(https://www.nandkrishnachemicals.com/) We are a time-honored organization engaged in manufacturing and exporting of industrial chemicals, commercial industrial chemicals, organic industrial chemicals such as diethyl ether, specialty chemicals and raw material for API. Being an ISO 9001:2008 certified company, we maintain quality policy in our range that bears accurate composition and are known for unmatched quality and purity. These are prepared from ethyl alcohol (Denatured) and other chemicals sourced from distilleries of sugar factories and adhere to the specified norms of IP and IS standards.
Industrial Chemicals By Nandkrishna Chemicals Private Limited
1.
2. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 1
1. Present Status of Project:
1. This is the project of Manufacturing of Synthetic Organic Chemicals & Allied Chemicals.
2. We have received the consent to operate for Expansion on 04.02.2019 and it is attached
as Annexure-I
3. Now the project is not operating on its full capacity because we have applied for the
change in product mix.
4. Environment monitoring is carried out at project site and Reports are attached as
Annexure-II
3. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 2
2. Point by Point comment on Environment Clearance letter
Point by Point comment on Environment Clearance letter
General conditions
1 PP to achieve Zero Liquid Discharge; PP
shall ensure that there is no increase in
the effluent load to CETP.
The Project Proponent is having existing
full-fledged Effluent Treatment Plant
comprising Primary, Secondary and
Tertiary treatment. The treated effluent is
pumped to RO permeate will be
reuse/recycle. RO reject will be subject to
Multiple Effect Evaporator (MEE) to
achieve zero liquid discharge. As the
project is ZLD and there is no increase in
the effluent load to CETP.
2 No additional land shall be used /acquired
for any activity of the project without
obtaining proper Permission.
No additional land will be acquired for any
activity of the project without obtaining
proper Permission.
3 PP to take utmost precaution for the
health and safety of the people working in
the unit as also for protecting the
environment.
All the health & safety precautions are
being taken and proper training is given to
the workers.
4 Proper Housekeeping programmers shall
be implemented.
Housekeeping is being carried out on
regularly basis.
5 In the event of the failure of any pollution
control system adopted by the unit, the
unit shall be immediately put out of
operation and shall not be restarted until
the desired efficiency has been achieve.
Agreed and Noted.
6 A stack of adequate height based on DG
set capacity shall be provided for control
and dispersion of pollutant from DG set. (If
applicable).
Adequate stack height i.e. 3.5 m above the
enclosure is provided for control and
dispersion of pollutants from existing DG
set.
7 A detailed scheme for rainwater
harvesting shall be prepared and
implemented to recharge ground water.
Rain water harvesting system will provide
at site, Bore wells are not allowed as the
plot is in MIDC.
8 Arrangement shall be made that effluent
and storm water does not get mixed.
To avoid mixing of wastewater separate
storm water drains are provided.
9 Periodic monitoring of ground water shall
be undertaken and results analyzed to
ascertain any change in the quality of
water. Results shall be regularly submitted
to the Maharashtra Pollution Control
Periodic monitoring of ground water is not
applicable, as there is no permission from
MIDC for extracting of ground water.
4. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 3
Board.
10 Noise level shall be maintained as per
standards. For people working in the high
noise area, requisite personal protective
equipment like earplugs etc. shall be
provided.
Personal protective equipment (PPE) for
working people is being provided and this
has been regularly done.
Reports are attached as an Annexure- II.
11 The overall noise levels in and around the
plant are shall be kept well within the
standards by providing noise control
measures including acoustic hoods,
silencers, enclosures, etc. on all sources of
noise generation. The ambient noise levels
shall confirm to the standards prescribed
under Environment (Protection) Act, 1986
Rules, 1989.
Noise levels are kept under control by
carrying out (a) Acoustical enclosures (b)
periodical preventive maintenance of
equipment and machineries, (b) providing
vibration absorption pads, (c) providing
proper lubrications. (d) Some instruments
have its own canopy for mitigation of
noise.
A survey of Noise level in the study area is
being carried out once in a year to ensure
that the noise levels are within stipulated
standards prescribed under Environment
(Protection) Act, 1986 Rules, 1989.
Reports are attached as an Annexure- II.
12 Green belt shall be developed &
maintained around the plant periphery.
Green Belt Development shall be carried
out considering CPCB guidelines including
selection of plant species and in
consultation with the local DFO/
Agriculture Dept.
Total green belt area is 2178 sq. m, which
is 33% of total plot area; maintained
around the plant periphery. Plants are
selected as per CPCB guideline and
consultation with the local DFO/
Agriculture Department.
