04   test controlling and tracking
Upcoming SlideShare
Loading in...5
×
 

04 test controlling and tracking

on

  • 1,402 views

Testing with Visual Studio 2012 Agile TMap

Testing with Visual Studio 2012 Agile TMap

Statistics

Views

Total Views
1,402
Views on SlideShare
581
Embed Views
821

Actions

Likes
1
Downloads
22
Comments
0

7 Embeds 821

http://www.clemensreijnen.nl 664
http://clemensreijnen.nl 101
http://feeds.feedburner.com 27
http://clemens.azurewebsites.net 24
http://www.newsblur.com 2
http://feedreader.com 2
http://www.sayes.co 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

04   test controlling and tracking 04 test controlling and tracking Presentation Transcript

  • Module 03Test Controllingand Tracking
  • Topics
  • Providing the client with sufficient insight into, and the opportunity to influence, the following:• The progressof the test process• The quality and risks of the test object• The quality of the test processManage the test process, the infrastructure and the test products. Using the data thus obtained as a basis, and theanalyses of possibletrends.http://www.tmap.net/en/tmap/4-essentials/structured-test-process/acceptance-and-system/control-phaseThe Control Phase
  • Software Testing with Visual Studio
  • Reporting on Software Quality
  • Monitoring Quality Metrics
  • Available Test Reports
  • Rich InformationRich VisualizationHarder to CustomizeSQL Server Reports
  • Out of the BoxEasy to create your ownEasy to CustomizeExcel Reports
  • All information inone place – the browserBased on Excel ServicesCustomizableIdeal for “Self-Service BI”SharePoint/Web Access Dashboards
  • Manual/FunctionalTest ResultsMicrosoft Test Manager Results
  • Filters allow you to controlwhich builds you seeView the test and code coverageresults for each build todetermine quality
  • Line-by-line highlighting illustrateswhich code is covered, uncovered,or partially covered by testResults show which methods arecovered by test and total coverage isindicated by a percentage
  • Track total percentage hourscompleted by user storyView real-time status ofeach user storyTest results quickly displayquality status of each user storyTrack active and resolvedbugs by user story
  • DemoQuality Reports
  • Bugs and Defects
  • Manual Testing
  • Catching and Tracking BugsRich InformationCustomizableCollect rich Informationwith Data DiagnosticAdaptersCustomizable bug flow,states and reporting
  • Organize testing in multipleconfigurationsPlayback a prior recording to savetime with frequently-repeatedsetup steps and prerequisitesBind data to controls, tosupport multiple iterationsand future automationPause, save, close, return, andpick up where you left off
  • Filing BugsRich InformationCustomizableMicrosoft Test RunnerMicrosoft Test ManagerTFS Web AccessVisual StudioFeedback Manager*3rd party tools*
  • IntelliTrace LogsSystem logs & configurationDetailed status and historyvisible to all team membersAudio & Video recordings
  • Action RecordingVideoIntellitraceTest Impact“Create your own”Data Diagnostic Adapters
  • Get an overview of the test runwith summary pie charts, or drillinto the details for each test.Analyze code coverage for manualtests to determine which specificparts of your code were tested .Associate manual test runswith builds and environments.
  • DemoCreating and Resolving a Bug
  • The Bug BacklogPut Bugs on theBacklogCreate your ownBug Workflow
  • Custom Reports
  • Relational Databases(TFS)Data Warehouse(Reporting Services)Creating Customized Reports
  • Creating Excel Reports for Test
  • Quality Status Reports“What is the status of testing of specific user stories or product areas?”“What is the quality of builds based on the number of failed and passed tests?”“How many test cases have never been run?”“Which test cases have never been run?”Quality Trend Reports“How many tests are blocked, passing, or failing over time?”“How many tests are regressing?”“How consistent is the manual test activity over time?”Test Results - Data Points
  • DemoCreating an Excel Pivot Table