half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 1
1. Present Status of Project:
1. This is the project of Manufacturing of Synthetic Organic Chemicals & Allied Chemicals.
2. We have received the consent to operate for Expansion on 04.02.2019 and it is attached
as Annexure-I
3. Now the project is not operating on its full capacity because we have applied for the
change in product mix.
4. Environment monitoring is carried out at project site and Reports are attached as
Annexure-II
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 2
2. Point by Point comment on Environment Clearance letter
Point by Point comment on Environment Clearance letter
General conditions
1 PP to achieve Zero Liquid Discharge; PP
shall ensure that there is no increase in
the effluent load to CETP.
The Project Proponent is having existing
full-fledged Effluent Treatment Plant
comprising Primary, Secondary and
Tertiary treatment. The treated effluent is
pumped to RO permeate will be
reuse/recycle. RO reject will be subject to
Multiple Effect Evaporator (MEE) to
achieve zero liquid discharge. As the
project is ZLD and there is no increase in
the effluent load to CETP.
2 No additional land shall be used /acquired
for any activity of the project without
obtaining proper Permission.
No additional land will be acquired for any
activity of the project without obtaining
proper Permission.
3 PP to take utmost precaution for the
health and safety of the people working in
the unit as also for protecting the
environment.
All the health & safety precautions are
being taken and proper training is given to
the workers.
4 Proper Housekeeping programmers shall
be implemented.
Housekeeping is being carried out on
regularly basis.
5 In the event of the failure of any pollution
control system adopted by the unit, the
unit shall be immediately put out of
operation and shall not be restarted until
the desired efficiency has been achieve.
Agreed and Noted.
6 A stack of adequate height based on DG
set capacity shall be provided for control
and dispersion of pollutant from DG set. (If
applicable).
Adequate stack height i.e. 3.5 m above the
enclosure is provided for control and
dispersion of pollutants from existing DG
set.
7 A detailed scheme for rainwater
harvesting shall be prepared and
implemented to recharge ground water.
Rain water harvesting system will provide
at site, Bore wells are not allowed as the
plot is in MIDC.
8 Arrangement shall be made that effluent
and storm water does not get mixed.
To avoid mixing of wastewater separate
storm water drains are provided.
9 Periodic monitoring of ground water shall
be undertaken and results analyzed to
ascertain any change in the quality of
water. Results shall be regularly submitted
to the Maharashtra Pollution Control
Periodic monitoring of ground water is not
applicable, as there is no permission from
MIDC for extracting of ground water.
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 3
Board.
10 Noise level shall be maintained as per
standards. For people working in the high
noise area, requisite personal protective
equipment like earplugs etc. shall be
provided.
Personal protective equipment (PPE) for
working people is being provided and this
has been regularly done.
Reports are attached as an Annexure- II.
11 The overall noise levels in and around the
plant are shall be kept well within the
standards by providing noise control
measures including acoustic hoods,
silencers, enclosures, etc. on all sources of
noise generation. The ambient noise levels
shall confirm to the standards prescribed
under Environment (Protection) Act, 1986
Rules, 1989.
Noise levels are kept under control by
carrying out (a) Acoustical enclosures (b)
periodical preventive maintenance of
equipment and machineries, (b) providing
vibration absorption pads, (c) providing
proper lubrications. (d) Some instruments
have its own canopy for mitigation of
noise.
A survey of Noise level in the study area is
being carried out once in a year to ensure
that the noise levels are within stipulated
standards prescribed under Environment
(Protection) Act, 1986 Rules, 1989.
Reports are attached as an Annexure- II.
12 Green belt shall be developed &
maintained around the plant periphery.
Green Belt Development shall be carried
out considering CPCB guidelines including
selection of plant species and in
consultation with the local DFO/
Agriculture Dept.
Total green belt area is 2178 sq. m, which
is 33% of total plot area; maintained
around the plant periphery. Plants are
selected as per CPCB guideline and
consultation with the local DFO/
Agriculture Department.
13 Adequate safety measures shall be
provided to limit the risk zone within the
plant boundary, in case of an accident.
Leak detection devices shall also be
installed at strategic places for early
detection and warning.
Risk Analysis, on-site Emergency plan is
prepared and will update regularly.
14 Occupational health surveillance of the
workers shall be done on a regular basis
and record maintained as per Factories
Act.
Occupational health surveillance program
will be taken as a regular exercise for all
The employees and their records are
maintained as per Factories act.
15 The company shall make the arrangement
for protection of possible fire hazards
during manufacturing process in material
handling.
Firefighting equipment will be provided
whenever needed. Personal Protective
Equipment is being used at the time of
material handling.
16 The project authorities must strictly Project proponents will comply with the
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 4
comply with the rules and regulations with
regard to handling and disposal of
hazardous wastes in accordance with the
Hazardous Waste (Management and
Handling) Rules, 2003 (amended).
Authorization from the MPCB shall be
obtained for collections/ treatment/
storage/ disposal of hazardous wastes.
rules and regulations with regard to
handling and disposal of hazardous wastes
in accordance with the Hazardous and
Other Waste (Management and
Transboundary movement) Rules, 2016.
Project proponent Will obtain the
Authorization from the MPCB for
collections/ treatment/ storage/ disposal
of hazardous wastes.
17 Regular mock drills for the on-site
emergency management plan shall be
carried out. Implementation of changes /
improvements required, if any, in the on-
site management plan shall be ensured.
Regular mock drills for the on-site
emergency management plan will be
carried out. Implementation of changes /
improvements in the on-site management
plan will be updated time to time.
18 A separate environment management cell
with qualified staff shall be set up for
implementation of the stipulated
environmental safeguards.
A separate Environmental Cell at project
level will be incorporated with qualified
personnel for implementation of the
stipulated environmental safe guards for
implementation of the stipulated
environmental safeguards.
19 Separate funds shall be allocated for
implementation of environmental
protection measures/EMP along with
item-wise breaks-up. These cost shall be
included as part of the project cost. The
funds earmarked for the environment
protection measures shall not be diverted
for other purposes and year-wise
expenditure should reported to the MPCB
& this department
Separate fund of Rs 19.26 Lacs/Annum is
allocated for implementation of
environmental protection measures/EMP
along with item-wise breaks-up. These
cost are included as part of the project
cost. The funds earmarked for the
environment protection measures will not
be diverted for other purposes and year-
wise expenditure will be report to the
MPCB & this department
20 The project management shall advertise at
least in two local newspapers widely
circulated in the region around the
project, one of which shall be in the
Marathi language of the local concerned
within seven days of issue of this letter,
informing that the project has been
accorded environmental clearance and
copies of clearance letter are available
with the Maharashtra Pollution Control
Board and may also be seen at Website at
http://ec.maharashtra.gov.in
Advertisement in local newspaper was
circulated in "Lokmat Times" in English
and “Apla Maharashtra” in Marathi
newspaper published on June 20th
2018
i.e., within seven days from date of issue
of EC.
The details are already submitted in 1st EC
Compliance Report.
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 5
21 Project management should submit half
yearly compliance reports in respect of the
stipulated prior environment clearance
terms and conditions in hard & soft copies
to the MPCB & this department, on 1st
June & 1st December of each calendar
year.
Project management will submit half
yearly compliance reports in respect of the
stipulated prior environment clearance
terms and conditions in hard & soft copies
to the MPCB & this department, on 1st
June & 1st December of each calendar
year.
22 A copy of the clearance letter shall be sent
by proponent to the concerned Municipal
Corporation and the local NGO, if any,
from whom suggestions/representations,
if any, were received while processing the
proposal. The clearance letter shall also be
put on the website of the Company by the
proponent.
EC letter will put on the website of the
Company.
23 The proponent shall upload the status of
compliance of the stipulated EC
conditions, including results of monitored
data on their website and shall update the
same periodically. It shall simultaneously
be sent to the Regional Office of MoEF,
the respective Zonal Office of CPCB and
the SPCB. The criteria pollutant levels
namely; SPM, RSPM. SO2, NOx (ambient
levels as well as stack emissions) or critical
sectorial parameters, indicated for the
project shall be monitored and displayed
at a convenient location near the main
gate of the company in the public domain.
● The proponent will upload the status of
compliance of the stipulated EC
conditions, including results of monitored
data on company website and shall update
the same periodically.
● The pollutant levels namely; SPM, RSPM.
SO2, NOx (ambient levels as well as stack
emissions) will monitor and displayed at
an entrance (the main gate) of the
company.
24 The project proponent shall also submit six
monthly reports on the status of
compliance of the stipulated EC conditions
including results of monitored data (both
in hard copies as well as by e-mail) to the
respective Regional Office of MoEF, the
