SlideShare a Scribd company logo
1 of 3
Download to read offline
Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03
www.ijera.com 1 | P a g e
Reliability and Fuzzy Logic Concepts as Applied to Slope
Stability Analysis – A Review
Nazarullah Khan*, Dr. R Bhuvana Vijaya ** Dr A Mallikarjuna Reddy***,
Dr M T Prathap Kumar****
*(Assistant Professor, Department of Mathematics, Ghousia College of Engineering, Ramanagara, India)
** (Assistant Professor, Department of Mathematics JNTUA, Anantapur, Andhra Pradesh, India)
*** (Professor, Department of Mathematics, S K University, Anantapur, Andhra Pradesh, India)
**** (Senior Professor and R&D Coordinator, REVA Institute of Technology and Management, Bengaluru,
India,)
ABSTRACT
Considerable uncertainty exist with regard to stability of slopes due to several factors and recognition of these
uncertainties has made designees to introduce factor of safety. Several studies, during recent years on analytical
methods using soil properties have improved understanding the several uncertainties. The reliability analysis of
slopes can be used to represent uncertainty in mathematical models, which can be assumed to follow the
characteristic of random uncertainty. The distribution uncertain variable, which is unknown, makes its
estimation difficult. Hence, the concepts of fuzzy set theory appear to be quite reliable when limited
information is available. This paper attempts to review the slope stability problem and deals with the intricacies
of the concept of reliability and fuzzy logic as applied to stability analysis of slope. It has been suggested that the
FOSM algorithm provides a general agreement among the different slope stability solutions.
Keywords – factor of safety, fuzzy logic, reliability method, slope stability,, uncertainty
I. INTRODUCTION
Slope stability analysis includes assessing
failure of an element by checking whether the stress
in the element equals the strength of an element.
However, the strength of soil varies from one
location to another, as well as, with time.
Considerable uncertainty exist with regard to
stability of slopes due to several factors such as-the
method of measurement of soil properties are not
perfect, stress in soil is being uncertain and most of
the methods used contain simplifying assumptions
that leads to errors of uncertain magnitudes.
Recognition of these uncertainties has made
designees to introduce factor of safety, which is
defined as the ratio of measured strength to
calculated stress.
Risk and uncertainty in slope stability shall be
dealt using observational method [1]. It shall be
noted that this method will be applicable only during
construction stage, where in the design can be
changed. Where critical behavior cannot be
observed ,the designer must rely on calculated
risk[2].Several studies, during recent years on
analytical methods using soil properties have
improved understanding the several uncertainties.
This paper attempts to summarize the slope stability
problem and consider their effect in design practice
and introduces the concept of reliability and fuzzy
logic as applied to stability analysis of slope.
II. PROBABILITY CONCEPTS TO
SLOPE STABILITY ANALYSIS
Several investigators[3,4,5 and 6] described
effective application of probability concepts for
stability analysis of slopes have used first –order
second moment methods(FOSM). The established
methods previously deal with uncertainty regarding
natural properties and loading conditions. However
they do not address inadequacies such as erosion,
errors in construction and inadequate soil
exploration that might miss a critical geological
detail. Thus, it is still better to deal relative
probabilities of failure or other measures of
reliability. Mean-first –order reliability method that
incorporates uncertainty into decision–making
process without establishing an absolute value of t
he probability of failure was also used[7].
However, the probability of failure incorporates only
those factors that are included in the analysis and
hence considered as a lower bound of actual
probability of failure. An approach in six steps to
compute uncertainty in factors of safety and the
corresponding reliability index as follows was
recommended [2]:
(i) Identify variables such as geometry, weight
and strength of soil.
(ii) To determine the mean value of each variable
so onto calculate best estimate of factor of
safety
RESEARCH ARTICLE OPEN ACCESS
Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03
www.ijera.com 2 | P a g e
(iii) Determine the uncertainty in each variable with
its likely variable.
(iv) Perform sensitivity analysis to determine
change in factor of safety
(v) Obtain V [ F ] =
𝜕𝑔
𝜕𝑥 𝑖
2
𝑘
𝑖=1 V x j +
V e
(1)
where „g‟ is a geometrical simplified model such
as method of stress that depends on vector x of
geometry and soil properties. „e‟ is a modeling
error that describes how a model deviates from
real.
(vi) The reliability index then can be computed
using 𝛽 =
𝐸 𝐹 −1.0
𝜎 𝐹
(2)
where 𝜎 𝐹 is the square root of V [ F ]
𝛽 is the reliability index
F is the computed factor of safety.
The equation (2) gives the reliability index that
describes the safety by the number of standard
deviations separately, the best estimate of F from its
defined failure value of 1.0. However, it shall be
noted from equation (1), that the uncertainty in the
model error e is uncorrelated with uncertainties in
the model parameter 𝑋𝑖 + and 𝑋𝑗 +
III. RELIABILITY ANALYSIS
It was also pointed out that there is the
possibility of obtaining different reliability index
values for a chosen probabilistic failure surface [8].
The minimum reliability index occurs in same
critical probabilistic failure surface that does not
coincide with critical deterministic failure surface.
