2. Meeting Purpose
• Discussion of project recommendations
• Gather public feedback
Items to Review and Discuss
• Alternatives
▫ Review alternative selection process
▫ Present modeling results and recommendations
• Discussion
• Next step – Final Report and City Council
Presentation
3. Project Goals
• Reduce probability of flooding by improving
stormwater management
• Identify cost of implementation per level of service
• Do not adversely impact downstream interests
• Maintain and/or enhance water quality
• Long term sustainability
7. Areas Outside of City Boundary
Ice Cube
Medium
Meadowinds Basin
Low
X
X
X
2
3
4
X
X
X
X
X
X
5
6
X
X
Alternative Package 7
Alternative Package 5
Alternative Package 6
Alternative Package 4
X
X
X
X
X
X
X
X
1
Low
Low
Alternative Package 3
High
Medium
High
Low
Low
Medium
Low
Alternative Package 2
High
High
Medium
Low
Low
Low
Low
Alternative Package 1
Expected Cost
Name
Lawton Park
Eisenhower Park
Lans Basin
Pioneer HS (W of 7th)
Pioneer HS (E of 7th)
Cardinal Homes
Las Vegas
Impact Potential
Alternative Packages
X
X
X
X
X
X
X
7
16. Footing drain analysis
•
•
•
•
Measured flow approximately 5 gallons per minute
Study using conservative flow of 10 gpm
Total system flow is 483 cubic feet per second
Total footing drain flow is 28 cfs
Footing Drain Flow as Percentage
Of Overall System Flow
5.8%
94.2%
17. Footing drain analysis
Footing Drain Flow as Percentage
Of Eisenhower Basin Flow
Footing Drain Flow as Percentage
Of Lawton Basin Flow
2.2%
5.4%
97.8%
94.6%
No flow attributed to Pioneer basin due to drainage area specifics
20. Upper Malletts Creek Stormwater Conveyance Study Timeline
Public Engagement
Preliminary
Alternatives
Analysis &
Memo
Finalized
Alternatives
Analysis &
Memo
February 2014
Final Study
Report
January 2014
September 2013
July 2013
April 2013
March 2013
February 2013
Data
Collection, Monitorin
g, & Modeling
Project Award
January 2013
Draft
Study
Report
December 2013
Gather
Information