respective Zonal Office of CPCB and the
SPCB.
This is 3rd
half yearly reports on the status
of compliance of the stipulated EC
conditions including results of monitored
data.
25 The environmental statement for each
financial year ending 31st March in Form-V
as is mandated to be submitted by the
project proponent to the concerned State
Pollution Control Board as prescribed
● The environmental statement for the
financial year ending 31st
March in Form-V
submitted by the project proponent to the
Maharashtra State Pollution Control Board
as prescribed under the Environment
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 6
under the Environment (Protection) Rules,
1986, as amended subsequently, shall also
be put on the website of the company
along with the status of compliance of EC
conditions and shall also be sent to the
respective Regional Offices of MoEF by e-
mail.
(Protection) Rules, 1986, as amended
subsequently.
● Environment Statement and status of
compliance of EC conditions will be put on
the Company website and sent to Regional
Office of MoEF by e-mail.
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 7
DATA SHEET
No.
1. Project type: River Valley / Mining /
Industry / Thermal / Nuclear / Others
(specify)
: Synthetic Organic Chemical
Name of Project: Proposed expansion project of
Manufacturing of Synthetic Organic Chemicals &
Allied Chemicals
2. Name of the Project : NANDKRISHNA CHEMICAL PRIVATE LIMITED
3. Clearance letter (s) / OM No. and date : SEIAA-EC-0000000362 Dated June 15, 2018
4. Location
a) District (s) : Dhule (Nardana, Sindkheda)
b) State (s) : Maharashtra
c) Location latitude / longitude : Latitude: 21° 6'42.85"N
Longitude:74°48'26.63"E
5. Address for Correspondence
a) Address of the Concerned
Project Chief Engineer (with Pin
code & Telephone / Telex / Fax
Numbers)
:
Mr. Ashish Kulkarni.
M/s NANDKRISHNA CHEMICALS PRIVATE LIMITED
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule
Pin :-- 425 404
Tel.: +91 2566 227 061
Fax: +91 2566 227 336
b) Address of the Concerned
Project Chief Engineer (with Pin
code & Telephone / Telex / Fax
Numbers)
6. Salient features
a) of the Project
:  It is Project Of Manufacturing Of Synthetic
Organic Chemicals & Allied Chemicals Total
Capacity Of Products 195.535 TPM
 Boiler capacity is 0.3 TPH x 1 no. quantity of
fuel 25 Kg/H
 Total water requirement for the integrated
project is 33.6 m3/day.
 The water source is MIDC
 Generation of ETP sludge and salts from
evaporator is about 349.72 TPA.
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 8
 Total effluent generation is about 17.5 m3/day
(Trade effluent = 16 m3/day and Domestic
effluent = 1.5 m3/day)
b) of the Environmental
Management Plans
Total EMP cost during operational phase
shall be Capital cost Rs. 105 lacs
recurring cost 19.26 lacs/Annum
Environment Management Plan Includes-
 Air pollution control in that provision of
stacks for heating units and scrubbers.
 Water pollution control include Effluent
treatment plant, RO Plant, Evaporator,
waste minimization of effluent recycle
 Noise pollution control include Acoustic
enclosure anti vibration pads
 Occupation health includes medical
checkup, health insurance policy, medical
staff charges, first aid facilities
consumables, in-house first aid room, other
infrastructure and equipment.
 Environmental Monitoring Plan.
 Green belt development (Plantation with
mostly indigenous plant species on an area
of about 2190 sq.m. which is 33% of total
plot area.)
 Hazardous Waste storage &
disposal(CHWTSDF at MIDC Ranjangaon)
7. Breakup of the Project Area
a) Submergence area: forest & non
forest
:
Nil
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 9
b) Others
Sr.No Item Area in sq. m
1
Area used for
manufacturing
810
2
Area used for storage
of raw
material/products
830
3
Area used for
utilities(Boiler,
Thermopack,
Chimneys, DG Sets,
Cooling Tower, ETP)
271
4
Administrative Building
(Including offices,
security, lab)
159
5 Internal Roads 1584
6
Area for Green belt
development (33% of
total area)
2190
7.
Area provided for
parking (12% of total
area)
756
Total 6600
8. Breakup of the project affected
population with the enumeration of
those losing Houses / Dwelling units
only, Agricultural Land & Landless
Laborers / Artisans:
a) SC, ST / Adivasi
:
As the land is in notified industrial area and
there is no project affected population.
b) Others :
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 10
(please indicate whether these figures
are based on any scientific and
systematic survey carried out or only
provisional figures, if a survey is carried
out give details & year of survey)
9
a)
Financial Details: Project cost as
originally planned and subsequent
revised estimates and the year of price
reference
:
Cost of Project 4.454 Cr.
b) Allocation made for environmental
management plans with item wise and
year wise breakup
: S.
No.
Particulars Capital
Cost
(Rs.
Lacs)
Recurring
cost (Rs.
Lacs/Annum)
1. Air pollution control
Provision of
Stacks for
heating
units
1.0 0.5
Scrubbers 4.0 1.0
2. Water Pollution control
Effluent
Treatment
Plant
35 2.0
RO Plant 25 1.0
Evaporator 30 1.0
Waste
minimization
of effluent
recycle
3.0 1.0
3. Noise Pollution control
Acoustic encl./
Ant vibration
1.0 1.0
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 11
pads
4. Occupational health
Medical
checkup
1.0 0.5
Health
insurance
policy
0.5 0.4
Medical staff
charges
- 0.4
First aid
facilities
consumables
1.0 1.0
In-house first
aid room
0.5 0.2
Other
infrastructure
and Equipment
1.0 0.5
5. Environmental
Monitoring
Plan
-- 6.96
6 Green belt 1.0 0.4
7 Hazardous
waste storage
& disposal
1.0 1.4
Total 105.0 19.26
c) Benefit cost ratio/Internal rate of
Return and the year of assessment
: Not calculated as company is not operating on its
full capacity.
d) Whether (c) includes the cost of
environmental management as shown
in the above
: Yes
e) Actual expenditure incurred on the : Rs. 514 Lacs
3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 12
project so far
f) Actual expenditure incurred on the
environmental management plans so
far
: ---
10 Forest Land Requirement
a) The status of approval for diversion of
forest land for non-forestry use
:
N.A
b) The status of clearing felling : N.A.
c) The status of compensatory
afforestation, if any Comments on the
viability & sustainability of
compensatory afforestation program in
the light of actual field experience so
far
:
N.A
11 The status of clear felling in non-forest
areas (such as submergence area or
reservoir, approach roads.), if any with
quantitative information required.
:
Nil
12 Status of construction (Actual&/or
planned)
Construction is completed
13 Reasons for the delay if the project is
yet to start
:
Not applicable
14 Dates of Site Visits
a) The dates on which the project was
monitored by the Regional Office on
previous occasions, if any
:
Nil
b) Date of site visits for this monitoring
report
:
Nil
ANNEXURE-1
Consent to Operate
ANNEXURE-II
Environmental Monitoring Report
Eoldl*nch Engineering Systems-' Frivate Limited
Report Ref. No. : GFL/AA/R119111-146
Analysis Report For Ambient Air Monitoring
ffiLffiFINEH'
One-stopEnvironmentalSolution'
[Formerly Waste Encare lndia Pvt' Ltd']
C (Wagle Estate)
546 / 9920093829
/ Website : www.goldfinchengg'com
Remark- ND= Not Detected
For Goldfinch Engineering Systems Private Limited
Analyzed BY Verified BY
QF/LA/10-A
Report Date: 07 .12'2019
Approved BY
.(,
A{r-,.u''
Director-Lab/Govt. AnalYst
Page 1 of 1
l).t eu*'t-
Govt. AnalYst
wLab-ln-charge
hD u eanaradhaNhemicalsGshnadNan kri
Name of the Ambient
29.11.2019)lin(Date of Sam
LaboratorY
Sam le DescriPtion :
Sample Collected bY:
is ComPleted :
Date of
02.12.2019Date of ReceiPt of SamPle :
07.12.2019
03.12.2019is Started :
Date of Anal
lest MethodUnitsLimitsGFL/AA/1 46-11911Code No.Sam
Near Main Gate
Location
10.06.2019Date/Duration &700620 R15S ):part-2382(
e-lVolumNAAOSLrg/m310061 .13PM 10
CPCB NAAQS Vol ume-l
6023.78PM 2,5 7ed-201rmReaffi00282S
q o'(part
umeVolNAAQSPCBCl-rg/m3BO26.66SO2 conc. 17
5S 1
aumVolBO41.74NOx conc.
CPCE] NAAQS Volunte I
[-rg/m30'1NDLead me-lVoluSBC NAAQPCglm40035.27Ammonia 4201ed-rmReaf{i.-1 9991S 5 0)82(part04NDCarbon Monoxide Volume I
CPCB NAAQS
nglm06NDArsenic Volume I
CPCB NAAQS
n20NDNickel 4d-20Reaffirme971 4oI B2( (part-0180NDOzone CBPC4 &01artoa1 Pi 2)IS
evolumNAAQSppm05NDBenzene BPCC41 &rmed-202I ReaffiPartS 15 82
olu mVONAAQSng/m301<0.1
Benzo(a)PYrene
SamPling carried out'j':'lg
GOLDFINCH/INST-AD S/41
Calibrated on :09.08.2019
Due on : 08.08.2020
ADS
GOLDFINCH/INST-HVS/37
Calibrated on : 08.06.2019
Due on : 07.06.2020
HVSout usingSampling carried
PAN No.
UAN NO
AAACW1593P
tvIH33B0010167
PF No.
ESIC No.
MH/rHA/37337
34-00-009299-000-0908GSTIN : 27AAACW1 593PlZP
,ch Engineering Systems" Private Limited
i_-;i::,:r'-:i lTM
,. -. ,, --. ,. ,.. :, rr
: :- : .:
-l accredited EIA consultant, lS0 S001:2015 Certified Company
,ry Gazetted by MoEF & Certified by OHSAS 18001-2007
One-stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
c.A-288,RoadNo. 16Z,0pp AgrcitLrr:0-ce3L,s-stop,Thanelndustrial Area,MlDC(WagleEstate)
e (West) - 400 604. lVlaharashtra, Ind a r Te 91 322 lAU 5554 / 2580 1529 I 1521 I 1546i 9920093829
ail :mktg@goldfinchengg.com,accountslgcdf nchengg.com, lab@goldfinchengg.com / Website:www.goldfinchengg.com
Report Ref. No.: GFL/AS/R/19111-147 Report Date: 07.12.2019
Analysis Report for Stack Emission Monitoring
Sampling carried out using
Stack Monitoring Kit
lD No. GOLDFINCH/INST-STACI(50
Calibrated on -24.10.2019
Calibrated due -23.1 0.2020
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
[].o*.*-
w
QF/LA/10.8
Di rector-Lab/Govt. Analyst
Page I of I
Govt. Analyst Lab-ln-charge
Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Stack
Date of Receipt of Sample : 02.12.2019 Sample Gollected by : Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed: 07.12.2019
Sample Code No. GFL/AS/19t1't-147 Limits Units Test Method
Stack Attached To Boiler stack
lS 1 1255 (Part 3):2018
Stack Diameter 0.25 meter
Stack Height 15 meter
Fuel used & Consumption LDOt25 Kg/Hr
Velocity of flue gases 5.57 mls
Temperature of flue Gases 142 oc
Flow/volume of flue Gases 983.6 m3/Hr
Particulate Matter 100.0 150 mg/Nm3
lS 1'1255 (Part l).1985
Reaffirmed - 2014
Sulphur Di Oxide Gontent 0.94 7.20 Kg/Day
lS-11255 ( Part 2)
1985,Reaff umed-2014
PAN No,
UAN No
AAACWl593P
MH33B001 01 67
GSTIN : 27AAACW1 593P1ZP
PF No.
ESIC No.
MHT-HA/37337
34-00-009299-000-0908
!!
