Department of Transportation 
Project Name 
Communication Plan 
Project ID: 
Division, Program Name 
Prepared by: 
Date:
Project Team 
Approval Signatures 
Name: Name: 
Title: Project Sponsor Title: Project Manager 
Name: Name: 
Title: Technical Lead Title: Business Lead 
Name: Name: 
Title: Title:
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
Template Revision History 
REVISION HISTORY 
REVISION DATE OF RELEASE OWNER SUMMARY OF CHANGES 
1.0 04/2009 ETID – PMO Initial Release 
Remove template revision history and insert Project Communication Plan revision 
history. 
Revision History Approvals 
REVISION NAME ROLE DATE 
Insert template approvals here. 
Template Instructions: 
This template is color coded to differentiate between boilerplate language, 
instructions, sample language, and hyperlinks. In consideration of those 
reviewing a black and white hard copy of this document we have also 
differentiated these sections of the document using various fonts and styles. 
Details are described below. Please remove the template instructions when 
the document is finalized. 
Standard boilerplate language has been developed for this management plan. 
This language is identified in black Arial font and will not be modified without the 
prior approval of the Enterprise Technology Investment Division (ETID), Project 
Management Office (PMO). If the project has identified a business need to 
modify the standard boilerplate language, the request must be communicated to 
the PMO for review. 
Instructions for using this template are provided in blue Times New Roman font and 
describe general information for completing this management plan. All blue text should 
be removed from the final version of this plan. 
Sample language is identified in red italic Arial font. This language provides 
suggestions for completing specific sections. All red text should be replaced with 
project-specific information and the font color replaced with black text. 
Hyperlinks are annotated in purple underlined Arial text and can be accessed by 
following the on-screen instructions. To return to the original document after 
accessing a hyperlink, click on the back arrow in your browser’s toolbar. The “File 
Download” dialog box will open. Click on “Open” to return to this document. 
i
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
Table of Contents 
1. INTRODUCTION........................................................................................................................1 
2 PARTICIPANTS ROLES AND RESPONSIBILITIES .................................................................2 
3 COMMUNICATION PROCESS...................................................................................................7 
4 COMMUNICATION MANAGEMENT.........................................................................................10 
5 GENERAL INFORMATION.......................................................................................................11 
ii
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
1. INTRODUCTION 
1.1 Purpose 
The purpose of the Communication Plan is to capture how communications will 
be managed throughout the project life cycle. 
The Communication Plan describes the planned and periodic communications 
occurring between all the <project name> Project stakeholders. This plan also 
covers scheduled written and oral communications, responses to unsolicited 
requests for information, the frequency of the scheduled communications, and 
the responsible person(s) for providing the information. The Communication Plan 
is an integral part of the overall Project Management Plan and will be used to 
provide guidance to the <project name> project. 
1.2 Scope 
This Communication Plan identifies the activities, processes, and procedures used to 
manage this Communication Plan. 
The Communication Plan identifies the procedures used to manage 
communication for the <Project>. The plan focuses on formal communication 
elements. Other communication channels exist on informal levels and enhance 
those discussed within this plan. This plan is not intended to limit, but to enhance 
communication practices. Open, ongoing communication between stakeholders 
is critical to the success of the <Project>. 
1.3 References 
1.3.1 Project Centralized Document Repository 
If applicable, indicate the name of the document management tool the project is using. If 
the project is not using a specific tool, list any relevant documents that can be used as 
references for this document and its corresponding location. A copy of all project 
management plans, control agency approval documents, and project status reports must 
be saved into the IT Project Management Office (PMO) centralized document repository. 
These files are located on the network in the directory N:PMO – New. 
1.3.2 External References 
PMBOK Guide, 3rd Edition, Section 10 - Project Communication Management 
1.4 Document Maintenance 
This document will be reviewed quarterly and updated as needed, as the project 
proceeds through each phase of the system development life cycle. If the 
document is written in an older format, the document should be revised into the latest 
PMO template format at the next quarterly review. 
This document contains a revision history log. When changes occur, the 
document’s revision history log will reflect an updated version number as well as 
1
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
the date, the owner making the change, and change description will be recorded 
in the revision history log of the document. 
2 PARTICIPANTS ROLES AND RESPONSIBILITIES 
This section describes the roles and responsibilities of the <Project Name> staff 
with regard to the Communication Plan. In this section, briefly describe the project 
organization, as it pertains to the flow of communication internally (vertically and 
horizontally), and relationships between the project team, the project sponsor, and the 
prime contractor (if applicable). This section will also identify the oversight agencies and 
other stakeholders that will be involved in managing communications. 
A full list of general roles and responsibilities are contained in the Staff Management 
Plan. 
2.1 Project Structure 
The Organizational chart is very useful in clarifying the Project Structure. 
2
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
2.1.1 Steering Committee 
If the project has a committee, this section should be added. Describe the role of the 
committee in issue resolution, escalation and dispute resolution. The following is an 
example: 
The <Project Name> committee will provide strategic direction, and resolve 
conflicts or expedite a process that is not resolved at a lower level. The 
committee is responsible for providing and maintaining the necessary resources 
needed for the successful completion of the <Project Name> project. Also the 
committee will provide leadership, support, and assist in implementing 
departmental policies as required to support the <Project Name>. 
The committee will primarily communicate and provide direction through the 
project sponsor. At times the committee members will have direct communication 
with the <Project Name> project manager for quick responses to inquiries and 
through meetings. The committee has the responsibility to ensure that the 
Caltrans Director and <Project Sponsor> are provided information on the 
<Project Name> project. Members help to ensure the success of the project 
strategy by sharing project information with the stakeholder groups they 
represent. 
List the organizations who participate in the committee, including names and their roles. 
2.1.2 Project Sponsor 
This section should summarize the sponsor’s involvement in communications. 
