Autorecloser relays are widely implemented in the electric utilities Over Head Lines networks to improve power availability and to maintain system stability. ...

Autorecloser relays are widely implemented in the electric utilities Over Head Lines networks to improve power availability and to maintain system stability.
Site testing need to be performed before operation to ensure proper function of Autoreclosers.

Statistics

Views

Total Views
12,024
Views on SlideShare
12,001
Embed Views
23

Actions

Likes
7
Downloads
405
Comments
2

1 Embed 23

http://www.slideshare.net 23

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • Thanks, kmkvelu
    Are you sure you want to
    Your message goes here
    Processing…
  • very useful for engrs
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Auto Reclose Testing Auto Reclose Testing Presentation Transcript

  • ON SITE TESTING OF AUTO RECLOSER RELAYS Riam A. Wibowo
  • Introduction
    • Autorecloser relays are widely implemented in the electric utilities Over Head Lines networks to improve power availability and to maintain system stability.
    • Site testing need to be performed before operation to ensure proper function of Autoreclosers.
    • There is not much manufacturer guidance in functional site testing of Autoreclosers. Therefore, testing engineers have to carry out the functional site tests according to specific requirements of the installations.
    • Application of multifunction and numerical relays has reduced the number of elements and wirings to be tested on site, but it would not eliminate the requirement to perform site testing.
  • An Over head line with Auto recloser relays
    • A temporary fault occur
    • Protective relays operate
      • breaker tripped
      • Power off
    • Fault extinguished
    • Autorecloser relays order the breaker to reclose
      • Breaker reclose
      • Power is restored automatically
    Utility Substation Customers
  • An Over head line without Auto recloser relays
    • A temporary fault occur
    • Protective relays operate
      • breaker tripped
      • Power off
    • Fault extinguished
    • Breaker need to be closed manually to restore power
    Utility Substation Customers
  • TYPICAL CONFIGURATION & SETTING of AUTORECLOSER RELAY in INDONESIA Currently under Construction 275kV Over Current Distance Relay Distance Relay Protective relay one
    • One
    • two (for “One & Half Breaker” S/S)
    two Number of Breakers three poles single and three poles single pole Single or Multi Pole single shot single shot single shot Number of shots   180 second   40 second 40 second  Reclaim Time Setting 60 second    1 second 0.7 or 0.9 second Dead Time Setting 20kV 150kV 500kV
  • Basic Requirement of Autorecloser Relay Performance
    • The Autorecloser Relay should reclose the Breaker(s) whenever it is initiated by Protective Relay
    • The Autorecloser Relay should not reclose the Breaker(s) if the initiation occurs during the Reclaim Time
    • For single pole mode, the Autorecloser Relay should only reclose the Breaker(s) for single phase to earth fault.
    • The Autorecloser Relay should never reclose the Breaker(s) if :
      • no initiation from Protective Relay (e.g. when the Breaker(s) are intentionally opened by people)
      • Any of the Breaker(s) is not ready
      • it is not switched to active
  • Basic Requirement of Autorecloser Relay Performance (2)
    • For single and three poles mode :
      • The Autorecloser Relay should reclose the Breaker(s) for line-line fault under control of synchrocheck relay
      • The Autorecloser Relay should reclose the Breaker(s) for single phase to earth fault
    • Three poles reclosing should be under Synchro Check control (except for 20kV radial networks)
    • Failure of reclosing after single pole tripping should be followed by tripping of all poles
  • Specific requirement for 500 kV Autorecloser Relay
    • The Autorecloser Relay should reclose the Breaker(s) when initiated by any Distance Relay (due to duplex configuration of 500 kV protection scheme)
    • Since 500kV Substations are one & half breaker type, the Autorecloser Relay should be able to recognize and control each of the Breaker as “leader Breaker ” and “follower Breaker”
  • TYPICAL SITE TESTS ITEMS OF AUTORECLOSER RELAY INSTALLATION OPERATION Visual Check Check of the Power Supply Test of the Autorecloser settings Functional Testing (involving operation of Protective Relays & Circuit Breaker(s)
  • Protective Relay technology development Multi elements Relays Single Module Relays Multifunction Relays Electro mechanical Electronic Digital/numerical
  • Effect of relay technology development to Autorecloser site testing
    • Many elements need to to be tested on site
    • Many site wiring need to be tested
    • Many problems can be detected early by visual inspection
    • In most cases, defective in Autorecloser element can be repaired on site and replacements can be obtained in local market.
    • The function of other elements are not effected by failure of an element.
    • The site test engineers are less dependent on the manufacturer. Often, experienced engineers could perform the site test without reading the Manufacturer Manuals
    • Site test can be performed using simple relay test set
    • Multi elements (Several electro mechanic /electronic elements hard wired to perform Autorecloser function)
    •  
    Disadvantage Advantage   Type of Autorecloser
  • Effect of relay technology development to Autorecloser site testing
    • Only few problems can be detected early by visual inspection
    • Defective Autorecloser elements might effecting the whole functions of Autorecloser. and usually can not be repaired on site
    • The site test is depend on the manufacturer. The test engineers need to study Manufacturer Manuals to perform the site test
    • Elements to be tested on site are less than the multi elements type of Autorecloser
    • Site wiring to be tested are less than the multi elements type of Autorecloser
    • Often, relay power consumption is lower,
    • Single modulo ( Single electronic module perform Autorecloser function)
    •  
    Disadvantage Advantage   Type of Autorecloser
  • Effect of relay technology development to Autorecloser site testing
    • It is difficult to detect problems by visual inspection
    • The site test is highly depend on the manufacturer. Even an experienced test engineers need to carefully study Manufacturer Manuals. Moreover a special software and hardware is needed to perform the site test.
    • Defective in Autorecloser element can not be repaired on site. In some cases, the whole relay need to be replaced
    • Modern and computerized relay test set is needed to perform the site test
    • Elements to be tested on site are less then the single modulo type of Autorecloser
    • Only few site wiring need to be tested
    • Often, relay power consumption is lower,
    • multifunction relay ( Autorecloser function integrated in a multifunction relay)
    Disadvantage Advantage   Type of Autorecloser
  • SUMMARY
    • Application of multifunction and numerical relays has reduced the number of elements and wirings to be tested on site. But it would not eliminate the requirement to perform site testing
    • By implementing multifunction and numerical relays, utilities have became more dependent to the relays manufacturers.
    • Trend of relay development toward multifunction and numerical relaying affect the site testing practice, but the basic configuration/setting and the expected results of Autorecloser function test are practically the same
  • Appendix
    • Autorecloser Relay Block Diagram
  • Multi elements Autorecloser ( Previous Generation of Autorecloser)
    • An Autorecloser consist of several electro mechanic/ electronic elements that hard wired to form Autorecloser function
    Autorecloser Timer(s) & Counters Aux. Relays & contacts Logic Circuit Power Supply Protective relay CIRCUIT BREAKER(S) Synchro Check relay
    • A single electronic module perform Autorecloser function
    Autorecloser Single Module Autorecloser ( Previous Generation of Autorecloser) Protective relay CIRCUIT BREAKER(S) Synchro Check relay
  • Current Generation of Autorecloser
    • Autorecloser function is integrated in a multifunction relay
    Protective .relay Autorecloser Synch Check CIRCUIT BREAKER(S)