,rch Engineering Systems'" Frivate Limited
:T accredited EIA consultant, IS0 9001 :2015 Certified Company
rry Gazetted by IVIoEF I Certified by 0HSAS 18001-2007
'. .....'.... '. ,,,.TM
.:
One-stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
,ro. A - 288, Road No. 16 Z, Opp. Agriculture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate)
ne (West) - 400 604. Maharashtra. lndia. o Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 /ogZOOgegZS
,tail : mktg@goldfinchengg.com, accounts@goldfinchengg.com. lab@goldfinchengg.com / Website : www.goldfinchengg.com
QF/LA/I0.C
Report Date: 07.12.2019Report Ref. No. : GFL/AN/R/19111-149
Analysis Report for Ambient Noise Level Survey
Survey carried out using dB meter
Sr. No. GOLDFINCH/INST-DB METERY32
Calibrated On: 23.10.2019
Calibration due: 22.10.2020
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
Vd-r,-,
w R,ip
Govt. Analyst Lab-ln-charge Di rector-La b/Govt. Ana lyst
Page I of I
Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Noise
Date of Receipt of Sample : 02.12.2019 Sample Collected by: Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019
Sample Gode No"- GFL/AN/19/11-149 Ambient Noise Level Test Method
Sr. No Location Day dB Night dB
rs 9989-1981
Reaffirmed 2014
1 Near Main Gate 57.9 50.9
2 Outside Manufacturing Area 64.9 60.9
M.P.C.B. Limit 75 70
PAN No.
UAN No
AAACW1593P
IVIH3380010167
GSTIN : 27AAACW1 593PIZP PF No.
ESIC No.
MH/iHA/37337
34-00-009299-000-0908
,rch Engineering Systems" Private Limited
TM
iT accredited EIA consultant, lS0 9001:2015 Certified Company
.ory Gazetted by lVloEF & Certified by 0HSAS 18001 2007
One -stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
,rlo. A - 288, Road No. 16 Z, Opp. Agricuiture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate)
,ne (West) - 400 604. [Vlaharashtra, India. r Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 / 9920093829
,nail : mktg@goldfinchengg.com, accounts@goldfinchengg.com, Iab@goldfinchengg.com / Website : www.goldfinchengg.com
QF/LA/I0-D
Report Ref. No. : GFUAWIN19[11-148 Report Date: 07.12.2019
ANALYSIS REPORT FOR WORK PLAGE MONITORING
Remark:- ND =Not Detected
Sampling Carried out using
Handy Sampler Monitoring Kit
lD No. GOLDFINCH/INSTR-HD Sampler/52
Calibrated on - 24.10.2019
Calibration due - 22.10.2020
*{cutt*,n-
Govt. Analyst
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
w h;O
Lab-ln-charge D irector-Lab/Govt. An alyst
Name of the Industry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Workplace
Date of Receipt of Sample : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019
Sample Code No. Location Parameter Result Limit Unit Test Method
GFL/AW19t11-148
Acid Storage
Area
Hydrochloric
Acid
1.09 8.0 mg/rm
3
EPA OO51
Page 1 of 1
PAN No.
iUAN No.
AAACW1593P
MH338001 01 67
One-stoP Environmental S oluti o n
[FormerlY Waste Encare lndia Pvt. Ltd.l
QF/LA/o9
Report Ref. No.: GFLIW'R/I9111'283
RePort Date: 09.1 2'201 9
AnalYsis RePort
For G Engineering SYstem s Private Limited
Approved BY
AnalYzed BY
Verified BY
[t<u.ot fu,,@" $r,r.Q
E{31*l' INUH
D i rector-Lab/G ovt'AnalYst
Page 1 of 2
Govt AnalYst
Lab-lncharge
ehuDaardanNL mited,rivatePicalsChemnahndkrisNaM/s.
Name of the Industry :
MIDC Water SamPle
SamPle DescriPtion:30.11.2019
Date of SamPling :
2 Liters
Sample Volume :
30.11.2019eSamof pReceilofDate pt
dCollecte bySamPle02.12.2019taS rtedsof AnalYsDate Cans
Sample Container:09.12.2019is ComDate of Ana d
Test Method Used
irement(Acc
eptable Limit) as
per lS 10500:2012
Requ
GFL/WI9r11-283
MIDC Water
SamPle
UnitParametersSr.
No.
APHA-4 500 H+ B
(23rd Edition)6.5-8.57.75
pH1
APHA 2550 B (23rd
Edition)N.S.25.4oc
TemPerature2. npHn ztgo B (23rd
Edition)Max 1
0.10NTU
TurbiditY3 B (23rdAPHA 2510
Edition)N.S.460ps/cm
ConductivitY4
APHA 5OB A (1
Edition)N.S.<4mg/l
ChemicalOxYgen Demand5 ts 3025 (p-
44):199 RA- 2003)N.S.<2mg/lBio Oxygenlogical
270C )@daysDemand (36. C (23rdAPHA 2540
EditionMax 500228mg/l
Total Dissolved Solids7 APHA +soo ct-g
rdMax 25020mg/l
Chloride as Cl8. C (23rdAPHA 2340
Max 200124mg/l
Total Hardness as CaCOsI (23rdAPHA 2320 B
Max 200121mg/l
Total Alkalinity as CaCOa10.
PF No.
ESIC No.
MH/THA/37337
34-00-009299-000-0!GSTIN : 27AAACW1 s93P1 ZP
PAN No. : AAACW1593P
uArl ru0. : MH33B0010167
Email
.,dfinrh Engineering systems"Frivate Limited
.dI-NABET accredited EIA consultant. lS0 900,,:2015 Certified Company
Laboratory Gazetred by MoEF I Certified Uv OfriAi iao 01_ZOo:
Office Bus-stop, Thane lndustrial
.:91-022-2081 S5S4 I Z5B0 j12g
ffiffiilffiFlNIH"
One-stop Environmentat Sotution...
[Formerly Waste Encare lndia pr,,t. Ltd.]
oldfinchengg.com
culture
ia. r Tel
Area, Ml
/ 1521 /
ldfinchengg.com
DC (Wagle Estate)
1 s46 / 9920093829
/ Website : www.glab@go
Report Ref. No.: GFL/WR/19 t11-2l3,
QF/LA/o9
Report Date: 09.12.201 9
Analysis Report
For Goldfinch Engineering Systems private Limited
Analyzed By Vep;.fied BV
Wcettrctz_ f[^rhr_
Govt Analyst t;;;;
Approved By
I1';t
D irector-Lab/G ovt.Anatyst
Page 2 of 2
Name of the lndustry : Nandkrishna chemicars private Limited,Nardana Dhure
M/s.
Date of Sampling : 30.11.2019 Sample Description : MIDC Water Sample
Date of Receipt of Sample: 30.11 .2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by: Laboratory
Date of Analysis Compteted : 09.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLttNl19l11-283
MIDC Water
Sample
I
Requirement
(Acceptable
Limit) as per
lS 10500:2012
Test Method Used
Sulphate as SOa mg/l 14.8 Max 200
AP HA 4500 C (23 rd
Edition
12. Nitrate as NO3 mg/l <0.5 Max 45
APHA 4500 NO3-B (23rd Edition)
& CPCB
13. Total Phosphorus mg/l <0.2 N.S. APHA 4500 P.C. (23rd Edition)
14 Fluoride mg/l 0.60 Max 1.0 APHA 4500 F D (23rd Edition)
15. Sodium as Na mg/l 23.10 N.S. APHA 3500 Na B (23rd Edition)
16 Potassium as K mg/l 1.07 N.S APHA 3500 K B (23rd Edition)
17 TotalChromium as Cr mg/l <0.05 Max 0.05 APHA 3112 B (23rd Edition)
1B Zinc asZn mg/l 0.058 Max 5 APHA 3111 B (23rd Edition)
PAN
UAN
No. : AAACW1593p
No. : MH33B00t0t67 GSTIN : 27AAACW1 S93plZp PF No.
ESIC No
MH/THN31337
34-00-009299-000-0908
11.
.,dfinch Engineering Systems'. Private Limited ffiffituffiFlNEl{'
One-stop Environmental Solution .
[Formerly Waste Encare lndia Prrt. Ltd.].,-:I-NABET accredtted EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by MoEF & Certified by 0HSAS 18001-2007
Report Ref. No. : GFLMI/R/19111'283
dfinchengg.com
QF/LA/o9
Report Date: 04.12.2019
Approved BY
Director-Lab/Govt.AnalYst
Page 1 of 1
Analysis RePort
For Gotdfinch Engineering Systems Private Limited
Analyzed By Verified By
ft<cu,ez
Govt Analyst Lab-lncharge
M/s. Nandkrishna chemicats Private Limited, Nardana Dhule
Name of the lndustry
MIDC Water SamPleSample DescriPtion30.11.2019Date of SamPling
125 mlSample Volume30.1 1 .2019Date of Receipt of SamPle
LaboratorySample Collected bY02.12.2019Date of AnalYsis Started
Polythene bottle (Sterlized)Sample Container04.12.2019Date of AnalYsis GomPleted
Parameters Unit
Result
Requirement
Limit as per lS
10500:2012
Test MethodGFL/W19/11-283
MIDC Water SamPIe
TotalColiforms MPN/100m1
Absent
(.2)
Absent
MPN
lS-1622:1981
E.coli MPN/100m1 Absent Absent
MPN
lS-1622:1981
GSTIN : 27AAACW1 593P1ZPPAN No. : AAACW1593P
UAN No. : MH33B0010167
PF No.
ESIC No
MHn-HA/37s37
34-00-009299-000-0908
FA;I)
,rdfinch Engineering Systerns'" Private Limited
,CI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by MoEF I Certified by 0HSAS 18001-2007
Plot No. A - 288, Road No. I 6 Z, Opp. Agriculture 0ffice Bus-stop,
Thane (West) - 400 604, Maharashtra. India. o Tel.: 91-OZZ-2091' s
ffiffiilffiFINf,H,,
One-stop Environmental Solution...
[Formerly Waste Encare lndia Pvt. Ltd.]
Thane lndustrial Area, MIDC (Wagle Estate)
1/1546/9920093829554 / 2580 1529 / 152
Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www.
Report Ref. No.: GFL/WR/19111-284 Report Date: 07 .12.2019
Analysis Report
Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule
Date of Sampling : 30.11.2019 Sample Description : Effluent Sample
Date of Receipt of Sample : 30.1 1 .2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Completed: 07.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLMl19t',t1-284
ETP lnlet
Limit as per
MPCB
Consent
Test Method Used
1 pH 7.84
APHA-4500 H+ B (23rd
Edition)
2
Biological Oxygen Demand
(3 days @27'C)
mg/l 1 089
lS 3025 (p- aa):1993(RA-
2003)
3 ChemicalOxygen Demand mg/l 4B3B APHA 508 A 1tsth edition;
4 Total Dissolved Solids mg/l 14100 APHA 2540 C (23rd Edition)
5 TotalSuspended Solids mg/l 360
APHA 2540 D (23rd Edition)
b Oil & Grease mg/l 10 lS 3025 part 39
For Goldfinch Engineering Systems Private Limited
Analyzed By By
Ltks-ilt 6.L.
Govt Analyst Lab-lncharge
Approved By
5:ilP
Di rector-La b/Govt.Ana lyst
Page 1 of 1
PAN No. : AAACWl593P
UAN No. : MH33B0010167 GSTIN : 2TAAACWI 593PlZP PF No.
ESIC No,
MH[HA/37337
34-00-009299,000-0908
rdfinch Engineering $ystems" Private Limited ffiffitffiFlNIH"
ICI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by IVoEF & Certified by 0HSAS I8001-2007
One-stop Environmental Sotution...
[Formerly Waste Encare lndia Pvt. Ltd.]
Plot No. A - 288, Road No. 16 Z. Opp. Agriculture 0ffice Bus-stop, Thane lndustrial Area, MIDC (Wagle Estate)
Thane (West) - 400 604. Maharashtra, lndia. o Tel.: 91-022-2081 5554 / 2580 1529 I 1521 / 1546 / 9920093829
Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www.goldfinchengg.com
Report Ref. No.: GFL/WR/19111-285
QF/LA/o9
Report Date: 07.12.201 9
Analysis Report
Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule
Date of Sampling : 30.11.2019 Sample Description : Effluent Sample
Date of Receipt of Sample : 30.11.2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Gompleted : 07.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLMt19l1',l-285
ETP Outlet
Limit as per
MPCB
Consent
Test Method Used
1 pH 7.32
APHA-4500 H+ B (23rd
Edition)
2
Biological Oxygen Demand
(3 days @27"C)
mg/l 50
lS 3025 (p- aa):1993(RA-
2003)
3 ChemicalOxygen Demand mg/l 185 APHA 5OB A 11sth Editionl
4 Total Dissolved Solids mg/l 106 APHA 2540 C (23rd Edition)
TotalSuspended Solids mg/l 14
APHA 2540 D (23rd Edition)
6 Oil & Grease mg/l <1 lS 3025 part 39
For Goldfinch Engineering Systems Private Limited
Analyzed By
(r;'{<eut aul
Govt Analyst
Verified By
Lab-lncharge
Approved By
F$s
D i rector-Lab/G ovt.Analyst
Page 1 of 1
PAN No. : AAACWl593P
UAN No. : MH33B0010167
GSTIN : 27AAACW1 593P1ZP
PF No. : MH/|-HA/37337
ESIC No. : 34-00-00929S-000-0908
5
Industrial Chemicals By Nandkrishna Chemicals Private Limited