Thus, the aim of reliability analysis shall be to find
minimum 𝛽 value that indicates the most critical
slip surface. However the reliability index can be
associated with a slope but not to any specific
surface.
The reliability analysis of slopes can be used to
represent uncertainty in mathematical models, which
can be assumed to follow the characteristic of
random uncertainty. However not all uncertainties
are random, especially those based on incomplete
information. Hence, such uncertainties cannot be
handled by probability based reliability analysis.
Further, the distributions type of uncertain variable
is also unknown, making its estimation rather
difficult. Hence, the concepts of fuzzy set theory
were recommended and appear to be quite reliable
when limited information is available [9]. When the
uncertainty arises due to impression and ambiguity,
the variable becomes fuzzy and hence one can
incorporate the fuzzy uncertainty in reliability
analysis of slopes.
IV CONCEPTS OF FUZZY SET
THEORY
In this method, the soil parameters can be
represented by fuzzy numbers that allows a simple
and practice oriented way to allow for expert
judgment [9]. The chosen membership shape can be
trapezoidal one as shown in fig (1).
Fig. 1 Membership Shape for an uncertain parameter
The 𝛼 − cut of a fuzzy set A can be defined
as: 𝐴 𝛼 = 𝑥 ∈ 𝑋|𝛼𝐴(𝑥) ≥ 𝛼 , for 𝛼 ∈ 0 ,1 , i.e., the
𝛼 − cut of a fuzzy set A is the crisp set 𝐴 𝛼 that
contains all the elements of the universal set X hose
membership grades in A are greater than or equal to
the specified value of 𝛼.
Thus the 𝛼 − 𝑐𝑢𝑡 discretise a fuzzy member
into a group of 𝛼 − cut intervals .For each
uncertain parameters , the 𝛼 − cut gives upper and
lower bound values for a particular 𝛼 − cut.
In the fig.1, a b, c and d are calculated as:
a = 𝐸 𝑥𝑖 − 𝑚1 𝜎 𝑥1 ;
b = 𝐸 𝑥𝑖 − 𝑚2 𝜎 𝑥1 ;
c = 𝐸 𝑥𝑖 + 𝑚3 𝜎 𝑥1 ;
and d = 𝐸 𝑥𝑖 + 𝑚4 𝜎 𝑥1 ;
where 𝑚𝑖 being the number of standard deviations
between expected value of the parameter and the
fuzzy set vertices. Based on the expected judgments,
the 𝑚𝑖 values are reported as 𝑚1 = 0.5 and 𝑚2 =
1.5. However, the value of 𝑚𝑖 can be modified to
allow for soil behavior.
The vertex method, based on the 𝛼 − cut
concept involves interval analysis, there by reducing
the fuzzy computation as a series of interval analysis
[10]. The value of 𝛼 is set to a value in the range of
0 to 1 and drawing a horizontal line that intersects
fuzzy member at two points 𝑋𝑖 − and 𝑋𝑖 +. Thus,
the 𝛼 − cut ranging from 0.1 to 0.995 can be
considered to involve fuzzy number. For four
strength parameters, there will four fuzzy numbers
that can be investigated at 2 × 4 = 8 vertex
dimension .Each of the 𝑋𝑖 vertex are treated as
weak value to find the most critical failure
surface[12] with the remaining parameters set at
their mean values. Thus, the first order second
moment (FOSM) algorithm is used to calculate
minimum reliability index.
The vertex method computes two factors of
safety 𝐹𝑆 +
and 𝐹𝑆 −
. By approximate method, the
Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03
www.ijera.com 3 | P a g e
derivatives for each 𝛼 − cut is applied. The final
step comprises assuming the fuzzy mean value for
each derivative calculated using the following
formula:
𝐸
𝜕 𝐹𝑆
𝜕 𝑥 𝑗
=
𝛼 𝑖 𝑊 𝑥𝑖
𝑁
𝑗 =1
𝑁
(3)
Where 𝑥𝑖 is the investigated possibility level
𝑊𝑥𝑖 =
𝐹𝑠 𝑥𝑖
+
+ 𝐹𝑠 𝑥𝑖
−
2𝑚𝑖 𝜎 𝑋𝑖
4
where 𝑚𝑖 is the number of standard deviation of
which 𝑋𝑖
+
and 𝑋𝑖
−
are greater or smaller than the
mean of 𝑋𝑖 , N s the number of 𝛼 − cut . The
application of simple algorithm with correct
experienced based parameter provides the result in
good agreement with slope stability solutions.
IV. CONCLUDING REMARKS
The reliability approach has evolved to a point
that they can be used in actual practice but requires
considerable effort and should have a good reason to
use. A better and consistent approach is by a
probabilistic approach based on fuzzy set theory.
This approach takes into account the variability in
parameters used for factor of safety calculations.
Further, the FOSM algorithm provides a general
agreement among the different slope stability
solutions.
REFERENCES
[1] Peck, R .B . “Advantages and limitations of
the observational method in applied soil
mechanics: Ninth Rankine Lecture.‟‟
Geotechnique, 1969, Vol. 19(2), pp171-187.
[2] John T Christian, Charles C Ladd and
Gregory B Baecher, “Reliability Applied to
slope stability analysis” Jou. Of
Geotechnical Engg., 1993, Vol.120(12), pp
2180-2205.
[3] Wu . T. H , and Kraft, L.M “Safety analysis
of slopes ” J. Soil mech. and Found. Div.,
ASCE, 1970, Vol. 96(2), pp609-630.
[4] Cornell. C . A . “First –order uncertainty
analysis of soils deformation and stability.”
Proc., of First Int . Conf. on Applications
of probability and Statistics in Soil and
Struct. Engrg (ICAP) , Hong Kong, 1971,
pp129-144
[5] Alonso . E .E . “ Risk analysis of Slopes and
its applications to Slopes in Canadian
sensitive clays .” Geotechnique . 1976, vol.
26(3), pp 453-472
[6] Tang. W .H., Yucemen ,M.S. , and Ang. A
. H.-S , “ Probability –based short term
design of slopes ” Can . Geotech . Jou,,
1976, Vol.13 (3), pp201 – 215
[7] Christian .J.T., Ladd .C.C., and Baecher
.G.B., “Reliability and probability in
stability analysis” Proc. Stability and
Performance of Slopes and Embankment –II
ASCE, New York .N. Y.,1992, Vol.2, 1071-
1111
[8] Hassan.A. Wolff.TF.,”Search algorithm for
minimum reliability index of Earth slopes”,
.Journal of Geotechnical and Geo
environmental Engineering 1999, pp 301-
308
[9] G R Dodagoudar and G Venkatachalam,
“Reliability analysis of slopes using Fuzzy
set theory”, Jou. of Computers and
Geotechnics, 2000, Vol. 27, pp 101-115.
[10] Juang CH, Jhi Y-Y,Lee DH “Stability
analysis of existing slopes considering
uncertainty”,. Engineering Geology, 1998,
vol. 49, pp 111-122.