13 Adequate safety measures shall be
provided to limit the risk zone within the
plant boundary, in case of an accident.
Leak detection devices shall also be
installed at strategic places for early
detection and warning.
Risk Analysis, on-site Emergency plan is
prepared and will update regularly.
14 Occupational health surveillance of the
workers shall be done on a regular basis
and record maintained as per Factories
Act.
Occupational health surveillance program
will be taken as a regular exercise for all
The employees and their records are
maintained as per Factories act.
15 The company shall make the arrangement
for protection of possible fire hazards
during manufacturing process in material
handling.
Firefighting equipment will be provided
whenever needed. Personal Protective
Equipment is being used at the time of
material handling.
16 The project authorities must strictly Project proponents will comply with the
5. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 4
comply with the rules and regulations with
regard to handling and disposal of
hazardous wastes in accordance with the
Hazardous Waste (Management and
Handling) Rules, 2003 (amended).
Authorization from the MPCB shall be
obtained for collections/ treatment/
storage/ disposal of hazardous wastes.
rules and regulations with regard to
handling and disposal of hazardous wastes
in accordance with the Hazardous and
Other Waste (Management and
Transboundary movement) Rules, 2016.
Project proponent Will obtain the
Authorization from the MPCB for
collections/ treatment/ storage/ disposal
of hazardous wastes.
17 Regular mock drills for the on-site
emergency management plan shall be
carried out. Implementation of changes /
improvements required, if any, in the on-
site management plan shall be ensured.
Regular mock drills for the on-site
emergency management plan will be
carried out. Implementation of changes /
improvements in the on-site management
plan will be updated time to time.
18 A separate environment management cell
with qualified staff shall be set up for
implementation of the stipulated
environmental safeguards.
A separate Environmental Cell at project
level will be incorporated with qualified
personnel for implementation of the
stipulated environmental safe guards for
implementation of the stipulated
environmental safeguards.
19 Separate funds shall be allocated for
implementation of environmental
protection measures/EMP along with
item-wise breaks-up. These cost shall be
included as part of the project cost. The
funds earmarked for the environment
protection measures shall not be diverted
for other purposes and year-wise
expenditure should reported to the MPCB
& this department
Separate fund of Rs 19.26 Lacs/Annum is
allocated for implementation of
environmental protection measures/EMP
along with item-wise breaks-up. These
cost are included as part of the project
cost. The funds earmarked for the
environment protection measures will not
be diverted for other purposes and year-
wise expenditure will be report to the
MPCB & this department
20 The project management shall advertise at
least in two local newspapers widely
circulated in the region around the
project, one of which shall be in the
Marathi language of the local concerned
within seven days of issue of this letter,
informing that the project has been
accorded environmental clearance and
copies of clearance letter are available
with the Maharashtra Pollution Control
Board and may also be seen at Website at
http://ec.maharashtra.gov.in
Advertisement in local newspaper was
circulated in "Lokmat Times" in English
and “Apla Maharashtra” in Marathi
newspaper published on June 20th
2018
i.e., within seven days from date of issue
of EC.
The details are already submitted in 1st EC
Compliance Report.
6. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 5
21 Project management should submit half
yearly compliance reports in respect of the
stipulated prior environment clearance
terms and conditions in hard & soft copies
to the MPCB & this department, on 1st
June & 1st December of each calendar
year.
Project management will submit half
yearly compliance reports in respect of the
stipulated prior environment clearance
terms and conditions in hard & soft copies
to the MPCB & this department, on 1st
June & 1st December of each calendar
year.
22 A copy of the clearance letter shall be sent
by proponent to the concerned Municipal
Corporation and the local NGO, if any,
from whom suggestions/representations,
if any, were received while processing the
proposal. The clearance letter shall also be
put on the website of the Company by the
proponent.
EC letter will put on the website of the
Company.
23 The proponent shall upload the status of
compliance of the stipulated EC
conditions, including results of monitored
data on their website and shall update the
same periodically. It shall simultaneously
be sent to the Regional Office of MoEF,
the respective Zonal Office of CPCB and
the SPCB. The criteria pollutant levels
namely; SPM, RSPM. SO2, NOx (ambient
levels as well as stack emissions) or critical
sectorial parameters, indicated for the
project shall be monitored and displayed
at a convenient location near the main
gate of the company in the public domain.
● The proponent will upload the status of
compliance of the stipulated EC
conditions, including results of monitored
data on company website and shall update
the same periodically.
● The pollutant levels namely; SPM, RSPM.
SO2, NOx (ambient levels as well as stack
emissions) will monitor and displayed at
an entrance (the main gate) of the
company.