More Related Content

More from IndiaMART InterMESH Limited

Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...
Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...
Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...IndiaMART InterMESH Limited
 
Projectors & Projector Accessories By Egate Infotel Private Limited
Projectors & Projector Accessories By Egate Infotel Private Limited Projectors & Projector Accessories By Egate Infotel Private Limited
Projectors & Projector Accessories By Egate Infotel Private Limited IndiaMART InterMESH Limited
 
LABORATORY & SCIENTIFIC PRODUCTS By Classic Scientific
LABORATORY & SCIENTIFIC PRODUCTS By Classic ScientificLABORATORY & SCIENTIFIC PRODUCTS By Classic Scientific
LABORATORY & SCIENTIFIC PRODUCTS By Classic ScientificIndiaMART InterMESH Limited
 

More from IndiaMART InterMESH Limited (20)

Home Furnishing Products By Kent International
Home Furnishing Products By Kent InternationalHome Furnishing Products By Kent International
Home Furnishing Products By Kent International
 
Home Furnishing Products By Kent International
Home Furnishing Products  By Kent InternationalHome Furnishing Products  By Kent International
Home Furnishing Products By Kent International
 
3A Exports
3A Exports3A Exports
3A Exports
 
Bhavani Engineering Works
Bhavani Engineering WorksBhavani Engineering Works
Bhavani Engineering Works
 
Jash Precision Tools Private Limited
Jash Precision Tools Private LimitedJash Precision Tools Private Limited
Jash Precision Tools Private Limited
 
3A Exports
3A Exports3A Exports
3A Exports
 
Coconut Processing Machines
Coconut Processing MachinesCoconut Processing Machines
Coconut Processing Machines
 
Reflectosafe
ReflectosafeReflectosafe
Reflectosafe
 
A.G.Industries
A.G.IndustriesA.G.Industries
A.G.Industries
 
Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...
Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...
Files, Folder, Executive Notebook & Dairies by Worldone Brand Of Arora Gifts ...
 
