Presentor: James Cox




  P2P Program Presentation
     Path to Productivity
Path to Productivity – P2P
One of the key things we have learned in 20
years is that to succeed with investments for
plant information systems
1. you need a clear understanding of where you are
2. where you’re going
3. why you’re going there – you need to find a path
forward
…that’s why we developed a P2P, path to
productivity program.
Path to Productivity Options
     Visualization Dashboards
         Data Collection Now
         Downtime Analysis Test Drive
         Simple OEE
     Plant Readiness Assessment

     OPEX- Change Management

     Pilot

     Pathfinder
P2P Programs – Real time visualization scoreboards
Areas of Expertise
                     KPI
                 Dashboards
                & Scoreboards



     Data
 Analytics &
  Intelligent                   Mobile Data
  Historians                      Access




                 Execution &
                  Workflow
Definition
A dashboard is a visual display of the most
important information needed to achieve one
or more business objectives, consolidated from
multiple sources and arranged on a single
display so it can be easily monitored and
understood
    Think of it as the instrumentation or the
     navigation system for your manufacturing
     business
Intelligent Dashboard




         Manufacturing Performance Monitoring
Applications of Dashboards/Scoreboards
1.   Production & Equipment Efficiency
2.   Process & Product Quality
        Product Give Away – Net weight
        Statistical Process Control (SPC)
        Process Centerlining
        Traceability
3.   Labor Tracking and Costs
4.   Inventory Management
        Work in Process/Raw Goods/Finish Goods
5.   Genealogy & Batch Tracking
6.   EWC - Energy Monitoring
Efficiency Example

•   Performance on a specific line seems low.
•   This “slow down” is effecting production and
    overall delivery times of current orders.
•   We need real-time visibility in to production,
    showing the problems in real-time.
•   We also need drill-down analysis of
    surround events and factors.
Real World Examples

   Let’s Look at Some Manufacturing
          Company Dashboards
Packaging Operator Details
Packaging Dashboard - Quality
Line Scoreboard
Energy Monitoring Dashboard
Keys To P2P Success
Define Proper Metrics and Visualizations
     Understand the business objectives
     Do NOT allow data or tech tools to drive
      content…enterprise objectives should determine
     Focus on actionable items and improvements
      rather than just monitoring performance
     Measure initial baseline prior to implementation
     Less is more…start small and get solid gains.
     Go for the “Low Hanging Fruit” first to establish
      some traction and help develop proper culture
Next Steps:    Path to Productivity Event
             Detailed Presentation

         Walk-through of the facility
           #1 Discuss potential paths forward



   Well defined scope       Need to analyze objectives,
   and objectives to       data sources, & infrastructure
    move forward
                                Plant           Pathfinder
      Project or              Readiness
   proof of concept
P2P Summary
We deliver value as we have to many
customers for more than 20 years…
#1 - Leveraging your existing manufacturing
and ERP application and 3rd party systems
  •   Reporting quality, efficiency and regulatory
      compliance (KPI’s/OEE/SPC/CIP)
  •   Visualizing the factory floor to top floor
  •   Reducing risk and lowering operating costs
Questions




    James Cox
    (M) 636-448-8079
    jcox@ins3.com P2E plant automation
    Jim.cox@seeitmii.com SAP Mii

More Related Content

What's hot

Successful SAP Implementation Checklist
Successful SAP Implementation ChecklistSuccessful SAP Implementation Checklist
Successful SAP Implementation ChecklistCygnet Infotech
 
Maintenance fitter kpi
Maintenance fitter kpiMaintenance fitter kpi
Maintenance fitter kpiletresjom
 
Process safety engineer kpi
Process safety engineer kpiProcess safety engineer kpi
Process safety engineer kpijomlendigas
 
Six Sigma, BPM, Digitalization - Different paths to the same destination?
Six Sigma, BPM, Digitalization - Different paths to the same destination?Six Sigma, BPM, Digitalization - Different paths to the same destination?
Six Sigma, BPM, Digitalization - Different paths to the same destination?innovelocity
 
ERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyKunal Gawade, CFE
 
Restaurants server kpi
Restaurants server kpiRestaurants server kpi
Restaurants server kpijomfesdir
 
Food safety officer kpi
Food safety officer kpiFood safety officer kpi
Food safety officer kpijomxasri
 
Keda case analysis- ERP Implementation
Keda case analysis- ERP ImplementationKeda case analysis- ERP Implementation
Keda case analysis- ERP ImplementationRachna Gupta
 
Safety steward kpi
Safety steward kpiSafety steward kpi
Safety steward kpijomxasri
 
Safety inspector kpi
Safety inspector kpiSafety inspector kpi
Safety inspector kpijomlendigas
 