24 The project proponent shall also submit six
monthly reports on the status of
compliance of the stipulated EC conditions
including results of monitored data (both
in hard copies as well as by e-mail) to the
respective Regional Office of MoEF, the
respective Zonal Office of CPCB and the
SPCB.
This is 3rd
half yearly reports on the status
of compliance of the stipulated EC
conditions including results of monitored
data.
25 The environmental statement for each
financial year ending 31st March in Form-V
as is mandated to be submitted by the
project proponent to the concerned State
Pollution Control Board as prescribed
● The environmental statement for the
financial year ending 31st
March in Form-V
submitted by the project proponent to the
Maharashtra State Pollution Control Board
as prescribed under the Environment
7. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 6
under the Environment (Protection) Rules,
1986, as amended subsequently, shall also
be put on the website of the company
along with the status of compliance of EC
conditions and shall also be sent to the
respective Regional Offices of MoEF by e-
mail.
(Protection) Rules, 1986, as amended
subsequently.
● Environment Statement and status of
compliance of EC conditions will be put on
the Company website and sent to Regional
Office of MoEF by e-mail.
8. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 7
DATA SHEET
No.
1. Project type: River Valley / Mining /
Industry / Thermal / Nuclear / Others
(specify)
: Synthetic Organic Chemical
Name of Project: Proposed expansion project of
Manufacturing of Synthetic Organic Chemicals &
Allied Chemicals
2. Name of the Project : NANDKRISHNA CHEMICAL PRIVATE LIMITED
3. Clearance letter (s) / OM No. and date : SEIAA-EC-0000000362 Dated June 15, 2018
4. Location
a) District (s) : Dhule (Nardana, Sindkheda)
b) State (s) : Maharashtra
c) Location latitude / longitude : Latitude: 21° 6'42.85"N
Longitude:74°48'26.63"E
5. Address for Correspondence
a) Address of the Concerned
Project Chief Engineer (with Pin
code & Telephone / Telex / Fax
Numbers)
:
Mr. Ashish Kulkarni.
M/s NANDKRISHNA CHEMICALS PRIVATE LIMITED
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule
Pin :-- 425 404
Tel.: +91 2566 227 061
Fax: +91 2566 227 336
b) Address of the Concerned
Project Chief Engineer (with Pin
code & Telephone / Telex / Fax
Numbers)
6. Salient features
a) of the Project
: It is Project Of Manufacturing Of Synthetic
Organic Chemicals & Allied Chemicals Total
Capacity Of Products 195.535 TPM
Boiler capacity is 0.3 TPH x 1 no. quantity of
fuel 25 Kg/H
Total water requirement for the integrated
project is 33.6 m3/day.
The water source is MIDC
Generation of ETP sludge and salts from
evaporator is about 349.72 TPA.
9. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 8
Total effluent generation is about 17.5 m3/day
(Trade effluent = 16 m3/day and Domestic
effluent = 1.5 m3/day)
b) of the Environmental
Management Plans
Total EMP cost during operational phase
shall be Capital cost Rs. 105 lacs
recurring cost 19.26 lacs/Annum
Environment Management Plan Includes-
Air pollution control in that provision of
stacks for heating units and scrubbers.
Water pollution control include Effluent
treatment plant, RO Plant, Evaporator,
waste minimization of effluent recycle
Noise pollution control include Acoustic
enclosure anti vibration pads
Occupation health includes medical
checkup, health insurance policy, medical
staff charges, first aid facilities
consumables, in-house first aid room, other
infrastructure and equipment.
Environmental Monitoring Plan.
Green belt development (Plantation with
mostly indigenous plant species on an area
of about 2190 sq.m. which is 33% of total
plot area.)
Hazardous Waste storage &
disposal(CHWTSDF at MIDC Ranjangaon)
7. Breakup of the Project Area
a) Submergence area: forest & non
forest
:
Nil
10. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 9
b) Others
Sr.No Item Area in sq. m
1
Area used for
manufacturing
810
2
Area used for storage
of raw
material/products
830
3
Area used for
utilities(Boiler,
Thermopack,
Chimneys, DG Sets,
Cooling Tower, ETP)
271
4
Administrative Building
(Including offices,
security, lab)
159
5 Internal Roads 1584
6
Area for Green belt
development (33% of
total area)
2190
7.
