Issue on Manesar
plant (Maruti Suzuki)
Team Members
• Athif
• Anil
• Afif
• Balu
• Basheer
Powerpoint Templates
Page 2
Maruti Suzuki India Limited
• Maruti Suzuki India Limited (MSIL) has been
established and incorporated since 1983.
• MSIL is a subsidy of the Suzuki Motor Corporation,
Japan.
• Maruti Suzuki has been renowned for producing
the most fuel efficient, affordable and reliable cars
and therefore has been the leader of the Indian
car market for over the past two and halve
decades.
• Manufacturing facilities are located at two facilities
Gurgaon and Manesar
Powerpoint Templates
Page 3
About Maruti Manesar Plant
oIndia's largest passenger car company, accounting for
over 45% of the domestic car market
oFirst company in India to mass-produce and sell more
than a million cars
oAnnually exports more than 50,000 cars
oIt offers 14 brands and over 150 variants ranging from
peoples car Maruti Alto 800 to the stylish hatchback Ritz
Powerpoint Templates
Page 4
What Happened In Manesar Plant
On 18th July 2012 at Maruti‟s labour plant, industrial
disputes broke out when workers became aggressive
and over 96 staff members were injured while also
leading to the death of a human resource manager.
More then two-thirds of the employees were
involved in the strike, causing Maruti to lose about
INR 75 crores ($11.81 million) in revenue and INR 8
crores ($1.3 million) in operating profit daily while also
halting Maruti‟s production line causing it to lose
around 1200-1400 units daily.
Powerpoint Templates
Page 5
Development of the
Strike
•The company knew that trouble was brewing, they
knew that some workers planned on registering a
separate union and the company had already
prepared legal documents for a possible expulsion of
workers from the premises.
•Maruti Suzuki management tried to back a single
union, the Maruti Suzuki Kamgar Union, for both
Gurgaon and Manesar plant.
• This union had been set-up by forces close to
management after the lock-out at Gurgaon plant in
2000/2001.
Powerpoint Templates
Page 6
Development of the
Strike
•“On 3rd of June, eleven leaders of the workers went
to Chandigarh to meet the Labour Department to
complete the formalities regarding registration of our
union on June 3, 2011. On the morning of that day,
the labour department officials faxed the news of our
application to the management.
•On the morning of June 4, 2011, through struggle,
we were able to retrieve some of the blank signed
papers from the management. By the afternoon, it
became clear that the management was using all
kind of tricks to break our unity. In such
circumstances, we were forced to go on flash tool
down strike from the afternoon of June 4, 2011.”
Powerpoint Templates
Page 7
Development of the
Strike
•On the 4th of June after the change between
morning and late shift around 2,000 workers stop
work and remain in factory. Later on, the C-shift
would not be refused entry by management and
these workers largely remained outside the factory.
•During this initial stage, workers raised various
issues and demands: low wages, incentive cuts, few
breaks. The workers have demanded that the
temporary workers should be given preference for
permanent posts in new departments, which the
company is currently building on the premises.
Powerpoint Templates
Page 8
Causes
Differences in salary pay
Working Conditions
 Unions generally limit themselves to acting as a
voice of permanent employees
Demand for a new union
Powerpoint Templates
Page 9
Impact on Company
• Operations stopped for a month.
• Loss estimated to be over Rs. 1,500 crore
• Fear of insecurity to the employees and their families
• Problem of lack of labor resource
• Maruti changed its recruitment policy
• GOODWILL….
Powerpoint Templates
Page 10
Impact on Economy
Large labor- unemployed
GDP affected
Loss of country resources
Disturbance- affecting the common man
Powerpoint Templates
Page 11
Problems
 Lack of communication between HR people and
labour
 Lack of coordination between labour union and HR
department
Powerpoint Templates
Page 12
Causes
Powerpoint Templates
Page 13
PROBLEM FROM WORKERS VIEW
POINT
“If the floor supervisor is rude and even
slaps us, he is awarded with a promotion but
in case a labourer dares to reply, he is issued
a notice on grounds of disciplinary action,"
said Rajender Kumar, a technician
Powerpoint Templates
Page 14
PROBLEM FROM WORKERS VIEW
POINT
Revenge for June's strike.
Cockroaches and dead flies found in the food in the hurried
lunch-break that workers earn in the canteen ½ km from the
working station.
The tea was without tea leaves or sugar in the 7 minute break
The company doctor give heavy doses of „instant‟ medicines
even on minor complaint so that disruption of work could be
prevented.
One day‟s wage cut of Rs.1500, two days Rs.2200, three days
cut of Rs.7-8000 is implemented, so that almost the total
month‟s wage is cut.
One second late into punching-card entry is a day‟s wage cut,
but they have to give full production for that day too.