More Related Content

Viewers also liked

Getting Started with Office 365
Getting Started with Office 365Getting Started with Office 365
Getting Started with Office 365Scott Hoag
 
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...IJERA Editor
 
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...IJERA Editor
 
On The Number of Representations of a Positive Integer By Certain Binary Quad...
On The Number of Representations of a Positive Integer By Certain Binary Quad...On The Number of Representations of a Positive Integer By Certain Binary Quad...
On The Number of Representations of a Positive Integer By Certain Binary Quad...IJERA Editor
 
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...IJERA Editor
 
Non-life claims reserves using Dirichlet random environment
Non-life claims reserves using Dirichlet random environmentNon-life claims reserves using Dirichlet random environment
Non-life claims reserves using Dirichlet random environmentIJERA Editor
 
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...IJERA Editor
 
Research on Iris Region Localization Algorithms
Research on Iris Region Localization AlgorithmsResearch on Iris Region Localization Algorithms
Research on Iris Region Localization AlgorithmsIJERA Editor
 
Parallel Processing Technique for Time Efficient Matrix Multiplication
Parallel Processing Technique for Time Efficient Matrix MultiplicationParallel Processing Technique for Time Efficient Matrix Multiplication
Parallel Processing Technique for Time Efficient Matrix MultiplicationIJERA Editor
 
Laboratory Proposal for Studies on Poultry Environment
Laboratory Proposal for Studies on Poultry EnvironmentLaboratory Proposal for Studies on Poultry Environment
Laboratory Proposal for Studies on Poultry EnvironmentIJERA Editor
 
A Survey on Constellation Based Attribute Selection Method for High Dimension...
A Survey on Constellation Based Attribute Selection Method for High Dimension...A Survey on Constellation Based Attribute Selection Method for High Dimension...
A Survey on Constellation Based Attribute Selection Method for High Dimension...IJERA Editor
 
