultation with First Nations.
9
First Nations Consultation
Impacts to Aboriginal Interests (Rights and Title)
• Past, present, and anticipated future uses
• Potential adverse effects to Aboriginal Interests
• Measures to mitigate potential adverse effects to
Aboriginal Interests, and views expressed by Aboriginal
Groups regarding mitigation measures
• Residual effects, and views expressed by Aboriginal
Groups regarding these effects
10
11
Certificate Issued:
Permitting, C&E,
amendments
Certificate
Refused
AIR
Section
11
Order
Project description
(Section 10 Order)
Application
Developed
Screening
30 days
Application
Review
180 days
Application
Aboriginal Consultation Report
(section 11 order defines timelines)
Aboriginal Consultation
Plan (30-60 d after S11)
Further
study
required
FIRST NATIONS CONSULTATION
Decision
within
45 days
Aboriginal Groups Information Requirements (Part C)
• Background Information
• Aboriginal Consultation
• Aboriginal Interests (Rights and Title/ Treaty Rights)
• Other Concerns
12
Additional Comments on Part C
• Information provided by First Nations (to EAO/
Proponent) through Application Review informs EAO’s
conclusions on the seriousness of potential impacts to
Aboriginal Interests.
• Key information includes:
– Traditional territories and specific areas of use overlapped
by the proposed Project area
– What Aboriginal Interests would be impacted
– The nature of the potential impacts
– Mitigation/ accommodation
13
14
EA Timelines for Proposed Projects
Referral
day 180
Application
Screening
30 days
Application Review
day 150
EAO internal reviews
day 1 day 42
WG
comments
due
day 70-84
WG
Meetings
day 115-135
WG review
draft
Assessment
Report,
Conditions,
CPD
day 63-77
Review Prop
Responses
day 130-150
First Nations review
EAO Aboriginal
Consultation Report
(Part C)
day 160
Separate FN
Submission
15
A quick overview…
• How is Kitselas First Nation engaging in the EA process?
• Agreements
16
17
Memorandum of Understanding
• Provides funding for Kitselas Lands and Resources to:
– Employ community liaison officers
– Employ staff
– Hold community meetings with proponents
– Participate in the EA process
– Conduct Traditional Use Studies
– Employ expert knowledge
• Does not indicate support for the project, but enables the
Department to form a decision based on evidence
gathered through review of project documents, field work
and meeting with proponents
18
Where are we?
Projects in Kitimat
- Pipelines:
- PNG Looping: LOA complete. MOU almost finalised.
- Northern Gateway: LOA complete. New agreement.
- PTP: LOA complete. MOU complete. New agreement
finalised.
- Coastal GasLink: LOA complete. MOU complete.
- Facilities:
- LNG Canada: LOA complete. MOU almost finalised.
- Kitimat LNG: The facility portion of PTP.
19
Where are we?
Projects in Prince Rupert
- Pipelines:
- WCGT: LOA complete. MOU finalised.
- PRGT: LOA complete. MOU in progress.
- Facilities:
- PNW LNG : LOA complete. MOU finalised.
- PR LNG: LOA complete. MOU in progress.
- Nexen: MOU in progress.
- Woodside: Initial meeting complete. LOA in progress.
- Imperial Oil LNG: Initial meeting complete.
20
Community Liaison Officers
Pat Squires:
- Coastal GasLink.
- WCGT
- Nexen
Kristie Bevan:
- PRGT
- PNW LNG
- LNG Canada
21
Community Liaison Officers
Noel Argueta:
- PNG Looping
- PTP
- Prince Rupert LNG
Rhonda MacPherson:
- Woodside
- Imperial Oil LNG
- Northern Gateway
22
• Prince Rupert Gas Transmission (TransCanada)
– Nathan Braun (250-387-0233)
• West Coast Connector Gas Transmission (Spectra)
– Nathan Braun (250-387-0233)
• Coastal Gas Link (TransCanada)
– Michael Shepard (250-387-8745)
• PNG Looping (PNG)
– Ricardo Toledo (250-387-0833)
• Pacific North West (Petronas)
– Ken Howes (250-387-2445)
• LNG Canada
– Scott Bailey (250-356-1124)
• Prince Rupert LNG
– Tavis McDonald (250-638-5172)
23
EAO Project Lead Contacts
http://www.eao.gov.bc.ca/ea_process.html
http://engage.gov.bc.ca/lnginbc/

More Related Content

What's hot

006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)djhutch
 
A Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordA Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordNow Dentons
 