The project sponsor is responsible for the success of the project and ensuring 
that project-related program policies are implemented. The project manager and 
project sponsor frequently communicate on project status, issues, and risks. The 
sponsor is the point of contact for federal and state agencies and the state 
legislature regarding program policy issues. Communication regarding project 
status and all program policies and decisions on issues with statewide impact is 
conducted in coordination with the PMO. 
The <Project Name> project sponsor will provide direction and resolve issues 
that impact the project schedule, budget, or scope. The project sponsor will work 
with the PMO, project manager, technical and business project leads, and the 
<Project Name> vendors to achieve solutions and reduce or mitigate risks. 
The project sponsor will keep the committee apprised of the project status. 
The project sponsor will meet with the <Project Name> project manager as 
needed to review project progress and to provide needed guidance, resources, 
and funding support. 
3
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
2.1.3 Project Director 
This section should summarize the project director’s involvement in communications. 
The Project Director is responsible for planning, directing and overseeing the project, 
and ensuring that deliverables and functionality are achieved as defined in the 
Project Charter, funding documentation, and subsequent project plans. The Project 
Director is also responsible for the management of all resources assigned to the 
project, serves as the primary liaison between the project and the Project Sponsor 
and the Steering Committee, and escalates decisions and issues as needed. The 
Project Director coordinates project related issues with other efforts, reviews and 
resolves project issues not resolved at lower levels, and directs the project 
management functions. 
2.1.4 Project Manager 
The project manager generally manages the project communications. 
The <Project Name> project manager is responsible for communicating status 
for scope, schedule, and cost, as well as monitoring, controlling, and 
communicating the risks. The <Project Name> project manager has the 
responsibility to ensure that all information related to the <Project Name> project 
is consistent, correct, accurate, and timely. The <Project Name> project 
manager will review and approve all information being provided to the various 
stakeholders, including the legal office, IV&V, IPOC, and any external agencies. 
The project manager will ensure continued user involvement and requirements 
remain relatively stable throughout the <Project Name> project. The <Project 
Name> project manager reports directly to the <Project Name> project sponsor. 
2.1.5 Advisory Committee 
This section should summarize the advisory committee’s involvement in 
communications. 
The roles and responsibilities of the <Project Name> Advisory Committee are: 
· Provide leadership and direction. 
· Review progress, risks, and issues and recommend resolution. 
· Make recommendations to the project sponsor. 
· Assure <Project Name> implementation by educating district and program 
staff, provide means for training, and support implementation efforts. 
2.1.6 Business Project Team 
This section should summarize the business project team’s involvement in 
communications. 
· Define requirements. 
· Perform user testing. 
· Accept products and solution. 
4
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
2.1.7 Technical Project Team 
If applicable, indicate how the <Project Name> technical project team assists the project 
with communications and what communications the project receives from the technical 
project team. 
The <Project Name> technical project team will be responsible for the successful 
development, documentation, data conversion, implementation, and ongoing 
operational support of the <Project Name>. The technical team will also be 
responsible for developing, providing, and conducting training to the state for the 
<Project Name> project. The <Project Name> technical team will deliver a 
system that meets all the functional requirements of the contract. The <Project 
Name> technical team shall deliver the system per the schedule that will be 
described in the state approved <Project Name> Project Management Plan. The 
<Project Name> technical project lead will oversee the other technical personnel 
working on the solution, including any contractors and sub-contractors. The 
<Project Name> technical project lead is responsible to report any issues 
impacting the project, provide recommendations to resolve issues, and assist the 
project manager in successful implementation of the <Project Name> project. 
The <Project Name> technical project lead will report directly to the <Project 
Name> project manager and provide all project information to them. The 
<Project Name> technical project lead will be responsible for collecting and 
gathering all <Project Name> related information from the subcontractors under 
their current contract. 
2.2 Oversight 
If applicable, indicate the oversight agencies that will be involved in the project and their 
specific responsibilities. 
2.2.1 Office of the State Chief Information Officer 
The Office of the State Chief Information Officer (OCIO) is a cabinet-level agency 
with statutory authority over IT strategic vision and planning, enterprise 
architecture, policy, and project approval and oversight. The responsibilities of 
the OCIO are to review, approve, and monitor IT project investments. 
. 
2.2.2 IT Project Management Office 
The PMO provides direction and stewardship of Caltrans IT project portfolio. 
This responsibility includes developing, managing, and monitoring policies, 
methodologies, processes, and standards for proposed project concepts, 
feasibility studies, and approved projects. The PMO provides guidance and 
support in the areas of project management and IT methodology and standards, 
receives project status information, and acts as the liaison for communications 
with the OCIO on project issues. 
5
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
2.2.3 Independent Verification and Validation Consultant 
The role of the Independent Verification &Validation (IV&V) consultant is to 
perform reviews and assessments of the system engineering deliverables to 
ensure that the product meets the intended objectives and requirements 
specified in the FSR and the RFP. Typically the IV&V consultant reports to the 
advisory committee an independent assessment on the progress of a project 
including risks, issues, and problems that may impact the achievement of 
program and project objectives. Activities include periodic progress reports, 
requirements traceability, and specific technical assessments encompassing the 
entire system development life cycle of the project. 
2.2.4 Independent Project Oversight Consultant 
The role of the Independent Project Oversight Consultant (IPOC) is to perform 
independent periodic assessments of project management activities to identify 
areas that may need improvement to better ensure project success. 
Responsibilities of the IPOC include but are not limited to: 
· Review and evaluation of project management deliverables, including 
quality assurance, project management, risk management plans, and 
supporting activities for compliance with standards, processes, and 
procedures. 
· Independent risk assessments and performance monitoring through the 
use of project metrics (e.g. earned value metrics, software testing metrics, 
etc.). 
· Independent evaluations of the project schedule and reports offering 
recommendations to the project. 
· Review of IV&V deliverables. 
· Monitoring, reviewing, and advising the project team on all risk related 
