The ultimate goal of commissioning is for the systems and the interaction of systems to be optimized to meet the daily needs of its occupants. For more information please visit http://blog.mckenneys.com/2016/10/is-it-magic.
2. Do you know what the ultimate focus of commissioning is or should be
on your project?
Depending on your role in a project, you will certainly have wide variety
of answers to this question – but if it is done correctly a facility owner
or operator will know exactly what the effort produces for their facility
and its occupants.
3. The commissioning effort is intended to ensure building systems
operate as they were intended to include the variety of systems that
interact with each other in most every facility. A system in its most
simple form is a set of components that are connected together to
deliver an intended result or set of results.
Many participants in a construction project see the commissioning
effort in its simplest form, at the component level. Thoroughly checking
and testing the components that comprise a system is major part of the
commissioning process. After all, if one component is faulty or not
performing as expected then wouldn’t it follow that the system would
not perform well either? The answer is – not necessarily.
4. Systems (especially HVAC systems) are very good at overcoming or
masking performance issues at the component level – this creates
operational stability for any given system and it also creates an
operational opportunity. The opportunity always exists for systems to
perform better, to consume less energy, to provide a higher level of
occupant comfort, to operate completely in the background for the
facility served in the least disruptive way, but the list goes on.
The commissioning effort is all about systems.
5. Systems are commissioned – from HVAC systems, to electrical systems,
fire protection systems, building envelope systems, and so on.
Ultimately the entire facility with all of its installed systems along with
its occupants are seen as components in a system (that is the facility)
and ideally they all interact in a positive and most efficient manner.
The ultimate goal of commissioning is for the systems and the
interaction of systems to be optimized to meet the daily needs of its
occupants. If the systems are indeed meeting the daily needs of the
occupants then the systems will seemingly disappear into the
background, supporting the ultimate function of the facility and its
occupants.
6.
7. 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com