2015 Hawaii Congress of Planning Officials -- AICP Law
2015 Hawaii Congress of Planning Officials -- AICP Law2015 Hawaii Congress of Planning Officials -- AICP Law
2015 Hawaii Congress of Planning Officials -- AICP LawJesse Souki
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014KEPHART
 
2014 planning case law update 180214 [2]
2014 planning case law update 180214 [2]2014 planning case law update 180214 [2]
2014 planning case law update 180214 [2]JRidley12
 
Recent Developments in Planning and Land Use Law 2021
Recent Developments in Planning and Land Use Law 2021Recent Developments in Planning and Land Use Law 2021
Recent Developments in Planning and Land Use Law 2021Jesse Souki
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Association for Project Management
 
Plan Nord
Plan NordPlan Nord
Plan Nordcgla
 
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...Jesse Souki
 
Low res 0082_EA_CoastalComms_AW_LR
Low res 0082_EA_CoastalComms_AW_LRLow res 0082_EA_CoastalComms_AW_LR
Low res 0082_EA_CoastalComms_AW_LRJohn Gower
 
IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16Graeme Donaldson
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
Planning & Environment Law Update
Planning & Environment Law UpdatePlanning & Environment Law Update
Planning & Environment Law Update39 Essex Chambers
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...latrobeuni
 

What's hot (20)

006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)
 
A Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordA Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan Nord
 
2015 Hawaii Congress of Planning Officials -- AICP Law
2015 Hawaii Congress of Planning Officials -- AICP Law2015 Hawaii Congress of Planning Officials -- AICP Law
2015 Hawaii Congress of Planning Officials -- AICP Law
 
Transboundary EIA and planning
Transboundary EIA and planningTransboundary EIA and planning
Transboundary EIA and planning
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014
 
11 cunningham
11 cunningham11 cunningham
11 cunningham
 
2014 planning case law update 180214 [2]
2014 planning case law update 180214 [2]2014 planning case law update 180214 [2]
2014 planning case law update 180214 [2]
 
Recent Developments in Planning and Land Use Law 2021
Recent Developments in Planning and Land Use Law 2021Recent Developments in Planning and Land Use Law 2021
Recent Developments in Planning and Land Use Law 2021
 
Planning Case Law Update
Planning Case Law UpdatePlanning Case Law Update
Planning Case Law Update
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
 
Plan Nord
Plan NordPlan Nord
Plan Nord
 
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...
Measures that Passed the 27th Legislature and Will Affect Hawaii's Statewide ...
 
Low res 0082_EA_CoastalComms_AW_LR
Low res 0082_EA_CoastalComms_AW_LRLow res 0082_EA_CoastalComms_AW_LR
Low res 0082_EA_CoastalComms_AW_LR
 
IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16IID Quechan Tribe_Salton Sea update-5.4.16
IID Quechan Tribe_Salton Sea update-5.4.16
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Env training ppt rev01
Env training ppt rev01Env training ppt rev01
Env training ppt rev01
 
Post pn-173
Post pn-173Post pn-173
Post pn-173
 
Planning & Environment Law Update
Planning & Environment Law UpdatePlanning & Environment Law Update
Planning & Environment Law Update
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
 
23 january 2012 kuper chicago remarks(21 jan'13)
23 january 2012 kuper chicago remarks(21 jan'13)23 january 2012 kuper chicago remarks(21 jan'13)
23 january 2012 kuper chicago remarks(21 jan'13)
 

Similar to Environmental Assessment Presentation Kitselas Aug 15, 2014

4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - BairdEthical Sector
 
Planning & development club, June 2018, Nottingham
Planning & development club, June 2018, Nottingham Planning & development club, June 2018, Nottingham
Planning & development club, June 2018, Nottingham Browne Jacobson LLP
 
2012 ceqa presentation for ce class
2012 ceqa presentation for ce class2012 ceqa presentation for ce class
2012 ceqa presentation for ce classCEQAplanner
 
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...PERUMIN - Convención Minera
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14Competition Advisory Services (India) LLP
 
Windpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference BrochureWindpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference Brochuregm330
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basicsnado-web
 
2014 06 mel nicholls
2014   06 mel nicholls2014   06 mel nicholls
2014 06 mel nichollsSevernEstuary
 
Bill frews and Geraint Ellis presentations
Bill frews and Geraint Ellis presentationsBill frews and Geraint Ellis presentations
Bill frews and Geraint Ellis presentationsallytibbitt
 
Planning: The People#s Perspective conference
Planning: The People#s Perspective conferencePlanning: The People#s Perspective conference
Planning: The People#s Perspective conferenceallytibbitt
 
