Venu Kalidoss
PORTFOLIO
+1 647 894 3201
gosush@gmail.com
Costa Rica Hotel Project
Improved Living Housing
Project
TECHxHIBIT
West Hawaii Civic Center
Shopaholics
Farm House Projec...
COSTA RICA HOTEL PROJECT   DIGITALLY RENDERED IN REVIT
IMPROVED LIVING PROJECT
EMPHASIS ON ECO FRIENDLY MATERIALS   RENDERED IN SKETCH UP
West Hawaii Civic Center
DIGITALLY RENDERED IN SKETCHUP + V-RAY COMPONENT + ILLUSTRATOR
SHOPAHOLICS
PARTICIPATED AT THE 2006
CAL-POLY DESIGN VILLAGE




DESIGN-BUILD
  PROJECT
FARM HOUSE PROJECT
                                      INDIA




    3 BED 3 BATH + 1705 SFT.

RENDERED IN VIZ AND PHOTO...
WASHINGTON STREET
                                    REDEVELOPMENT PROJECT
                                1




        ...
Portfolio
Portfolio
Upcoming SlideShare
Loading in …5
×

Portfolio

380 views
365 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
380
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Portfolio

  1. 1. Venu Kalidoss PORTFOLIO +1 647 894 3201 gosush@gmail.com
  2. 2. Costa Rica Hotel Project Improved Living Housing Project TECHxHIBIT West Hawaii Civic Center Shopaholics Farm House Project Washington Street Redevelopment Project
  3. 3. COSTA RICA HOTEL PROJECT DIGITALLY RENDERED IN REVIT
  4. 4. IMPROVED LIVING PROJECT EMPHASIS ON ECO FRIENDLY MATERIALS RENDERED IN SKETCH UP
  5. 5. West Hawaii Civic Center DIGITALLY RENDERED IN SKETCHUP + V-RAY COMPONENT + ILLUSTRATOR
  6. 6. SHOPAHOLICS PARTICIPATED AT THE 2006 CAL-POLY DESIGN VILLAGE DESIGN-BUILD PROJECT
  7. 7. FARM HOUSE PROJECT INDIA 3 BED 3 BATH + 1705 SFT. RENDERED IN VIZ AND PHOTOSHOP
  8. 8. WASHINGTON STREET REDEVELOPMENT PROJECT 1 2 TO THE EXISTING 110 FT. OF ASPHALT GLORY ON WASHINGTON STREET (BETWEEN THE 163 N EXIT 3 AND NORMAL ST;) BE REDEVELOPED TO ACCOMMODATE LOW COST HOUSING WHICH CAN 4 SUPORT THE NEED FOR THIS COMMUNITY’S HOUSING SHORTAGE ANTICIPATED TO OCCURE IN THE NEAR 5 8 FUTURE. THIS RECLAIMED LAND SITS AS THE DECK OF A FOUR LANE TUNNEL 40 FEET BELOW GRADE. THIS 6 EXPERIMENTAL UNDERTAKING BRIDGES TWO 7 DISJOINTED COMMUNITIES OF HILLCREST AND UNIVERSITY HEIGHTS, MAKING WASHINGTON STREET A GATEWAY INTO THESE WARM NEIGHBORHOOD. PROPOSED MASTER PLAN 1. CULTURAL CENTER (2 STORIES + PROPOSED) 9 2. HOTEL (4 STORIES + PROPOSED) 3. MULTI FAMILY HOUSING (2 STORIES) 4. RECREATIONAL CENTER (1 STORY + PROPOSED) 5. MULTI FAMILY HOUSING (2 STORIES) 6. HOUSING PROJECT (2 STORIES + PROPOSED) 7. BRIANS RESTAURANT (1 STORY) 8. COMMUNITY PARK (PROPOSED) 9. MULTI FAMILY HOUSING (4 STORIES)

×