• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Filming Schedule
 

Filming Schedule

on

  • 976 views

 

Statistics

Views

Total Views
976
Views on SlideShare
155
Embed Views
821

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 821

http://www.nctc-media.co.uk 821

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Filming Schedule Filming Schedule Document Transcript

    • Date: 1st November Scene/Section 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15 16. 17. 18. 19. Time 9:30 am Location Playground Director in charge Notes Ashley Meet at poppy’s House at 9:00am, ready to start filming at 9:30 Playground Poppy and street Travel to Coombe Abbey at 9:45 - 30 Mins Coombe 10:30 Danielle Abbey Different location Coombe 10:45 Poppy within CA – Costume Abbey change Coombe Different location 11:00 Poppy Abbey within CA Coombe Different location 11:15 Ashley Abbey within CA - Bench Coombe Different location 11:25 Ashley Abbey within CA – Path Coombe Same location as scene 11: 45 Ashley Abbey 7 Water break - 11:50 to 12:00 Coombe 12:00 Ashley Brick wall location Abbey Coombe Within an urban 12:15 Danielle Abbey location. Coombe 12:25 Ashley Water Location Abbey Dress scene with Coombe 12:45 Poppy natural objects :D Abbey costume change ! Coombe 12:55 Poppy Abbey Break for LUNCH !! 1:00 to 1:45 Coombe 1:50 Poppy Abbey Coombe 2:15 Ashley Costume Change ! Abbey Coombe Change in location 2:30 Poppy Abbey within CA. Coombe Change in location 3:00 Danielle Abbey within CA– Bench. Coombe Change in location 3:15 Danielle Abbey within CA. Coombe Change in location 3:30 Danielle Abbey within CA. Travel Home To Poppy’s Home – 3:30 to 4:30 9:35 am
    • 20. 4:10 21. 4:25 Silver Birch Avenue. Playground Danielle Danielle Finished Filming for day 4:45 - That’s a wrap !!! Things to remember ; Actors to arrive ready in costume. Ask about transport Easy costumes to change. Food and Drink for break throughout the day !!! Docking station – Ash Don’t forget !!! Collect natural objects for end scene throughout the day! REMEMBER all work and no play makes for a very unhappy actor! Necklace x2 Diary Cameras – Danielle and Ashley Guitar - Danielle Ukelele - Poppy