© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
A very green proposal

•Saving hotels more than 50% on energy
 bills
•Helping make hotels more eco friendly
•Eco friendly hotels attract higher occupancy
 rates.



                           © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Agenda
   Greener building
   Energy at work
   Value Innovation
   A couple of numbers




                         © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Hotel Hot Water




        © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
“Best in Class”




                       © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Eco heat pumps Ltd ©
Commercial hot-water heat pumps

                           Zero CO2 emissions




   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Oil fired boilers – 80% efficient at best!
                      © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Fuel Oil 1992 to 2012
100

 90

 80                                                                                                   91.48
                                                                                                                                  91.2
 70                                                                                                                       87.04

 60
                                                                                                                  71.21
 50                                                                                            64.2
                                                                                        58.3
  40                                                                            50.04                     53.48
  30
                                                                        37.66
  20      19.25                                  27.39
               16.75          20.46
  10
                    15.6616.75     18.64
                                            16.56
                                                      23   22.81
                                                                27.69
                                                                                206% increase in LPG
                                       11.91
                                                                                180% increase in Fuel Oil
      0

          1992



                                                                                                 2008
                                                                                                                    2012




                                                                © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
6   12 3
                 5
                              Ventilation
                     6
                              Refrigeration
                              Office
                              Cooking
                              Cooling
41                       18
                              Heating
                              Lighting
                              Water Heating
                              Other

            18
© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Tallest hotel in the
                                                        World – Ritz Carlton
                                                          Hong Kong: 312
                                                              rooms and
                                                        suites, 170 litres of
                                                           hot water per
                                                        occupant per day, 2
                                                         million litres of hot
                                                          water per annum
                                                          based upon 50%
                                                              occupancy
 “Energy Costs have
never been higher and
  they have affected
     profitability”     © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Energy Costs –v- Profits




Oil Fired & LPG Boilers           Renewable Energy Heat Pump
• Oil boilers - 70% efficient     • Heat pumps 300% efficient
• LPG boilers - 85% efficient     • Designed for Hot-water generation
• Oil & Gas highest prices EVER   • 75% FREE ENERGY


                                  © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Hotels Mean Business
Business means supplying endless amounts of hot water




                            © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Each occupant consumes 140 liters of


                                       Making a 1st impression….
          hot water a DAY




                                                 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Each occupant shower consumes 65 liters of hot water
                    per HOUR

                           © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
General areas consume a lot of water…..




                    © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Each occupant consumes 140 liters of hot water a DAY

                           © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Warm water everywhere…..




             © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
restaurant serving 400 meals per day will use
           5000 litres of hot water




                        © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Swimming Pool water management
                © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
300 bed 4 star hotel requires hot-water storage of 40 litres
  per occupant – 50% occupancy = 12000 litres. 75%
                occupancy = 18000 litres.

 400 bed 4 star hotel requires hot-water storage of 40 litres
   per occupant – 50% occupancy = 16000 litres. 75%
                 occupancy = 24000 litres.

400 bed 5 star hotel requires hot-water storage of 50 litres
  per occupant – 50% occupancy = 20000 litres. 75%
                occupancy = 30000 litres.

600 bed 5 star hotel requires hot-water storage of 50 litres
  per occupant – 50% occupancy = 30000 litres. 75%
                occupancy = 45000 litres.
                                 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Benefits:
                                            Replace fossil fuel
                                      boilers with 100% safer
                                  Renewable energy solution
heat pumps


                      Designed for faster water heating times
                                     Low power consumption
             Save 60-75% compared to oil and electric heaters
               Patented heat exchange system prevents cross-
                               contamination of water supply




                              Low noise & vibration operation
                         Programmable temperature (to 650c)
Pattaya, Thailand

100% run by tropical
Heat Pumps for Hot
Water
100% success
© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Unique value proposition




             © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
The "Accounting Rate of Return" is
 the net income generated from an
investment during a period, divided
by the book value of the investment
     at the start of the period -




                              © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Affordability




       © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Affordability




       © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Affordability




       © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Affordability
                         You only pay from the savings we make *




* set-up charge plus agreed time scale and percentage   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Your Hotel action plan?
•CO2 neutralisation now and in the future
•Making energy savings
•Involving guests
•Establishing a CO2 neutral hotel network
•Collaborating with climate networks/alliances
including climate friendly specialists.
Agree
    Complex           Contract
    process
                       Survey


