Your SlideShare is downloading. ×
Mp Star Chart Pp[1]
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Mp Star Chart Pp[1]

136
views

Published on

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
136
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Monday Primary Star Chart
  • 2. “ One Chance in a Lifetime”
            • Monday Primary
  • 3. Agenda
    • Teaching and Learning
    • Educator Preparation & Development
    • Leadership, Administration, & Instructional Support
    • Infrastructure for Technology
  • 4. Teaching & Learning
    • Classifications fluctuated slightly due to an increase in technology application implementation and student mastery of technology applications in 2007-2008
  • 5. Educator Preparation & Development
    • The scores were fairly consistent. However they did decrease in 2007-2008 due to lack of professional development.
  • 6. Leadership, Administration, & Instructional Support
    • Improvement was made in this area. Instructional Support & Leadership and Support of on-line Learning allowed the campus to reach and maintain advanced classification.
  • 7. Infrastructure for Technology
    • The scores in this area were the least consistent.
    • Matching students with computers
  • 8.  
  • 9.
    • Click here for more information about KISD
  • 10. Conclusion
    • Most areas remained fairly consistent over the 3 year time span. The area of inconsistency was Infrastructure for Technology. I believe this was primarily due to the increased population in 2007-2008. This increase left the campus unequipped to provide the appropriate number of computers and other technological equipment to students.