2.7 "Role of the Drilling Contractor" – Dean Hills [EN]

669 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
669
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

2.7 "Role of the Drilling Contractor" – Dean Hills [EN]

  1. 1. Role of the Drilling Contractor OPERATOR DRILLING CONTRACTOR Roads & Access Site Construction Cementing Mud Engineering Coring Logging Water Supply Waste Management Site Rehabilitation FRACKING CONTRACTOR Regulators Local Community
  2. 2. United States Canada Venezuela Oman Argentina Libya Qatar Indonesia Australia New Zealand Gabon Thailand
  3. 3. Rig 41 GDYNIA, POLAND September 2011
  4. 6. Elk Hills, California. Rig on one level, Mud tanks and power section on lower level.
  5. 7. Pad Drilling by Rig Skidding Multiple wells drilled from same location .
  6. 10. Rig Move – Desert Mobile Rig
  7. 11. PLC – Control Panel DRILLER - Controls Top Drive, Power Slips, Mud Pumps, BOP’s, etc. ASST DRILLER – Controls Pipe Arm and Hydraulic Pipe Tubs CREW – Mud Tanks & Shakers. Preparing casing.
  8. 12. PEOPLE – The Vital Ingredient…!!
  9. 13. Thank You QUESTIONS…???

×