Automated Testing of C-Band Rotary Field Ferrite Phase Shifter
Automated Testing of C-Band Rotary Field Ferrite Phase ShifterAutomated Testing of C-Band Rotary Field Ferrite Phase Shifter
Automated Testing of C-Band Rotary Field Ferrite Phase ShifterIJERA Editor
 
FEDSPUG - SharePoint 2013 - A Brief Capability Overview
FEDSPUG - SharePoint 2013 - A Brief Capability OverviewFEDSPUG - SharePoint 2013 - A Brief Capability Overview
FEDSPUG - SharePoint 2013 - A Brief Capability OverviewScott Hoag
 

Viewers also liked (20)

Getting Started with Office 365
Getting Started with Office 365Getting Started with Office 365
Getting Started with Office 365
 
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...
Effect of Process Parameters of Friction Stir Welded Joint for Similar Alumin...
 
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...
GTSH: A New Channel Assignment Algorithm in Multi-Radio Multi-channel Wireles...
 
Aa04408138142
Aa04408138142Aa04408138142
Aa04408138142
 
On The Number of Representations of a Positive Integer By Certain Binary Quad...
On The Number of Representations of a Positive Integer By Certain Binary Quad...On The Number of Representations of a Positive Integer By Certain Binary Quad...
On The Number of Representations of a Positive Integer By Certain Binary Quad...
 
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...
Catalytic Degradation of 4-Nitrophenol Using Gamma Irradiated PVA/Ag Nanocomp...
 
Non-life claims reserves using Dirichlet random environment
Non-life claims reserves using Dirichlet random environmentNon-life claims reserves using Dirichlet random environment
Non-life claims reserves using Dirichlet random environment
 
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...
Detecting Aspect Intertype Declaration Interference at Aspect Oriented Design...
 
Eh4301812815
Eh4301812815Eh4301812815
Eh4301812815
 
G49033740
G49033740G49033740
G49033740
 
F44092630
F44092630F44092630
F44092630
 
Research on Iris Region Localization Algorithms
Research on Iris Region Localization AlgorithmsResearch on Iris Region Localization Algorithms
Research on Iris Region Localization Algorithms
 
Parallel Processing Technique for Time Efficient Matrix Multiplication
Parallel Processing Technique for Time Efficient Matrix MultiplicationParallel Processing Technique for Time Efficient Matrix Multiplication
Parallel Processing Technique for Time Efficient Matrix Multiplication
 
Laboratory Proposal for Studies on Poultry Environment
Laboratory Proposal for Studies on Poultry EnvironmentLaboratory Proposal for Studies on Poultry Environment
Laboratory Proposal for Studies on Poultry Environment
 
A Survey on Constellation Based Attribute Selection Method for High Dimension...
A Survey on Constellation Based Attribute Selection Method for High Dimension...A Survey on Constellation Based Attribute Selection Method for High Dimension...
A Survey on Constellation Based Attribute Selection Method for High Dimension...
 
T4301102105
T4301102105T4301102105
T4301102105
 
Automated Testing of C-Band Rotary Field Ferrite Phase Shifter
Automated Testing of C-Band Rotary Field Ferrite Phase ShifterAutomated Testing of C-Band Rotary Field Ferrite Phase Shifter
Automated Testing of C-Band Rotary Field Ferrite Phase Shifter
 
H43023946
H43023946H43023946
H43023946
 
Q43019295
Q43019295Q43019295
Q43019295
 
FEDSPUG - SharePoint 2013 - A Brief Capability Overview
FEDSPUG - SharePoint 2013 - A Brief Capability OverviewFEDSPUG - SharePoint 2013 - A Brief Capability Overview
FEDSPUG - SharePoint 2013 - A Brief Capability Overview
 

Similar to Reliability and Fuzzy Logic Concepts as Applied to Slope Stability Analysis – A Review

Reliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodReliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodIJERA Editor
 
Uncertainity
UncertainityUncertainity
UncertainityVIGNESH C
 
Optimum penetration depth of cantilever sheet pile walls in dry granular soil
Optimum penetration depth of cantilever sheet pile walls in dry granular soil Optimum penetration depth of cantilever sheet pile walls in dry granular soil
Optimum penetration depth of cantilever sheet pile walls in dry granular soil Ahmed Ebid
 
Number of iterations needed in Monte Carlo Simulation using reliability analy...
Number of iterations needed in Monte Carlo Simulation using reliability analy...Number of iterations needed in Monte Carlo Simulation using reliability analy...
Number of iterations needed in Monte Carlo Simulation using reliability analy...IJERA Editor
 