Roofing sales kpi
Roofing sales kpiRoofing sales kpi
Roofing sales kpixaztaribet
 
Sales agronomist kpi
Sales agronomist kpiSales agronomist kpi
Sales agronomist kpixaztaribet
 
Sonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percentSonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percentIntelligentManufacturingInstitute
 
Success and Failure Examples of ERP Implementation
Success and Failure Examples of ERP ImplementationSuccess and Failure Examples of ERP Implementation
Success and Failure Examples of ERP ImplementationSunidhi Kumari
 
The Checklist for Modern ERP: ERP Made Sexy
The Checklist for Modern ERP: ERP Made SexyThe Checklist for Modern ERP: ERP Made Sexy
The Checklist for Modern ERP: ERP Made SexyBlytheco
 
Scott Pacich - 2016 Resume
Scott Pacich - 2016 ResumeScott Pacich - 2016 Resume
Scott Pacich - 2016 ResumeScott Pacich
 

What's hot (20)

Successful SAP Implementation Checklist
Successful SAP Implementation ChecklistSuccessful SAP Implementation Checklist
Successful SAP Implementation Checklist
 
Maintenance fitter kpi
Maintenance fitter kpiMaintenance fitter kpi
Maintenance fitter kpi
 
Process safety engineer kpi
Process safety engineer kpiProcess safety engineer kpi
Process safety engineer kpi
 
ERP Gap Analysis
ERP Gap AnalysisERP Gap Analysis
ERP Gap Analysis
 
Six Sigma, BPM, Digitalization - Different paths to the same destination?
Six Sigma, BPM, Digitalization - Different paths to the same destination?Six Sigma, BPM, Digitalization - Different paths to the same destination?
Six Sigma, BPM, Digitalization - Different paths to the same destination?
 
ERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System Study
 
Restaurants server kpi
Restaurants server kpiRestaurants server kpi
Restaurants server kpi
 
Success and Failure of ERP
Success and Failure of ERPSuccess and Failure of ERP
Success and Failure of ERP
 
Food safety officer kpi
Food safety officer kpiFood safety officer kpi
Food safety officer kpi
 
Maximo kpi
Maximo kpiMaximo kpi
Maximo kpi
 
Keda case analysis- ERP Implementation
Keda case analysis- ERP ImplementationKeda case analysis- ERP Implementation
Keda case analysis- ERP Implementation
 
Safety steward kpi
Safety steward kpiSafety steward kpi
Safety steward kpi
 
Safety inspector kpi
Safety inspector kpiSafety inspector kpi
Safety inspector kpi
 
Roofing sales kpi
Roofing sales kpiRoofing sales kpi
Roofing sales kpi
 
Sales agronomist kpi
Sales agronomist kpiSales agronomist kpi
Sales agronomist kpi
 
Sonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percentSonoco products smart manufacturing initiative boosts uptime 30 percent
Sonoco products smart manufacturing initiative boosts uptime 30 percent
 
Success and Failure Examples of ERP Implementation
Success and Failure Examples of ERP ImplementationSuccess and Failure Examples of ERP Implementation
Success and Failure Examples of ERP Implementation
 
The Checklist for Modern ERP: ERP Made Sexy
The Checklist for Modern ERP: ERP Made SexyThe Checklist for Modern ERP: ERP Made Sexy
The Checklist for Modern ERP: ERP Made Sexy
 
Scott Pacich - 2016 Resume
Scott Pacich - 2016 ResumeScott Pacich - 2016 Resume
Scott Pacich - 2016 Resume
 
SikanderShaikh
SikanderShaikhSikanderShaikh
SikanderShaikh
 

Viewers also liked

090909 Ligduurverkorting Versie 3
090909 Ligduurverkorting Versie 3090909 Ligduurverkorting Versie 3
090909 Ligduurverkorting Versie 3leeuwenk
 
Vertige jp.v.a acdghmny[1]
Vertige jp.v.a acdghmny[1]Vertige jp.v.a acdghmny[1]
Vertige jp.v.a acdghmny[1]catavrio
 
Valle de tena i. sallent, portalet, la sarra
Valle de tena i. sallent, portalet, la sarraValle de tena i. sallent, portalet, la sarra
Valle de tena i. sallent, portalet, la sarrappabubal
 
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...IJMER
 
Why is pdhpe important for primary school education
Why is pdhpe important for primary school educationWhy is pdhpe important for primary school education
Why is pdhpe important for primary school educationliailiou
 
You and I [4]
You and I [4]You and I [4]
You and I [4]Shirley *
 
Ali's Lap Reports
Ali's Lap ReportsAli's Lap Reports
Ali's Lap ReportsAli Saleh
 
Equipos de trabajo
Equipos de trabajoEquipos de trabajo
Equipos de trabajocamilealsj
 
