6. After clearing away debris, securing the slab with a
perimeter fence was a priority.
7. The slab was the center of operations; with trailers
as temporary storage.
8. This 98 foot “tent” would serve as a temporary
building.
9. The tent was a winter shelter, while the new building
was under construction.
10. That concludes this section. Thank you for viewing.