activities. 
· Developing and providing independent project oversight reports (IPOR) to 
the OCIO. 
2.2.5 State Legislative Analyst’s Office 
If applicable, this section should indicate the Legislative Analyst’s Office involvement 
with the project. 
The Legislative Analyst’s Office (LAO) serves as oversight for the state 
Legislature to ensure that the executive branch is implementing legislative policy 
in a cost efficient and effective manner. Historically, one of the most important 
responsibilities of the LAO has been to analyze the annual Governor's budget 
and publish a detailed review at the end of February. This document, the 
Analysis of the Budget Bill, includes individual department reviews and 
recommendations for legislative action. The LAO may require departments to 
submit reports annually, or at their request, on specific aspects of IT projects. 
6
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
2.2.6 Department of Finance 
The Department of Finance (DOF) provides oversight and funding approval of 
state planned IT project expenditures. The DOF will provide: 
· Review and approval of all proposed IT project budget change proposals 
and finance letters. 
· Assist in ensuring project funding issues are identified to Caltrans 
executives and the PMO. 
2.2.7 Department of General Services 
The Department of General Services (DGS) provides acquisition support and 
procurement guidelines to state IT projects as outlined in the State Contracting 
Manual. The responsibilities of the DGS are: 
· Ensure that the appropriate terms and conditions are included in the 
contract. 
· Assist with negotiation of contracts and obtain any applicable waivers. 
· Provide review and approval of IT Procurement Plans. 
· Provide RFP development support and serve as primary point of contact 
with contractors through bid and proposal efforts. 
· Provide bid evaluation facilitation and assist with developing evaluation 
criteria and selection of contractors. 
· Facilitate and assist with the preparation of bidder’s conferences. 
· Assist with hardware and software acquisition. 
2.3 Stakeholders Identification 
List the stakeholders vested in the project. Consider the communication needs of 
stakeholders that will be the system end users, as well as others that could influence the 
outcome and success of the project. Typical stakeholders include federal partners, the 
system users, interfacing programs or organizations, advocates, and unions. 
Name Title Program Contact Role Comments 
Joe Smith Manager IT 916-555-5555 
joe@dot.ca.gov 
Steering 
Committee 
Member 
Comments 
Jane Doe Business 
Analyst 
Administration 916-555-5556 Project 
Team 
Comments 
3 COMMUNICATION PROCESS 
3.1 Informal 
Informal communications consist of e-mail, conversations, or phone calls and serve to 
supplement and enhance formal communications. Due to the varied types and ad-hoc 
nature of informal communications, they are not discussed in this plan. 
7
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
3.2 Formal 
The <Project Name> Project will engage in various types of formal communication. The 
general types and their purpose are described below. 
3.2.1 Status Meetings 
There are five basic types of status meetings for the <Project Name> Project: 
1. Status meetings internal to the <Project Name> business team to discuss 
assignments, activities, and to share information; 
2. Status meetings and reports between the <Project Name> business team, 
and the technical project team; 
3. Advisory Committee meetings with the project sponsor, project 
stakeholders, and project manager to review progress, risks, and issues; 
4. Status meetings and reports between the <Project Name> project 
sponsors and the steering committee; and 
5. Status meetings and reports to stakeholders, such as oversight agencies. 
3.2.2 Status Reports 
A variety of status reports will be produced during the project. The status reports 
will be produced on regular intervals to provide stakeholders project information 
on the status and progress of the <Project Name> project. At a minimum the 
reports will contain: 
· Project status on major activities 
· Project schedule 
· Budget and cost tracking 
· Status of issues and risks 
· Health status 
· Status of action items, if applicable. 
· Future or planned activities 
The intent of the status reports is to inform stakeholders of the project’s progress 
and keep them actively involved in the project. The information provided will 
contain enough detail to allow stakeholders to make informed decisions and 
maintain oversight of the project. 
3.3 External Communication 
This section describes the Caltrans policy regarding inquiries from news and print media 
and other public records requests. This standard policy language can be incorporated for 
all Caltrans IT projects. Please note that for some projects, communications may need to 
be vetted through the Caltrans Legal Office. 
3.3.1 News and Print Media 
Project staff is not allowed to communicate with the media unless prior approval 
or direction has been granted from the <Project Name> project sponsor. If a news 
8
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
or print media requests an interview or information, project staff must inform the 
project manager who will immediately contact the project sponsor. The <Project 
Name> project sponsor will contact the Caltrans Division of Public Affairs. 
3.3.2 Public Inquiries and Public Records Requests 
A public records request should be made in writing, unless the request involves 
records that are maintained by the project for the purpose of immediate public 
inspection, and should sufficiently describe records so that project personnel can 
identify, locate, and retrieve the records. Public records maintained by the 
project will be available for inspection by members of the public during regular 
business hours of the project. Requests for inspection or copying of public 
records should be directed to the Division of Public Affairs and should be 
specific, focused and not interfere with the ordinary business operations of the 
project. Public Affairs will contact the appropriate California Public Records Act 
(CPRA) Coordinator for IT at Caltrans. If you are contacted by individuals for 
copies of any public record, please advise them to contact Public Affairs. Public 
Affairs will work with the appropriate CPRA coordinator to respond to the 
requester. The operational functions of the project will not be suspended to 
permit inspection of records during periods in which project personnel in the 
performance of their duties reasonably require such records. If the request 
requires review of numerous records, a mutually agreeable time should be 
established for the inspection of the records. 
Occasionally, the project may receive requests from the public for information 
(e.g., statistics, reports, program information). If the project receives any of these 
requests, the requestor should be directed to the project manager, who will refer 
the individual to the appropriate program, agency or department. 
The project may refuse to disclose any records that are exempt from disclosure 
under the Public Records Act. (Refer to Government Code Section 6254.) 
Physical inspection of the records shall be permitted within the project’s offices 
and under the conditions determined by the department. Upon either the 
completion of the inspection or the oral request of project personnel, the person 
conducting the inspection shall relinquish physical possession of the records. 
Persons inspecting project records shall not destroy, mutilate, deface, alter, or 
remove any such records from the project. The project reserves the right to have 