Spacial distribution of risk and reliability in slopes
Spacial distribution of risk and reliability in slopesSpacial distribution of risk and reliability in slopes
Spacial distribution of risk and reliability in slopeseSAT Publishing House
 
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERS
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERSSTRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERS
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERSP singh
 
13 16090 paper 069 ijeecs(edit)
13 16090 paper 069 ijeecs(edit)13 16090 paper 069 ijeecs(edit)
13 16090 paper 069 ijeecs(edit)IAESIJEECS
 
Parametric estimation of construction cost using combined bootstrap and regre...
Parametric estimation of construction cost using combined bootstrap and regre...Parametric estimation of construction cost using combined bootstrap and regre...
Parametric estimation of construction cost using combined bootstrap and regre...IAEME Publication
 
Uncertainty modelling and limit state reliability of
Uncertainty modelling and limit state reliability ofUncertainty modelling and limit state reliability of
Uncertainty modelling and limit state reliability ofeSAT Publishing House
 
Uncertainty modelling and limit state reliability of tunnel supports under se...
Uncertainty modelling and limit state reliability of tunnel supports under se...Uncertainty modelling and limit state reliability of tunnel supports under se...
Uncertainty modelling and limit state reliability of tunnel supports under se...eSAT Journals
 
On Confidence Intervals Construction for Measurement System Capability Indica...
On Confidence Intervals Construction for Measurement System Capability Indica...On Confidence Intervals Construction for Measurement System Capability Indica...
On Confidence Intervals Construction for Measurement System Capability Indica...IRJESJOURNAL
 
Risk Assessment in Geotechnical Engineering
Risk Assessment in Geotechnical EngineeringRisk Assessment in Geotechnical Engineering
Risk Assessment in Geotechnical Engineeringsoumaya Addou
 
Numerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadNumerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadeSAT Journals
 
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENT
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENTPROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENT
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENTIRJET Journal
 
Adaptive response surface by kriging using pilot points for structural reliab...
Adaptive response surface by kriging using pilot points for structural reliab...Adaptive response surface by kriging using pilot points for structural reliab...
Adaptive response surface by kriging using pilot points for structural reliab...IOSR Journals
 
Analysis of stress in circular hollow section by fea and analytical technique
Analysis of stress in circular hollow section by fea and analytical techniqueAnalysis of stress in circular hollow section by fea and analytical technique
Analysis of stress in circular hollow section by fea and analytical techniqueeSAT Journals
 
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric Structures
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric StructuresUsage of N2 Method for the Performance Evaluation of Plan Asymmetric Structures
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric StructuresIRJET Journal
 
Calculation of solar radiation by using regression methods
Calculation of solar radiation by using regression methodsCalculation of solar radiation by using regression methods
Calculation of solar radiation by using regression methodsmehmet şahin
 
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...IRJET Journal
 

Similar to Reliability and Fuzzy Logic Concepts as Applied to Slope Stability Analysis – A Review (20)

Reliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodReliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point Method
 
Uncertainity
UncertainityUncertainity
Uncertainity
 
Optimum penetration depth of cantilever sheet pile walls in dry granular soil
Optimum penetration depth of cantilever sheet pile walls in dry granular soil Optimum penetration depth of cantilever sheet pile walls in dry granular soil
Optimum penetration depth of cantilever sheet pile walls in dry granular soil
 
Number of iterations needed in Monte Carlo Simulation using reliability analy...
Number of iterations needed in Monte Carlo Simulation using reliability analy...Number of iterations needed in Monte Carlo Simulation using reliability analy...
Number of iterations needed in Monte Carlo Simulation using reliability analy...
 
Spacial distribution of risk and reliability in slopes
Spacial distribution of risk and reliability in slopesSpacial distribution of risk and reliability in slopes
Spacial distribution of risk and reliability in slopes
 
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERS
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERSSTRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERS
STRUCTURAL RELIABILITY ASSESSMENT WITH STOCHASTIC PARAMETERS
 
13 16090 paper 069 ijeecs(edit)
13 16090 paper 069 ijeecs(edit)13 16090 paper 069 ijeecs(edit)
13 16090 paper 069 ijeecs(edit)
 
Parametric estimation of construction cost using combined bootstrap and regre...
Parametric estimation of construction cost using combined bootstrap and regre...Parametric estimation of construction cost using combined bootstrap and regre...
Parametric estimation of construction cost using combined bootstrap and regre...
 
