SlideShare a Scribd company logo
1 of 3
Kevin Manson
CURRICULUM VITAE
NATIONALITY
British
QUALIFICATIONS
 NVQ Level 3 in Nuclear Decommissioning - Supervision ( 2009)
 NEBOSH Construction (2009)
 IOSH Managing Safely (BNFL) Construction (2008) (12 day)
 NEBOSH Level 3 in Occupational Health and Safety (2008)
 NEBOSH General (2008)
 IOSH Managing Safely (2005) (5 day)
 O grades in Woodwork, Metalwork, Modern Studies, Arithmetic & Engineering drawing
 City & Guilds in Carpentry and Joinery
 City & Guilds in Communication
KEY SKILLS
 Classified Worker
 SC cleared
 Radiological Material Controller
 Radiation Protection Supervisor (2013)
 British Red Cross First Aider (2013) (3 day)
 Manual Handling
 PVC suit trained
 Pressurised Air Line Suit
 Overhead crane operator
 Rigging & lifting ( basic slinging )
 Abrasive wheels
 Forward Control Point Liaison Officer
 Powered respirator ( Proflow & Sari )
 Confined Spaces Trained
 Safe Work in Confined Spaces Permit Issuer
 Work Permit Issuer
 BA trained (GE Healthcare)
 Building controller
 PASMA scaffolding
 MEWP trained
 IPAF 3b (cherry picker)
 Harness trained
 ECITB Supervisory qualified
 ECITB SMSTS ( Site Mangers Safety Training Scheme ) (2013)
PROFILE
13 year’s experience in the Decommissioning Nuclear field.
Appointed RPS (Radiation Protection Supervisor) & RMC ( Radioactive Materials Controller)
NEBOSH General & NEBOSH Construction
CURRENT POSITION
Site Supervisor - Studsvik UK
 Working on various site projects around the country
EXPERIENCE
 August 2013 – Present
Berkely Nuclear Plant : the installation of new ventilation system in the AWVR building
 May 2013 – July 2013
Tioxcide Chemical Plant (Hartlepool): the site removal of redundant radioactive iron ore filter
cloth’s (Radon contamination) from the Chemical Plant Complex.
 Oct 2012-May 2013
Berkeley Nuclear Plant: The Removal of 15 redundant heat exchangers (Boilers) each weighing
approx. 300t each.
 April 2012 – Oct 2012
Studsvik UK Metal Recycling Facility (Workington);
Updating COSHH paperwork and the Health & Safety files for the day to day production of the
Recycling Facility.
 March 2011 – April 2012
GE Healthcare (Cardiff): Decommissioning redundant labs, full strip out including all the fume
hoods and ventilation systems. Also the removal of all RP1,CD1 & RP2 effluent pipework from the
GE Healthcare building. (Including writing the decommissioning methodology for the project).
 LLWR (Drigg): Writing Decommissioning Methodology for removing 3 Forklifts from the Active
Magazine buildings for LLWR.
 Sept 2010- March 2011
NDSL (Dounreay)
D1204 : The removal of High contaminated Trough liners & redundant services from the cell faces in
airline suits.
D2670: Working in the Redundant Labs removing Alpha contaminated materials (off scale) from the
redundant Lab Glove box’s. (Airline suits)
 Aug 2009 - Aug 2010
Mitsui Babcock Engineering (Dounreay)
D2900:Size reduction of redundant PunNit Flasks, Moducon entries wearing airline suits to size
reduce highly contaminated waste and materials, on a regular basis.
 March 2007 – Aug 2009
Site Supervisor for Studsvik UK Limited
Sellafield Nuclear Site; Supervising personal and work at the BNFL Sellafield Nuclear Site in
building D204 building.
Also Based at Devonport Naval Base processing waste stream documents for the removal of the
Submarine Nuclear Reactors from the SRC.
 2002 – Feb 2007
Decommissioning Charge hand for
Mitsui Babcock Engineering
Based at Dounreay Nuclear Power Plant
 D1217: Working with machical manipulators within the cave facility, size reducing highly radioactive
waste items, also weekly removal of broken/ redundant manipulators, Moducon entries wearing
airline suits to size reduce highly contaminated waste and materials, on a regular basis.
 DMTR: Camera and radiation survey in a reactor vessel (first in UK) and also assisting (German)
Studsvik Engineers in the first successful dry coring of a nuclear reactor. RPS for this building, and
the other outlying buildings.
 D1313: Decontaminate the walls and floors of the building.
 D8550: Redundant criticality building, airline suite entries to decontaminate the fuel preparation
Room, Alpha (Plutonium).
 D1254: Decontaminate the floor and walls, where highly enriched Uranium was stored.
 D1200 Labs: Decommissioning redundant laboratory glove boxes, where there was Alpha, Beta and
Gamma radiation present.
 Cementation Building: High contaminated particles was pumped out of a drain and cemented into ‘c'
bins.
 SILO: Risk Assessments and Method Statements, Permit to work Issuer and RPS for
Decommissioning of the large Silo building.
 1984 – 2002 Joiner/Carpenter
Various companies
Time served joiner and carpenter.

