SlideShare a Scribd company logo
1 of 5
Group 4 Takiantong Group
Flies Killer.
No Name     Description             Material   Manufacturing Quantity Unit    Total
                                               Process                cost    cost

1   Head    The head that drilled   Plastic    Cutting ,      1       13.33   13.33
            for assembled the                  Painting
            lamp.

2   Body1   The part that drilled   Plastic    Cutting ,      1       13.33   13.33
            2*2 cm^2 around                    Drilling and
            part.                              painting
3   Body2   The part that cut       Plastic    Cutting ,      1       13.33   13.33
            form the bottom                    Painting
            battle.

4   Body3   The part is head of     Plastic    Cutting ,      1       13.33   13.33
            battle for assembled               Painting
            the part.

5   Lamp    The size of lamp is     Glass      -              1       75      75
            match to another
            part.
                                                                  Total 129 bath
   The head of part is difficult to assembled to
    Lamp.
   Drill on head for little than plug of lamp.
Project first prototype

More Related Content

Viewers also liked

Local and Global Music Education
Local and Global Music EducationLocal and Global Music Education
Local and Global Music Educationlkapalka
 
Wetland Science by David D'amore
Wetland Science by David D'amoreWetland Science by David D'amore
Wetland Science by David D'amoreshtumpa
 
Restaurar sistema operativo a un estado anterior
Restaurar sistema operativo a un estado anteriorRestaurar sistema operativo a un estado anterior
Restaurar sistema operativo a un estado anterioraakros
 
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)Tutorial para la_instalaci_n_de_un_sistema_operativo (1)
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)aakros
 
你的灯亮着吗
你的灯亮着吗你的灯亮着吗
你的灯亮着吗changsiuki
 
MoG recruitment
MoG recruitmentMoG recruitment
MoG recruitmentlegacy123
 
必 证券市场基础知识2010版
必 证券市场基础知识2010版必 证券市场基础知识2010版
必 证券市场基础知识2010版changsiuki
 

Viewers also liked (11)

Mb final-web
Mb final-webMb final-web
Mb final-web
 
Taxonomy Change Management
Taxonomy Change ManagementTaxonomy Change Management
Taxonomy Change Management
 
Taxonomy card sort research summary
Taxonomy card sort research summaryTaxonomy card sort research summary
Taxonomy card sort research summary
 
Local and Global Music Education
Local and Global Music EducationLocal and Global Music Education
Local and Global Music Education
 
Wetland Science by David D'amore
Wetland Science by David D'amoreWetland Science by David D'amore
Wetland Science by David D'amore
 
Information Standards Lunch and Learn
Information Standards Lunch and LearnInformation Standards Lunch and Learn
Information Standards Lunch and Learn
 
Restaurar sistema operativo a un estado anterior
Restaurar sistema operativo a un estado anteriorRestaurar sistema operativo a un estado anterior
Restaurar sistema operativo a un estado anterior
 
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)Tutorial para la_instalaci_n_de_un_sistema_operativo (1)
Tutorial para la_instalaci_n_de_un_sistema_operativo (1)
 
你的灯亮着吗
你的灯亮着吗你的灯亮着吗
你的灯亮着吗
 
MoG recruitment
MoG recruitmentMoG recruitment
MoG recruitment
 
必 证券市场基础知识2010版
必 证券市场基础知识2010版必 证券市场基础知识2010版
必 证券市场基础知识2010版
 

Project first prototype

  • 1. Group 4 Takiantong Group Flies Killer.
  • 2. No Name Description Material Manufacturing Quantity Unit Total Process cost cost 1 Head The head that drilled Plastic Cutting , 1 13.33 13.33 for assembled the Painting lamp. 2 Body1 The part that drilled Plastic Cutting , 1 13.33 13.33 2*2 cm^2 around Drilling and part. painting 3 Body2 The part that cut Plastic Cutting , 1 13.33 13.33 form the bottom Painting battle. 4 Body3 The part is head of Plastic Cutting , 1 13.33 13.33 battle for assembled Painting the part. 5 Lamp The size of lamp is Glass - 1 75 75 match to another part. Total 129 bath
  • 3. The head of part is difficult to assembled to Lamp.
  • 4. Drill on head for little than plug of lamp.