project personnel present during the inspection of records in order to prevent the 
loss or destruction of records. 
Upon any request for a copy of records, other than records the project has 
determined to be exempt from disclosure under the Public Records Act, project 
personnel shall provide copies of the records to any person upon payment of a 
fee covering costs of duplication. 
9
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
4 COMMUNICATION MANAGEMENT 
4.1 Communication Distribution 
Various methods will be used to distribute project information and communicate with 
project stakeholders. The primary method to distribute information will be through the 
Lotus Notes email system established at Caltrans. Whenever possible, to expedite the 
dissemination of information, documents will be distributed via email. 
Teleconferencing will be used to the maximum extent possible to communicate to 
stakeholders in out of town locations. This will help to reduce the amount of travel 
required and provide for an effective method of communication. 
Whatever method is used to distribute information or communicate, the proper 
precautions and procedures must be followed to ensure safe and protected delivery of 
information. Any confidential information must be sent through the proper procedures as 
established by the appropriate policies. The standard order of precedence would be state 
policies and procedures, Caltrans policies and procedures, and <Project Name> Project 
policies and procedures in that order. 
4.2 Communication Tracking and Storage 
Discuss how communications received by the project are tracked and stored. 
This section shall refer the reader to the procedures for document tracking, naming 
conventions, and document version control. Also indicate how critical e-mail are stored 
and if fax transmissions or acknowledgements are retained. 
A copy of all project management plans, control agency approval documents, 
and project status reports must be saved into the PMO centralized document 
repository. These files are located on the network in the directory N:PMO – 
New. 
Please refer to the <Project Name> Configuration Management Plan, regarding 
the document management procedures for communication and document 
naming, tracking, review, storage, retention, and change control. 
Written communications received or generated by the project are retained and 
stored in the project’s library and/or document management tool, depending on 
the format in which they were received. Project e-mail that document decisions 
or have pertinent value to the project are stored in the project’s library and/or 
document management tool and retained for historical purposes. 
4.3 Communication Changes 
This section should address changes to the communication process, such as implementing 
a new or modified report, adding or combining meetings, updating the distribution lists, 
etc. Indicate what types of changes require approvals, notification of pending changes 
and where such changes are documented. 
Changes to the communication process may be proposed by any recipient or 
communication creator. The Project Manager must approve the change for it to 
10
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
be approved. Often a draft version will be used to generate discussion with the 
communication stakeholders prior to making the change official. 
Changes to communication format or content are handled through the normal 
document change control process. Changes to content must be approved by the 
respective project lead or manager (depending on the content), and then are 
disseminated with an explanation of the change. Appropriate revision and 
version markings are included with the updated version. This Communication 
Plan will be updated on a quarterly basis. 
5 GENERAL INFORMATION 
5.1 Acronyms 
Acronym Description 
AIO Agency Information Officer 
BCP Budget Change Proposal 
CPRA California Public Records Act 
DTS Department of Technology Services 
ETID Enterprise Technology Investment Division 
DGS Department of General Services 
DOF Department of Finance 
IEEE Institute of Electrical and Electronics Engineers 
IPOC Independent Project Oversight Consultant 
IPOR Independent Project Oversight Report 
IT Information Technology 
IV&V Independent Verification & Validation 
OCIO Office of the State Chief Information Officer 
LAO Legislative Analyst’s Office. 
PIER Post Implementation and Evaluation Report 
PMI Project Management Institute 
PMO Project Management Office 
SPR Special Project Report 
11
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
5.2 Glossary 
A standard glossary of terms, including the names of all methodologies and stages, is 
included in the standard Glossary. This section defines additional terms, including those 
specific to this business or project. 
Term Definition 
5.3 Communication Plan Revision History 
REVISION HISTORY 
VERSION # DATE OF RELEASE OWNER COMMENTS 
Insert Communication Plan revision history. 
12
APPENDIX 
B-1
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
APPENDIX A: COMMUNICATION SCHEDULE 
The following chart describes the planned communications that <Project Name> Project staff is responsible for or participate 
in. Add additional meetings as appropriate and modify the frequency to meet the needs of the project. Other impromptu 
meetings occur as needed to resolve issues or problems that arise within the department and with external stakeholders. 
Definitions: 
Weekly – One occurrence each week 
Bi-Weekly – One occurrence every other week 
Monthly – One occurrence each month 
Bi-Monthly – One occurrence every other month 
Quarterly – One occurrence every three months 
Semi-Annually – One occurrence every six months 
Annually – One occurrence each year 
Type of 
Prepared By/ 
Distribution List/ 
Information 
Chaired By 
Participants 
Purpose of Communication Frequency Transmittal Method 
<Project Name> 
Project Plan 
Project Manager Project Team, 
PMO 
To articulate project background, 
scope, roles/responsibilities, risk, 
deliverables, schedule, staffing, 
communication, and close-out. 
At project start-up 
Email 
<Project Name> 
Project Schedule 
Project Manager Project Team, 
Sponsor, 
Customer, PMO 
Document and monitor key tasks, 
milestones and assigned resources 
As Needed Email 
<Project Name> 
Kick Off Meeting 
Project Manager Project Team, 
PMO 
The kick-off meeting is used to 
clarify goals and objectives, 
individual roles and responsibilities, 
interdependencies 
Once at project 
start-up 
Meeting 
<Project Name> 
Weekly Status 
Meeting 
Project Manager Project Team, 
PMO 
Discuss status, issues and 
concerns related to the Project 
Weekly Oral presentation, 
discussions 
<Project Name> 
Project Sponsor 
Meeting 
Project Manager Project Sponsor, 
PMO 
Communicate Risk, issues, 
resource concerns, schedule, 
deliverables, milestones, etc. 
Monthly Meeting 
A-1
Project Name: (Project Name) 
Project Number: (FSR Number) 
Criticality Rating: (Low, Medium, High) 
Communication Plan 
<Date> 
Type of 
Information 
Prepared By/ 
Chaired By 
Distribution List/ 
Participants 
Purpose of Communication Frequency Transmittal Method 
<Project Name> 
PMO Status 
Meetings 
Project Manager Project Manager, 
PMO 
Report project status, including 
significant accomplishments, 
issues, and costs. 
Distributed prior 
to the scheduled 
meeting 
Email, Meeting 
<Project Name> 
Status Reporting 
Project Manager Project Team, 
Sponsor, 
Customer, PMO 
Report project progress, 
milestones, status, risks and 
issues, etc. 
Weekly Email 
<Project Name> 
Change Requests 
Project Manager Program Staff, 
Project Sponsor, 
Project Manager, 
PMO 
Communicate, receive approval 
and document status of all change 
requests. 
As Needed Email, Meeting 
A-1