                      Site Set Up      Enabling                         Main
Each and every                                                          Plant
stage is in unison
with hotel
                                                                    Controls
management &
director of
engineering          Hand Over Commission                     System Test

                                 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Repercussions for staff of a new element
                                          New Element
             Resistance to                itself
             new element
                                                              Communicate
                                                              new element
       Commitment
       to Green Plan

                                                              Empowerment

                Involvement
                                         Motivation


                              © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Process, Fees &
works programme




                   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Preliminary
• Contract
• Site set-up
• Accommodation


$ 40,000




                  © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Dimensioning
1. Establish pipe runs and plant location
2. Confirm             requirements
3. Establish any other needs or requirements




                              © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Enabling works:
• Re-routing
• Pipe-routes
• Pumps
• Valves




                  © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Main plant:
• Heat-pumps




               © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Controls:
• Field wiring
• Control panels
• Sensors




                   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Test , commission
and hand over
system:




                    © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Our Value
                                                                      Global
       Proposition                                                    Green

B
e
n
e                                                           One Stop Hotel Stop
       Local
f                                                            Carbon Footprint
i                                  Economies of                   Solved
t                                      Scale                 Repeat Business
                Internationally   Entrepreneurial
s                                                             Growing Global
       Local       Renown               flair                 Green Business
    Knowledge     Expertise &     Green Platform
    Connections   Standards
     Expertise



                          Local to Global Green
                                         © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Typical hotel Current energy costs, say $300,000 per annum

Typical New energy costs, say $150,000 per annum

Saving of $150,000 per annum

Our fees merely require a fixed percentage of the savings:
A. 35% of the annual saving each year for 5 years
B. 40% of the annual saving each year for 4 years
C. 50% of the annual saving each year for 3 years

Example shown:

A.   35% of $150,000 = $52,500 x 5 years = $262,500 ($750,000 total savings)
B.   40% of $150,000 = $60,000 x 4 years = $240,000 ($600,000 total savings)
C.   50% of $150,000 = $75,000 x 3 years = $225,000 ($450,000 total savings)

Process fee of $40,000 in addition to above, all fees payable monthly in advance.
                                                   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
How customers DO business




           © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
© Tony Sweet & Ashley Fordham Eco Engineering and water solutions
Otakuki.energy@gmail.com
  Tony Sweet +44-77-99-00-47-03
Ashley Fordham +44-74-23-58-11-26
                   © Tony Sweet & Ashley Fordham Eco Engineering and water solutions

More Related Content

Viewers also liked

=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
omg
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
Liguidliguid
 

Viewers also liked (9)

BS 1- Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotelBS 1- Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
 
Cold Water Supply Distribution In Building
Cold Water Supply Distribution In BuildingCold Water Supply Distribution In Building
Cold Water Supply Distribution In Building
 
Cold water supply and pipe sizing
Cold water supply and pipe sizingCold water supply and pipe sizing
Cold water supply and pipe sizing
 
Water Management and Efficiency in Hospitality
Water Management and Efficiency in HospitalityWater Management and Efficiency in Hospitality
Water Management and Efficiency in Hospitality
 
Special Events from Planning to Execution
Special Events from Planning to ExecutionSpecial Events from Planning to Execution
Special Events from Planning to Execution
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
 
Tutorial introduction to revenue management for hotels hospitality seminar w...
Tutorial introduction to revenue management for hotels hospitality seminar  w...Tutorial introduction to revenue management for hotels hospitality seminar  w...
Tutorial introduction to revenue management for hotels hospitality seminar w...
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
Cold water supply system & Components
Cold water supply system & ComponentsCold water supply system & Components
Cold water supply system & Components
 

Similar to Hotel Hot Water Solution

Similar to Hotel Hot Water Solution (20)

Superhomes - Decarbonising Irish Homes with Deep Retrofit
Superhomes - Decarbonising Irish Homes with Deep RetrofitSuperhomes - Decarbonising Irish Homes with Deep Retrofit
Superhomes - Decarbonising Irish Homes with Deep Retrofit
 
Galaxy Heat Pump
Galaxy Heat Pump Galaxy Heat Pump
Galaxy Heat Pump
 
Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...
Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...
Blake Lapthorn Green Breakfast, 12 December 2012, with guest speaker Alex Fla...
 