InKnowVision January 2013 HNW Marketing PPT
InKnowVision January 2013 HNW Marketing PPTInKnowVision January 2013 HNW Marketing PPT
InKnowVision January 2013 HNW Marketing PPTInKnowVision
 
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.BizTimes Media
 
Certificate33779 ekp000097358
Certificate33779 ekp000097358Certificate33779 ekp000097358
Certificate33779 ekp000097358Cian Ó Briain
 

Viewers also liked (17)

090909 Ligduurverkorting Versie 3
090909 Ligduurverkorting Versie 3090909 Ligduurverkorting Versie 3
090909 Ligduurverkorting Versie 3
 
Vertige jp.v.a acdghmny[1]
Vertige jp.v.a acdghmny[1]Vertige jp.v.a acdghmny[1]
Vertige jp.v.a acdghmny[1]
 
Valle de tena i. sallent, portalet, la sarra
Valle de tena i. sallent, portalet, la sarraValle de tena i. sallent, portalet, la sarra
Valle de tena i. sallent, portalet, la sarra
 
Top bell
Top bellTop bell
Top bell
 
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...
Experimental Investigation on Effect of Particle Sizes of Molybdenum Disulphi...
 
Why is pdhpe important for primary school education
Why is pdhpe important for primary school educationWhy is pdhpe important for primary school education
Why is pdhpe important for primary school education
 
plan_de_negosios
plan_de_negosiosplan_de_negosios
plan_de_negosios
 
You and I [4]
You and I [4]You and I [4]
You and I [4]
 
Ali's Lap Reports
Ali's Lap ReportsAli's Lap Reports
Ali's Lap Reports
 
Equipos de trabajo
Equipos de trabajoEquipos de trabajo
Equipos de trabajo
 
InKnowVision January 2013 HNW Marketing PPT
InKnowVision January 2013 HNW Marketing PPTInKnowVision January 2013 HNW Marketing PPT
InKnowVision January 2013 HNW Marketing PPT
 
Bmw F1 The Race
Bmw F1 The RaceBmw F1 The Race
Bmw F1 The Race
 
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.
Paul Grangaard, President and CEO of Allen Edmonds Shoe Corp.
 
La montaña 5 de octubre 2012 nacimiento
La montaña 5 de octubre 2012 nacimientoLa montaña 5 de octubre 2012 nacimiento
La montaña 5 de octubre 2012 nacimiento
 
Wipe out
Wipe outWipe out
Wipe out
 
Certificate33779 ekp000097358
Certificate33779 ekp000097358Certificate33779 ekp000097358
Certificate33779 ekp000097358
 
FY15 Budget Amendment No. 1
FY15 Budget Amendment No. 1FY15 Budget Amendment No. 1
FY15 Budget Amendment No. 1
 

Similar to P2P Path To Productivity Linkedin

A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...paulkfenton
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecardssanolan
 
Performance Continuous Integration
Performance Continuous IntegrationPerformance Continuous Integration
Performance Continuous IntegrationAlmudena Vivanco
 
Linkedin kpi's + mii = manufacturing intelligence
Linkedin kpi's + mii = manufacturing intelligenceLinkedin kpi's + mii = manufacturing intelligence
Linkedin kpi's + mii = manufacturing intelligenceINS
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinarAisurya Puhan
 
Why CIO\'s need Value Creator
Why CIO\'s need Value CreatorWhy CIO\'s need Value Creator
Why CIO\'s need Value Creatorrealtimeco
 
Beyond Automation: Extracting Actionable Intelligence from Clinical Trials
Beyond Automation: Extracting Actionable Intelligence from Clinical TrialsBeyond Automation: Extracting Actionable Intelligence from Clinical Trials
Beyond Automation: Extracting Actionable Intelligence from Clinical TrialsMontrium
 
Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...Richard Gordon
 
Moving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingMoving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingZero Wait-State
 
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...Susan Bouchard
 
Best practice for_agile_ds_projects
Best practice for_agile_ds_projectsBest practice for_agile_ds_projects
Best practice for_agile_ds_projectsKhalid Kahloot
 
Upgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableUpgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableTerillium
 
Business Intelligence - Data Practices
Business Intelligence - Data PracticesBusiness Intelligence - Data Practices
Business Intelligence - Data PracticesManuell Labor
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10mccall1966
 
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...Appnovation Technologies
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical DebtCAST
 
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...Joseph Alaimo Jr
 

Similar to P2P Path To Productivity Linkedin (20)

A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...A knowledge based collaborative model for the rapid integration of platforms,...
A knowledge based collaborative model for the rapid integration of platforms,...
 