Uncertainty modelling and limit state reliability of
Uncertainty modelling and limit state reliability ofUncertainty modelling and limit state reliability of
Uncertainty modelling and limit state reliability of
 
Uncertainty modelling and limit state reliability of tunnel supports under se...
Uncertainty modelling and limit state reliability of tunnel supports under se...Uncertainty modelling and limit state reliability of tunnel supports under se...
Uncertainty modelling and limit state reliability of tunnel supports under se...
 
On Confidence Intervals Construction for Measurement System Capability Indica...
On Confidence Intervals Construction for Measurement System Capability Indica...On Confidence Intervals Construction for Measurement System Capability Indica...
On Confidence Intervals Construction for Measurement System Capability Indica...
 
Risk Assessment in Geotechnical Engineering
Risk Assessment in Geotechnical EngineeringRisk Assessment in Geotechnical Engineering
Risk Assessment in Geotechnical Engineering
 
Numerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral loadNumerical modeling to evaluate pile head deflection under the lateral load
Numerical modeling to evaluate pile head deflection under the lateral load
 
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENT
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENTPROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENT
PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR SEISMIC RISK ASSESSMENT
 
Adaptive response surface by kriging using pilot points for structural reliab...
Adaptive response surface by kriging using pilot points for structural reliab...Adaptive response surface by kriging using pilot points for structural reliab...
Adaptive response surface by kriging using pilot points for structural reliab...
 
Analysis of stress in circular hollow section by fea and analytical technique
Analysis of stress in circular hollow section by fea and analytical techniqueAnalysis of stress in circular hollow section by fea and analytical technique
Analysis of stress in circular hollow section by fea and analytical technique
 
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric Structures
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric StructuresUsage of N2 Method for the Performance Evaluation of Plan Asymmetric Structures
Usage of N2 Method for the Performance Evaluation of Plan Asymmetric Structures
 
Calculation of solar radiation by using regression methods
Calculation of solar radiation by using regression methodsCalculation of solar radiation by using regression methods
Calculation of solar radiation by using regression methods
 
FORECASTING MODELS
FORECASTING MODELSFORECASTING MODELS
FORECASTING MODELS
 
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...
IRJET - Hazardous Asteroid Classification through Various Machine Learning Te...
 

Recently uploaded

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 

Recently uploaded (20)

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Reliability and Fuzzy Logic Concepts as Applied to Slope Stability Analysis – A Review

