Project summary education

  • 302 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
302
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. EDUCATION Project: School Extension with featured timber domed roof Head Teacher: George Potrykus Architect: Stewart Maclachlan, LBN This prestigious project involved the erection of a steel framed building with a featured timber domed roof. The building designed by Stewart Maclachlan of London Borough of Newham (LBN) incorporates an innovative RONALD OPENSHAW NURSERY vaulted and domed semi-circular timber roof. The roof was VALUE: £457,000 manufactured on site with traditional craft hand skills. The finished inside is a beautiful array of circular timber. Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domed end to accurately meet the vaulted section. The finished project is a unique quality piece of work not often seen on construction sites these days. The quality and precision achieved in this project is testament to our teamwork and co-operation. MARYLAND PRIMARY SCHOOL VALUE: £63, 700 ELMHURST PRIMARY SCHOOL VALUE: £350, 000 Project: Refurbishment of School toilets Project: Refurbishment of School toilets Head Teacher: Shahed Ahmed Head Teacher: Lorna Jackson - 020 8534 8135 Site Contact: Maxine Dixon - 020 8472 1062 The project comprised the complete strip out and This project involved the complete strip out and refurbishment of boys, girls and staff toilets. The refurbishment of 27 toilets. We used the time leading time leading up to the start was used to develop up to the project start date to develop the design. We the design. We engaged the school heads in the assisted the school in selecting the design, colours process of working up a design together until they and appliances they required. Works were carried were satisfied. out over a ten month period including school term- time on a rolling programme without a hitch. This is The project was completed during the summer because our tradesmen are specially trained to work holidays and the school was very pleased with the in school environments. outcome. The Head teacher is available for reference. The school was very pleased with the outcome. The Head Teacher is available to give reference. 363 Ripple Road, Essex. IG1 19PN Tel: 020 8594 2594 Fax: 020 8591 1213 Email: info@carmelcrest.co.uk Website: www.carmelcrest.co.uk