What can Developments of National Significance learn from the NSIP regime?
What can Developments of National Significance learn from the NSIP regime?What can Developments of National Significance learn from the NSIP regime?
What can Developments of National Significance learn from the NSIP regime?The Planning Inspectorate
 
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...Shellfish Association
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDOECD Environment
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-IndiaKezar Ali. Shah
 

Similar to Environmental Assessment Presentation Kitselas Aug 15, 2014 (20)

4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird4. Outline Public Participation Guidelines - Baird
4. Outline Public Participation Guidelines - Baird
 
Planning & development club, June 2018, Nottingham
Planning & development club, June 2018, Nottingham Planning & development club, June 2018, Nottingham
Planning & development club, June 2018, Nottingham
 
2012 ceqa presentation for ce class
2012 ceqa presentation for ce class2012 ceqa presentation for ce class
2012 ceqa presentation for ce class
 
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...
PERUMIN 31: Engineering permitting requirements for mining projects in Peru a...
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
 
Windpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference BrochureWindpower Monthly Offshore Consenting Conference Brochure
Windpower Monthly Offshore Consenting Conference Brochure
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basics
 
Aboriginal Title and Rights after Tsilhqot'in_M Alexander
Aboriginal Title and Rights after Tsilhqot'in_M AlexanderAboriginal Title and Rights after Tsilhqot'in_M Alexander
Aboriginal Title and Rights after Tsilhqot'in_M Alexander
 
2014 06 mel nicholls
2014   06 mel nicholls2014   06 mel nicholls
2014 06 mel nicholls
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
 
Bill frews and Geraint Ellis presentations
Bill frews and Geraint Ellis presentationsBill frews and Geraint Ellis presentations
Bill frews and Geraint Ellis presentations
 
Planning: The People#s Perspective conference
Planning: The People#s Perspective conferencePlanning: The People#s Perspective conference
Planning: The People#s Perspective conference
 
What can Developments of National Significance learn from the NSIP regime?
What can Developments of National Significance learn from the NSIP regime?What can Developments of National Significance learn from the NSIP regime?
What can Developments of National Significance learn from the NSIP regime?
 
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...
Martyn Youell (Marine Management Organisation (MMO)) - “The Marine Planning S...
 
6 jornada aae-060312_louis meuleman
6 jornada aae-060312_louis meuleman6 jornada aae-060312_louis meuleman
6 jornada aae-060312_louis meuleman
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
 