Biomass - Procuring & Contracting for Success
Biomass - Procuring & Contracting for SuccessBiomass - Procuring & Contracting for Success
Biomass - Procuring & Contracting for Success
 
3d
3d3d
3d
 
Water Energy Nexus 10 18 11
Water Energy Nexus 10 18 11Water Energy Nexus 10 18 11
Water Energy Nexus 10 18 11
 
ACES | Air Conditioning Energy Saver
ACES | Air Conditioning Energy SaverACES | Air Conditioning Energy Saver
ACES | Air Conditioning Energy Saver
 
Ocean Thermal Energy - An Introduction
Ocean Thermal Energy - An IntroductionOcean Thermal Energy - An Introduction
Ocean Thermal Energy - An Introduction
 
Hydrogen Energy Technology 2010
Hydrogen Energy Technology 2010Hydrogen Energy Technology 2010
Hydrogen Energy Technology 2010
 
Swimming Pool Heat Pump Brochure-BLUEWAY
Swimming Pool Heat Pump Brochure-BLUEWAYSwimming Pool Heat Pump Brochure-BLUEWAY
Swimming Pool Heat Pump Brochure-BLUEWAY
 
Ecolivinguk.com Big Green Home Show Low Energy New Build
Ecolivinguk.com Big Green Home Show Low Energy New BuildEcolivinguk.com Big Green Home Show Low Energy New Build
Ecolivinguk.com Big Green Home Show Low Energy New Build
 
Keyland Polymer UV Cured Powder Overview
Keyland Polymer UV Cured Powder OverviewKeyland Polymer UV Cured Powder Overview
Keyland Polymer UV Cured Powder Overview
 
Achema industrial heat pumps v6
Achema industrial heat pumps v6Achema industrial heat pumps v6
Achema industrial heat pumps v6
 
Reverse combustion (1)
Reverse combustion (1)Reverse combustion (1)
Reverse combustion (1)
 
PWG Company Brochure 2017
PWG Company Brochure 2017PWG Company Brochure 2017
PWG Company Brochure 2017
 
Oxy- Hydrogen Generator (www.watercar.in)
Oxy- Hydrogen Generator (www.watercar.in)Oxy- Hydrogen Generator (www.watercar.in)
Oxy- Hydrogen Generator (www.watercar.in)
 
Final hydro oil presentation
Final hydro oil presentationFinal hydro oil presentation
Final hydro oil presentation
 
SAFETY BELT AND FIRE HELMET By Shubh Enterprises
SAFETY BELT AND FIRE HELMET By Shubh EnterprisesSAFETY BELT AND FIRE HELMET By Shubh Enterprises
SAFETY BELT AND FIRE HELMET By Shubh Enterprises
 
Geothermal For Commercial Buildings
Geothermal For Commercial BuildingsGeothermal For Commercial Buildings
Geothermal For Commercial Buildings
 
Geothermal for Commercial Buildings
Geothermal for Commercial BuildingsGeothermal for Commercial Buildings
Geothermal for Commercial Buildings
 