Powerpoint Templates
Page 15
PROBLEM FROM WORKERS VIEW
POINT
Forced to fill an undertaking form, which means that in case
of any problem, workers cannot raise any objections against
management.
Powerpoint Templates
Page 16
WORKER’S DEMAND
Worker‟s demand to establish an independent union Maruti
Suzuki Employees Union (MSEU)in the company.
Currently, the company has one recognized union – Maruti
Udyog Kamgar Union which is dominated by workers at the
Gurgaon plant
Powerpoint Templates
Page 17
MANAGEMENT VIEW OF
PROBLEM
“ Unhappy workers have found out a new way to
disrupt ongoing work at the plant by creating serious
defects in quality of the cars, so they would fail the
compulsory vehicle inspection (VI) quality test.”
Powerpoint Templates
Page 18
MANAGEMENT VIEW OF
PROBLEM
 Workers indulging in deliberate attempts to reduce output
and are compromising customer interests
Revenge for the June strike.
Refused to sign good conduct form which aims at ensuring
the production of good quality products.
Employees are being charged with sabotage and causing
quality problems in the cars produced.
Powerpoint Templates
Page 19
MANAGEMENT VIEW OF
PROBLEM
"In the last three days, a series of serious quality
problems have been observed in the vehicles
produced. For example, vehicle door was not
properly clamped leading to doors falling during
production, wiring harnesses were found cut in
produced vehicle, dents were noticed on the body
and critical components were not fitted on to
vehicles. Such deliberate acts, if not detected during
quality checks, would have led to serious
implications and directly harmed customers," a
senior company official said.
Powerpoint Templates
Page 20
ACTION TAKEN AGAINST
EMPLOYEES
 Suspension of 10 workers
 Dismissal of five
 Discontinued the services of six trainees.
 Also suspended four workers for "instigating
indiscipline" a week before
 Another four suspended in late July for
manhandling supervisors.
 Charges of sabotage and causing quality problems
in the cars produced.
 On 14th August; police force of 500 send to
occupy the factory to „prevent violent activities‟
Powerpoint Templates
Page 21
ACTION TAKEN AGAINST
EMPLOYEES
 The company terminated 11 workers and suspended
38 on August 29th and 30th on false charges demanding
a „good-conduct bond‟ with the state police and
administration, the media, and „bouncers‟ on its payroll as
its willing pawns.
 The Maruti Suzuki Employees Union (MSEU) is
demanding as an immediate measure, the withdrawal of
the charge-sheet, termination, suspension of the 49
workers. The workers are sitting day-and-night at the
factory gate, peeling off the layers of Maruti Suzuki‟s
“way of life”.
Powerpoint Templates
Page 22
Solution
Identified reasons of the conflict.
1. Establishment of separate union for Manesar
Plant
2. Code of Conduct- Falling standards of
manufacturing.
3. Basic sanitary enhancements demanded by the
workforce.
Powerpoint Templates
Page 23
Trade Union Establishment
Trade union would be established with prior
conditions: -
1. Members of the trade union to be nominated
with consent of both workers and management.
2. The leader of this union would be appointed by
the management.
If not agreed then management would move to plan
B.
1. Technology oriented operations reducing
demand of man power.
Powerpoint Templates
Page 24
For Managers….
• They have to Properly Co Ordinate with each
other
• Proper rules for indiscrimination in salary
• They have to control the public pokers
• They should try to understand the labour‟s
problem
Powerpoint Templates
Page 25
Improved hygienic conditions at workplace
reduces employee‟s dissatisfaction
Powerpoint Templates
Page 26
Powerpoint Templates
Page 27
Employee rights in
Manesar
Labour Law
A minimum time rate of wages
A minimum piece rate
Non-Discrimination of people at Workplace.
Local Hiring
Leave without wages
Working hours, holidays and overtime
Powerpoint Templates
Page 28
Employee rights in
Manesar
Labour Laws tweaked by Maruti
Enforcement of the Labour Laws was not followed strictly.
Differences in Salary Pay.
Working Conditions.
Lack of proper negotiations.
Powerpoint Templates
Page 29
Employee rights in
Manesar
Necessary changes done after the event
Hiring contract workers through company HR and not
through a contractor.
Reopened the plant with 300 workers
Fresh recruitment of permanent workers
Terminate the services of 500 permanent workers.
(Involved in Violence)
Powerpoint Templates
Page 30
What could had been done in
order to avoid the
event
Employee Labour Relationship should had been
maintained in decorum.
Flexibility is the key, not the cheapness.
Treat workers in the factory like humans.
The workers should refrain from taking law into their own
hands.
This would be a wrong reading. Companies hire
temporary (temps) and contract workers not only
because they are cheaper, but because they can be laid
off when they are not required. Flexibility is the key, not
the cheapness.
Powerpoint Templates
Page 31