More Related Content

What's hot

Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
Asa Chan
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel
 
It projects austria
It projects austriaIt projects austria
It projects austria
happiashi
 
Project Scope Management Plan New
Project Scope Management Plan NewProject Scope Management Plan New
Project Scope Management Plan New
MelanieRos
 
Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3
Loren Schwappach
 
Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5
Loren Schwappach
 
J.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject constructionJ.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel
 

What's hot (20)

Liberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers keyLiberty university busi 313 quiz 2 complete solutions correct answers key
Liberty university busi 313 quiz 2 complete solutions correct answers key
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3
 
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshareLiberty university busi 313 quiz 2 complete solutions correct answers slideshare
Liberty university busi 313 quiz 2 complete solutions correct answers slideshare
 
It projects austria
It projects austriaIt projects austria
It projects austria
 
CONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTCONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORT
 
Operational Level Agreements (OLAs) of Pool of People applied in Project Mana...
Operational Level Agreements (OLAs) of Pool of People applied in Project Mana...Operational Level Agreements (OLAs) of Pool of People applied in Project Mana...
Operational Level Agreements (OLAs) of Pool of People applied in Project Mana...
 
Project Scope Management Plan New
Project Scope Management Plan NewProject Scope Management Plan New
Project Scope Management Plan New
 
Project Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualProject Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions Manual
 
Program management-steps
Program management-stepsProgram management-steps
Program management-steps
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Communication management plan template
Communication management plan templateCommunication management plan template
Communication management plan template
 
Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3Pm610 1103 b-02-schwappach-loren-p3-ip3
Pm610 1103 b-02-schwappach-loren-p3-ip3
 
Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5Pm610 1103 b-02-schwappach-loren-p5-gp5
Pm610 1103 b-02-schwappach-loren-p5-gp5
 
J.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject constructionJ.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject construction
 
Project charter-template
Project charter-templateProject charter-template
Project charter-template
 
Conveyor belt project
Conveyor belt projectConveyor belt project
Conveyor belt project
 
Chap004 4er1
Chap004 4er1Chap004 4er1
Chap004 4er1
 

Viewers also liked

Project communication plan v1c cmmaao pmi pmp
Project communication plan v1c cmmaao pmi pmpProject communication plan v1c cmmaao pmi pmp
Project communication plan v1c cmmaao pmi pmp
vishvasyadav676
 
Cmmaao communication-plan-pmi-pmp
Cmmaao communication-plan-pmi-pmpCmmaao communication-plan-pmi-pmp
Cmmaao communication-plan-pmi-pmp
pmicmmaao
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
Talha Siddiqui
 

Viewers also liked (7)

Project communication plan v1c cmmaao pmi pmp
Project communication plan v1c cmmaao pmi pmpProject communication plan v1c cmmaao pmi pmp
Project communication plan v1c cmmaao pmi pmp
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Cmmaao communication-plan-pmi-pmp
Cmmaao communication-plan-pmi-pmpCmmaao communication-plan-pmi-pmp
Cmmaao communication-plan-pmi-pmp
 
Project tracking and metrics on share point
Project tracking and metrics on share pointProject tracking and metrics on share point
Project tracking and metrics on share point
 
Scope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessScope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization Success
 
Airport Construction
Airport ConstructionAirport Construction
Airport Construction
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
 

Similar to Caltrans Communication Plan Template

Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-template
Vivek Srivastava
 
Communications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docxCommunications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docx
clarebernice
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
AASTHA76
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
briancrawford30935
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docx
woodruffeloisa
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
clarebernice
 
Status reports
Status reportsStatus reports
Status reports
Samir Sami
 
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
hyacinthshackley2629
 
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docxPROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
wkyra78
 
Sources httpwww.projectmanagementdocs.comtemplatesCo.docx
Sources   httpwww.projectmanagementdocs.comtemplatesCo.docxSources   httpwww.projectmanagementdocs.comtemplatesCo.docx
Sources httpwww.projectmanagementdocs.comtemplatesCo.docx
rafbolet0
 
Department of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docxDepartment of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docx
salmonpybus
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
TechNoleGirl
 
Project management-plan
Project management-planProject management-plan
Project management-plan
Tran Tien
 
Project Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docxProject Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docx
woodruffeloisa
 
Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012
bm80
 
MGT2 - GenRays Project Roles & Communication Plan
MGT2 - GenRays Project Roles & Communication PlanMGT2 - GenRays Project Roles & Communication Plan
MGT2 - GenRays Project Roles & Communication Plan
Alan Oviatt, MBA
 

Similar to Caltrans Communication Plan Template (20)

Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-template
 
Communications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docxCommunications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docx
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docx
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 
Status reports
Status reportsStatus reports
Status reports
 
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx10.9  STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
10.9 STORE-DRIVEN FORECASTS. The Home Depot is a lead.docx
 
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docxPROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
 
Sources httpwww.projectmanagementdocs.comtemplatesCo.docx
Sources   httpwww.projectmanagementdocs.comtemplatesCo.docxSources   httpwww.projectmanagementdocs.comtemplatesCo.docx
Sources httpwww.projectmanagementdocs.comtemplatesCo.docx
 
Department of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docxDepartment of TransportationProject NameOrganizational Cha.docx
Department of TransportationProject NameOrganizational Cha.docx
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 
Project management-plan
Project management-planProject management-plan
Project management-plan
 
Global slit lamps market2020 industry research report gives adva
Global slit lamps market2020 industry research report gives advaGlobal slit lamps market2020 industry research report gives adva
Global slit lamps market2020 industry research report gives adva
 
Project charter template
Project charter templateProject charter template
Project charter template
 
Project Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docxProject Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docx
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012
 
MGT2 - GenRays Project Roles & Communication Plan
MGT2 - GenRays Project Roles & Communication PlanMGT2 - GenRays Project Roles & Communication Plan
MGT2 - GenRays Project Roles & Communication Plan
 