Hotel Hot Water Solution

  • 1. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 2. A very green proposal •Saving hotels more than 50% on energy bills •Helping make hotels more eco friendly •Eco friendly hotels attract higher occupancy rates. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 3. Agenda Greener building Energy at work Value Innovation A couple of numbers © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 4. Hotel Hot Water © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 5. “Best in Class” © Tony Sweet & Ashley Fordham Eco Engineering and water solutions Eco heat pumps Ltd ©
  • 6. Commercial hot-water heat pumps Zero CO2 emissions © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 7. Oil fired boilers – 80% efficient at best! © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 8. Fuel Oil 1992 to 2012 100 90 80 91.48 91.2 70 87.04 60 71.21 50 64.2 58.3 40 50.04 53.48 30 37.66 20 19.25 27.39 16.75 20.46 10 15.6616.75 18.64 16.56 23 22.81 27.69 206% increase in LPG 11.91 180% increase in Fuel Oil 0 1992 2008 2012 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 9. 6 12 3 5 Ventilation 6 Refrigeration Office Cooking Cooling 41 18 Heating Lighting Water Heating Other 18
  • 10. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 11. Tallest hotel in the World – Ritz Carlton Hong Kong: 312 rooms and suites, 170 litres of hot water per occupant per day, 2 million litres of hot water per annum based upon 50% occupancy “Energy Costs have never been higher and they have affected profitability” © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 12. Energy Costs –v- Profits Oil Fired & LPG Boilers Renewable Energy Heat Pump • Oil boilers - 70% efficient • Heat pumps 300% efficient • LPG boilers - 85% efficient • Designed for Hot-water generation • Oil & Gas highest prices EVER • 75% FREE ENERGY © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 13. Hotels Mean Business Business means supplying endless amounts of hot water © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 14. Each occupant consumes 140 liters of Making a 1st impression…. hot water a DAY © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 15. Each occupant shower consumes 65 liters of hot water per HOUR © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 16. General areas consume a lot of water….. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 17. Each occupant consumes 140 liters of hot water a DAY © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 18. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 19. Warm water everywhere….. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 20. restaurant serving 400 meals per day will use 5000 litres of hot water © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 21. Swimming Pool water management © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 22. 300 bed 4 star hotel requires hot-water storage of 40 litres per occupant – 50% occupancy = 12000 litres. 75% occupancy = 18000 litres. 400 bed 4 star hotel requires hot-water storage of 40 litres per occupant – 50% occupancy = 16000 litres. 75% occupancy = 24000 litres. 400 bed 5 star hotel requires hot-water storage of 50 litres per occupant – 50% occupancy = 20000 litres. 75% occupancy = 30000 litres. 600 bed 5 star hotel requires hot-water storage of 50 litres per occupant – 50% occupancy = 30000 litres. 75% occupancy = 45000 litres. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 23. Benefits: Replace fossil fuel boilers with 100% safer Renewable energy solution heat pumps Designed for faster water heating times Low power consumption Save 60-75% compared to oil and electric heaters Patented heat exchange system prevents cross- contamination of water supply Low noise & vibration operation Programmable temperature (to 650c)
  • 24. Pattaya, Thailand 100% run by tropical Heat Pumps for Hot Water 100% success
  • 25. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 26. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 27. Unique value proposition © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 28. The "Accounting Rate of Return" is the net income generated from an investment during a period, divided by the book value of the investment at the start of the period - © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 29. Affordability © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 30. Affordability © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 31. Affordability © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 32. Affordability You only pay from the savings we make * * set-up charge plus agreed time scale and percentage © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 33. Your Hotel action plan? •CO2 neutralisation now and in the future •Making energy savings •Involving guests •Establishing a CO2 neutral hotel network •Collaborating with climate networks/alliances including climate friendly specialists.
  • 34. Agree Complex Contract process Survey Site Set Up Enabling Main Each and every Plant stage is in unison with hotel Controls management & director of engineering Hand Over Commission System Test © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 35. Repercussions for staff of a new element New Element Resistance to itself new element Communicate new element Commitment to Green Plan Empowerment Involvement Motivation © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 36. Process, Fees & works programme © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 37. Preliminary • Contract • Site set-up • Accommodation $ 40,000 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 38. Dimensioning 1. Establish pipe runs and plant location 2. Confirm requirements 3. Establish any other needs or requirements © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 39. Enabling works: • Re-routing • Pipe-routes • Pumps • Valves © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 40. Main plant: • Heat-pumps © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 41. Controls: • Field wiring • Control panels • Sensors © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 42. Test , commission and hand over system: © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 43. Our Value Global Proposition Green B e n e One Stop Hotel Stop Local f Carbon Footprint i Economies of Solved t Scale Repeat Business Internationally Entrepreneurial s Growing Global Local Renown flair Green Business Knowledge Expertise & Green Platform Connections Standards Expertise Local to Global Green © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 44. Typical hotel Current energy costs, say $300,000 per annum Typical New energy costs, say $150,000 per annum Saving of $150,000 per annum Our fees merely require a fixed percentage of the savings: A. 35% of the annual saving each year for 5 years B. 40% of the annual saving each year for 4 years C. 50% of the annual saving each year for 3 years Example shown: A. 35% of $150,000 = $52,500 x 5 years = $262,500 ($750,000 total savings) B. 40% of $150,000 = $60,000 x 4 years = $240,000 ($600,000 total savings) C. 50% of $150,000 = $75,000 x 3 years = $225,000 ($450,000 total savings) Process fee of $40,000 in addition to above, all fees payable monthly in advance. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 45. How customers DO business © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 46. © Tony Sweet & Ashley Fordham Eco Engineering and water solutions
  • 47. Otakuki.energy@gmail.com Tony Sweet +44-77-99-00-47-03 Ashley Fordham +44-74-23-58-11-26 © Tony Sweet & Ashley Fordham Eco Engineering and water solutions