Ring Road Project Around Jaipur, A six-lane road is to be developed connecting Agra Road, Tonk Road and Ajmer Road in the initial phase of the project. In Phase I & II, a road with a length of 47 km will be constructed in the south of Jaipur, connecting Ajmer Road, Tonk Road and Agra Road. In Phase III, a road with a length of 97.75 km will be constructed in the northern part of Jaipur and will connect Agra Road, Delhi Road, Sikar Road and Ajmer Road. It will consist of a six-lane access controlled expressway; a three-lane service road on both sides; a 135 m R&R and an investors' development corridor on both sides. The road is envisaged as a toll-free and signal free expressway.