Weavetech Engineers Limited
Weavetech Engineers LimitedWeavetech Engineers Limited
Weavetech Engineers Limited
 
Industrial Fasteners
Industrial FastenersIndustrial Fasteners
Industrial Fasteners
 
Industrial Fasteners
Industrial FastenersIndustrial Fasteners
Industrial Fasteners
 
Food Processing Machinery And Equipment
Food Processing Machinery And EquipmentFood Processing Machinery And Equipment
Food Processing Machinery And Equipment
 
MEGATECH INTERNATIONAL PRIVATE LIMITED
 MEGATECH INTERNATIONAL PRIVATE LIMITED MEGATECH INTERNATIONAL PRIVATE LIMITED
MEGATECH INTERNATIONAL PRIVATE LIMITED
 
Projectors & Projector Accessories By Egate Infotel Private Limited
Projectors & Projector Accessories By Egate Infotel Private Limited Projectors & Projector Accessories By Egate Infotel Private Limited
Projectors & Projector Accessories By Egate Infotel Private Limited
 
Powder Coating Plant And Liquid Paint Booth
Powder Coating Plant And Liquid Paint BoothPowder Coating Plant And Liquid Paint Booth
Powder Coating Plant And Liquid Paint Booth
 
MEGATECH INTERNATIONAL PRIVATE LIMITED
MEGATECH INTERNATIONAL PRIVATE LIMITEDMEGATECH INTERNATIONAL PRIVATE LIMITED
MEGATECH INTERNATIONAL PRIVATE LIMITED
 
Chemical Gases By Abhijit Enterprises
Chemical Gases By Abhijit EnterprisesChemical Gases By Abhijit Enterprises
Chemical Gases By Abhijit Enterprises
 
LABORATORY & SCIENTIFIC PRODUCTS By Classic Scientific
LABORATORY & SCIENTIFIC PRODUCTS By Classic ScientificLABORATORY & SCIENTIFIC PRODUCTS By Classic Scientific
LABORATORY & SCIENTIFIC PRODUCTS By Classic Scientific
 

Recently uploaded

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Recently uploaded (20)