Environmental Assessment Presentation Kitselas Aug 15, 2014

  • 1. Kitselas and the BC Environmental Assessment Community Information Session August 15/16, 2014 1
  • 2. 2 Purpose of the Presentation • Overview of the EA Process • Describe how Kitselas is engaged • Overview of LNG projects currently in the EA Process • How concerns and views about the potential impacts of the proposed Projects and the Application Review process are addressed • Discuss how potential impacts to Aboriginal Interests are identified and assessed in the EA; • How Kitselas Department of Lands and Resources are working with proponents and the EA process.
  • 3. 3 Purpose of Environmental Assessment • Focussed review, early in life cycle of a major proposed project • Assess potential significant adverse environmental, economic, social, heritage & health effects • Identify ways to prevent or reduce adverse effects • Specify terms and conditions in an EA Certificate, if issued • Strategic rather than detailed level of assessment
  • 4. Public Comment Period Application Prepared and Submitted Application Review Assessment Report Project Decision by Ministers Certificate Issued with set conditions-- Project Authorized to Proceed to Permitting Certificate Refused – Project Cannot Proceed Public Comment Period Application Information Requirements Environmental Assessment Process Working Group Review Scope and Process for Review Determined (Section 11 Order) Project Description Determination that Project is Reviewable (Section 10 Order) FIRST NATION CONSULTATION Monitoring, compliance, and enforcement Approved Not Approved Further Assessment Required ED Referral To Ministers Compliance Management begins here Develop Requirements Minister(s) may consider any other matters that they consider relevant to the public interest in making their decision Pre-Application Stage (no timeline) (30 days) Application Review Stage (180 days) Decision (45 days) Application Evaluated for Completeness 4
  • 5.
  • 6. 6 Certificate Issued: Permitting, C&E, amendments Certificate Refused AIR Section 11 Order Project description (Section 10 Order) Application Developed Screening 30 days Application Review 180 days Application Aboriginal Consultation Report (section 11 order defines timelines) Aboriginal Consultation Plan (30-60 d after S11) Further study required FIRST NATIONS CONSULTATION Decision within 45 days
  • 7. • Kitselas is involved directly in the following EAO working groups: – Coastal GasLink – West Coast Connector Gas Transmission Line – Prince Rupert Gas Transmission – Pacific Northern Gas Looping Project – LNG Canada Export Facility – Pacific Northwest LNG Export Facility – Prince Rupert LNG Export Facility 7
  • 8. 8 First Nations Engagement in the EA Process
  • 9. First Nations consultation is a key component of EA: • EAO engages in direct government-to- government consultation with First Nations; and • EAO requires proponents to conduct meaningful consultation with First Nations. 9 First Nations Consultation
  • 10. Impacts to Aboriginal Interests (Rights and Title) • Past, present, and anticipated future uses • Potential adverse effects to Aboriginal Interests • Measures to mitigate potential adverse effects to Aboriginal Interests, and views expressed by Aboriginal Groups regarding mitigation measures • Residual effects, and views expressed by Aboriginal Groups regarding these effects 10
  • 11. 11 Certificate Issued: Permitting, C&E, amendments Certificate Refused AIR Section 11 Order Project description (Section 10 Order) Application Developed Screening 30 days Application Review 180 days Application Aboriginal Consultation Report (section 11 order defines timelines) Aboriginal Consultation Plan (30-60 d after S11) Further study required FIRST NATIONS CONSULTATION Decision within 45 days
  • 12. Aboriginal Groups Information Requirements (Part C) • Background Information • Aboriginal Consultation • Aboriginal Interests (Rights and Title/ Treaty Rights) • Other Concerns 12
  • 13. Additional Comments on Part C • Information provided by First Nations (to EAO/ Proponent) through Application Review informs EAO’s conclusions on the seriousness of potential impacts to Aboriginal Interests. • Key information includes: – Traditional territories and specific areas of use overlapped by the proposed Project area – What Aboriginal Interests would be impacted – The nature of the potential impacts – Mitigation/ accommodation 13
  • 14. 14 EA Timelines for Proposed Projects Referral day 180 Application Screening 30 days Application Review day 150 EAO internal reviews day 1 day 42 WG comments due day 70-84 WG Meetings day 115-135 WG review draft Assessment Report, Conditions, CPD day 63-77 Review Prop Responses day 130-150 First Nations review EAO Aboriginal Consultation Report (Part C) day 160 Separate FN Submission
  • 15. 15 A quick overview… • How is Kitselas First Nation engaging in the EA process? • Agreements
  • 16. 16
  • 17. 17 Memorandum of Understanding • Provides funding for Kitselas Lands and Resources to: – Employ community liaison officers – Employ staff – Hold community meetings with proponents – Participate in the EA process – Conduct Traditional Use Studies – Employ expert knowledge • Does not indicate support for the project, but enables the Department to form a decision based on evidence gathered through review of project documents, field work and meeting with proponents
  • 18. 18 Where are we? Projects in Kitimat - Pipelines: - PNG Looping: LOA complete. MOU almost finalised. - Northern Gateway: LOA complete. New agreement. - PTP: LOA complete. MOU complete. New agreement finalised. - Coastal GasLink: LOA complete. MOU complete. - Facilities: - LNG Canada: LOA complete. MOU almost finalised. - Kitimat LNG: The facility portion of PTP.
  • 19. 19 Where are we? Projects in Prince Rupert - Pipelines: - WCGT: LOA complete. MOU finalised. - PRGT: LOA complete. MOU in progress. - Facilities: - PNW LNG : LOA complete. MOU finalised. - PR LNG: LOA complete. MOU in progress. - Nexen: MOU in progress. - Woodside: Initial meeting complete. LOA in progress. - Imperial Oil LNG: Initial meeting complete.
  • 20. 20 Community Liaison Officers Pat Squires: - Coastal GasLink. - WCGT - Nexen Kristie Bevan: - PRGT - PNW LNG - LNG Canada
  • 21. 21 Community Liaison Officers Noel Argueta: - PNG Looping - PTP - Prince Rupert LNG Rhonda MacPherson: - Woodside - Imperial Oil LNG - Northern Gateway
  • 22. 22
  • 23. • Prince Rupert Gas Transmission (TransCanada) – Nathan Braun (250-387-0233) • West Coast Connector Gas Transmission (Spectra) – Nathan Braun (250-387-0233) • Coastal Gas Link (TransCanada) – Michael Shepard (250-387-8745) • PNG Looping (PNG) – Ricardo Toledo (250-387-0833) • Pacific North West (Petronas) – Ken Howes (250-387-2445) • LNG Canada – Scott Bailey (250-356-1124) • Prince Rupert LNG – Tavis McDonald (250-638-5172) 23 EAO Project Lead Contacts http://www.eao.gov.bc.ca/ea_process.html http://engage.gov.bc.ca/lnginbc/