Area provided for
parking (12% of total
area)
756
Total 6600
8. Breakup of the project affected
population with the enumeration of
those losing Houses / Dwelling units
only, Agricultural Land & Landless
Laborers / Artisans:
a) SC, ST / Adivasi
:
As the land is in notified industrial area and
there is no project affected population.
b) Others :
11. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 10
(please indicate whether these figures
are based on any scientific and
systematic survey carried out or only
provisional figures, if a survey is carried
out give details & year of survey)
9
a)
Financial Details: Project cost as
originally planned and subsequent
revised estimates and the year of price
reference
:
Cost of Project 4.454 Cr.
b) Allocation made for environmental
management plans with item wise and
year wise breakup
: S.
No.
Particulars Capital
Cost
(Rs.
Lacs)
Recurring
cost (Rs.
Lacs/Annum)
1. Air pollution control
Provision of
Stacks for
heating
units
1.0 0.5
Scrubbers 4.0 1.0
2. Water Pollution control
Effluent
Treatment
Plant
35 2.0
RO Plant 25 1.0
Evaporator 30 1.0
Waste
minimization
of effluent
recycle
3.0 1.0
3. Noise Pollution control
Acoustic encl./
Ant vibration
1.0 1.0
12. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 11
pads
4. Occupational health
Medical
checkup
1.0 0.5
Health
insurance
policy
0.5 0.4
Medical staff
charges
- 0.4
First aid
facilities
consumables
1.0 1.0
In-house first
aid room
0.5 0.2
Other
infrastructure
and Equipment
1.0 0.5
5. Environmental
Monitoring
Plan
-- 6.96
6 Green belt 1.0 0.4
7 Hazardous
waste storage
& disposal
1.0 1.4
Total 105.0 19.26
c) Benefit cost ratio/Internal rate of
Return and the year of assessment
: Not calculated as company is not operating on its
full capacity.
d) Whether (c) includes the cost of
environmental management as shown
in the above
: Yes
e) Actual expenditure incurred on the : Rs. 514 Lacs
13. 3
rd
half yearly EC Compliance Report For M/s Nandkrishna Chemicals Pvt. Ltd at
Plot No.: B-10, Nardana MIDC, Sindkheda, Dhule- 425 404, Maharashtra. Page | 12
project so far
f) Actual expenditure incurred on the
environmental management plans so
far
: ---
10 Forest Land Requirement
a) The status of approval for diversion of
forest land for non-forestry use
:
N.A
b) The status of clearing felling : N.A.
c) The status of compensatory
afforestation, if any Comments on the
viability & sustainability of
compensatory afforestation program in
the light of actual field experience so
far
:
N.A
11 The status of clear felling in non-forest
areas (such as submergence area or
reservoir, approach roads.), if any with
quantitative information required.
:
Nil
12 Status of construction (Actual&/or
planned)
Construction is completed
13 Reasons for the delay if the project is
yet to start
:
Not applicable
14 Dates of Site Visits
a) The dates on which the project was
monitored by the Regional Office on
previous occasions, if any
:
Nil
b) Date of site visits for this monitoring
report
:
Nil
24. Eoldl*nch Engineering Systems-' Frivate Limited
Report Ref. No. : GFL/AA/R119111-146
Analysis Report For Ambient Air Monitoring
ffiLffiFINEH'
One-stopEnvironmentalSolution'
[Formerly Waste Encare lndia Pvt' Ltd']
C (Wagle Estate)
546 / 9920093829
/ Website : www.goldfinchengg'com
Remark- ND= Not Detected
For Goldfinch Engineering Systems Private Limited
Analyzed BY Verified BY
QF/LA/10-A
Report Date: 07 .12'2019
Approved BY
.(,
A{r-,.u''
Director-Lab/Govt. AnalYst
Page 1 of 1
l).t eu*'t-
Govt. AnalYst
wLab-ln-charge
hD u eanaradhaNhemicalsGshnadNan kri
Name of the Ambient
29.11.2019)lin(Date of Sam
LaboratorY
Sam le DescriPtion :
Sample Collected bY:
is ComPleted :
Date of
02.12.2019Date of ReceiPt of SamPle :
07.12.2019
03.12.2019is Started :
Date of Anal
lest MethodUnitsLimitsGFL/AA/1 46-11911Code No.Sam
Near Main Gate
Location
10.06.2019Date/Duration &700620 R15S ):part-2382(
e-lVolumNAAOSLrg/m310061 .13PM 10
CPCB NAAQS Vol ume-l
6023.78PM 2,5 7ed-201rmReaffi00282S
q o'(part
umeVolNAAQSPCBCl-rg/m3BO26.66SO2 conc. 17
5S 1
aumVolBO41.74NOx conc.