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

Industrial Chemicals By Nandkrishna Chemicals Private Limited

  • 1.
  • 2. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 1 1. Present Status of Project: 1. This is the project of Manufacturing of Synthetic Organic Chemicals & Allied Chemicals. 2. We have received the consent to operate for Expansion on 04.02.2019 and it is attached as Annexure-I 3. Now the project is not operating on its full capacity because we have applied for the change in product mix. 4. Environment monitoring is carried out at project site and Reports are attached as Annexure-II
  • 3. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 2 2. Point by Point comment on Environment Clearance letter Point by Point comment on Environment Clearance letter General conditions 1 PP to achieve Zero Liquid Discharge; PP shall ensure that there is no increase in the effluent load to CETP. The Project Proponent is having existing full-fledged Effluent Treatment Plant comprising Primary, Secondary and Tertiary treatment. The treated effluent is pumped to RO permeate will be reuse/recycle. RO reject will be subject to Multiple Effect Evaporator (MEE) to achieve zero liquid discharge. As the project is ZLD and there is no increase in the effluent load to CETP. 2 No additional land shall be used /acquired for any activity of the project without obtaining proper Permission. No additional land will be acquired for any activity of the project without obtaining proper Permission. 3 PP to take utmost precaution for the health and safety of the people working in the unit as also for protecting the environment. All the health & safety precautions are being taken and proper training is given to the workers. 4 Proper Housekeeping programmers shall be implemented. Housekeeping is being carried out on regularly basis. 5 In the event of the failure of any pollution control system adopted by the unit, the unit shall be immediately put out of operation and shall not be restarted until the desired efficiency has been achieve. Agreed and Noted. 6 A stack of adequate height based on DG set capacity shall be provided for control and dispersion of pollutant from DG set. (If applicable). Adequate stack height i.e. 3.5 m above the enclosure is provided for control and dispersion of pollutants from existing DG set. 7 A detailed scheme for rainwater harvesting shall be prepared and implemented to recharge ground water. Rain water harvesting system will provide at site, Bore wells are not allowed as the plot is in MIDC. 8 Arrangement shall be made that effluent and storm water does not get mixed. To avoid mixing of wastewater separate storm water drains are provided. 9 Periodic monitoring of ground water shall be undertaken and results analyzed to ascertain any change in the quality of water. Results shall be regularly submitted to the Maharashtra Pollution Control Periodic monitoring of ground water is not applicable, as there is no permission from MIDC for extracting of ground water.
  • 4. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 3 Board. 10 Noise level shall be maintained as per standards. For people working in the high noise area, requisite personal protective equipment like earplugs etc. shall be provided. Personal protective equipment (PPE) for working people is being provided and this has been regularly done. Reports are attached as an Annexure- II. 11 The overall noise levels in and around the plant are shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosures, etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989. Noise levels are kept under control by carrying out (a) Acoustical enclosures (b) periodical preventive maintenance of equipment and machineries, (b) providing vibration absorption pads, (c) providing proper lubrications. (d) Some instruments have its own canopy for mitigation of noise. A survey of Noise level in the study area is being carried out once in a year to ensure that the noise levels are within stipulated standards prescribed under Environment (Protection) Act, 1986 Rules, 1989. Reports are attached as an Annexure- II. 12 Green belt shall be developed & maintained around the plant periphery. Green Belt Development shall be carried out considering CPCB guidelines including selection of plant species and in consultation with the local DFO/ Agriculture Dept. Total green belt area is 2178 sq. m, which is 33% of total plot area; maintained around the plant periphery. Plants are selected as per CPCB guideline and consultation with the local DFO/ Agriculture Department. 13 Adequate safety measures shall be provided to limit the risk zone within the plant boundary, in case of an accident. Leak detection devices shall also be installed at strategic places for early detection and warning. Risk Analysis, on-site Emergency plan is prepared and will update regularly. 14 Occupational health surveillance of the workers shall be done on a regular basis and record maintained as per Factories Act. Occupational health surveillance program will be taken as a regular exercise for all The employees and their records are maintained as per Factories act. 15 The company shall make the arrangement for protection of possible fire hazards during manufacturing process in material handling. Firefighting equipment will be provided whenever needed. Personal Protective Equipment is being used at the time of material handling. 16 The project authorities must strictly Project proponents will comply with the
  • 5. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 4 comply with the rules and regulations with regard to handling and disposal of hazardous wastes in accordance with the Hazardous Waste (Management and Handling) Rules, 2003 (amended). Authorization from the MPCB shall be obtained for collections/ treatment/ storage/ disposal of hazardous wastes. rules and regulations with regard to handling and disposal of hazardous wastes in accordance with the Hazardous and Other Waste (Management and Transboundary movement) Rules, 2016. Project proponent Will obtain the Authorization from the MPCB for collections/ treatment/ storage/ disposal of hazardous wastes. 17 Regular mock drills for the on-site emergency management plan shall be carried out. Implementation of changes / improvements required, if any, in the on- site management plan shall be ensured. Regular mock drills for the on-site emergency management plan will be carried out. Implementation of changes / improvements in the on-site management plan will be updated time to time. 18 A separate environment management cell with qualified staff shall be set up for implementation of the stipulated environmental safeguards. A separate Environmental Cell at project level will be incorporated with qualified personnel for implementation of the stipulated environmental safe guards for implementation of the stipulated environmental safeguards. 19 Separate funds shall be allocated for implementation of environmental protection measures/EMP along with item-wise breaks-up. These cost shall be included as part of the project cost. The funds earmarked for the environment protection measures shall not be diverted for other purposes and year-wise expenditure should reported to the MPCB & this department Separate fund of Rs 19.26 Lacs/Annum is allocated for implementation of environmental protection measures/EMP along with item-wise breaks-up. These cost are included as part of the project cost. The funds earmarked for the environment protection measures will not be diverted for other purposes and year- wise expenditure will be report to the MPCB & this department 20 The project management shall advertise at least in two local newspapers widely circulated in the region around the project, one of which shall be in the Marathi language of the local concerned within seven days of issue of this letter, informing that the project has been accorded environmental clearance and copies of clearance letter are available with the Maharashtra Pollution Control Board and may also be seen at Website at http://ec.maharashtra.gov.in Advertisement in local newspaper was circulated in "Lokmat Times" in English and “Apla Maharashtra” in Marathi newspaper published on June 20th 2018 i.e., within seven days from date of issue of EC. The details are already submitted in 1st EC Compliance Report.
  • 6. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 5 21 Project management should submit half yearly compliance reports in respect of the stipulated prior environment clearance terms and conditions in hard & soft copies to the MPCB & this department, on 1st June & 1st December of each calendar year. Project management will submit half yearly compliance reports in respect of the stipulated prior environment clearance terms and conditions in hard & soft copies to the MPCB & this department, on 1st June & 1st December of each calendar year. 22 A copy of the clearance letter shall be sent by proponent to the concerned Municipal Corporation and the local NGO, if any, from whom suggestions/representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent. EC letter will put on the website of the Company. 23 The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; SPM, RSPM. SO2, NOx (ambient levels as well as stack emissions) or critical sectorial parameters, indicated for the project shall be monitored and displayed at a convenient location near the main gate of the company in the public domain. ● The proponent will upload the status of compliance of the stipulated EC conditions, including results of monitored data on company website and shall update the same periodically. ● The pollutant levels namely; SPM, RSPM. SO2, NOx (ambient levels as well as stack emissions) will monitor and displayed at an entrance (the main gate) of the company. 24 The project proponent shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by e-mail) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. This is 3rd half yearly reports on the status of compliance of the stipulated EC conditions including results of monitored data. 25 The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed ● The environmental statement for the financial year ending 31st March in Form-V submitted by the project proponent to the Maharashtra State Pollution Control Board as prescribed under the Environment
