This document discusses quality control processes for welding and non-destructive testing (NDT). It outlines 3 key steps: 1) documenting weld and test information in the DorsaPMIS system, 2) conducting welding, fitting, and NDT tasks according to drawings and specifications, and 3) completing a test package that can be accepted or rejected. If accepted, the test package is closed out, and if rejected, non-conforming items must be addressed before resubmission.
5. Schedule, Class, Spec, Sheet, End line
Unit,Area,Sub contractor line
Area, Unit, Size, End, spool No, Field/shop
line Spool
Line PWHT
NDT line
line
5
welders
6. Drawing
Iso
Iso Drawing
Iso Iso No.
Iso
line PipeLine Iso
Iso No. line Line No. Pipe Line
Iso sheet
Joint Line Joint Joint
Joint line
Spool
Spool Spool
Spool Shop
Shop Shop
Feild Shop
line line NDT 6
line (RT, PWHT,
PT/MT)
7.
;
Sub Contractor Welder
line
New Rew
; AFC
7
9. COMPLETED ACCEPT
TEST PACKAGE
If Rejected
If Accepted
Test package 9
10. Welder
Fit up
Fit up
Weld
Daily Weld
Daily Report
Weld Fit up
NDT Request
Requst
Weld Fit up Pending Task
Completed
Weld Fit up
Task
Fit up Weld Canceled Task
10
Rejected Task
Weld Fit up