More Related Content

What's hot

case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)
Sakshi Sharma
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog ppt
imamraza
 

What's hot (20)

Maruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plantMaruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plant
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
 
Human resource policy of hul
Human resource policy of hulHuman resource policy of hul
Human resource policy of hul
 
Product Mix of HUL(best ppt)
Product Mix of HUL(best ppt)Product Mix of HUL(best ppt)
Product Mix of HUL(best ppt)
 
case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog ppt
 
HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT HINDUSTAN UNILEVER LIMITED PPT
HINDUSTAN UNILEVER LIMITED PPT
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
 
Maruti suzuki case study
Maruti suzuki case studyMaruti suzuki case study
Maruti suzuki case study
 
MBA Summer Internship Project Report
MBA Summer Internship Project ReportMBA Summer Internship Project Report
MBA Summer Internship Project Report
 
Recruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project ReportRecruitment and Selection Summer Internship Project Report
Recruitment and Selection Summer Internship Project Report
 
project report on mahindra and mahindra
project report on mahindra and mahindraproject report on mahindra and mahindra
project report on mahindra and mahindra
 
Project Report on Performance Appraisal System and Effectiveness in Flora Hot...
Project Report on Performance Appraisal System and Effectiveness in Flora Hot...Project Report on Performance Appraisal System and Effectiveness in Flora Hot...
Project Report on Performance Appraisal System and Effectiveness in Flora Hot...
 
tata motors
tata motorstata motors
tata motors
 
HUL BCG MATRIX
HUL BCG MATRIXHUL BCG MATRIX
HUL BCG MATRIX
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
 
HMSI HR Failure
HMSI HR FailureHMSI HR Failure
HMSI HR Failure
 
HR Policy and HR Practices of Tata Motors
HR  Policy and HR Practices of Tata MotorsHR  Policy and HR Practices of Tata Motors
HR Policy and HR Practices of Tata Motors
 
A project report on dabur
A project report on daburA project report on dabur
A project report on dabur
 
Strategic Business Management Project Report on HUL
Strategic Business Management Project Report on HULStrategic Business Management Project Report on HUL
Strategic Business Management Project Report on HUL
 

Viewers also liked

Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
Navneet Jingar
 
How did lenin tackle the problems he faced
How did lenin tackle the problems he facedHow did lenin tackle the problems he faced
How did lenin tackle the problems he faced
cnewmanbsh
 
Executive seminar global_leadership_nissan_case_study
Executive seminar global_leadership_nissan_case_studyExecutive seminar global_leadership_nissan_case_study
Executive seminar global_leadership_nissan_case_study
Rohan Maheshwari
 

Viewers also liked (20)

Maruti Manesar Issue
Maruti Manesar IssueMaruti Manesar Issue
Maruti Manesar Issue
 
Maruti unrest
Maruti unrestMaruti unrest
Maruti unrest
 
Maruti Manesar Case
Maruti Manesar CaseMaruti Manesar Case
Maruti Manesar Case
 
Maruti strike Case study.ER
Maruti strike Case study.ERMaruti strike Case study.ER
Maruti strike Case study.ER
 
Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012
 
Maruti suzuki ppt
Maruti suzuki pptMaruti suzuki ppt
Maruti suzuki ppt
 
maruti case study
maruti case  studymaruti case  study
maruti case study
 
Ammy maruti
Ammy marutiAmmy maruti
Ammy maruti
 
Maruti manesar
Maruti manesarMaruti manesar
Maruti manesar
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
 