  • 1. Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03 www.ijera.com 1 | P a g e Reliability and Fuzzy Logic Concepts as Applied to Slope Stability Analysis – A Review Nazarullah Khan*, Dr. R Bhuvana Vijaya ** Dr A Mallikarjuna Reddy***, Dr M T Prathap Kumar**** *(Assistant Professor, Department of Mathematics, Ghousia College of Engineering, Ramanagara, India) ** (Assistant Professor, Department of Mathematics JNTUA, Anantapur, Andhra Pradesh, India) *** (Professor, Department of Mathematics, S K University, Anantapur, Andhra Pradesh, India) **** (Senior Professor and R&D Coordinator, REVA Institute of Technology and Management, Bengaluru, India,) ABSTRACT Considerable uncertainty exist with regard to stability of slopes due to several factors and recognition of these uncertainties has made designees to introduce factor of safety. Several studies, during recent years on analytical methods using soil properties have improved understanding the several uncertainties. The reliability analysis of slopes can be used to represent uncertainty in mathematical models, which can be assumed to follow the characteristic of random uncertainty. The distribution uncertain variable, which is unknown, makes its estimation difficult. Hence, the concepts of fuzzy set theory appear to be quite reliable when limited information is available. This paper attempts to review the slope stability problem and deals with the intricacies of the concept of reliability and fuzzy logic as applied to stability analysis of slope. It has been suggested that the FOSM algorithm provides a general agreement among the different slope stability solutions. Keywords – factor of safety, fuzzy logic, reliability method, slope stability,, uncertainty I. INTRODUCTION Slope stability analysis includes assessing failure of an element by checking whether the stress in the element equals the strength of an element. However, the strength of soil varies from one location to another, as well as, with time. Considerable uncertainty exist with regard to stability of slopes due to several factors such as-the method of measurement of soil properties are not perfect, stress in soil is being uncertain and most of the methods used contain simplifying assumptions that leads to errors of uncertain magnitudes. Recognition of these uncertainties has made designees to introduce factor of safety, which is defined as the ratio of measured strength to calculated stress. Risk and uncertainty in slope stability shall be dealt using observational method [1]. It shall be noted that this method will be applicable only during construction stage, where in the design can be changed. Where critical behavior cannot be observed ,the designer must rely on calculated risk[2].Several studies, during recent years on analytical methods using soil properties have improved understanding the several uncertainties. This paper attempts to summarize the slope stability problem and consider their effect in design practice and introduces the concept of reliability and fuzzy logic as applied to stability analysis of slope. II. PROBABILITY CONCEPTS TO SLOPE STABILITY ANALYSIS Several investigators[3,4,5 and 6] described effective application of probability concepts for stability analysis of slopes have used first –order second moment methods(FOSM). The established methods previously deal with uncertainty regarding natural properties and loading conditions. However they do not address inadequacies such as erosion, errors in construction and inadequate soil exploration that might miss a critical geological detail. Thus, it is still better to deal relative probabilities of failure or other measures of reliability. Mean-first –order reliability method that incorporates uncertainty into decision–making process without establishing an absolute value of t he probability of failure was also used[7]. However, the probability of failure incorporates only those factors that are included in the analysis and hence considered as a lower bound of actual probability of failure. An approach in six steps to compute uncertainty in factors of safety and the corresponding reliability index as follows was recommended [2]: (i) Identify variables such as geometry, weight and strength of soil. (ii) To determine the mean value of each variable so onto calculate best estimate of factor of safety RESEARCH ARTICLE OPEN ACCESS
  • 2. Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03 www.ijera.com 2 | P a g e (iii) Determine the uncertainty in each variable with its likely variable. (iv) Perform sensitivity analysis to determine change in factor of safety (v) Obtain V [ F ] = 𝜕𝑔 𝜕𝑥 𝑖 2 𝑘 𝑖=1 V x j + V e (1) where „g‟ is a geometrical simplified model such as method of stress that depends on vector x of geometry and soil properties. „e‟ is a modeling error that describes how a model deviates from real. (vi) The reliability index then can be computed using 𝛽 = 𝐸 𝐹 −1.0 𝜎 𝐹 (2) where 𝜎 𝐹 is the square root of V [ F ] 𝛽 is the reliability index F is the computed factor of safety. The equation (2) gives the reliability index that describes the safety by the number of standard deviations separately, the best estimate of F from its defined failure value of 1.0. However, it shall be noted from equation (1), that the uncertainty in the model error e is uncorrelated with uncertainties in the model parameter 𝑋𝑖 + and 𝑋𝑗 + III. RELIABILITY ANALYSIS It was also pointed out that there is the possibility of obtaining different reliability index values for a chosen probabilistic failure surface [8]. The minimum reliability index occurs in same critical probabilistic failure surface that does not coincide with critical deterministic failure surface. Thus, the aim of reliability analysis shall be to find minimum 𝛽 value that