CPCE] NAAQS Volunte I
[-rg/m30'1NDLead me-lVoluSBC NAAQPCglm40035.27Ammonia 4201ed-rmReaf{i.-1 9991S 5 0)82(part04NDCarbon Monoxide Volume I
CPCB NAAQS
nglm06NDArsenic Volume I
CPCB NAAQS
n20NDNickel 4d-20Reaffirme971 4oI B2( (part-0180NDOzone CBPC4 &01artoa1 Pi 2)IS
evolumNAAQSppm05NDBenzene BPCC41 &rmed-202I ReaffiPartS 15 82
olu mVONAAQSng/m301<0.1
Benzo(a)PYrene
SamPling carried out'j':'lg
GOLDFINCH/INST-AD S/41
Calibrated on :09.08.2019
Due on : 08.08.2020
ADS
GOLDFINCH/INST-HVS/37
Calibrated on : 08.06.2019
Due on : 07.06.2020
HVSout usingSampling carried
PAN No.
UAN NO
AAACW1593P
tvIH33B0010167
PF No.
ESIC No.
MH/rHA/37337
34-00-009299-000-0908GSTIN : 27AAACW1 593PlZP
25. ,ch Engineering Systems" Private Limited
i_-;i::,:r'-:i lTM
,. -. ,, --. ,. ,.. :, rr
: :- : .:
-l accredited EIA consultant, lS0 S001:2015 Certified Company
,ry Gazetted by MoEF & Certified by OHSAS 18001-2007
One-stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
c.A-288,RoadNo. 16Z,0pp AgrcitLrr:0-ce3L,s-stop,Thanelndustrial Area,MlDC(WagleEstate)
e (West) - 400 604. lVlaharashtra, Ind a r Te 91 322 lAU 5554 / 2580 1529 I 1521 I 1546i 9920093829
ail :mktg@goldfinchengg.com,accountslgcdf nchengg.com, lab@goldfinchengg.com / Website:www.goldfinchengg.com
Report Ref. No.: GFL/AS/R/19111-147 Report Date: 07.12.2019
Analysis Report for Stack Emission Monitoring
Sampling carried out using
Stack Monitoring Kit
lD No. GOLDFINCH/INST-STACI(50
Calibrated on -24.10.2019
Calibrated due -23.1 0.2020
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
[].o*.*-
w
QF/LA/10.8
Di rector-Lab/Govt. Analyst
Page I of I
Govt. Analyst Lab-ln-charge
Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Stack
Date of Receipt of Sample : 02.12.2019 Sample Gollected by : Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed: 07.12.2019
Sample Code No. GFL/AS/19t1't-147 Limits Units Test Method
Stack Attached To Boiler stack
lS 1 1255 (Part 3):2018
Stack Diameter 0.25 meter
Stack Height 15 meter
Fuel used & Consumption LDOt25 Kg/Hr
Velocity of flue gases 5.57 mls
Temperature of flue Gases 142 oc
Flow/volume of flue Gases 983.6 m3/Hr
Particulate Matter 100.0 150 mg/Nm3
lS 1'1255 (Part l).1985
Reaffirmed - 2014
Sulphur Di Oxide Gontent 0.94 7.20 Kg/Day
lS-11255 ( Part 2)
1985,Reaff umed-2014
PAN No,
UAN No
AAACWl593P
MH33B001 01 67
GSTIN : 27AAACW1 593P1ZP
PF No.
ESIC No.
MHT-HA/37337
34-00-009299-000-0908
26. !!
,rch Engineering Systems'" Frivate Limited
:T accredited EIA consultant, IS0 9001 :2015 Certified Company
rry Gazetted by IVIoEF I Certified by 0HSAS 18001-2007
'. .....'.... '. ,,,.TM
.:
One-stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
,ro. A - 288, Road No. 16 Z, Opp. Agriculture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate)
ne (West) - 400 604. Maharashtra. lndia. o Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 /ogZOOgegZS
,tail : mktg@goldfinchengg.com, accounts@goldfinchengg.com. lab@goldfinchengg.com / Website : www.goldfinchengg.com
QF/LA/I0.C
Report Date: 07.12.2019Report Ref. No. : GFL/AN/R/19111-149
Analysis Report for Ambient Noise Level Survey
Survey carried out using dB meter
Sr. No. GOLDFINCH/INST-DB METERY32
Calibrated On: 23.10.2019
Calibration due: 22.10.2020
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
Vd-r,-,
w R,ip
Govt. Analyst Lab-ln-charge Di rector-La b/Govt. Ana lyst
Page I of I
Name of the lndustry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Noise
Date of Receipt of Sample : 02.12.2019 Sample Collected by: Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019
Sample Gode No"- GFL/AN/19/11-149 Ambient Noise Level Test Method
Sr. No Location Day dB Night dB
rs 9989-1981
Reaffirmed 2014
1 Near Main Gate 57.9 50.9
2 Outside Manufacturing Area 64.9 60.9
M.P.C.B. Limit 75 70
PAN No.