Project propal
Project propalProject propal
Project propal
 

Caltrans Communication Plan Template

  • 1. Department of Transportation Project Name Communication Plan Project ID: Division, Program Name Prepared by: Date:
  • 2. Project Team Approval Signatures Name: Name: Title: Project Sponsor Title: Project Manager Name: Name: Title: Technical Lead Title: Business Lead Name: Name: Title: Title:
  • 3. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> Template Revision History REVISION HISTORY REVISION DATE OF RELEASE OWNER SUMMARY OF CHANGES 1.0 04/2009 ETID – PMO Initial Release Remove template revision history and insert Project Communication Plan revision history. Revision History Approvals REVISION NAME ROLE DATE Insert template approvals here. Template Instructions: This template is color coded to differentiate between boilerplate language, instructions, sample language, and hyperlinks. In consideration of those reviewing a black and white hard copy of this document we have also differentiated these sections of the document using various fonts and styles. Details are described below. Please remove the template instructions when the document is finalized. Standard boilerplate language has been developed for this management plan. This language is identified in black Arial font and will not be modified without the prior approval of the Enterprise Technology Investment Division (ETID), Project Management Office (PMO). If the project has identified a business need to modify the standard boilerplate language, the request must be communicated to the PMO for review. Instructions for using this template are provided in blue Times New Roman font and describe general information for completing this management plan. All blue text should be removed from the final version of this plan. Sample language is identified in red italic Arial font. This language provides suggestions for completing specific sections. All red text should be replaced with project-specific information and the font color replaced with black text. Hyperlinks are annotated in purple underlined Arial text and can be accessed by following the on-screen instructions. To return to the original document after accessing a hyperlink, click on the back arrow in your browser’s toolbar. The “File Download” dialog box will open. Click on “Open” to return to this document. i
  • 4. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> Table of Contents 1. INTRODUCTION........................................................................................................................1 2 PARTICIPANTS ROLES AND RESPONSIBILITIES .................................................................2 3 COMMUNICATION PROCESS...................................................................................................7 4 COMMUNICATION MANAGEMENT.........................................................................................10 5 GENERAL INFORMATION.......................................................................................................11 ii
  • 5. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 1. INTRODUCTION 1.1 Purpose The purpose of the Communication Plan is to capture how communications will be managed throughout the project life cycle. The Communication Plan describes the planned and periodic communications occurring between all the <project name> Project stakeholders. This plan also covers scheduled written and oral communications, responses to unsolicited requests for information, the frequency of the scheduled communications, and the responsible person(s) for providing the information. The Communication Plan is an integral part of the overall Project Management Plan and will be used to provide guidance to the <project name> project. 1.2 Scope This Communication Plan identifies the activities, processes, and procedures used to manage this Communication Plan. The Communication Plan identifies the procedures used to manage communication for the <Project>. The plan focuses on formal communication elements. Other communication channels exist on informal levels and enhance those discussed within this plan. This plan is not intended to limit, but to enhance communication practices. Open, ongoing communication between stakeholders is critical to the success of the <Project>. 1.3 References 1.3.1 Project Centralized Document Repository If applicable, indicate the name of the document management tool the project is using. If the project is not using a specific tool, list any relevant documents that can be used as references for this document and its corresponding location. A copy of all project management plans, control agency approval documents, and project status reports must be saved into the IT Project Management Office (PMO) centralized document repository. These files are located on the network in the directory N:PMO – New. 1.3.2 External References PMBOK Guide, 3rd Edition, Section 10 - Project Communication Management 1.4 Document Maintenance This document will be reviewed quarterly and updated as needed, as the project proceeds through each phase of the system development life cycle. If the document is written in an older format, the document should be revised into the latest PMO template format at the next quarterly review. This document contains a revision history log. When changes occur, the document’s revision history log will reflect an updated version number as well as 1
  • 6. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> the date, the owner making the change, and change description will be recorded in the revision history log of the document. 2 PARTICIPANTS ROLES AND RESPONSIBILITIES This section describes the roles and responsibilities of the <Project Name> staff with regard to the Communication Plan. In this section, briefly describe the project organization, as it pertains to the flow of communication internally (vertically and horizontally), and relationships between the project team, the project sponsor, and the prime contractor (if applicable). This section will also identify the oversight agencies and other stakeholders that will be involved in managing communications. A full list of general roles and responsibilities are contained in the Staff Management Plan. 2.1 Project Structure The Organizational chart is very useful in clarifying the Project Structure. 2
  • 7. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 2.1.1 Steering Committee If the project has a committee, this section should be added. Describe the role of the committee in issue resolution, escalation and dispute resolution. The following is an example: The <Project Name> committee will provide strategic direction, and resolve conflicts or expedite a process that is not resolved at a lower level. The committee is responsible for providing and maintaining the necessary resources needed for the successful completion of the <Project Name> project. Also the committee will provide leadership, support, and assist in implementing departmental policies as required to support the <Project Name>. The committee will primarily communicate and provide direction through the project sponsor. At times the committee members will have direct communication with the <Project Name> project manager for quick responses to inquiries and through meetings. The committee has the responsibility to ensure that the Caltrans Director and <Project Sponsor> are provided information on the <Project Name> project. Members help to ensure the success of the project strategy by sharing project information with the stakeholder groups they represent. List the organizations who participate in the committee, including names and their roles. 2.1.2 Project Sponsor This section should summarize the sponsor’s involvement in communications. The project sponsor is responsible for the success of the project and ensuring that project-related program policies are implemented. The project manager and project sponsor frequently communicate on project status, issues, and risks. The sponsor is the point of contact for federal and state agencies and the state legislature regarding program policy issues. Communication regarding project status and all program policies and decisions on issues with statewide impact is conducted in coordination with the PMO. The <Project Name> project sponsor will provide direction and resolve issues that impact the project schedule, budget, or scope. The project sponsor will work with the PMO, project manager, technical and business project leads, and the <Project Name> vendors to achieve solutions and reduce or mitigate risks. The project sponsor will keep the committee apprised of the project status. The project sponsor will meet with the <Project Name> project manager as needed to review project progress and to provide needed guidance, resources, and funding support. 3
  • 8. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 2.1.3 Project Director This section should summarize the project director’s involvement in communications. The Project Director is responsible for planning, directing and overseeing the project, and ensuring that deliverables and functionality are achieved as defined in the Project Charter, funding documentation, and subsequent project plans. The Project Director is also responsible for the management of all resources assigned to the project, serves as the primary liaison between the project and the Project Sponsor and the Steering Committee, and escalates decisions and issues as needed. The Project Director coordinates project related issues with other efforts, reviews and resolves project issues not resolved at lower levels, and directs the project management functions. 2.1.4 Project Manager The project manager generally manages the project communications. The <Project Name> project manager is responsible for communicating status for scope, schedule, and cost, as well as monitoring, controlling, and communicating the risks. The <Project Name> project manager has the responsibility to ensure that all information related to the <Project Name> project is consistent, correct, accurate, and timely. The <Project Name> project manager will review and approve all information being provided to the various stakeholders, including the legal office, IV&V, IPOC, and any external agencies. The project manager will ensure continued user involvement and requirements remain relatively stable throughout the <Project Name> project. The <Project Name> project manager reports directly to the <Project Name> project sponsor. 2.1.5 Advisory Committee This section should summarize the advisory committee’s involvement in communications. The roles and responsibilities of the <Project Name> Advisory Committee are: · Provide leadership and direction. · Review progress, risks, and issues and recommend resolution. · Make recommendations to the project sponsor. · Assure <Project Name> implementation by educating district and program staff, provide means for training, and support implementation efforts. 2.1.6 Business Project Team This section should summarize the business project team’s involvement in communications. · Define requirements. · Perform user testing. · Accept products and solution. 4