indicates the most critical slip surface. However the reliability index can be associated with a slope but not to any specific surface. The reliability analysis of slopes can be used to represent uncertainty in mathematical models, which can be assumed to follow the characteristic of random uncertainty. However not all uncertainties are random, especially those based on incomplete information. Hence, such uncertainties cannot be handled by probability based reliability analysis. Further, the distributions type of uncertain variable is also unknown, making its estimation rather difficult. Hence, the concepts of fuzzy set theory were recommended and appear to be quite reliable when limited information is available [9]. When the uncertainty arises due to impression and ambiguity, the variable becomes fuzzy and hence one can incorporate the fuzzy uncertainty in reliability analysis of slopes. IV CONCEPTS OF FUZZY SET THEORY In this method, the soil parameters can be represented by fuzzy numbers that allows a simple and practice oriented way to allow for expert judgment [9]. The chosen membership shape can be trapezoidal one as shown in fig (1). Fig. 1 Membership Shape for an uncertain parameter The 𝛼 − cut of a fuzzy set A can be defined as: 𝐴 𝛼 = 𝑥 ∈ 𝑋|𝛼𝐴(𝑥) ≥ 𝛼 , for 𝛼 ∈ 0 ,1 , i.e., the 𝛼 − cut of a fuzzy set A is the crisp set 𝐴 𝛼 that contains all the elements of the universal set X hose membership grades in A are greater than or equal to the specified value of 𝛼. Thus the 𝛼 − 𝑐𝑢𝑡 discretise a fuzzy member into a group of 𝛼 − cut intervals .For each uncertain parameters , the 𝛼 − cut gives upper and lower bound values for a particular 𝛼 − cut. In the fig.1, a b, c and d are calculated as: a = 𝐸 𝑥𝑖 − 𝑚1 𝜎 𝑥1 ; b = 𝐸 𝑥𝑖 − 𝑚2 𝜎 𝑥1 ; c = 𝐸 𝑥𝑖 + 𝑚3 𝜎 𝑥1 ; and d = 𝐸 𝑥𝑖 + 𝑚4 𝜎 𝑥1 ; where 𝑚𝑖 being the number of standard deviations between expected value of the parameter and the fuzzy set vertices. Based on the expected judgments, the 𝑚𝑖 values are reported as 𝑚1 = 0.5 and 𝑚2 = 1.5. However, the value of 𝑚𝑖 can be modified to allow for soil behavior. The vertex method, based on the 𝛼 − cut concept involves interval analysis, there by reducing the fuzzy computation as a series of interval analysis [10]. The value of 𝛼 is set to a value in the range of 0 to 1 and drawing a horizontal line that intersects fuzzy member at two points 𝑋𝑖 − and 𝑋𝑖 +. Thus, the 𝛼 − cut ranging from 0.1 to 0.995 can be considered to involve fuzzy number. For four strength parameters, there will four fuzzy numbers that can be investigated at 2 × 4 = 8 vertex dimension .Each of the 𝑋𝑖 vertex are treated as weak value to find the most critical failure surface[12] with the remaining parameters set at their mean values. Thus, the first order second moment (FOSM) algorithm is used to calculate minimum reliability index. The vertex method computes two factors of safety 𝐹𝑆 + and 𝐹𝑆 − . By approximate method, the
  • 3. Nazarullah Khan Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 5, Issue 6, ( Part -2) June 2015, pp.01-03 www.ijera.com 3 | P a g e derivatives for each 𝛼 − cut is applied. The final step comprises assuming the fuzzy mean value for each derivative calculated using the following formula: 𝐸 𝜕 𝐹𝑆 𝜕 𝑥 𝑗 = 𝛼 𝑖 𝑊 𝑥𝑖 𝑁 𝑗 =1 𝑁 (3) Where 𝑥𝑖 is the investigated possibility level 𝑊𝑥𝑖 = 𝐹𝑠 𝑥𝑖 + + 𝐹𝑠 𝑥𝑖 − 2𝑚𝑖 𝜎 𝑋𝑖 4 where 𝑚𝑖 is the number of standard deviation of which 𝑋𝑖 + and 𝑋𝑖 − are greater or smaller than the mean of 𝑋𝑖 , N s the number of 𝛼 − cut . The application of simple algorithm with correct experienced based parameter provides the result in good agreement with slope stability solutions. IV. CONCLUDING REMARKS The reliability approach has evolved to a point that they can be used in actual practice but requires considerable effort and should have a good reason to use. A better and consistent approach is by a probabilistic approach based on fuzzy set theory. This approach takes into account the variability in parameters used for factor of safety calculations. Further, the FOSM algorithm provides a general agreement among the different slope stability solutions. REFERENCES [1] Peck, R .B . “Advantages and limitations of the observational method in applied soil mechanics: Ninth Rankine Lecture.‟‟ Geotechnique, 1969, Vol. 19(2), pp171-187. [2] John T Christian, Charles C Ladd and Gregory B Baecher, “Reliability Applied to slope stability analysis” Jou. Of Geotechnical Engg., 1993, Vol.120(12), pp 2180-2205. [3] Wu . T. H , and Kraft, L.M “Safety analysis of slopes ” J. Soil mech. and Found. Div., ASCE, 1970, Vol. 96(2), pp609-630. [4] Cornell. C . A . “First –order uncertainty analysis of soils deformation and stability.” Proc., of First Int . Conf. on Applications of probability and Statistics in Soil and Struct. Engrg (ICAP) , Hong Kong, 1971, pp129-144 [5] Alonso . E .E . “ Risk analysis of Slopes and its applications to Slopes in Canadian sensitive clays .” Geotechnique . 1976, vol. 26(3), pp 453-472 [6] Tang. W .H., Yucemen ,M.S. , and Ang. A . H.-S , “ Probability –based short term design of slopes ” Can . Geotech . Jou,, 1976, Vol.13 (3), pp201 – 215 [7] Christian .J.T., Ladd .C.C., and Baecher .G.B., “Reliability and probability in stability analysis” Proc. Stability and Performance of Slopes and Embankment –II ASCE, New York .N. Y.,1992, Vol.2, 1071- 1111 [8] Hassan.A. Wolff.TF.,”Search algorithm for minimum reliability index of Earth slopes”, .Journal of Geotechnical and Geo environmental Engineering 1999, pp 301- 308 [9] G R Dodagoudar and G Venkatachalam, “Reliability analysis of slopes using Fuzzy set theory”, Jou. of Computers and Geotechnics, 2000, Vol. 27, pp 101-115. [10] Juang CH, Jhi Y-Y,Lee DH “Stability analysis of existing slopes considering uncertainty”,. Engineering Geology, 1998, vol. 49, pp 111-122.