SATHYABAMA UNIVERSITY
(Established under section 3 of UGC Act, 1956)
Course & Branch: B.E .- CIVIL
Title of the paper: Water Resources Engineering
Semester: VII Max. Marks: 80
Sub.Code: 20704(2002/2003/2004) Time: 3 Hours
Date: 18-03-2008 Session: FN
PART – A (10 x 2 = 20)
Answer All the Questions
1. Mention any five components of water management.
2. Mention the essence of national water policy.
3. List any four common types of precipitation.
4. Mention the factors affecting runoff.
5. Define consumptive use and the methods to estimate it.
6. Define Net Irrigation Requirement [NIR].
7. Mention the types of Reserviors.
8. Define Design flood mention the types of flood that can be
estimated.
9. List the types of Irrigation.
10. Define the terms (i) Duty (ii) Delta.
PART – B (5 x 12 = 60)
Answer All the Questions
11. Describe National water policy and mention its salient features.
(or)
12. Define Irrigation water management and its objectives and
explain any five components of water management.
13. Explain in detail the various forms of precipitation also discuss
the types of precipitation.
(or)
14. (a) Compute the S-curve ordinate for the following 4 hour unit
hydrograph of a catchment of 300 km2
area.
(b) Also compute 5 hr unit hydrograph for this basin with the
help of above desired s – curve.
Time in hour Unit graph co-ordinates in
cumecs.
0 0
1 6
2 36
3 66
4 91
5 106
6 93
7 79
8 68
9 58
10 49
11 41
12 34
13 27
14 23
15 17
16 13
17 9
18 6
19 3
20 1
21 0
22 0
15. (a) Write a note on water Requirement of crops.
(b) Explain depth and Frequency of Irrigation.
(or)
16. Determine consumptive use and Net Irrigation Requirement for a
crop from the data below.
Period Oct(10 -
31)
Nov(1-
30)
Dec(1 -
31)
Jan (1
– 31)
Feb (1
– 15)
Pan
Evaporation
Ep(cm)
5 10 9 8 4
Cu
Coefficient,
K
0.5 0.55 1.0 0.9 0.7
Effective
Rainfall
Re(cm)
2 1.5 1 0.5 0.2
17. Explain the methods for Flood control.
(or)
18. Explain the pre-construction and post-constructing measures
adopted for silt control in Reservoirs.
19. Explain in detail the different types of Irrigation.
(or)
20. (a) Wheat is to be grown at a certain place, the useful
climaatological conditions are as below. If wheat Requires about
7.5 cm of water after every 28 days and the base period for wheat
is 140 days find out the value for wheat
(b) Briefly explain the terms
i) Cash crops iii) Crop Rotation
ii) Crop seasons iv) Crop Ratio

More Related Content

What's hot

The key controls in a db system & hydrographs
The key controls in a db system & hydrographsThe key controls in a db system & hydrographs
The key controls in a db system & hydrographs
geographypods
 
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
stoughne
 

What's hot (12)

EcoWest Landscope America
EcoWest Landscope AmericaEcoWest Landscope America
EcoWest Landscope America
 
DSD-INT 2018 - Climate Change Service Agricultural project - Weerts
DSD-INT 2018 - Climate Change Service Agricultural project - WeertsDSD-INT 2018 - Climate Change Service Agricultural project - Weerts
DSD-INT 2018 - Climate Change Service Agricultural project - Weerts
 
CSpryFinal5
CSpryFinal5CSpryFinal5
CSpryFinal5
 
Considering the Reliability of Rainwater Harvesting in the Brazilian Semi-Arid
Considering the Reliability of Rainwater Harvesting in the Brazilian Semi-AridConsidering the Reliability of Rainwater Harvesting in the Brazilian Semi-Arid
Considering the Reliability of Rainwater Harvesting in the Brazilian Semi-Arid
 
CO2 Storage resource and atlas development, Robert Wright, DOE
CO2 Storage resource and atlas development, Robert Wright, DOECO2 Storage resource and atlas development, Robert Wright, DOE
CO2 Storage resource and atlas development, Robert Wright, DOE
 
Ch. 10 Models Classwork
Ch. 10 Models ClassworkCh. 10 Models Classwork
Ch. 10 Models Classwork
 
Uncertainty in simulating biomass yield and carbon-water fluxes from Euro-Med...
Uncertainty in simulating biomass yield and carbon-water fluxes from Euro-Med...Uncertainty in simulating biomass yield and carbon-water fluxes from Euro-Med...
Uncertainty in simulating biomass yield and carbon-water fluxes from Euro-Med...
 
2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler
 
The key controls in a db system & hydrographs
The key controls in a db system & hydrographsThe key controls in a db system & hydrographs
The key controls in a db system & hydrographs
 
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
Nigtrogen Pollution Change Due to Land Use Changes in the Plano/Allen area.
 