UAN No
AAACW1593P
IVIH3380010167
GSTIN : 27AAACW1 593PIZP PF No.
ESIC No.
MH/iHA/37337
34-00-009299-000-0908
27. ,rch Engineering Systems" Private Limited
TM
iT accredited EIA consultant, lS0 9001:2015 Certified Company
.ory Gazetted by lVloEF & Certified by 0HSAS 18001 2007
One -stop Environmental Solution...
IFormerly Waste Encare lndia Pvt. Ltd.]
,rlo. A - 288, Road No. 16 Z, Opp. Agricuiture 0ffice Bus-stop, Thane lndustrialArea, MIDC (Wagle Estate)
,ne (West) - 400 604. [Vlaharashtra, India. r Tel.: 91-022-2081 5554 / 2580 1529 / 1521 I 1546 / 9920093829
,nail : mktg@goldfinchengg.com, accounts@goldfinchengg.com, Iab@goldfinchengg.com / Website : www.goldfinchengg.com
QF/LA/I0-D
Report Ref. No. : GFUAWIN19[11-148 Report Date: 07.12.2019
ANALYSIS REPORT FOR WORK PLAGE MONITORING
Remark:- ND =Not Detected
Sampling Carried out using
Handy Sampler Monitoring Kit
lD No. GOLDFINCH/INSTR-HD Sampler/52
Calibrated on - 24.10.2019
Calibration due - 22.10.2020
*{cutt*,n-
Govt. Analyst
For Goldfinch Engineering Systems Private Limited
Analyzed By Verified By Approved By
w h;O
Lab-ln-charge D irector-Lab/Govt. An alyst
Name of the Industry : M/S Nandkrishna Chemicals Naradhana Dhule
Date of Sampling : 29.11.2019 Sample Description : Workplace
Date of Receipt of Sample : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Started : 03.12.2019 Date of Analysis Completed : 07.12.2019
Sample Code No. Location Parameter Result Limit Unit Test Method
GFL/AW19t11-148
Acid Storage
Area
Hydrochloric
Acid
1.09 8.0 mg/rm
3
EPA OO51
Page 1 of 1
PAN No.
iUAN No.
AAACW1593P
MH338001 01 67
28. One-stoP Environmental S oluti o n
[FormerlY Waste Encare lndia Pvt. Ltd.l
QF/LA/o9
Report Ref. No.: GFLIW'R/I9111'283
RePort Date: 09.1 2'201 9
AnalYsis RePort
For G Engineering SYstem s Private Limited
Approved BY
AnalYzed BY
Verified BY
[t<u.ot fu,,@" $r,r.Q
E{31*l' INUH
D i rector-Lab/G ovt'AnalYst
Page 1 of 2
Govt AnalYst
Lab-lncharge
ehuDaardanNL mited,rivatePicalsChemnahndkrisNaM/s.
Name of the Industry :
MIDC Water SamPle
SamPle DescriPtion:30.11.2019
Date of SamPling :
2 Liters
Sample Volume :
30.11.2019eSamof pReceilofDate pt
dCollecte bySamPle02.12.2019taS rtedsof AnalYsDate Cans
Sample Container:09.12.2019is ComDate of Ana d
Test Method Used
irement(Acc
eptable Limit) as
per lS 10500:2012
Requ
GFL/WI9r11-283
MIDC Water
SamPle
UnitParametersSr.
No.
APHA-4 500 H+ B
(23rd Edition)6.5-8.57.75
pH1
APHA 2550 B (23rd
Edition)N.S.25.4oc
TemPerature2. npHn ztgo B (23rd
Edition)Max 1
0.10NTU
TurbiditY3 B (23rdAPHA 2510
Edition)N.S.460ps/cm
ConductivitY4
APHA 5OB A (1
Edition)N.S.<4mg/l
ChemicalOxYgen Demand5 ts 3025 (p-
44):199 RA- 2003)N.S.<2mg/lBio Oxygenlogical
270C )@daysDemand (36. C (23rdAPHA 2540
EditionMax 500228mg/l
Total Dissolved Solids7 APHA +soo ct-g
rdMax 25020mg/l
Chloride as Cl8. C (23rdAPHA 2340
Max 200124mg/l
Total Hardness as CaCOsI (23rdAPHA 2320 B
Max 200121mg/l
Total Alkalinity as CaCOa10.