  • 9. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 2.1.7 Technical Project Team If applicable, indicate how the <Project Name> technical project team assists the project with communications and what communications the project receives from the technical project team. The <Project Name> technical project team will be responsible for the successful development, documentation, data conversion, implementation, and ongoing operational support of the <Project Name>. The technical team will also be responsible for developing, providing, and conducting training to the state for the <Project Name> project. The <Project Name> technical team will deliver a system that meets all the functional requirements of the contract. The <Project Name> technical team shall deliver the system per the schedule that will be described in the state approved <Project Name> Project Management Plan. The <Project Name> technical project lead will oversee the other technical personnel working on the solution, including any contractors and sub-contractors. The <Project Name> technical project lead is responsible to report any issues impacting the project, provide recommendations to resolve issues, and assist the project manager in successful implementation of the <Project Name> project. The <Project Name> technical project lead will report directly to the <Project Name> project manager and provide all project information to them. The <Project Name> technical project lead will be responsible for collecting and gathering all <Project Name> related information from the subcontractors under their current contract. 2.2 Oversight If applicable, indicate the oversight agencies that will be involved in the project and their specific responsibilities. 2.2.1 Office of the State Chief Information Officer The Office of the State Chief Information Officer (OCIO) is a cabinet-level agency with statutory authority over IT strategic vision and planning, enterprise architecture, policy, and project approval and oversight. The responsibilities of the OCIO are to review, approve, and monitor IT project investments. . 2.2.2 IT Project Management Office The PMO provides direction and stewardship of Caltrans IT project portfolio. This responsibility includes developing, managing, and monitoring policies, methodologies, processes, and standards for proposed project concepts, feasibility studies, and approved projects. The PMO provides guidance and support in the areas of project management and IT methodology and standards, receives project status information, and acts as the liaison for communications with the OCIO on project issues. 5
  • 10. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 2.2.3 Independent Verification and Validation Consultant The role of the Independent Verification &Validation (IV&V) consultant is to perform reviews and assessments of the system engineering deliverables to ensure that the product meets the intended objectives and requirements specified in the FSR and the RFP. Typically the IV&V consultant reports to the advisory committee an independent assessment on the progress of a project including risks, issues, and problems that may impact the achievement of program and project objectives. Activities include periodic progress reports, requirements traceability, and specific technical assessments encompassing the entire system development life cycle of the project. 2.2.4 Independent Project Oversight Consultant The role of the Independent Project Oversight Consultant (IPOC) is to perform independent periodic assessments of project management activities to identify areas that may need improvement to better ensure project success. Responsibilities of the IPOC include but are not limited to: · Review and evaluation of project management deliverables, including quality assurance, project management, risk management plans, and supporting activities for compliance with standards, processes, and procedures. · Independent risk assessments and performance monitoring through the use of project metrics (e.g. earned value metrics, software testing metrics, etc.). · Independent evaluations of the project schedule and reports offering recommendations to the project. · Review of IV&V deliverables. · Monitoring, reviewing, and advising the project team on all risk related activities. · Developing and providing independent project oversight reports (IPOR) to the OCIO. 2.2.5 State Legislative Analyst’s Office If applicable, this section should indicate the Legislative Analyst’s Office involvement with the project. The Legislative Analyst’s Office (LAO) serves as oversight for the state Legislature to ensure that the executive branch is implementing legislative policy in a cost efficient and effective manner. Historically, one of the most important responsibilities of the LAO has been to analyze the annual Governor's budget and publish a detailed review at the end of February. This document, the Analysis of the Budget Bill, includes individual department reviews and recommendations for legislative action. The LAO may require departments to submit reports annually, or at their request, on specific aspects of IT projects. 6
  • 11. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 2.2.6 Department of Finance The Department of Finance (DOF) provides oversight and funding approval of state planned IT project expenditures. The DOF will provide: · Review and approval of all proposed IT project budget change proposals and finance letters. · Assist in ensuring project funding issues are identified to Caltrans executives and the PMO. 2.2.7 Department of General Services The Department of General Services (DGS) provides acquisition support and procurement guidelines to state IT projects as outlined in the State Contracting Manual. The responsibilities of the DGS are: · Ensure that the appropriate terms and conditions are included in the contract. · Assist with negotiation of contracts and obtain any applicable waivers. · Provide review and approval of IT Procurement Plans. · Provide RFP development support and serve as primary point of contact with contractors through bid and proposal efforts. · Provide bid evaluation facilitation and assist with developing evaluation criteria and selection of contractors. · Facilitate and assist with the preparation of bidder’s conferences. · Assist with hardware and software acquisition. 2.3 Stakeholders Identification List the stakeholders vested in the project. Consider the communication needs of stakeholders that will be the system end users, as well as others that could influence the outcome and success of the project. Typical stakeholders include federal partners, the system users, interfacing programs or organizations, advocates, and unions. Name Title Program Contact Role Comments Joe Smith Manager IT 916-555-5555 joe@dot.ca.gov Steering Committee Member Comments Jane Doe Business Analyst Administration 916-555-5556 Project Team Comments 3 COMMUNICATION PROCESS 3.1 Informal Informal communications consist of e-mail, conversations, or phone calls and serve to supplement and enhance formal communications. Due to the varied types and ad-hoc nature of informal communications, they are not discussed in this plan. 7
  • 12. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 3.2 Formal The <Project Name> Project will engage in various types of formal communication. The general types and their purpose are described below. 3.2.1 Status Meetings There are five basic types of status meetings for the <Project Name> Project: 1. Status meetings internal to the <Project Name> business team to discuss assignments, activities, and to share information; 2. Status meetings and reports between the <Project Name> business team, and the technical project team; 3. Advisory Committee meetings with the project sponsor, project stakeholders, and project manager to review progress, risks, and issues; 4. Status meetings and reports between the <Project Name> project sponsors and the steering committee; and 5. Status meetings and reports to stakeholders, such as oversight agencies. 3.2.2 Status Reports A variety of status reports will be produced during the project. The status reports will be produced on regular intervals to provide stakeholders project information on the status and progress of the <Project Name> project. At a minimum the reports will contain: · Project status on major activities · Project schedule · Budget and cost tracking · Status of issues and risks · Health status · Status of action items, if applicable. · Future or planned activities The intent of the status reports is to inform stakeholders of the project’s progress and keep them actively involved in the project. The information provided will contain enough detail to allow stakeholders to make informed decisions and maintain oversight of the project. 3.3 External Communication This section describes the Caltrans policy regarding inquiries from news and print media and other public records requests. This standard policy language can be incorporated for all Caltrans IT projects. Please note that for some projects, communications may need to be vetted through the Caltrans Legal Office. 3.3.1 News and Print Media Project staff is not allowed to communicate with the media unless prior approval or direction has been granted from the <Project Name> project sponsor. If a news 8