Anàlisi de les afectacions de la processionària amb UAV i LANDSAT
Anàlisi de les afectacions de la processionària amb UAV i LANDSATAnàlisi de les afectacions de la processionària amb UAV i LANDSAT
Anàlisi de les afectacions de la processionària amb UAV i LANDSAT
 
Unit II Review
Unit II ReviewUnit II Review
Unit II Review
 

Similar to (Www.entrance exam.net)-sathyabama university b.tech in civil engineering- water resources engineering sample paper 5

07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
imaduddin91
 
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
Kaveh Ostad-Ali-Askari
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
imaduddin91
 

Similar to (Www.entrance exam.net)-sathyabama university b.tech in civil engineering- water resources engineering sample paper 5 (20)

07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
 
Ee ready-print
Ee ready-printEe ready-print
Ee ready-print
 
Exfiltration Trench Design Manual
Exfiltration Trench Design ManualExfiltration Trench Design Manual
Exfiltration Trench Design Manual
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Suhas Seminar 2 PPT.pptx
Suhas Seminar 2 PPT.pptxSuhas Seminar 2 PPT.pptx
Suhas Seminar 2 PPT.pptx
 
UnitHydrograph.pptx
UnitHydrograph.pptxUnitHydrograph.pptx
UnitHydrograph.pptx
 
Nicot+scanlon es&t 12_si
Nicot+scanlon es&t 12_siNicot+scanlon es&t 12_si
Nicot+scanlon es&t 12_si
 
Environmental Science & Technology:
Environmental Science & Technology:Environmental Science & Technology:
Environmental Science & Technology:
 
Solution Manual for Water Supply and Pollution Control – Warren Viessman, Mar...
Solution Manual for Water Supply and Pollution Control – Warren Viessman, Mar...Solution Manual for Water Supply and Pollution Control – Warren Viessman, Mar...
Solution Manual for Water Supply and Pollution Control – Warren Viessman, Mar...
 
RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
 
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
 
Abdel1
Abdel1Abdel1
Abdel1
 
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
18- (IBWRD) Developing an Optimal Design Model of Furrow Irrigation Based on ...
 
a3-4.park.pdf
a3-4.park.pdfa3-4.park.pdf
a3-4.park.pdf
 
Ijirt148701 paper
Ijirt148701 paperIjirt148701 paper
Ijirt148701 paper
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
 
Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...
 
145_7
145_7145_7
145_7
 
Implications of climate change on existing and planned water resource develop...
Implications of climate change on existing and planned water resource develop...Implications of climate change on existing and planned water resource develop...
Implications of climate change on existing and planned water resource develop...
 

(Www.entrance exam.net)-sathyabama university b.tech in civil engineering- water resources engineering sample paper 5

  • 1. SATHYABAMA UNIVERSITY (Established under section 3 of UGC Act, 1956) Course & Branch: B.E .- CIVIL Title of the paper: Water Resources Engineering Semester: VII Max. Marks: 80 Sub.Code: 20704(2002/2003/2004) Time: 3 Hours Date: 18-03-2008 Session: FN PART – A (10 x 2 = 20) Answer All the Questions 1. Mention any five components of water management. 2. Mention the essence of national water policy. 3. List any four common types of precipitation. 4. Mention the factors affecting runoff. 5. Define consumptive use and the methods to estimate it. 6. Define Net Irrigation Requirement [NIR]. 7. Mention the types of Reserviors. 8. Define Design flood mention the types of flood that can be estimated. 9. List the types of Irrigation. 10. Define the terms (i) Duty (ii) Delta.
  • 2. PART – B (5 x 12 = 60) Answer All the Questions 11. Describe National water policy and mention its salient features. (or) 12. Define Irrigation water management and its objectives and explain any five components of water management. 13. Explain in detail the various forms of precipitation also discuss the types of precipitation. (or) 14. (a) Compute the S-curve ordinate for the following 4 hour unit hydrograph of a catchment of 300 km2 area. (b) Also compute 5 hr unit hydrograph for this basin with the help of above desired s – curve. Time in hour Unit graph co-ordinates in cumecs. 0 0 1 6 2 36 3 66 4 91 5 106 6 93 7 79 8 68 9 58 10 49 11 41 12 34 13 27 14 23 15 17 16 13
  • 3. 17 9 18 6 19 3 20 1 21 0 22 0 15. (a) Write a note on water Requirement of crops. (b) Explain depth and Frequency of Irrigation. (or) 16. Determine consumptive use and Net Irrigation Requirement for a crop from the data below. Period Oct(10 - 31) Nov(1- 30) Dec(1 - 31) Jan (1 – 31) Feb (1 – 15) Pan Evaporation Ep(cm) 5 10 9 8 4 Cu Coefficient, K 0.5 0.55 1.0 0.9 0.7 Effective Rainfall Re(cm) 2 1.5 1 0.5 0.2 17. Explain the methods for Flood control. (or) 18. Explain the pre-construction and post-constructing measures adopted for silt control in Reservoirs. 19. Explain in detail the different types of Irrigation. (or) 20. (a) Wheat is to be grown at a certain place, the useful climaatological conditions are as below. If wheat Requires about 7.5 cm of water after every 28 days and the base period for wheat is 140 days find out the value for wheat
  • 4. (b) Briefly explain the terms i) Cash crops iii) Crop Rotation ii) Crop seasons iv) Crop Ratio