Nissan case study on leadership
Nissan case study on leadershipNissan case study on leadership
Nissan case study on leadership
 
Hrm maruti suzuki
Hrm maruti suzukiHrm maruti suzuki
Hrm maruti suzuki
 
Hr policy in maruthi
Hr policy in maruthi Hr policy in maruthi
Hr policy in maruthi
 
Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
 
Maruti
Maruti Maruti
Maruti
 
Manesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of BusinessManesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of Business
 
How did lenin tackle the problems he faced
How did lenin tackle the problems he facedHow did lenin tackle the problems he faced
How did lenin tackle the problems he faced
 
Executive seminar global_leadership_nissan_case_study
Executive seminar global_leadership_nissan_case_studyExecutive seminar global_leadership_nissan_case_study
Executive seminar global_leadership_nissan_case_study
 
BlogWell Bay Area Social Media Case Study: The Coca-Cola Company, presented b...
BlogWell Bay Area Social Media Case Study: The Coca-Cola Company, presented b...BlogWell Bay Area Social Media Case Study: The Coca-Cola Company, presented b...
BlogWell Bay Area Social Media Case Study: The Coca-Cola Company, presented b...
 
Volkswagen problem
Volkswagen problemVolkswagen problem
Volkswagen problem
 

Similar to Manesar Plant Issue

Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
Jagtar Dhaliwal
 
Libu organiations study at the aluminium industries limited, mannar
Libu organiations study at the aluminium industries limited, mannarLibu organiations study at the aluminium industries limited, mannar
Libu organiations study at the aluminium industries limited, mannar
Libu Thomas
 
Technology as A Tool for Turnaround: A Case of Scooter India Limited
 Technology as A Tool for Turnaround: A Case of Scooter India Limited  Technology as A Tool for Turnaround: A Case of Scooter India Limited
Technology as A Tool for Turnaround: A Case of Scooter India Limited
Abhishek Jain
 
Sem 1 sep 2018 assignments
Sem 1 sep 2018 assignmentsSem 1 sep 2018 assignments
Sem 1 sep 2018 assignments
PRADEEP SHARMA
 

Similar to Manesar Plant Issue (20)

Collective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case studyCollective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case study
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
 
Maruti
MarutiMaruti
Maruti
 
Maruti
MarutiMaruti
Maruti
 
Manesar plant
Manesar plantManesar plant
Manesar plant
 
case study on automotive private limited
case study on automotive private limitedcase study on automotive private limited
case study on automotive private limited
 
Hrm
HrmHrm
Hrm
 
Libu organiations study at the aluminium industries limited, mannar
Libu organiations study at the aluminium industries limited, mannarLibu organiations study at the aluminium industries limited, mannar
Libu organiations study at the aluminium industries limited, mannar
 
Hrm final ppt
Hrm final pptHrm final ppt
Hrm final ppt
 
People management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem GiriPeople management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem Giri
 
Quality control
Quality controlQuality control
Quality control
 
Technology as A Tool for Turnaround: A Case of Scooter India Limited
 Technology as A Tool for Turnaround: A Case of Scooter India Limited  Technology as A Tool for Turnaround: A Case of Scooter India Limited
Technology as A Tool for Turnaround: A Case of Scooter India Limited
 
Industrial unrest in_india_ppt
Industrial unrest in_india_pptIndustrial unrest in_india_ppt
Industrial unrest in_india_ppt
 
Organizational Change Management
Organizational Change ManagementOrganizational Change Management
Organizational Change Management
 
Hrm of haier china
Hrm of haier chinaHrm of haier china
Hrm of haier china
 
Industrial Disputes
Industrial DisputesIndustrial Disputes
Industrial Disputes
 
Sem 1 sep 2018 assignments
Sem 1 sep 2018 assignmentsSem 1 sep 2018 assignments
Sem 1 sep 2018 assignments
 
Nmims sem 3 pgdhrm june assignments
Nmims sem 3 pgdhrm june assignmentsNmims sem 3 pgdhrm june assignments
Nmims sem 3 pgdhrm june assignments
 
Make in India Needs Labour Reforms
Make in India Needs Labour ReformsMake in India Needs Labour Reforms
Make in India Needs Labour Reforms
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 