  • 13. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> or print media requests an interview or information, project staff must inform the project manager who will immediately contact the project sponsor. The <Project Name> project sponsor will contact the Caltrans Division of Public Affairs. 3.3.2 Public Inquiries and Public Records Requests A public records request should be made in writing, unless the request involves records that are maintained by the project for the purpose of immediate public inspection, and should sufficiently describe records so that project personnel can identify, locate, and retrieve the records. Public records maintained by the project will be available for inspection by members of the public during regular business hours of the project. Requests for inspection or copying of public records should be directed to the Division of Public Affairs and should be specific, focused and not interfere with the ordinary business operations of the project. Public Affairs will contact the appropriate California Public Records Act (CPRA) Coordinator for IT at Caltrans. If you are contacted by individuals for copies of any public record, please advise them to contact Public Affairs. Public Affairs will work with the appropriate CPRA coordinator to respond to the requester. The operational functions of the project will not be suspended to permit inspection of records during periods in which project personnel in the performance of their duties reasonably require such records. If the request requires review of numerous records, a mutually agreeable time should be established for the inspection of the records. Occasionally, the project may receive requests from the public for information (e.g., statistics, reports, program information). If the project receives any of these requests, the requestor should be directed to the project manager, who will refer the individual to the appropriate program, agency or department. The project may refuse to disclose any records that are exempt from disclosure under the Public Records Act. (Refer to Government Code Section 6254.) Physical inspection of the records shall be permitted within the project’s offices and under the conditions determined by the department. Upon either the completion of the inspection or the oral request of project personnel, the person conducting the inspection shall relinquish physical possession of the records. Persons inspecting project records shall not destroy, mutilate, deface, alter, or remove any such records from the project. The project reserves the right to have project personnel present during the inspection of records in order to prevent the loss or destruction of records. Upon any request for a copy of records, other than records the project has determined to be exempt from disclosure under the Public Records Act, project personnel shall provide copies of the records to any person upon payment of a fee covering costs of duplication. 9
  • 14. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 4 COMMUNICATION MANAGEMENT 4.1 Communication Distribution Various methods will be used to distribute project information and communicate with project stakeholders. The primary method to distribute information will be through the Lotus Notes email system established at Caltrans. Whenever possible, to expedite the dissemination of information, documents will be distributed via email. Teleconferencing will be used to the maximum extent possible to communicate to stakeholders in out of town locations. This will help to reduce the amount of travel required and provide for an effective method of communication. Whatever method is used to distribute information or communicate, the proper precautions and procedures must be followed to ensure safe and protected delivery of information. Any confidential information must be sent through the proper procedures as established by the appropriate policies. The standard order of precedence would be state policies and procedures, Caltrans policies and procedures, and <Project Name> Project policies and procedures in that order. 4.2 Communication Tracking and Storage Discuss how communications received by the project are tracked and stored. This section shall refer the reader to the procedures for document tracking, naming conventions, and document version control. Also indicate how critical e-mail are stored and if fax transmissions or acknowledgements are retained. A copy of all project management plans, control agency approval documents, and project status reports must be saved into the PMO centralized document repository. These files are located on the network in the directory N:PMO – New. Please refer to the <Project Name> Configuration Management Plan, regarding the document management procedures for communication and document naming, tracking, review, storage, retention, and change control. Written communications received or generated by the project are retained and stored in the project’s library and/or document management tool, depending on the format in which they were received. Project e-mail that document decisions or have pertinent value to the project are stored in the project’s library and/or document management tool and retained for historical purposes. 4.3 Communication Changes This section should address changes to the communication process, such as implementing a new or modified report, adding or combining meetings, updating the distribution lists, etc. Indicate what types of changes require approvals, notification of pending changes and where such changes are documented. Changes to the communication process may be proposed by any recipient or communication creator. The Project Manager must approve the change for it to 10
  • 15. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> be approved. Often a draft version will be used to generate discussion with the communication stakeholders prior to making the change official. Changes to communication format or content are handled through the normal document change control process. Changes to content must be approved by the respective project lead or manager (depending on the content), and then are disseminated with an explanation of the change. Appropriate revision and version markings are included with the updated version. This Communication Plan will be updated on a quarterly basis. 5 GENERAL INFORMATION 5.1 Acronyms Acronym Description AIO Agency Information Officer BCP Budget Change Proposal CPRA California Public Records Act DTS Department of Technology Services ETID Enterprise Technology Investment Division DGS Department of General Services DOF Department of Finance IEEE Institute of Electrical and Electronics Engineers IPOC Independent Project Oversight Consultant IPOR Independent Project Oversight Report IT Information Technology IV&V Independent Verification & Validation OCIO Office of the State Chief Information Officer LAO Legislative Analyst’s Office. PIER Post Implementation and Evaluation Report PMI Project Management Institute PMO Project Management Office SPR Special Project Report 11
  • 16. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> 5.2 Glossary A standard glossary of terms, including the names of all methodologies and stages, is included in the standard Glossary. This section defines additional terms, including those specific to this business or project. Term Definition 5.3 Communication Plan Revision History REVISION HISTORY VERSION # DATE OF RELEASE OWNER COMMENTS Insert Communication Plan revision history. 12
  • 18. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> APPENDIX A: COMMUNICATION SCHEDULE The following chart describes the planned communications that <Project Name> Project staff is responsible for or participate in. Add additional meetings as appropriate and modify the frequency to meet the needs of the project. Other impromptu meetings occur as needed to resolve issues or problems that arise within the department and with external stakeholders. Definitions: Weekly – One occurrence each week Bi-Weekly – One occurrence every other week Monthly – One occurrence each month Bi-Monthly – One occurrence every other month Quarterly – One occurrence every three months Semi-Annually – One occurrence every six months Annually – One occurrence each year Type of Prepared By/ Distribution List/ Information Chaired By Participants Purpose of Communication Frequency Transmittal Method <Project Name> Project Plan Project Manager Project Team, PMO To articulate project background, scope, roles/responsibilities, risk, deliverables, schedule, staffing, communication, and close-out. At project start-up Email <Project Name> Project Schedule Project Manager Project Team, Sponsor, Customer, PMO Document and monitor key tasks, milestones and assigned resources As Needed Email <Project Name> Kick Off Meeting Project Manager Project Team, PMO The kick-off meeting is used to clarify goals and objectives, individual roles and responsibilities, interdependencies Once at project start-up Meeting <Project Name> Weekly Status Meeting Project Manager Project Team, PMO Discuss status, issues and concerns related to the Project Weekly Oral presentation, discussions <Project Name> Project Sponsor Meeting Project Manager Project Sponsor, PMO Communicate Risk, issues, resource concerns, schedule, deliverables, milestones, etc. Monthly Meeting A-1
  • 19. Project Name: (Project Name) Project Number: (FSR Number) Criticality Rating: (Low, Medium, High) Communication Plan <Date> Type of Information Prepared By/ Chaired By Distribution List/ Participants Purpose of Communication Frequency Transmittal Method <Project Name> PMO Status Meetings Project Manager Project Manager, PMO Report project status, including significant accomplishments, issues, and costs. Distributed prior to the scheduled meeting Email, Meeting <Project Name> Status Reporting Project Manager Project Team, Sponsor, Customer, PMO Report project progress, milestones, status, risks and issues, etc. Weekly Email <Project Name> Change Requests Project Manager Program Staff, Project Sponsor, Project Manager, PMO Communicate, receive approval and document status of all change requests. As Needed Email, Meeting A-1