PF No.
ESIC No.
MH/THA/37337
34-00-009299-000-0!GSTIN : 27AAACW1 s93P1 ZP
PAN No. : AAACW1593P
uArl ru0. : MH33B0010167
Email
29. .,dfinrh Engineering systems"Frivate Limited
.dI-NABET accredited EIA consultant. lS0 900,,:2015 Certified Company
Laboratory Gazetred by MoEF I Certified Uv OfriAi iao 01_ZOo:
Office Bus-stop, Thane lndustrial
.:91-022-2081 S5S4 I Z5B0 j12g
ffiffiilffiFlNIH"
One-stop Environmentat Sotution...
[Formerly Waste Encare lndia pr,,t. Ltd.]
oldfinchengg.com
culture
ia. r Tel
Area, Ml
/ 1521 /
ldfinchengg.com
DC (Wagle Estate)
1 s46 / 9920093829
/ Website : www.glab@go
Report Ref. No.: GFL/WR/19 t11-2l3,
QF/LA/o9
Report Date: 09.12.201 9
Analysis Report
For Goldfinch Engineering Systems private Limited
Analyzed By Vep;.fied BV
Wcettrctz_ f[^rhr_
Govt Analyst t;;;;
Approved By
I1';t
D irector-Lab/G ovt.Anatyst
Page 2 of 2
Name of the lndustry : Nandkrishna chemicars private Limited,Nardana Dhure
M/s.
Date of Sampling : 30.11.2019 Sample Description : MIDC Water Sample
Date of Receipt of Sample: 30.11 .2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by: Laboratory
Date of Analysis Compteted : 09.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLttNl19l11-283
MIDC Water
Sample
I
Requirement
(Acceptable
Limit) as per
lS 10500:2012
Test Method Used
Sulphate as SOa mg/l 14.8 Max 200
AP HA 4500 C (23 rd
Edition
12. Nitrate as NO3 mg/l <0.5 Max 45
APHA 4500 NO3-B (23rd Edition)
& CPCB
13. Total Phosphorus mg/l <0.2 N.S. APHA 4500 P.C. (23rd Edition)
14 Fluoride mg/l 0.60 Max 1.0 APHA 4500 F D (23rd Edition)
15. Sodium as Na mg/l 23.10 N.S. APHA 3500 Na B (23rd Edition)
16 Potassium as K mg/l 1.07 N.S APHA 3500 K B (23rd Edition)
17 TotalChromium as Cr mg/l <0.05 Max 0.05 APHA 3112 B (23rd Edition)
1B Zinc asZn mg/l 0.058 Max 5 APHA 3111 B (23rd Edition)
PAN
UAN
No. : AAACW1593p
No. : MH33B00t0t67 GSTIN : 27AAACW1 S93plZp PF No.
ESIC No
MH/THN31337
34-00-009299-000-0908
11.
30. .,dfinch Engineering Systems'. Private Limited ffiffituffiFlNEl{'
One-stop Environmental Solution .
[Formerly Waste Encare lndia Prrt. Ltd.].,-:I-NABET accredtted EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by MoEF & Certified by 0HSAS 18001-2007
Report Ref. No. : GFLMI/R/19111'283
dfinchengg.com
QF/LA/o9
Report Date: 04.12.2019
Approved BY
Director-Lab/Govt.AnalYst
Page 1 of 1
Analysis RePort
For Gotdfinch Engineering Systems Private Limited
Analyzed By Verified By
ft<cu,ez
Govt Analyst Lab-lncharge
M/s. Nandkrishna chemicats Private Limited, Nardana Dhule
Name of the lndustry
MIDC Water SamPleSample DescriPtion30.11.2019Date of SamPling
125 mlSample Volume30.1 1 .2019Date of Receipt of SamPle
LaboratorySample Collected bY02.12.2019Date of AnalYsis Started
Polythene bottle (Sterlized)Sample Container04.12.2019Date of AnalYsis GomPleted
Parameters Unit
Result
Requirement
Limit as per lS
10500:2012
Test MethodGFL/W19/11-283
MIDC Water SamPIe
TotalColiforms MPN/100m1
Absent
(.2)
Absent
MPN
lS-1622:1981
E.coli MPN/100m1 Absent Absent
MPN
lS-1622:1981
GSTIN : 27AAACW1 593P1ZPPAN No. : AAACW1593P
UAN No. : MH33B0010167
PF No.