  • 7. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 6 under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of EC conditions and shall also be sent to the respective Regional Offices of MoEF by e- mail. (Protection) Rules, 1986, as amended subsequently. ● Environment Statement and status of compliance of EC conditions will be put on the Company website and sent to Regional Office of MoEF by e-mail.
  • 8. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 7 DATA SHEET No. 1. Project type: River Valley / Mining / Industry / Thermal / Nuclear / Others (specify) : Synthetic Organic Chemical Name of Project: Proposed expansion project of Manufacturing of Synthetic Organic Chemicals & Allied Chemicals 2. Name of the Project : NANDKRISHNA CHEMICAL PRIVATE LIMITED 3. Clearance letter (s) / OM No. and date : SEIAA-EC-0000000362 Dated June 15, 2018 4. Location a) District (s) : Dhule (Nardana, Sindkheda) b) State (s) : Maharashtra c) Location latitude / longitude : Latitude: 21° 6'42.85"N Longitude:74°48'26.63"E 5. Address for Correspondence a) Address of the Concerned Project Chief Engineer (with Pin code & Telephone / Telex / Fax Numbers) : Mr. Ashish Kulkarni. M/s NANDKRISHNA CHEMICALS PRIVATE LIMITED Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule Pin :-- 425 404 Tel.: +91 2566 227 061 Fax: +91 2566 227 336 b) Address of the Concerned Project Chief Engineer (with Pin code & Telephone / Telex / Fax Numbers) 6. Salient features a) of the Project :  It is Project Of Manufacturing Of Synthetic Organic Chemicals & Allied Chemicals Total Capacity Of Products 195.535 TPM  Boiler capacity is 0.3 TPH x 1 no. quantity of fuel 25 Kg/H  Total water requirement for the integrated project is 33.6 m3/day.  The water source is MIDC  Generation of ETP sludge and salts from evaporator is about 349.72 TPA.
  • 9. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 8  Total effluent generation is about 17.5 m3/day (Trade effluent = 16 m3/day and Domestic effluent = 1.5 m3/day) b) of the Environmental Management Plans Total EMP cost during operational phase shall be Capital cost Rs. 105 lacs recurring cost 19.26 lacs/Annum Environment Management Plan Includes-  Air pollution control in that provision of stacks for heating units and scrubbers.  Water pollution control include Effluent treatment plant, RO Plant, Evaporator, waste minimization of effluent recycle  Noise pollution control include Acoustic enclosure anti vibration pads  Occupation health includes medical checkup, health insurance policy, medical staff charges, first aid facilities consumables, in-house first aid room, other infrastructure and equipment.  Environmental Monitoring Plan.  Green belt development (Plantation with mostly indigenous plant species on an area of about 2190 sq.m. which is 33% of total plot area.)  Hazardous Waste storage & disposal(CHWTSDF at MIDC Ranjangaon) 7. Breakup of the Project Area a) Submergence area: forest & non forest : Nil
  • 10. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 9 b) Others Sr.No Item Area in sq. m 1 Area used for manufacturing 810 2 Area used for storage of raw material/products 830 3 Area used for utilities(Boiler, Thermopack, Chimneys, DG Sets, Cooling Tower, ETP) 271 4 Administrative Building (Including offices, security, lab) 159 5 Internal Roads 1584 6 Area for Green belt development (33% of total area) 2190 7. Area provided for parking (12% of total area) 756 Total 6600 8. Breakup of the project affected population with the enumeration of those losing Houses / Dwelling units only, Agricultural Land & Landless Laborers / Artisans: a) SC, ST / Adivasi : As the land is in notified industrial area and there is no project affected population. b) Others :
  • 11. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 10 (please indicate whether these figures are based on any scientific and systematic survey carried out or only provisional figures, if a survey is carried out give details & year of survey) 9 a) Financial Details: Project cost as originally planned and subsequent revised estimates and the year of price reference : Cost of Project 4.454 Cr. b) Allocation made for environmental management plans with item wise and year wise breakup : S. No. Particulars Capital Cost (Rs. Lacs) Recurring cost (Rs. Lacs/Annum) 1. Air pollution control Provision of Stacks for heating units 1.0 0.5 Scrubbers 4.0 1.0 2. Water Pollution control Effluent Treatment Plant 35 2.0 RO Plant 25 1.0 Evaporator 30 1.0 Waste minimization of effluent recycle 3.0 1.0 3. Noise Pollution control Acoustic encl./ Ant vibration 1.0 1.0
  • 12. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 11 pads 4. Occupational health Medical checkup 1.0 0.5 Health insurance policy 0.5 0.4 Medical staff charges - 0.4 First aid facilities consumables 1.0 1.0 In-house first aid room 0.5 0.2 Other infrastructure and Equipment 1.0 0.5 5. Environmental Monitoring Plan -- 6.96 6 Green belt 1.0 0.4 7 Hazardous waste storage & disposal 1.0 1.4 Total 105.0 19.26 c) Benefit cost ratio/Internal rate of Return and the year of assessment : Not calculated as company is not operating on its full capacity. d) Whether (c) includes the cost of environmental management as shown in the above : Yes e) Actual expenditure incurred on the : Rs. 514 Lacs
  • 13. 3 rd half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 12 project so far f) Actual expenditure incurred on the environmental management plans so far : --- 10 Forest Land Requirement a) The status of approval for diversion of forest land for non-forestry use : N.A b) The status of clearing felling : N.A. c) The status of compensatory afforestation, if any Comments on the viability & sustainability of compensatory afforestation program in the light of actual field experience so far : N.A 11 The status of clear felling in non-forest areas (such as submergence area or reservoir, approach roads.), if any with quantitative information required. : Nil 12 Status of construction (Actual&/or planned) Construction is completed 13 Reasons for the delay if the project is yet to start : Not applicable 14 Dates of Site Visits a) The dates on which the project was monitored by the Regional Office on previous occasions, if any : Nil b) Date of site visits for this monitoring report : Nil
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 24. Eoldl*nch Engineering Systems-' Frivate Limited Report Ref. No. : GFL/AA/R119111-146 Analysis Report For Ambient Air Monitoring ffiLffiFINEH' One-stopEnvironmentalSolution' [Formerly Waste Encare lndia Pvt' Ltd'] C (Wagle Estate) 546 / 9920093829 / Website : www.goldfinchengg'com Remark- ND= Not Detected For Goldfinch Engineering Systems Private Limited Analyzed BY Verified BY QF/LA/10-A Report Date: 07 .12'2019 Approved BY .(, A{r-,.u'' Director-Lab/Govt. AnalYst Page 1 of 1 l).t eu*'t- Govt. AnalYst wLab-ln-charge hD u eanaradhaNhemicalsGshnadNan kri Name of the Ambient 29.11.2019)lin(Date of Sam LaboratorY Sam le DescriPtion : Sample Collected bY: is ComPleted : Date of 02.12.2019Date of ReceiPt of SamPle : 07.12.2019 03.12.2019is Started : Date of Anal lest MethodUnitsLimitsGFL/AA/1 46-11911Code No.Sam Near Main Gate Location 10.06.2019Date/Duration &700620 R15S ):part-2382( e-lVolumNAAOSLrg/m310061 .13PM 10 CPCB NAAQS Vol ume-l 6023.78PM 2,5 7ed-201rmReaffi00282S q o'(part umeVolNAAQSPCBCl-rg/m3BO26.66SO2 conc. 17 5S 1 aumVolBO41.74NOx conc. CPCE] NAAQS Volunte I [-rg/m30'1NDLead me-lVoluSBC NAAQPCglm40035.27Ammonia 4201ed-rmReaf{i.-1 9991S 5 0)82(part04NDCarbon Monoxide Volume I CPCB NAAQS nglm06NDArsenic Volume I CPCB NAAQS n20NDNickel 4d-20Reaffirme971 4oI B2( (part-0180NDOzone CBPC4 &01artoa1 Pi 2)IS evolumNAAQSppm05NDBenzene BPCC41 &rmed-202I ReaffiPartS 15 82 olu mVONAAQSng/m301<0.1 Benzo(a)PYrene SamPling carried out'j':'lg GOLDFINCH/INST-AD S/41 Calibrated on :09.08.2019 Due on : 08.08.2020 ADS GOLDFINCH/INST-HVS/37 Calibrated on : 08.06.2019 Due on : 07.06.2020 HVSout usingSampling carried PAN No. UAN NO AAACW1593P tvIH33B0010167 PF No. ESIC No. MH/rHA/37337 34-00-009299-000-0908GSTIN : 27AAACW1 593PlZP
  • 25. ,ch Engineering Systems" Private Limited i_-;i::,:r'-:i lTM ,. -. ,, --. ,. ,.. :, rr : :- : .: -l accredited EIA consultant, lS0 S001:2015 Certified Company ,ry Gazetted by MoEF & Certified by OHSAS 18001-2007 One-stop Environmental Solution... IFormerly Waste Encare lndia Pvt. Ltd.] c.A-288,RoadNo. 16Z,0pp AgrcitLrr:0-ce3L,s-stop,Thanelndustrial Area,MlDC(WagleEstate) e (West) - 400 604. lVlaharashtra, Ind a r Te 91 322 lAU 5554 / 2580 1529 I 1521 I 1546i 9920093829 ail :mktg@goldfinchengg.com,accountslgcdf nchengg.com, lab@goldfinchengg.com / Website:www.goldfinchengg.com Report Ref. No.: GFL/AS/R/19111-147 Report Date: 07.12.2019 Analysis Report for Stack Emission Monitoring Sampling carried out using Stack Monitoring Kit lD No. GOLDFINCH/INST-STACI(50 Calibrated on -24.10.2019 Calibrated due -23.1 0.2020 For Goldfinch Engineering Systems Private Limited Analyzed By Verified By Approved By [].o*.*- w QF/LA/10.8 Di rector-Lab/Govt. Analyst Page I of I Govt. Analyst Lab-ln-charge Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule Date of Sampling : 29.11.2019 Sample Description : Stack Date of Receipt of Sample : 02.12.2019 Sample Gollected by : Laboratory Date of Analysis Started : 03.12.2019 Date of Analysis Completed: 07.12.2019 Sample Code No. GFL/AS/19t1't-147 Limits Units Test Method Stack Attached To Boiler stack lS 1 1255 (Part 3):2018 Stack Diameter 0.25 meter Stack Height 15 meter Fuel used & Consumption LDOt25 Kg/Hr Velocity of flue gases 5.57 mls Temperature of flue Gases 142 oc Flow/volume of flue Gases 983.6 m3/Hr Particulate Matter 100.0 150 mg/Nm3 lS 1'1255 (Part l).1985 Reaffirmed - 2014 Sulphur Di Oxide Gontent 0.94 7.20 Kg/Day lS-11255 ( Part 2) 1985,Reaff umed-2014 PAN No, UAN No AAACWl593P MH33B001 01 67 GSTIN : 27AAACW1 593P1ZP PF No. ESIC No. MHT-HA/37337 34-00-009299-000-0908