Manesar Plant Issue

  • 1. Powerpoint Templates Page 1 Powerpoint Templates Issue on Manesar plant (Maruti Suzuki) Team Members • Athif • Anil • Afif • Balu • Basheer
  • 2. Powerpoint Templates Page 2 Maruti Suzuki India Limited • Maruti Suzuki India Limited (MSIL) has been established and incorporated since 1983. • MSIL is a subsidy of the Suzuki Motor Corporation, Japan. • Maruti Suzuki has been renowned for producing the most fuel efficient, affordable and reliable cars and therefore has been the leader of the Indian car market for over the past two and halve decades. • Manufacturing facilities are located at two facilities Gurgaon and Manesar
  • 3. Powerpoint Templates Page 3 About Maruti Manesar Plant oIndia's largest passenger car company, accounting for over 45% of the domestic car market oFirst company in India to mass-produce and sell more than a million cars oAnnually exports more than 50,000 cars oIt offers 14 brands and over 150 variants ranging from peoples car Maruti Alto 800 to the stylish hatchback Ritz
  • 4. Powerpoint Templates Page 4 What Happened In Manesar Plant On 18th July 2012 at Maruti‟s labour plant, industrial disputes broke out when workers became aggressive and over 96 staff members were injured while also leading to the death of a human resource manager. More then two-thirds of the employees were involved in the strike, causing Maruti to lose about INR 75 crores ($11.81 million) in revenue and INR 8 crores ($1.3 million) in operating profit daily while also halting Maruti‟s production line causing it to lose around 1200-1400 units daily.
  • 5. Powerpoint Templates Page 5 Development of the Strike •The company knew that trouble was brewing, they knew that some workers planned on registering a separate union and the company had already prepared legal documents for a possible expulsion of workers from the premises. •Maruti Suzuki management tried to back a single union, the Maruti Suzuki Kamgar Union, for both Gurgaon and Manesar plant. • This union had been set-up by forces close to management after the lock-out at Gurgaon plant in 2000/2001.
  • 6. Powerpoint Templates Page 6 Development of the Strike •“On 3rd of June, eleven leaders of the workers went to Chandigarh to meet the Labour Department to complete the formalities regarding registration of our union on June 3, 2011. On the morning of that day, the labour department officials faxed the news of our application to the management. •On the morning of June 4, 2011, through struggle, we were able to retrieve some of the blank signed papers from the management. By the afternoon, it became clear that the management was using all kind of tricks to break our unity. In such circumstances, we were forced to go on flash tool down strike from the afternoon of June 4, 2011.”
  • 7. Powerpoint Templates Page 7 Development of the Strike •On the 4th of June after the change between morning and late shift around 2,000 workers stop work and remain in factory. Later on, the C-shift would not be refused entry by management and these workers largely remained outside the factory. •During this initial stage, workers raised various issues and demands: low wages, incentive cuts, few breaks. The workers have demanded that the temporary workers should be given preference for permanent posts in new departments, which the company is currently building on the premises.
  • 8. Powerpoint Templates Page 8 Causes Differences in salary pay Working Conditions  Unions generally limit themselves to acting as a voice of permanent employees Demand for a new union
  • 9. Powerpoint Templates Page 9 Impact on Company • Operations stopped for a month. • Loss estimated to be over Rs. 1,500 crore • Fear of insecurity to the employees and their families • Problem of lack of labor resource • Maruti changed its recruitment policy • GOODWILL….
  • 10. Powerpoint Templates Page 10 Impact on Economy Large labor- unemployed GDP affected Loss of country resources Disturbance- affecting the common man
  • 11. Powerpoint Templates Page 11 Problems  Lack of communication between HR people and labour  Lack of coordination between labour union and HR department
  • 13. Powerpoint Templates Page 13 PROBLEM FROM WORKERS VIEW POINT “If the floor supervisor is rude and even slaps us, he is awarded with a promotion but in case a labourer dares to reply, he is issued a notice on grounds of disciplinary action," said Rajender Kumar, a technician
  • 14. Powerpoint Templates Page 14 PROBLEM FROM WORKERS VIEW POINT Revenge for June's strike. Cockroaches and dead flies found in the food in the hurried lunch-break that workers earn in the canteen ½ km from the working station. The tea was without tea leaves or sugar in the 7 minute break The company doctor give heavy doses of „instant‟ medicines even on minor complaint so that disruption of work could be prevented. One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.7-8000 is implemented, so that almost the total month‟s wage is cut. One second late into punching-card entry is a day‟s wage cut, but they have to give full production for that day too.