ESIC No
MHn-HA/37s37
34-00-009299-000-0908
FA;I)
31. ,rdfinch Engineering Systerns'" Private Limited
,CI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by MoEF I Certified by 0HSAS 18001-2007
Plot No. A - 288, Road No. I 6 Z, Opp. Agriculture 0ffice Bus-stop,
Thane (West) - 400 604, Maharashtra. India. o Tel.: 91-OZZ-2091' s
ffiffiilffiFINf,H,,
One-stop Environmental Solution...
[Formerly Waste Encare lndia Pvt. Ltd.]
Thane lndustrial Area, MIDC (Wagle Estate)
1/1546/9920093829554 / 2580 1529 / 152
Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www.
Report Ref. No.: GFL/WR/19111-284 Report Date: 07 .12.2019
Analysis Report
Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule
Date of Sampling : 30.11.2019 Sample Description : Effluent Sample
Date of Receipt of Sample : 30.1 1 .2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Completed: 07.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLMl19t',t1-284
ETP lnlet
Limit as per
MPCB
Consent
Test Method Used
1 pH 7.84
APHA-4500 H+ B (23rd
Edition)
2
Biological Oxygen Demand
(3 days @27'C)
mg/l 1 089
lS 3025 (p- aa):1993(RA-
2003)
3 ChemicalOxygen Demand mg/l 4B3B APHA 508 A 1tsth edition;
4 Total Dissolved Solids mg/l 14100 APHA 2540 C (23rd Edition)
5 TotalSuspended Solids mg/l 360
APHA 2540 D (23rd Edition)
b Oil & Grease mg/l 10 lS 3025 part 39
For Goldfinch Engineering Systems Private Limited
Analyzed By By
Ltks-ilt 6.L.
Govt Analyst Lab-lncharge
Approved By
5:ilP
Di rector-La b/Govt.Ana lyst
Page 1 of 1
PAN No. : AAACWl593P
UAN No. : MH33B0010167 GSTIN : 2TAAACWI 593PlZP PF No.
ESIC No,
MH[HA/37337
34-00-009299,000-0908
32. rdfinch Engineering $ystems" Private Limited ffiffitffiFlNIH"
ICI-NABET accredited EIA consultant, lS0 9001:2015 Certified Company
Laboratory Gazetted by IVoEF & Certified by 0HSAS I8001-2007
One-stop Environmental Sotution...
[Formerly Waste Encare lndia Pvt. Ltd.]
Plot No. A - 288, Road No. 16 Z. Opp. Agriculture 0ffice Bus-stop, Thane lndustrial Area, MIDC (Wagle Estate)
Thane (West) - 400 604. Maharashtra, lndia. o Tel.: 91-022-2081 5554 / 2580 1529 I 1521 / 1546 / 9920093829
Email : mktg@goldfinchengg.com, accounts@goldfinchengg.com, lab@goldfinchengg.com / Website : www.goldfinchengg.com
Report Ref. No.: GFL/WR/19111-285
QF/LA/o9
Report Date: 07.12.201 9
Analysis Report
Name of the lndustry : M/s. Nandkrishna Chemicals Private Limited,Nardana Dhule
Date of Sampling : 30.11.2019 Sample Description : Effluent Sample
Date of Receipt of Sample : 30.11.2019 Sample Volume : 2 Liters
Date of Analysis Started : 02.12.2019 Sample Collected by : Laboratory
Date of Analysis Gompleted : 07.12.2019 Sample Container: Polythene Cans
Sr.
No.
Parameters Unit
GFLMt19l1',l-285
ETP Outlet
Limit as per
MPCB
Consent
Test Method Used
1 pH 7.32
APHA-4500 H+ B (23rd
Edition)
2
Biological Oxygen Demand
(3 days @27"C)
mg/l 50
lS 3025 (p- aa):1993(RA-
2003)
3 ChemicalOxygen Demand mg/l 185 APHA 5OB A 11sth Editionl
4 Total Dissolved Solids mg/l 106 APHA 2540 C (23rd Edition)
TotalSuspended Solids mg/l 14
APHA 2540 D (23rd Edition)
6 Oil & Grease mg/l <1 lS 3025 part 39
For Goldfinch Engineering Systems Private Limited
Analyzed By
(r;'{<eut aul
Govt Analyst
Verified By
Lab-lncharge
Approved By
F$s
D i rector-Lab/G ovt.Analyst
Page 1 of 1
PAN No. : AAACWl593P
UAN No. : MH33B0010167
GSTIN : 27AAACW1 593P1ZP
PF No. : MH/|-HA/37337
ESIC No. : 34-00-00929S-000-0908
5