More Related Content

Similar to Kevin M CV

Aecon nuclear capabilities and experience
Aecon nuclear capabilities and experienceAecon nuclear capabilities and experience
Aecon nuclear capabilities and experience
Jinesh Gandhi
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016
Michael Chapman
 
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
glennmcgillivray
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
Alaa Ammar
 
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
International Research Journal of Modernization in Engineering Technology and Science
 

Similar to Kevin M CV (20)

CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
CO2QUEST: Techno-economic Assessment of CO2 Quality Effect on its Storage and...
 
Aecon nuclear capabilities and experience
Aecon nuclear capabilities and experienceAecon nuclear capabilities and experience
Aecon nuclear capabilities and experience
 
MY CV feb 2016
MY CV feb 2016MY CV feb 2016
MY CV feb 2016
 
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
Response of Steel & CFT (Concrete Filled Tube) Frame Structures with Various ...
 
Final Document
Final DocumentFinal Document
Final Document
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016
 
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
ICLR Friday Forum: Safety + serviceability of mass timber buildings for wind ...
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
CO2QUEST - Techno-economic Assessment of Impact of CO2 Impurities on its Tran...
CO2QUEST - Techno-economic Assessment of Impact of CO2 Impurities on its Tran...CO2QUEST - Techno-economic Assessment of Impact of CO2 Impurities on its Tran...
CO2QUEST - Techno-economic Assessment of Impact of CO2 Impurities on its Tran...
 
Carbonation
CarbonationCarbonation
Carbonation
 
Cotainment Building Presentation
Cotainment Building PresentationCotainment Building Presentation
Cotainment Building Presentation
 
Solomon Brown (University College London) - Material Considerations in CO2 Pi...
Solomon Brown (University College London) - Material Considerations in CO2 Pi...Solomon Brown (University College London) - Material Considerations in CO2 Pi...
Solomon Brown (University College London) - Material Considerations in CO2 Pi...
 
A012140107
A012140107A012140107
A012140107
 
Large Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof StructureLarge Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof Structure
 
Large Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof StructureLarge Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof Structure
 
An Update on Gas CCS Project: Effective Adsorbents for Establishing Solids Lo...
An Update on Gas CCS Project: Effective Adsorbents for Establishing Solids Lo...An Update on Gas CCS Project: Effective Adsorbents for Establishing Solids Lo...
An Update on Gas CCS Project: Effective Adsorbents for Establishing Solids Lo...
 
Webinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentWebinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology development
 
Bolelli2014
Bolelli2014Bolelli2014
Bolelli2014
 
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES AND DURABILITY OF REACTIVE POWDER...
 
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
UK research programme overview - Jon Gibbins at the Canada-UK Workshop, Londo...
 