Logicentrix Dashboards And Scorecards
Logicentrix Dashboards And ScorecardsLogicentrix Dashboards And Scorecards
Logicentrix Dashboards And Scorecards
 
Performance Continuous Integration
Performance Continuous IntegrationPerformance Continuous Integration
Performance Continuous Integration
 
MCIF- Per Kroll
MCIF-  Per KrollMCIF-  Per Kroll
MCIF- Per Kroll
 
Linkedin kpi's + mii = manufacturing intelligence
Linkedin kpi's + mii = manufacturing intelligenceLinkedin kpi's + mii = manufacturing intelligence
Linkedin kpi's + mii = manufacturing intelligence
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinar
 
Why CIO\'s need Value Creator
Why CIO\'s need Value CreatorWhy CIO\'s need Value Creator
Why CIO\'s need Value Creator
 
Beyond Automation: Extracting Actionable Intelligence from Clinical Trials
Beyond Automation: Extracting Actionable Intelligence from Clinical TrialsBeyond Automation: Extracting Actionable Intelligence from Clinical Trials
Beyond Automation: Extracting Actionable Intelligence from Clinical Trials
 
Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...
 
Moving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingMoving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial Manufacturing
 
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
 
Best practice for_agile_ds_projects
Best practice for_agile_ds_projectsBest practice for_agile_ds_projects
Best practice for_agile_ds_projects
 
Upgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More PredictableUpgrade JDE Quicker, Faster, and More Predictable
Upgrade JDE Quicker, Faster, and More Predictable
 
IT Solutions
IT SolutionsIT Solutions
IT Solutions
 
Business Intelligence - Data Practices
Business Intelligence - Data PracticesBusiness Intelligence - Data Practices
Business Intelligence - Data Practices
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
O2E Brands Case Study: Managing Technical Debt as part of a proactive IT heal...
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
 
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...
The Bill for IT: IT Service Costing, Showbacks & Chargebacks with Profitabili...
 
PCMCS - Have it Your Way
PCMCS - Have it Your WayPCMCS - Have it Your Way
PCMCS - Have it Your Way
 

P2P Path To Productivity Linkedin

  • 1. Presentor: James Cox P2P Program Presentation Path to Productivity
  • 2. Path to Productivity – P2P One of the key things we have learned in 20 years is that to succeed with investments for plant information systems 1. you need a clear understanding of where you are 2. where you’re going 3. why you’re going there – you need to find a path forward …that’s why we developed a P2P, path to productivity program.
  • 3. Path to Productivity Options  Visualization Dashboards  Data Collection Now  Downtime Analysis Test Drive  Simple OEE  Plant Readiness Assessment  OPEX- Change Management  Pilot  Pathfinder
  • 4. P2P Programs – Real time visualization scoreboards
  • 5. Areas of Expertise KPI Dashboards & Scoreboards Data Analytics & Intelligent Mobile Data Historians Access Execution & Workflow
  • 6. Definition A dashboard is a visual display of the most important information needed to achieve one or more business objectives, consolidated from multiple sources and arranged on a single display so it can be easily monitored and understood  Think of it as the instrumentation or the navigation system for your manufacturing business
  • 7. Intelligent Dashboard Manufacturing Performance Monitoring
  • 8. Applications of Dashboards/Scoreboards 1. Production & Equipment Efficiency 2. Process & Product Quality  Product Give Away – Net weight  Statistical Process Control (SPC)  Process Centerlining  Traceability 3. Labor Tracking and Costs 4. Inventory Management  Work in Process/Raw Goods/Finish Goods 5. Genealogy & Batch Tracking 6. EWC - Energy Monitoring
  • 9. Efficiency Example • Performance on a specific line seems low. • This “slow down” is effecting production and overall delivery times of current orders. • We need real-time visibility in to production, showing the problems in real-time. • We also need drill-down analysis of surround events and factors.
  • 10.
  • 11. Real World Examples Let’s Look at Some Manufacturing Company Dashboards
  • 16. Keys To P2P Success Define Proper Metrics and Visualizations  Understand the business objectives  Do NOT allow data or tech tools to drive content…enterprise objectives should determine  Focus on actionable items and improvements rather than just monitoring performance  Measure initial baseline prior to implementation  Less is more…start small and get solid gains.  Go for the “Low Hanging Fruit” first to establish some traction and help develop proper culture
  • 17. Next Steps: Path to Productivity Event Detailed Presentation Walk-through of the facility #1 Discuss potential paths forward Well defined scope Need to analyze objectives, and objectives to data sources, & infrastructure move forward Plant Pathfinder Project or Readiness proof of concept
  • 18. P2P Summary We deliver value as we have to many customers for more than 20 years… #1 - Leveraging your existing manufacturing and ERP application and 3rd party systems • Reporting quality, efficiency and regulatory compliance (KPI’s/OEE/SPC/CIP) • Visualizing the factory floor to top floor • Reducing risk and lowering operating costs
  • 19. Questions James Cox (M) 636-448-8079 jcox@ins3.com P2E plant automation Jim.cox@seeitmii.com SAP Mii