  • 26. !! ,rch Engineering Systems'" Frivate Limited :T accredited EIA consultant, IS0 9001 :2015 Certified Company rry Gazetted by IVIoEF I Certified by 0HSAS 18001-2007 '. .....'.... '. ,,,.TM .: One-stop Environmental Solution... IFormerly Waste Encare lndia Pvt. Ltd.] ,ro. A - 288, Road No. 16 Z, Opp. Agriculture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate) ne (West) - 400 604. Maharashtra. lndia. o Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 /ogZOOgegZS ,tail : mktg@goldfinchengg.com, accounts@goldfinchengg.com. lab@goldfinchengg.com / Website : www.goldfinchengg.com QF/LA/I0.C Report Date: 07.12.2019Report Ref. No. : GFL/AN/R/19111-149 Analysis Report for Ambient Noise Level Survey Survey carried out using dB meter Sr. No. GOLDFINCH/INST-DB METERY32 Calibrated On: 23.10.2019 Calibration due: 22.10.2020 For Goldfinch Engineering Systems Private Limited Analyzed By Verified By Approved By Vd-r,-, w R,ip Govt. Analyst Lab-ln-charge Di rector-La b/Govt. Ana lyst Page I of I Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule Date of Sampling : 29.11.2019 Sample Description : Noise Date of Receipt of Sample : 02.12.2019 Sample Collected by: Laboratory Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019 Sample Gode No"- GFL/AN/19/11-149 Ambient Noise Level Test Method Sr. No Location Day dB Night dB rs 9989-1981 Reaffirmed 2014 1 Near Main Gate 57.9 50.9 2 Outside Manufacturing Area 64.9 60.9 M.P.C.B. Limit 75 70 PAN No. UAN No AAACW1593P IVIH3380010167 GSTIN : 27AAACW1 593PIZP PF No. ESIC No. MH/iHA/37337 34-00-009299-000-0908
  • 27. ,rch Engineering Systems" Private Limited TM iT accredited EIA consultant, lS0 9001:2015 Certified Company .ory Gazetted by lVloEF & Certified by 0HSAS 18001 2007 One -stop Environmental Solution... IFormerly Waste Encare lndia Pvt. Ltd.] ,rlo. A - 288, Road No. 16 Z, Opp. Agricuiture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate) ,ne (West) - 400 604. [Vlaharashtra, India. r Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 / 9920093829 ,nail : mktg@goldfinchengg.com, accounts@goldfinchengg.com, Iab@goldfinchengg.com / Website : www.goldfinchengg.com QF/LA/I0-D Report Ref. No. : GFUAWIN19[11-148 Report Date: 07.12.2019 ANALYSIS REPORT FOR WORK PLAGE MONITORING Remark:- ND =Not Detected Sampling Carried out using Handy Sampler Monitoring Kit lD No. GOLDFINCH/INSTR-HD Sampler/52 Calibrated on - 24.10.2019 Calibration due - 22.10.2020 *{cutt*,n- Govt. Analyst For Goldfinch Engineering Systems Private Limited Analyzed By Verified By Approved By w h;O Lab-ln-charge D irector-Lab/Govt. An alyst Name of the Industry : M/S Nandkrishna Chemicals Naradhana Dhule Date of Sampling : 29.11.2019 Sample Description : Workplace Date of Receipt of Sample : 02.12.2019 Sample Collected by : Laboratory Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019 Sample Code No. Location Parameter Result Limit Unit Test Method GFL/AW19t11-148 Acid Storage Area Hydrochloric Acid 1.09 8.0 mg/rm 3 EPA OO51 Page 1 of 1 PAN No. iUAN No. AAACW1593P MH338001 01 67
  • 28. One-stoP Environmental S oluti o n [FormerlY Waste Encare lndia Pvt. Ltd.l QF/LA/o9 Report Ref. No.: GFLIW'R/I9111'283 RePort Date: 09.1 2'201 9 AnalYsis RePort For G Engineering SYstem s Private Limited Approved BY AnalYzed BY Verified BY [t<u.ot fu,,@" $r,r.Q E{31*l' INUH D i rector-Lab/G ovt'AnalYst Page 1 of 2 Govt AnalYst Lab-lncharge ehuDaardanNL mited,rivatePicalsChemnahndkrisNaM/s. Name of the Industry : MIDC Water SamPle SamPle DescriPtion:30.11.2019 Date of SamPling : 2 Liters Sample Volume : 30.11.2019eSamof pReceilofDate pt dCollecte bySamPle02.12.2019taS rtedsof AnalYsDate Cans Sample Container:09.12.2019is ComDate of Ana d Test Method Used irement(Acc eptable Limit) as per lS 10500:2012 Requ GFL/WI9r11-283 MIDC Water SamPle UnitParametersSr. No. APHA-4 500 H+ B (23rd Edition)6.5-8.57.75 pH1 APHA 2550 B (23rd Edition)N.S.25.4oc TemPerature2. npHn ztgo B (23rd Edition)Max 1 0.10NTU TurbiditY3 B (23rdAPHA 2510 Edition)N.S.460ps/cm ConductivitY4 APHA 5OB A (1 Edition)N.S.<4mg/l ChemicalOxYgen Demand5 ts 3025 (p- 44):199 RA- 2003)N.S.<2mg/lBio Oxygenlogical 270C )@daysDemand (36. C (23rdAPHA 2540 EditionMax 500228mg/l Total Dissolved Solids7 APHA +soo ct-g rdMax 25020mg/l Chloride as Cl8. C (23rdAPHA 2340 Max 200124mg/l Total Hardness as CaCOsI (23rdAPHA 2320 B Max 200121mg/l Total Alkalinity as CaCOa10. PF No. ESIC No. MH/THA/37337 34-00-009299-000-0!GSTIN : 27AAACW1 s93P1 ZP PAN No. : AAACW1593P uArl ru0. : MH33B0010167 Email
  • 29. .,dfinrh Engineering systems"Frivate Limited .dI-NABET accredited EIA consultant. lS0 900,,:2015 Certified Company Laboratory Gazetred by MoEF I Certified Uv OfriAi iao 01_ZOo: Office Bus-stop, Thane lndustrial .:91-022-2081 S5S4 I Z5B0 j12g ffiffiilffiFlNIH" One-stop Environmentat Sotution... [Formerly Waste Encare lndia pr,,t. Ltd.] oldfinchengg.com culture ia. r Tel Area, Ml / 1521 / ldfinchengg.com DC (Wagle Estate) 1 s46 / 9920093829 / Website : www.glab@go Report Ref. No.: GFL/WR/19 t11-2l3, QF/LA/o9 Report Date: 09.12.201 9 Analysis Report For Goldfinch Engineering Systems private Limited Analyzed By Vep;.fied BV Wcettrctz_ f[^rhr_ Govt Analyst t;;;; Approved By I1';t D irector-Lab/G ovt.Anatyst Page 2 of 2 Name of the lndustry : Nandkrishna chemicars private Limited,Nardana Dhure M/s. Date of Sampling : 30.11.2019 Sample Description : MIDC Water Sample Date of Receipt of Sample: 30.11 .2019 Sample Volume : 2 Liters Date of Analysis Started : 02.12.2019 Sample Collected by: Laboratory Date of Analysis Compteted : 09.12.2019 Sample Container: Polythene Cans Sr. No. Parameters Unit GFLttNl19l11-283 MIDC Water Sample I Requirement (Acceptable Limit) as per lS 10500:2012 Test Method Used Sulphate as SOa mg/l 14.8 Max 200 AP HA 4500 C (23 rd Edition 12. Nitrate as NO3 mg/l <0.5 Max 45 APHA 4500 NO3-B (23rd Edition) & CPCB 13. Total Phosphorus mg/l <0.2 N.S. APHA 4500 P.C. (23rd Edition) 14 Fluoride mg/l 0.60 Max 1.0 APHA 4500 F D (23rd Edition) 15. Sodium as Na mg/l 23.10 N.S. APHA 3500 Na B (23rd Edition) 16 Potassium as K mg/l 1.07 N.S APHA 3500 K B (23rd Edition) 17 TotalChromium as Cr mg/l <0.05 Max 0.05 APHA 3112 B (23rd Edition) 1B Zinc asZn mg/l 0.058 Max 5 APHA 3111 B (23rd Edition) PAN UAN No. : AAACW1593p No. : MH33B00t0t67 GSTIN : 27AAACW1 S93plZp PF No. ESIC No MH/THN31337 34-00-009299-000-0908 11.
  • 30. .,dfinch Engineering Systems'. Private Limited ffiffituffiFlNEl{' One-stop Environmental Solution . [Formerly Waste Encare lndia Prrt. Ltd.].,-:I-NABET accredtted EIA consultant, lS0 9001:2015 Certified Company Laboratory Gazetted by MoEF & Certified by 0HSAS 18001-2007 Report Ref. No. : GFLMI/R/19111'283 dfinchengg.com QF/LA/o9 Report Date: 04.12.2019 Approved BY Director-Lab/Govt.AnalYst Page 1 of 1 Analysis RePort For Gotdfinch Engineering Systems Private Limited Analyzed By Verified By ft<cu,ez Govt Analyst Lab-lncharge M/s. Nandkrishna chemicats Private Limited, Nardana Dhule Name of the lndustry MIDC Water SamPleSample DescriPtion30.11.2019Date of SamPling 125 mlSample Volume30.1 1 .2019Date of Receipt of SamPle LaboratorySample Collected bY02.12.2019Date of AnalYsis Started Polythene bottle (Sterlized)Sample Container04.12.2019Date of AnalYsis GomPleted Parameters Unit Result Requirement Limit as per lS 10500:2012 Test MethodGFL/W19/11-283 MIDC Water SamPIe TotalColiforms MPN/100m1 Absent (.2) Absent MPN lS-1622:1981 E.coli MPN/100m1 Absent Absent MPN lS-1622:1981 GSTIN : 27AAACW1 593P1ZPPAN No. : AAACW1593P UAN No. : MH33B0010167 PF No. ESIC No MHn-HA/37s37 34-00-009299-000-0908 FA;I)
  • 31. ,rdfinch Engineering Systerns'" Private Limited ,CI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company Laboratory Gazetted by MoEF I Certified by 0HSAS 18001-2007 Plot No. A - 288, Road No. I 6 Z, Opp. Agriculture 0ffice Bus-stop, Thane (West) - 400 604, Maharashtra. India. o Tel.: 91-OZZ-2091' s ffiffiilffiFINf,H,, One-stop Environmental Solution... [Formerly Waste Encare lndia Pvt. Ltd.] Thane lndustrial Area, MIDC (Wagle Estate) 1/1546/9920093829554 / 2580 1529 / 152 Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www. Report Ref. No.: GFL/WR/19111-284 Report Date: 07 .12.2019 Analysis Report Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule Date of Sampling : 30.11.2019 Sample Description : Effluent Sample Date of Receipt of Sample : 30.1 1 .2019 Sample Volume : 2 Liters Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory Date of Analysis Completed: 07.12.2019 Sample Container: Polythene Cans Sr. No. Parameters Unit GFLMl19t',t1-284 ETP lnlet Limit as per MPCB Consent Test Method Used 1 pH 7.84 APHA-4500 H+ B (23rd Edition) 2 Biological Oxygen Demand (3 days @27'C) mg/l 1 089 lS 3025 (p- aa):1993(RA- 2003) 3 ChemicalOxygen Demand mg/l 4B3B APHA 508 A 1tsth edition; 4 Total Dissolved Solids mg/l 14100 APHA 2540 C (23rd Edition) 5 TotalSuspended Solids mg/l 360 APHA 2540 D (23rd Edition) b Oil & Grease mg/l 10 lS 3025 part 39 For Goldfinch Engineering Systems Private Limited Analyzed By By Ltks-ilt 6.L. Govt Analyst Lab-lncharge Approved By 5:ilP Di rector-La b/Govt.Ana lyst Page 1 of 1 PAN No. : AAACWl593P UAN No. : MH33B0010167 GSTIN : 2TAAACWI 593PlZP PF No. ESIC No, MH[HA/37337 34-00-009299,000-0908
  • 32. rdfinch Engineering $ystems" Private Limited ffiffitffiFlNIH" ICI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company Laboratory Gazetted by IVoEF & Certified by 0HSAS I8001-2007 One-stop Environmental Sotution... [Formerly Waste Encare lndia Pvt. Ltd.] Plot No. A - 288, Road No. 16 Z. Opp. Agriculture 0ffice Bus-stop, Thane lndustrial Area, MIDC (Wagle Estate) Thane (West) - 400 604. Maharashtra, lndia. o Tel.: 91-022-2081 5554 / 2580 1529 I 1521 / 1546 / 9920093829 Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www.goldfinchengg.com Report Ref. No.: GFL/WR/19111-285 QF/LA/o9 Report Date: 07.12.201 9 Analysis Report Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule Date of Sampling : 30.11.2019 Sample Description : Effluent Sample Date of Receipt of Sample : 30.11.2019 Sample Volume : 2 Liters Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory Date of Analysis Gompleted : 07.12.2019 Sample Container: Polythene Cans Sr. No. Parameters Unit GFLMt19l1',l-285 ETP Outlet Limit as per MPCB Consent Test Method Used 1 pH 7.32 APHA-4500 H+ B (23rd Edition) 2 Biological Oxygen Demand (3 days @27"C) mg/l 50 lS 3025 (p- aa):1993(RA- 2003) 3 ChemicalOxygen Demand mg/l 185 APHA 5OB A 11sth Editionl 4 Total Dissolved Solids mg/l 106 APHA 2540 C (23rd Edition) TotalSuspended Solids mg/l 14 APHA 2540 D (23rd Edition) 6 Oil & Grease mg/l <1 lS 3025 part 39 For Goldfinch Engineering Systems Private Limited Analyzed By (r;'{<eut aul Govt Analyst Verified By Lab-lncharge Approved By F$s D i rector-Lab/G ovt.Analyst Page 1 of 1 PAN No. : AAACWl593P UAN No. : MH33B0010167 GSTIN : 27AAACW1 593P1ZP PF No. : MH/|-HA/37337 ESIC No. : 34-00-00929S-000-0908 5