Kevin M CV

  • 1. Kevin Manson CURRICULUM VITAE NATIONALITY British QUALIFICATIONS  NVQ Level 3 in Nuclear Decommissioning - Supervision ( 2009)  NEBOSH Construction (2009)  IOSH Managing Safely (BNFL) Construction (2008) (12 day)  NEBOSH Level 3 in Occupational Health and Safety (2008)  NEBOSH General (2008)  IOSH Managing Safely (2005) (5 day)  O grades in Woodwork, Metalwork, Modern Studies, Arithmetic & Engineering drawing  City & Guilds in Carpentry and Joinery  City & Guilds in Communication KEY SKILLS  Classified Worker  SC cleared  Radiological Material Controller  Radiation Protection Supervisor (2013)  British Red Cross First Aider (2013) (3 day)  Manual Handling  PVC suit trained  Pressurised Air Line Suit  Overhead crane operator  Rigging & lifting ( basic slinging )  Abrasive wheels  Forward Control Point Liaison Officer  Powered respirator ( Proflow & Sari )  Confined Spaces Trained  Safe Work in Confined Spaces Permit Issuer  Work Permit Issuer  BA trained (GE Healthcare)  Building controller  PASMA scaffolding  MEWP trained  IPAF 3b (cherry picker)  Harness trained  ECITB Supervisory qualified  ECITB SMSTS ( Site Mangers Safety Training Scheme ) (2013) PROFILE 13 year’s experience in the Decommissioning Nuclear field. Appointed RPS (Radiation Protection Supervisor) & RMC ( Radioactive Materials Controller) NEBOSH General & NEBOSH Construction
  • 2. CURRENT POSITION Site Supervisor - Studsvik UK  Working on various site projects around the country EXPERIENCE  August 2013 – Present Berkely Nuclear Plant : the installation of new ventilation system in the AWVR building  May 2013 – July 2013 Tioxcide Chemical Plant (Hartlepool): the site removal of redundant radioactive iron ore filter cloth’s (Radon contamination) from the Chemical Plant Complex.  Oct 2012-May 2013 Berkeley Nuclear Plant: The Removal of 15 redundant heat exchangers (Boilers) each weighing approx. 300t each.  April 2012 – Oct 2012 Studsvik UK Metal Recycling Facility (Workington); Updating COSHH paperwork and the Health & Safety files for the day to day production of the Recycling Facility.  March 2011 – April 2012 GE Healthcare (Cardiff): Decommissioning redundant labs, full strip out including all the fume hoods and ventilation systems. Also the removal of all RP1,CD1 & RP2 effluent pipework from the GE Healthcare building. (Including writing the decommissioning methodology for the project).  LLWR (Drigg): Writing Decommissioning Methodology for removing 3 Forklifts from the Active Magazine buildings for LLWR.  Sept 2010- March 2011 NDSL (Dounreay) D1204 : The removal of High contaminated Trough liners & redundant services from the cell faces in airline suits. D2670: Working in the Redundant Labs removing Alpha contaminated materials (off scale) from the redundant Lab Glove box’s. (Airline suits)  Aug 2009 - Aug 2010 Mitsui Babcock Engineering (Dounreay) D2900:Size reduction of redundant PunNit Flasks, Moducon entries wearing airline suits to size reduce highly contaminated waste and materials, on a regular basis.  March 2007 – Aug 2009 Site Supervisor for Studsvik UK Limited Sellafield Nuclear Site; Supervising personal and work at the BNFL Sellafield Nuclear Site in building D204 building. Also Based at Devonport Naval Base processing waste stream documents for the removal of the Submarine Nuclear Reactors from the SRC.  2002 – Feb 2007 Decommissioning Charge hand for Mitsui Babcock Engineering Based at Dounreay Nuclear Power Plant  D1217: Working with machical manipulators within the cave facility, size reducing highly radioactive waste items, also weekly removal of broken/ redundant manipulators, Moducon entries wearing airline suits to size reduce highly contaminated waste and materials, on a regular basis.  DMTR: Camera and radiation survey in a reactor vessel (first in UK) and also assisting (German) Studsvik Engineers in the first successful dry coring of a nuclear reactor. RPS for this building, and the other outlying buildings.  D1313: Decontaminate the walls and floors of the building.  D8550: Redundant criticality building, airline suite entries to decontaminate the fuel preparation Room, Alpha (Plutonium).
  • 3.  D1254: Decontaminate the floor and walls, where highly enriched Uranium was stored.  D1200 Labs: Decommissioning redundant laboratory glove boxes, where there was Alpha, Beta and Gamma radiation present.  Cementation Building: High contaminated particles was pumped out of a drain and cemented into ‘c' bins.  SILO: Risk Assessments and Method Statements, Permit to work Issuer and RPS for Decommissioning of the large Silo building.  1984 – 2002 Joiner/Carpenter Various companies Time served joiner and carpenter.