  • 15. Powerpoint Templates Page 15 PROBLEM FROM WORKERS VIEW POINT Forced to fill an undertaking form, which means that in case of any problem, workers cannot raise any objections against management.
  • 16. Powerpoint Templates Page 16 WORKER’S DEMAND Worker‟s demand to establish an independent union Maruti Suzuki Employees Union (MSEU)in the company. Currently, the company has one recognized union – Maruti Udyog Kamgar Union which is dominated by workers at the Gurgaon plant
  • 17. Powerpoint Templates Page 17 MANAGEMENT VIEW OF PROBLEM “ Unhappy workers have found out a new way to disrupt ongoing work at the plant by creating serious defects in quality of the cars, so they would fail the compulsory vehicle inspection (VI) quality test.”
  • 18. Powerpoint Templates Page 18 MANAGEMENT VIEW OF PROBLEM  Workers indulging in deliberate attempts to reduce output and are compromising customer interests Revenge for the June strike. Refused to sign good conduct form which aims at ensuring the production of good quality products. Employees are being charged with sabotage and causing quality problems in the cars produced.
  • 19. Powerpoint Templates Page 19 MANAGEMENT VIEW OF PROBLEM "In the last three days, a series of serious quality problems have been observed in the vehicles produced. For example, vehicle door was not properly clamped leading to doors falling during production, wiring harnesses were found cut in produced vehicle, dents were noticed on the body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said.
  • 20. Powerpoint Templates Page 20 ACTION TAKEN AGAINST EMPLOYEES  Suspension of 10 workers  Dismissal of five  Discontinued the services of six trainees.  Also suspended four workers for "instigating indiscipline" a week before  Another four suspended in late July for manhandling supervisors.  Charges of sabotage and causing quality problems in the cars produced.  On 14th August; police force of 500 send to occupy the factory to „prevent violent activities‟
  • 21. Powerpoint Templates Page 21 ACTION TAKEN AGAINST EMPLOYEES  The company terminated 11 workers and suspended 38 on August 29th and 30th on false charges demanding a „good-conduct bond‟ with the state police and administration, the media, and „bouncers‟ on its payroll as its willing pawns.  The Maruti Suzuki Employees Union (MSEU) is demanding as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers are sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzuki‟s “way of life”.
  • 22. Powerpoint Templates Page 22 Solution Identified reasons of the conflict. 1. Establishment of separate union for Manesar Plant 2. Code of Conduct- Falling standards of manufacturing. 3. Basic sanitary enhancements demanded by the workforce.
  • 23. Powerpoint Templates Page 23 Trade Union Establishment Trade union would be established with prior conditions: - 1. Members of the trade union to be nominated with consent of both workers and management. 2. The leader of this union would be appointed by the management. If not agreed then management would move to plan B. 1. Technology oriented operations reducing demand of man power.
  • 24. Powerpoint Templates Page 24 For Managers…. • They have to Properly Co Ordinate with each other • Proper rules for indiscrimination in salary • They have to control the public pokers • They should try to understand the labour‟s problem
  • 25. Powerpoint Templates Page 25 Improved hygienic conditions at workplace reduces employee‟s dissatisfaction
  • 27. Powerpoint Templates Page 27 Employee rights in Manesar Labour Law A minimum time rate of wages A minimum piece rate Non-Discrimination of people at Workplace. Local Hiring Leave without wages Working hours, holidays and overtime
  • 28. Powerpoint Templates Page 28 Employee rights in Manesar Labour Laws tweaked by Maruti Enforcement of the Labour Laws was not followed strictly. Differences in Salary Pay. Working Conditions. Lack of proper negotiations.
  • 29. Powerpoint Templates Page 29 Employee rights in Manesar Necessary changes done after the event Hiring contract workers through company HR and not through a contractor. Reopened the plant with 300 workers Fresh recruitment of permanent workers Terminate the services of 500 permanent workers. (Involved in Violence)
  • 30. Powerpoint Templates Page 30 What could had been done in order to avoid the event Employee Labour Relationship should had been maintained in decorum. Flexibility is the key, not the cheapness. Treat workers in the factory like humans. The workers should refrain from taking law into their own hands. This would be a wrong reading. Companies hire temporary (temps) and contract workers not only because they are cheaper, but because they can be laid off when they are not required. Flexibility is the key, not the cheapness.